2. Cottonwood Road Repairs Plans – Final.pdf
PDF 5 MB Posted
- Attached to
- 129JGP20R0017 - Cottonwood Road Repairs
- Solicitation number
- 129JGP20R0017
About this file
This is a solicitation for road repairs on the Cottonwood Road within the Stanislaus National Forest in California. The Forest Service is seeking offers for repairing three sites along the road, including stabilizing a landslide, reconstructing pavement, and replacing asphalt. Offerors should visit the site and submit any requests for information by April 28, 2020. Sealed offers are due by May 12, 2020. The estimated value of the contract is between $1,000,000 to $5,000,000. The solicitation is a total small business set aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Official Responses.pdf | ||
| A00002 - RFIs.pdf | ||
| A00001 - Time Extension - Site Visit.pdf | ||
| 4. Schedule of Items.pdf | ||
| 3. Supplemental Fire Plan.pdf | ||
| 5. Statement of Work.pdf | ||
| 1. Supplemental Specifications.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 6. WD # CA20200018.pdf | ||
| 129JGP20R0017 - Cottonwood Road Repairs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 2-
PL
AN
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Site Map
2/14/2020
AC
AC
TH
G1
18 2
Site 1, MP 16.31
Slide repair and stabilization
See sheet C1-C3
16.31 miles to
Tuolumne City, CA
Site 2, MP 18.71 - 20.10
Pavement reconstruction
See sheets C4-C5
Site 3, MP 20.69 - 20.80
Pavement reconstruction
See sheets C6-C7
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 2-
PL
AN
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Notes, Abbreviations & Symbols
2/14/2020
AC
AC
TH
G2
18 3
Abbreviations:
General Notes:
Work Notes:
AB
AC
BOA
BOP
CB
CMP
CO
CONST
CP
CY
EOA
EOP
ER
EXIST
HMA
IB
LF
LOD
LS
LVC
MAINT
MP
PC
PI
PT
PVI
RECONST
SF
STA
SY
TYP
WB
AGGREGATE ROAD BASE
ASPHALT CONCRETE
BEGINNING OF ALIGNMENT
BEGINNING OF PROJECT
CATCH BASIN
CORRUGATED METAL PIPE
CONTRACTING OFFICER
CONSTRUCT OR INSTALL FEATURE
CONTROL POINT
CUBIC YARD
END OF ALIGNMENT
END OF PROJECT
ENGINEERING REPRESENTATIVE
EXISTING FEATURE
HOT MIX ASPHALT
INLET BASIN
LINEAR FOOT
LEAD OFF DITCH
LUMP SUM
LENGTH OF VERTICAL CURVATURE
MAINTAIN EXISTING FEATURE
MILEPOST
POINT OF CURVATURE
POINT OF INTERSECTION
POINT OF TANGENCY
POINT OF VERTICAL INTERSECTION
RECONSTRUCT EXISTING FEATURE
SQUARE FOOT
STATION
SQUARE YARD
TYPICAL
WATERBAR
DX
Detail Reference Symbol
Detail number
Sheet number on which detail is drawn
1. Minimum clearing limits shall be as indicated on plans.
2. All dimensions are in U.S. feet.
3. The contractor is responsible for all project safety and safety compliance.
4. Limited operating periods are listed in the FSSS Section 107.
5. Provide copies of weight tickets for material delivered to the site from commercial sources. Aggregate shall be obtained from an approved source, certified weed free, and certified to contain no more than 0.25% asbestos to be in compliance with California Health and Safety Code Sections
93105 and 93106.
6. Borrow source: If needed, will be designated during construction by the Forest Service. Any material to be available at a borrow site will be unclassified borrow. Material may need to be sorted or mixed to meet gradation requirements.
7. Potential water sources: Bear Creek at 3N01 South crossing or drainage channel 0.1 miles prior to Reed Creek at 1N04 crossing. Meet in-stream drafting minimum flow requirements. When drafting from the river, use screening devices for water drafting pumps. Use pumps with low entry velocity to minimize removal of aquatic species, including juvenile fish, amphibian egg masses and tadpoles, from aquatic habitats.
8. Any merchantable timber needed to be removed to facilitate the road repair shall be marked by the Forest Service prior to felling. Perform felling, bucking, and decking of merchantable timber designated for removal. Operation shall use standard logging practices to minimize breakage of utilizable logs and protect residual trees from unnecessary damage. Merchantable timber shall be bucked into standard log lengths with proper trim allowance prior to decking.
