2. BMW_Helio_IRSC_Appendix A_WorkSpecs_2022Jan6.pdf

PDF 272 KB Posted

Attached to
BMW Helicopter Stewardship IRSC Federal contract opportunity
Solicitation number
12363N23Q4143
Issued by
Department of Agriculture Forest Service

About this file

This document outlines a federal contract opportunity for helicopter logging and stewardship services on National Forest lands near Bozeman, Montana. The BMW Helicopter Stewardship IRSC project aims to reduce wildfire risk in the Bozeman Municipal Watershed through mandatory helicopter logging of 208 acres and road reconstruction totaling 9.3 miles. Optional road decommissioning is also included. Quotes for the work are due on June 21, 2023 with a period of performance through October 16, 2025. The solicitation will be posted on May 16, 2023. A pre-bid site visit is scheduled for June 5, 2023. The USDA Forest Service will award the contract to achieve land management goals and meet local community needs through its Stewardship Authority.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BMW Helio Stewardship IRSC Custer Gallatin National Forest

Page 1 of 6 Bozeman Ranger District

Revised 01.06.2022

APPENDIX A

TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS

SECTION I – DESCRIPTION OF WORK:

Project Description: The BMW Helio Stewardship IRSC project is located in the northern Gallatin Mountain Range, just south of Bozeman, MT. Helicopter units are located on the east and west side of FS Road #979, along Bozeman Creek and adjacent to City of Bozeman land. A total of 4 landings have been identified for proposed use. This contract would allow:

• Cut and remove 208 acres of sawtimber via whole tree helicopter yarding/logging

• Build .30 miles of temporary roads for landing access

• Conduct 9.30 miles of road reconstruction and maintenance

• Road Decommissioning TRUP (Temporary Road Use Permit) Roads

Goal: Maintain high-quality, predictable water supply for Bozeman through cooperative efforts with the City of Bozeman in implementing sustainable land management practices. 100% of the City of Bozeman’s municipal water comes from the CGNF - 80% from Hyalite and Bozeman Creeks (project area) and 20% from Lyman Creek.

Overall Objectives:

• Implement vegetation management projects to reduce the severity and extent of wildland fires in the Municipal Watersheds. Reduce fuels in the Wildland Urban Interface.

• Focus on treatments that will begin to reduce the risk of excess sediment and ash reaching the municipal water treatment plant in the event of a severe wildland fire.

• Provide for firefighter and public safety by beginning to modify potential fire behavior.

Background:

The Bozeman Municipal Watershed Project is a cooperative fuels reduction project between the Custer Gallatin National Forest and the City of Bozeman to maintain a high-quality, predictable water supply for Bozeman residents. The project will reduce the risk of severe and extensive wildfire in the lower portions of Hyalite and Bozeman Creeks to limit the amount of sediment and ash entering the water treatment facilities. Up to 4,700 total acres were approved through NEPA and are available for treatment on NFS land. The Alternative selected authorizes 2,045 acres of ground based (37%), Skyline (24%) and Helicopter (39%) treatments, including 200 acres of partial cutting/helicopter removal in the Gallatin Fringe Inventoried Roadless Area (IRA). The USFS and City of Bozeman are currently implementing various parts of the project, which includes prescribed fire treatment, and thinning of smaller and larger diameter trees.

The planned helicopter treatment locations were determined important for the project in key areas due to modeling efforts that showed the highest risk of fire spread to be located on top of ridges and treating the ridge between the watersheds would have maximum effectiveness in reducing potential fire spread to adjacent drainages and serve as an important fire suppression control point. Thinning within the fuel breaks will improve the likelihood of controlling fires on the ridgeline and limiting the spread of fire into adjacent drainages.

SECTION II – WORK ITEMS

Mandatory Item 1: Cut and Remove Included Timber by Whole Tree Helicopter Yarding/Logging (Cutting units 1, 2, 3, 4, 5A, 5B, 6, 7, 11A, 11B).

Page 2 of 6 Bozeman Ranger District

Cut and remove from Contract Area sawtimber trees which meet the minimum tree specifications as identified in

Appendix B.

Accomplish Contractor requirements as specified in Appendix B.