9. Hazard trees: the contractor is responsible for mitigating any work hazards at the project site. Hazard trees can be directionally felled away from the road and left in place.
10. When State of California specifications are referred to, download is available at:
http://ppmoe.dot.ca.gov/hq/esc/oe/construction_contract_standards/std_specs/2018_stdspecs/2018_stdspecs.pdf
1. This is a public works contract. Davis-Bacon prevailing wages apply.
2. Specifications: 'Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects FP-14' (FP-14) or its applicable 'Forest Service Supplemental
Specification' (FSSS).
3. The contractor shall submit a construction schedule in accordance with the contract to the C.O. for approval prior to the start of work.
4. The contractor shall submit a traffic control plan in accordance with FP-14 Section 156 to the C.O. for approval prior to the start of work.
5. Required work not specified in the schedule of items shall be considered incidental to other pay items.
6. Before any excavation activities begin, the contractor shall contact a service to locate any buried utilities. USA 1-800-227-2600, the national 811 number, or the website http://www.call811.com.
7. Equipment, for this project, if driven on state or county roads shall be currently licensed.
8. All work shall be in compliance with the best management practices described in the
Region 5 Forest Service Soil and Water Conservation Handbook, dated December 2011, and the National Best Management Practices for Water Quality Management on National
Forest System Lands, dated April 2012.
Erosion Control Notes:
1. The contractor shall obtain coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity under the Construction General Permit Order 2009-0009-DWQ as administered by the California State Water Resources Control Board. To obtain coverage under the General Permit, the contractor shall electronically file the Permit Registration Documents (PRDs), which includes a Notice of Inent (NOI), Storm Water Pollution Prevention Plan (SWPPP), and other compliance related documents with the California State Water Board.
2. Provide the Forest Serivce with a copy of the SWPPP and all compliance related documents.
3. The areas of soil and vegetation disturbance shall be limited to that required for construction purposes.
except where required for access, there shall be no disturbance in areas to be left in a natural state.
4. Stockpiles shall be located in already disturbed and flat areas, and shall be surrounded with fiber rolls. If a stockpile is inactive for 14 days, it shall be stabilized with 6 mil. plastic or approved equal.
5. Any new disturbances made outside road corridors (such as staging areas) shall be restored. At a minimum, compacted areas shall be de-compacted to a 12" depth, re-contoured to match natural surrounding grade, and mulched with 2-4 inches of wood chips.
6. If tracking is evident due to construction, contractor shall broom excess sediment to an area it won't be carried away by storm flows. if this proves inadequate, contractor may have to street sweep.
7. Spill kits with absorbent pads shall be on site at all times in preparation for equipment leaks. All vehicle maintenance shall take place at least 100 feet from surface water and on a level area surrounded by a contour berm and trench.
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 2-
PL
AN
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Summary of Quantities
2/14/2020
AC
AC
TH
G3
18 4
SUMMARY OF ESTIMATED QUANTITIES
Pay Item
Number
Pay Item Description
Unit
Sheet and Description
Estimated
Quantities
RemarksC1-C3 C4-C5 C4-C5 C6-C7
Site #1 Site #2a Site # 2b Site #3 Bid Schedule
15101 Mobilization LS 1
15201
Construction survey and staking
LS 1
Staking of proposed work and existing features
15401
Contractor testing
LS 1
15713
Soil Erosion & Pollution Control, California Construction
General Permit
LS 1
Plan to be submitted by contractor. State of CA is regulating agency
63501
Temporary traffic control
LS 1
Plan to be submitted by contractor
20407
Roadway excavation, waste, offhaul
CY 1185 1185
Disposal off forest
20424
Drainage Excavation, type drainage ditch
LF 251 251
20701
Earthwork geosynthetics, type geotextile filter class 1, type C
SY 300 300
25101
Placed riprap, class 2
CY 83 83
62901
Temporary rolled erosion control product, type 3.B
SY 956 956
20304
Removal of asphalt concrete, disposal method (a) or (j)
SY 11751 6284 1174 19209
Stockpiled or disposal off forest
30309
Roadbed/base reconditioning, compaction placement method 1
SY 11777 6298 534 18609
30102
Aggregate base, California State DOT, Class 2 AB 1 1/2" max, compaction method (d)
Ton 1249 668 58 1975
40304
Asphalt concrete, California State DOT, Type A HMA, PG 64-16
Ton 2469 1321 357 4147
Includes traveled way, paved CMP inlets, paved overside drains. Tack coat incidental to this line item
60901
Curb, type HMA, 6 inch depth
LF 3919 1670 5589
63401
Pavement markings type H, double yellow
LF 3934 2141 440 6515
63401
Pavement markings type H, single white
LF 7868 4282 880 13030
60711
Reconditioning drainage structures, CMP drop inlet
EA 5 5
Includes cleaning and repair of drop inlet, inlet, and outlet
41802
Asphalt Concrete Pavement Patching, Type 2
SY 12 12
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Existing road alignment, 1N04
Existing CMP invert
Layback slide to minimum 2H:1V.
Remove waste material off of
Federal land.
Place erosion control blanket on all disturbed faces. See sheet D6
Construct new ditch on slide bench. See sheet C2
Line ditch with geotextile and riprap. See sheet C3
Scale: 1"=20'
Site #1 - Site Plan
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 3-
SI
TE
1.D W
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Site #1:
Site Plan
2/14/2020
AC
AC
TH
C1
18 5
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Existing CMP invert Construct new ditch on slide bench
Line ditch with geomembrane and riprap.
See sheet C3
E L E
V A
T I O
N
F
E E
T
E L E
V A
T I O
N
F
E E
T
STATION (FEET)
DITCHLINE - NEW PROFILE
-0+15 0+00 0+50 1+00 1+50 2+00 2+502+51
-6 .7
-9 .7
-7 .1
Existing Ground
Proposed Ditch, Flowline
Start ditch 2' below EG
Transition: to 3' below EG
3' below EG
Begin Transition: to 1' below EG
Begin Transition: match EG at paved ditch
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 3-
SI
TE
1.D W
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Site #1:
Ditch Plan & Profile
2/14/2020
AC
AC
TH
C2
18 6
Scale: 1"=20'
Site #1: New Ditch - Plan View
Scale: 1"=30'
Site #1: New Ditch - Profile View
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Riprap, 1' depth, sizing listed in notes
Lined ditch, Geotextile
Filter Class 1, Type C
Tie into existing cut slope
Tie into new layback slope
Depth as specified in profile, sheet C2
Ditch back slopes
2H:1V typ.
Ditch flowline
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+25.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+50.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+75.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
1+00.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
2+25.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
2+50.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
1+25.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
1+50.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
1+75.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
2+00.00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100
Existing ground, typ.
Finished ground, typ.
2H:1V minimum
Ditch per plan, profile, and section on sheets C2 & C3
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 3-
SI
TE
1.D W
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Site #1:
Section Views
2/14/2020
AC
AC
TH
C3
18 7
Scale: 1"=5'
Ditch - Typical Section
Work Notes:
1. Riprap sizing
1.1. Minimum Class1 per FP-14 Table 705-1 between STA 0+00 and 1+00.
1.2. Minimum Class 2 per FP-14 Table 705-1 between STA 1+00 and 1+85.
1.3. Minimum Class 1 per FP-14 Table 705-1 between STA 1+85 and 2+50.
1.4. Stationing for riprap sizing is based on alignment and profile of the ditch, shown on sheet C2.
2. Stationing for section views shown on this sheet are in reference to the road centerline.
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 4-
SI
TE
2& 3.D
W G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Site #2:
Site Plan
2/14/2020
AC
AC
TH
C4
18 8
Work Notes:
1. Roadway rehabilitation consists of the following work:
1.1. Remove the entire depth of AC surface course. Milled AC material may be processed to a maximum particle size of 2" and stockpiled at MP 18.92 or removed off forest.
1.2. Re-shape and re-compact full depth of existing base course. Place new aggregate base where needed to level the base and structurally support the new surface course. Compact according to FSSS 301.05(b).
1.3. Construct the new AC surface course as shown in the typical section on sheet
C5.
1.4. Stripe new centerline and fog lines.
2. Begin/End rehabilitation callouts mark the full depth repair points. Taper transition to existing asphalt outside of these limits according to detail 2, sheet C5.
3. New AC surface course shall match existing alignment, profile, transitions, cross slopes and superelevation of the existing pavement.