Mandatory Item 2: Road Reconstruction on Haul Routes. (9.3 miles)

Accomplish contract requirements as specified in Appendix D for Road Reconstruction Requirements, excluding the obliteration of NFSR P705-F Liebmann Ranch F-Spur.

Reconstruction of haul roads on 9.30 miles of road. Completion of work is required by 10/15/2023 and accepted prior to hauling.

Optional Item 3: Road Decommissioning TRUP (Temporary Road Use Permit) Roads

Accomplish all items listed for NFSR P705-F Liebmann Ranch F-Spur in Appendix D.

SECTION III – CONTROL OF WORK

The Contractor agrees to conduct its operations under this contract and other related business activities in compliance with

Federal, State, and local statutes, standards, orders, permits and other regulations.

The Contractor shall meet all State and local environmental quality laws applicable to National Forest system lands.

Page 3 of 6 Bozeman Ranger District

Work may be done any time during the term of the contract, except under the following conditions:

(1) When conditions are such that operations shall be restricted or ceased due to increased fire risk during the Fire

Precautionary Period.

(2) If any new cultural or archeological sites are discovered during operations of this contract, work will be suspended in the immediate vicinity of the site until a reconnaissance survey is completed by the Forest

Archeologist. Areas excluded from treatment shall be deleted from the contract.

(3) If new nests are discovered.

(4) When soil moisture conditions create excessive risk of damage to the soil.

(5) Conditions described in Appendix B, under provisions C6.24#, C6.316#, and C5.12#.

SECTION IV – INSPECTION AND ACCEPTANCE

For All Work Items:

At any point during the project, the Contractor and/or Project Manager may request (documented through email, text, or hand-written request) an in the field consultation with the Forest Service to inspect work progress, review contract specifications, or clarify issues. The Forest Service shall respond to Contractor’s request within 5 working days, excluding weekends and federal holidays.

GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Government Inspection Procedures - The COR, or a designated inspector (GTM), will make periodic inspections while work is in progress, usually daily at first, as needed to assure work is proceeding satisfactorily. The Contractor shall notify the COR when units are started, when problems are encountered and when contract work needs government oversight.

1. Each unit will be inspected as a separate unit. Unit will not be averaged with other units for acceptance or payment.

2. When units are completed and ready for government inspection, Contractor’s designated Project manager shall request unit inspection in writing, prior to moving out of the general area.

3. The COR, or designated inspector, will determine compliance with contract specifications through informal visual inspections. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.

Unsatisfactory Performance

1. If the work quality falls below the minimum Acceptable Quality Level (AQL), the COR will immediately notify the contractor, in writing, and order them to improve the quality of subsequent work. If the quality of subsequent work is not raised above the minimum AQL within the specified timeframe of the written notice, a Cure Notice will be issued.

2. Repeated failure to produce work quality at or above the AQL percent will be considered reason for no payment and/or contract Termination for Cause, and default action.

Page 4 of 6 Bozeman Ranger District

Government Inspection Procedures – Items 1-3

Table 1 – Minimum Acceptable Quality Levels (AQL) of Work

ITEM DESCRIPTION SCHEDULE UNIT Min AQL

Cut and Remove Included Timber by

Whole Tree Helicopter Yarding/Logging.

MANDATORY ACRE 100%

2 Road Reconstruction on Haul Routes MANDATORY MILE 100%

3 Item Road Decom TRUP Roads OPTIONAL

LUMP

SUM

100%

SECTION V – PAYMENT METHODS

Method of Measurement for Acreages

Acreages were determined by using Global Positioning Systems (GPS). The acreage for each work item will be rounded to the nearest acre and the mileage will be rounded to the nearest 1/10th of a mile and is final unless:

a. The contract is modified or,

b. The Government makes a determination to remeasure or,

c. The Contractor exercises his/her option under the following Remeasurement provisions:

Acceptance and Payment

1. Percentages as calculated herein shall be rounded to the nearest whole percent.

2. No allowance for variation or portion of a variation will be added which will create a percentage greater than

100 percent.

Acceptance and Payment – Item 2 Road Reconstruction of Haul Routes

Full payment will be made when visual and/or measurement inspection meets 100% AQL.

Acceptance and Payment – Optional Item 3 - Road Decommissioning TRUP (Temporary Road Use Permit) Roads

Full payment will be made when visual and/or measurement inspection meets 100% AQL.