4. Patch AC according to detail 1, sheet D4.
Work Breakdown:
1. Site #2a - Mandatory work bid items: Between STA 987+91 and STA 1035+63
2. Site #2b - Optional work bid items: Between STA 1040+67 and STA 1061+28
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
New AC surface course shall match existing alignment, profile, transitions, cross slopes and superelevation of the existing pavement.
C
L
11.00' 11.00'
1'
1'
Recondition full depth of existing base course
Profile grade point, match existing
New base course where needed to structurally support new AC. Depth will vary
Remove existing AC to full depth.
New AC course 0.35ft depth
AC shoulder, typ.
Existing cut or fill slope
Match Existing
Subgrade, existing
4H:1V
4H:1V
Match Existing
Existing cut or fill slope
Begin/End full depth roadway rehabilitation section
Top of existing
AC surface
Cold plane or mill
" per 10LF or
200H:1V minimum
Minimum thickness 2"
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 4-
SI
TE
2& 3.D
W G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Site #2:
Section and Quantities
2/14/2020
AC
AC
TH
C5
18 9
Scale: 1"=4'
Roadway Rehabilitation - Typical Section
Note:
1. Removal quantity is estimated as asphalt in place, not loose or in the haul vehicle. Assumed removal depth is 4".
2. Assumed depth of existing base course is 0.5ft
3. Assumed depth of new base course is 2". Assumed in place, compacted unit weight of 139 lb/cuft.
4. Depth of new AC course is 0.35ft per typical section. Assumed in place, compacted unit weight of 145.2 lb/cuft.
5. Total length, includes both left and right sides.
6. Total length, includes both left and right sides.
Roadway Rehabilitation - Estimated Quantities
Section
Length (mi) Length (ft)
AC Removal
(SY)1
Recondition
Base Course
(SY)2
New AB (ton)3 New AC (ton)4 HMA Curb (ft)5
Striping -
Double Yellow
(ft)
Striping -
Single White
(ft)6
2a 0.73 3854 11751 11777 1249 2469 3919 3934 7868
2b 0.4 2061 6284 6298 668 1321 1670 2141 4282
Work Notes:
1. Pulverized/milled/cold planed AC may be processed to have a maximum particle size of 2" and stockpiled at MP 18.92, or it may be removed off forest.
2. Typical section represents the road traveled way.
Pavement drainage feature typicals are shown in section D of the plans.
3. Construct HMA curbs, HMA ditches, paved CMP inlets, and paved overside drains as specified on sheet C4. Details for these items are shown on sheets D1-D3.
4. Place tack coat between milled AC surface and new
AC, between each lift of AC, and on any vertical surfaces new AC will be placed against. Use application rate of 0.07 gallons/sqyd.
Scale: 1"=4'
Asphalt Taper Transition to Existing Asphalt Pavement
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Repair section #1, 85 LF
Begin taper, section #1
End taper, section #1
Repair section #2, 80 LF
Begin taper, section #2
End taper, section #2
Repair section #3, 35 LF
Begin taper, section #3
End taper, section #3
Where taper sections overlap, mill to minimum
2" depth
E L
E V
A T
I O
N
F
E E
T
E L
E V
A T
I O
N
F
E E
T
STATION (FEET)
3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50
PVI STA: 5+77.11
PVI ELEV: 4359.93
K: 16.62
LVC: 50.00
V
S
T A
L E
V
A
E
V
PVI STA: 6+68.22
PVI ELEV: 4363.02
K: 45.53
LVC: 50.00
A
E
V
A
E
V
3.38%
2.29%
6.3 9%
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 4-
SI
TE
2& 3.D
W G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Site #3:
Plan & Profile
2/14/2020
AC
AC
TH
C6
18 10
Scale: 1"=60'
Site 3 - Plan View
Scale: 1"=60'
Site 3 - Profile View
Work Notes:
1. Roadway rehabilitation consists of the following work:
1.1. In repair sections: remove the entire depth of AC surface course. In taper sections: mill transition between the existing surface elevation and full removal depth at a rate of
" per 10 linear feet. Milled AC material may be processed to a specified size and stockpiled at MP 18.92 or removed off forest.
1.2. Re-shape and re-compact full depth of existing base course. Place new aggregate base where needed to level the base and structurally support the new surface course. Compact according to FSSS 301.05(b).
1.3. Construct the new AC surface course as shown in the typical section on sheet C7. In taper sections: place surface course to match existing surface elevation and transition to full AC depth in repair sections.
1.4. Stripe new centerline and fog lines.
2. New AC surface course shall match existing alignment, profile, transitions, cross slopes and superelevation of the existing pavement.
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
11.00' 11.00'
1'
1'
Recondition full depth of existing base course
Profile grade point, match existing
New base course where needed to structurally support new AC. Depth will vary
Remove existing AC to full depth.
New AC course 0.35ft depth
AC shoulder, typ.
Existing cut or fill slope
Match Existing
Subgrade, existing
4H:1V
4H:1V
Match Existing
Existing cut or fill slope
Begin/End full depth roadway rehabilitation section
Top of existing
AC surface
Cold plane or mill
" per 10LF or
200H:1V minimum
Minimum thickness 2"
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 4-
SI
TE
2& 3.D
W G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Site #3:
Section
2/14/2020
AC
AC
TH
C7
18 11
Scale: 1"=4'
Roadway Rehabilitation - Typical Section
Note:
1. Removal quantity is estimated as asphalt in place, not loose or in the haul vehicle. Assumed removal depth is 4".
2. Assumed depth of existing base course is 0.5ft
3. Assumed depth of new base course is 2". Assumed in place, compacted unit weight of 139 lb/cuft.
4. Depth of new AC course is 0.35ft per typical section. Assumed in place, compacted unit weight of 145.2 lb/cuft.
5. Total length, includes both left and right sides.
6. Total length, includes both left and right sides.
Work Notes:
1. Pulverized/milled/cold planed AC may be processed to have a maximum particle size of 2" and stockpiled at MP 18.92, or it may be removed off forest.
2. Typical section represents the road traveled way.
Pavement drainage feature typicals are shown in section D of the plans.
3. Construct HMA curbs, HMA ditches, paved CMP inlets, and paved overside drains as specified on sheet C6. Details for these items are shown on sheets D1-D3.
4. Place tack coat between milled AC surface and new
AC, between each lift of AC, and on any vertical surfaces new AC will be placed against. Use application rate of 0.07 gallons/sqyd.
Scale: 1"=4'
Asphalt Taper Transition to Existing Asphalt Pavement
Roadway Rehabilitation - Estimated Quantities
Section
Length (ft)
AC Removal
(SY)1
Recondition
Base Course
(SY)2
New AB (ton)3 New AC (ton)4 HMA Curb (ft)5
Striping -
Double Yellow
(ft)
Striping -
Single White
(ft)6
1 85 499 227 25 152 0 165 330
2 80 470 214 23 143 0 160 320
3 35 205 93 10 62 0 115 230
Total 200 1174 534 58 357 0 440 880
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Varies
11' typ.
Match existing
L
White stripe
For pavement structure, see typical sections
Existing cut or fill slope
HMA Curb
Level line
3" 5" 3"
6"
Slope to drain
Level line
Extend top HMA layer under curb with no joint
3" 5" 3"
6"
White stripe
Varies
11' typ.
C
L
M a t c h e x i s t i n g
HMA thickness equivalent to top lift of traveled way surface course
11'
11'
3"
4" yellow
4" yellow
4" white
Varies, 1' typ.
Varies, 1' typ.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 5-
DE
TA
IL
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
HMA Structures and Striping Typicals
2/14/2020
AC
AC
TH
D1
18 12
Not to scale
Road Section with HMA Curb
Not to scale
HMA Curb
Not to scale
Road Section with HMA Ditch
Not to scale
Striping Typical
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
F l o w
S K E W
E D
A
X I S T I N G
F l o w
Flow
Work Note:
1. Contractor to perform necessary reconstruction staking of drainage structures before removal. Cross section of slope ditch may be different from typical.
2. Contractor to verify existing dimensions and reconstruct features to same dimensions.
S l o p v a r i e s
Overside Drain on Grade
Overside Drain in Sag
A
A
Section A-A Type #1
Section C-C Type #1
Section C-C Type #2
Section B-B
B
B
C C
S l o p v r i e s
HMA Ditch Typ.
Edge of
HMA Curb
F l o w t y p t y p
1' min. typ.
Limit of traveled way t y p t y p
1' min. typ.
F l o w
Section A-A Type #2
3"
HMA
Curb
Varies, 2' min. typ.
Limit of traveled way
1' typ.