* Stewardship Credits will be earned first, whenever practical. Forest Service Funds will be used if the availability of Stewardship Credits is exhausted or if appropriated dollars are obligated to a specific item.

SECTION VI – DEFINITIONS

ACCEPTABLE QUALITY LEVEL (AQL): Acceptance of work will be based on compliance with all specifications corresponding to the appropriate task(s); refer to the Performance Requirements Summary in Section

E.4 of the contract. A minimum AQL is required for all service work – hand or mechanical. The minimum AQL will receive a satisfactory performance rating.

BIOMASS TREES: Any conifer material 2 feet in height to 4.9 inches DBH.

Page 5 of 6 Bozeman Ranger District

BOLE SPACING: The horizontal distance in feet from the edge of one leave tree bole to another leave tree bole, measured from the outside bark of each tree.

CIRCULAR PLOT: A sample plot within a thinning unit that is used to determine the number of desirable trees and other contract specifications.

COARSE WOODY DEBRIS: Woody material left on the ground to meet wildlife habitat requirements.

CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.

CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.

CLEARCUT: A cutting prescription in which all trees within a boundary are designated to be cut.

CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.

CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.

CUT TREES: Trees that do not possess the characteristics of desirable leave trees and are required to be cut. As described by the contract or otherwise marked to be cut.

CUTTING UNIT: See Treatment Unit definition

DAMAGED TREES: Trees damaged beyond recovery. A tree that is larger than 2 feet in height, and has the top knocked out, is leaning more than 10 degrees, has less than one half of its original limbs, or has approximately 50% of bark removed from the circumference of the bole.

DBH: Diameter at breast height, measured at a point of 4.5 feet above the ground level on the uphill side of the tree.

DECKING: Stockpiling of trees in a designated area.

DEAD/DYING TREES: Trees with the crown foliage changing from green to red, yellow, or needleless. Any tree that has pitch tubes indicating Mountain Pine Beetle infestation.

DESIGNATION BY SPECIES AND DIAMETER (DXSD): A cutting prescription in which species and diameter are used to determine which trees will be left and which will be cut.

DIB: Diameter inside bark.

HANG-UP TREE: Any cut tree suspended above ground level.

HEALTHY REGENERATION: Young, healthy, dwarf mistletoe free conifers, less than 4.9 inches in diameter, free of defect or characteristics listed in Section II, 2.2.2.

LEAVE TREE: Trees that possess desirable characteristics and that serve to create the basis for designated spacing requirements or are otherwise designated to be left.

NON-SAWTIMBER TREE: For all conifer species, minimum diameter of 5 inches DBH to minimum diameter by species identified in Appendix B, Division A.

OVERSTORY REMOVAL: A cutting prescription where all trees greater than a specified size are cut. Trees less than the specified size are protected.

PAYMENT UNIT: See Treatment Unit.

PERFORMANCE REQUIREMENTS SUMMARY (PRS): Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.

PILING: Material moved to an agreed upon location shall be piled for future treatment by Forest Service.

PROGRESSION OF WORK: Work conducted in a progressive, workmanlike and orderly manner by the

Contractor.

Page 6 of 6 Bozeman Ranger District

RESERVE CLUMPS: Groups of trees within a treatment area that are protected from cutting, may also include

Individual Reserve trees.

SAWTIMBER TREE: Included timber meeting sawlog size specifications as defined in Appendix B, Division A.2.

SLASH: Woody material existing or created that has accumulated on the forest floor. Woody material includes logs, pieces of logs, tops, and branches.

UNIT: See Treatment Unit.

TEMPORARY ROADS: Non-permanent roads that are constructed by Contractor for the purpose of treatment unit access.

TREATMENT UNIT: An individual area on the ground in which activities will be performed and which may appear as a separate pay item in the Schedule of Items.

UNSATISFACTORY WORK: If work quality falls below the AQL, the COR will issue a work order or notice of noncompliance to the Contractor in writing. Untreated or unsatisfactory treated areas shall be reworked to obtain satisfactory work quality.

WHOLE TREE YARDING: Whole tree logging includes cutting tree and removing the entire tree, including tops and branches, to the landing.

WILDLIFE TREE: Standing tree marked to be reserved as a wildlife tree. Used by birds and small mammals for shelter, nesting, perching, etc.