3"
VariesVaries
Compact per FSSS
204.11(e) before placing aggregate
Varies, 2' min. typ.
m i n t y p
Compact per FSSS
204.11(e) before placing aggregate
Limit of traveled way
1' typ.
3"
3' typ.
Varies
Compact per FSSS
204.11(e) before placing aggregate
3"
Compact per FSSS
204.11(e) before placing aggregate
3"
3' typ.
6' typ.
Varies
8" min. typ.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 5-
DE
TA
IL
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
HMA Overside Drain Typicals
2/14/2020
AC
AC
TH
D2
18 13
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
F l o w
Work Note:
1. Contractor to perform necessary reconstruction staking of drainage structures before removal.
2. Reconstruct inlet basin per existing configuration.
Contractor to verify existing dimensions.
Riser Inlet Basin on Grade
Note:
1. In sag location, use 10' length paved gutter flare on both sides of inlet basin.
F l o w
A
A
Section A-A
Flume Downdrain Typical
B
C
B
C
Section C - C (On grade)
Section B - B
Section C - C (In sag)
HMA Curb
Limit of traveled way t y p t y p
1' min. typ.
Top of HMA curb
3' typ.7' typ.
3"
Compact per FSSS
204.11(e) before placing aggregate
1.75" - 3"
Top of
HMA curb
3"
10' typ.10' typ.
Compact per FSSS
204.11(e) before placing aggregate
HMA
Curb
1.75" - 3"
3"
HMA
Curb
5"
6"
Tapered Inlet
Flume section 10' typ.
Fill slope
6" max.
t y p
1' t y p t y p
HMA
Curb
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 5-
DE
TA
IL
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Paved CMP Inlet Basin Typicals
2/14/2020
AC
AC
TH
D3
18 14
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Not to scale
Asphalt Pavement Partial Depth Patch, Type 2
Work Notes:
1. Extend the repair area 12 inches beyond the distress area. Sawcut repair limits to provide vertical sides in reasonably sound pavement. Remove all asphalt pavement within the repair limits down to the existing base course. Dispose of asphalt off project.
2. Clean the patch area by sweeping or other acceptable methods. Remove water and debris from pothole.
3. Compact existing base course or subgrade with vibratory plate compactor or similar.
4. Apply a tack coat to asphalt concrete surfaces within the patch area.
5. Place the asphalt concrete. Placed depth shall match the adjacent existing asphalt section.
6. Compact the asphalt concrete pavement patch to match the grade of the adjacent surface.
Crown top of new asphalt above existing road surface to prevent water pooling.
7. Asphalt sawcut, removal, tack coat and new asphalt concrete for patching are incidental to the pavement patch line item.
(E) Road
(E) Asphalt patch distress area, Typical
(N) Sawcut edges around pothole
(N) Place Asphalt Concrete, Match elevation of existing road surface, Crown patch to prevent water from pooling
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 5-
DE
TA
IL
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Asphalt Pavement Patch Typical
2/14/2020
AC
AC
TH
D4
18 15
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Requirements:
1. The frame may be collapsible or rigid. Possible materials are steel, HDPE, or other durable materials that can maintain rigidity. The frame must be posititioned and secured to maintain the required spacing between the foot valve and the exterior screen at all times
(d
2. The exterior screen mesh may be either rigid or flexible and made from durable material.
3. Stop use of the screen if any holes larger than
" diameter develop in the exterior screen. Use can be resumed after repair.
Required Minimum Dimensions
Drafting Condition
Dimension
Fish Bearing
Steam
[1]
Non-Fish Bearing Stream and drafting can't exceed
100GPM
[2] x
15" 9" y
19" 9" d
5" 3"
[1] The larger dimension screen shall be used in all fish bearing streams. The drafting rate shall be determined by the drafting table, attached separately.
[2] The smaller dimension screen may only be used if a stream is non-fish bearing and the required drafting rate is less than 100 GPM. The drafting rate shall be determined by the drafting table, attached separately.
Collapsible Rigid
Exterior
Screen
Foot
Valve d d d x y
Suction hose
Secure connection from exterior screen to hose with nylon rope drawstring, bungee cord, hose clamp, or other approved method
Max. opening:
" Ø for <100GPM
" Ø for >100GPM
Frame, See detail 2
Foot Valve
Exterior Screen
" max opening
" max opening
Section View
Frame Detail
Dimension View
Notes:
1. Water drafting device shall meet specifications on this sheet unless otherwise approved by the C.O.
2. Alternate designs that meet the intent of the drafting device to reduce intake velocity may be submitted to the C.O. for review and approval.
3. Determination of stream flow rate and fish-bearing status for a water source will be made by the Forest Service.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 5-
DE
TA
IL
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Water Drafting Screen
2/14/2020
AC
AC
TH
D5
18 16
Not to scale
Water Drafting Screen
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Notes:
1. Erosion control mat must be certified weed free.
2. Install temporary rolled erosion control products on all disturbed surfaces after completion of fill slope repairs.
3. Install staples according to the manufacturer's recommendations.
4. Overlap in the direction of the prevailing wind.
P r e v a i l i n g w i n d
S
N o t
4" edge overlap
3' max. o.c.
12" max. o.c.
Blanket edge
Staple (typ.)
Blanket ends
Shingle splice
See Detail C
Anchor Trench at top of slope
See Detail A
12" max. o.c.
m x o c
Staple Spacing
See Note 3
Anchor trench at toe of slope
See Detail B
Erosion Control
Blanket
Staple
Staples 12" spacing
Compacted native soil
Detail A
Anchor Trench at Top of Slope
Detail B
Anchor Trench at Toe of Slope
Detail C
Shingle Splice
Staple 12" Spacing
Erosion Control Blanket
Toe of Slope
Compacted Native Soil
6"
6"
F l o w
Staple
Erosion control blanket
6" min. overlap
6"x6" trench
Not to scale
Rolled Erosion Control Blanket, Type 3.B
Slope Stake
6"x6" trench
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 5-
DE
TA
IL
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Rolled Erosion Control Blanket Details
2/14/2020
AC
AC
TH
D6
18 17
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Traffic flow
Traffic flow
Device spacing
(See Length and
Spacing Table)
Buffer Space
(optional)
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
C B A
Taper Area
50' - 100' (optional)
Buffer Space
(optional)
Variable
Work Space
Buffer Space
(optional)
Taper Area
50' - 100' (optional)
A
Advance Warning Area (See Sign Spacing Table)
(See Length and Spacing Table)
Termination Area
Work Notes:
1. Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
2. Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
3. For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the contractor on the pilot car.
4. If closure is completely within the project limits, eliminate the "ROAD WORK AHEAD" (W20-1) and "END ROAD
WORK" (G20-2) signs.
5. For night time flagging operation, provide floodlighting at flagger stations.
6. For project specific minimum width, refer to the Special Contract Requirements, Section 156.
7. Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
W20-1
See Note 4
W20-4
W13-1P
(optional)
W20-7
W16-2P
(optional)
G20-2
See Note 4
* Approach speed based on the regulatory posted speed, not the advisory speed.
Channelizing devices
Flagger location
Flagger location
10' min.
See Note 6
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 4/2
0 1 4:
A
LL
EN
BC
OM
BS
C
:\U
SE
RS
\A
LL
EN
BC
OM
BS
\D
OC
UM
EN
TS
\_P
RO
JE
CT
S\
CO
TT
ON
W
OO
D
RE
PA
IR
S-
-D
ES
IG
N\
AU
TO
CA
D\ 5-
DE
TA
IL
S.
DW
G;
R05 Pacific Southwest Region
Cottonwood Road Repairs 2020
Stanislaus National Forest
Mi-Wok District, Groveland District
Temporary Traffic Control:
Single Lane Closure
Layout (With Flaggers)
2/14/2020
AC
AC
TH
D7
18 18
Length and Spacing Table
Approach Speed
(MPH)
Buffer Space
Length (Feet)
Channelizing Device
Taper Area Buffer Space Work Space
Spacing in Feet
20 115 20 40 40
25 155 20 50 50
30 200 20 60 60
35 250 20 70 70
40 305 20 80 80
45 360 20 90 90
50 425 20 100 100
55 495 20 110 110
60 570 20 120 120
65 645 20 130 130
70 730 20 140 140
Sign Spacing Table
Road Type
Distance Between Signs in Feet
A B C
Urban and Rural 30 MPH and less 100 100 100
Urban and Rural 35 MPH to 50 MPH 350 350 350
Rural greater than 50 MPH
500 500 500
Expressway / Freeway
1000 1500 2640
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Cottonwood2020 TITLE SIGNED |
| Cottonwood2020 99% |
File details come from the government source that posted it. Updated .