2.2.1 Attachment 6_GMP_CONUS July 2021.pdf

PDF 852 KB Posted

Attached to
CONUS Generator Maintenance Services Federal contract opportunity
Solicitation number
70FB7022R00000008
Issued by
Federal Emergency Management Agency

About this file

This document contains a federal contract opportunity solicitation for on-site generator maintenance services. FEMA is seeking a single-award contract for maintenance including annual services, quarterly services, return to storage, and repairs for generators across the continental United States. The contract term is for up to five years with firm fixed pricing. Services include inspection, testing, repair, replacement of parts and filters, and load bank testing. The NAICS code is 811310 and PSC code is J030. The solicitation number is 70FB7022R00000008 with a response due date of August 19, 2022. This requirement is set aside for small businesses to respond. Interested parties must register in SAM and complete online representations and certifications through that system.

View the file

Other files for this federal contract opportunity

Other files attached to CONUS Generator Maintenance Services, newest first.
File Type Posted
2.4.1 Amendment 0003 Form30 08.09.2022.pdf PDF
2.4.1 Amendment 0003 Attachment 1_CONUS Maintenance Pricing_Fillable_v2 08.09.2022.xlsx XLSX spreadsheet
2.4.1 Amendment_0002 Form30 08.09.2022.pdf PDF
2.2.1 Amendment 0002_Attachment 1_CONUS Maintenance Pricing_Fillable_v2 08.09.2022.xlsx XLSX spreadsheet
2.4.1 Amendment_0001 Form30 08.04.2022.pdf PDF
2.4.1 Amendment 0001_Questions and Answers_CONUS Generator Maintenance Services 08.04.2022.pdf PDF
2.2.1 Amendment_0001 .SOLICITATION - CONUS Generator Maintenance 70FB7022R00000008 8.4.2022.pdf PDF
2.2.1 .SOLICITATION - CONUS Generator Maintenance 70FB7022R00000008 8.1.2022.pdf PDF
2.2.1 Attachment 4B_Cust Complaint _CONUS_October 2021.pdf PDF
2.2.1 Attachment 3_FEMA CONUS Generator Inventory - April 2022.xlsx XLSX spreadsheet
2.2.1 Attachment 5_Auth for Repair_CONUS_October 2021.pdf PDF
2.2.1 Attachment 8B DC Frederick_Wage Determination 2022.pdf PDF
2.2.1 Attachment 1_CONUS Maintenance Pricing_Fillable_v2 July.xlsx XLSX spreadsheet
2.2.1 Attachment 4A_QA Monitoring_CONUS_October 2021.pdf PDF
2.2.1 Attachment 8 DC Atlanta_Wage Determination 2022.pdf PDF
2.2.1 Attachment 2_CONUS_Generator_PWS April 2022 v4.pdf PDF
2.2.1 Attachment 4_CONUS_QASP_October 2021.docx DOCX document
2.2.1 Attachment 7_SF_91_Motor Vehicle Accident Report - CONUS.pdf PDF
2.2.1 Attachment 8A DC Fort Worth_Wage Determination 2022.pdf PDF
2.2.1 Attachment 9 - CONUS Past Performance Questionnaire August 2022 v2.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIZE (kW):

MANUFACTURE:

DATE OF THIS SERVICE:

LOCATION OF SERVICE:

CURRENT READINESS STATUS

CURRENT PHYSICAL CONDITION

(SELECT):

LEVEL OF SERVICE (SELECT):

Quarterly Annual

& RTS

Every 3 Years

(Annual)

DISCONNECT Battery Cables / Master Battery Cutoff Switch P P

CHECK/CLEAN Battery terminals / battery hold down P P

CHECK/CLEAN Air filter(s) P P

INSPECT Coolant Leak P P

INSPECT Loose/worn belts/hoses P P

INSPECT Oil Leak P P

INSPECT

Turbocharger damage, mounts, connections, leaks, noises, wastegate P P

INSPECT

Turbo Charge Air Cooler piping leaks, signs of oil P P

INSPECT

Fuel Tank damage, leaks, caps/vents, hoses, quick-disconnects, sensor connectors P P

INSPECT Fuel Leak P P

INSPECT

Internal Fuel Tank - Drain if Fuel is present (if applicable) P P

INSPECT

All filters marked with date and run hours at replacement P P

INSPECT All gauges/meters P P

INSPECT Breaker(s)/lugs P P

INSPECT Frayed/Corroded Wiring P P

INSPECT Housing: damage, proper FEMA identification P P

INSPECT Loose Bolts/linkage/etc. Replace if missing P P

INSPECT Missing Parts/Nuts/Bolts P P

INSPECT Trailer/Chassis for damage P P

TEST Panel Lights P P

TEST Radiator Cap (Annual Pressure Test) P

LUBE/ADJUST Various linkages P P

CHECK Tension on belts P P

CHECK Exhaust components P P

CHECK Lube oil level P P

CHECK Silencer isolator mount P P

CHECK / ADD (IF NEEDED) Coolant fill level - add recharge if necessary P P

CHECK/ADJUST Output voltage/phase configuration P P

CHECK/ADJUST Governor P P

CLEAN Clean/remove all dirt/debris from gen/chassis P P

DRAIN Fuel / water separator P P

For CAT XQ1140, TWO GMP's are to be completed, indicating each engine either as Engine "A" (BC:

XXXXX-A) or Engine "B" (BC:

XXXXX-B)

NOTES

GENERATOR MAINTENACE PROFILE

IDENTIFICATION / CURRENT MAINTENANCE DATA

BARCODE (FEMA):

STATION OF ORIGIN (SELECT):

HOUR METER READING (@ START OF

SERVICE):

RUN UP HOUR METER READING (END):

CURRENT PHYSICAL CONDITION (SELECT)

Pre-existing damage:

GENERATOR MAINTENACE CHECKLIST - (TO BE COMPLETED AS SERVICES ARE RENDERED)

FEMA PWS REQUIRED GENERATOR MAINTNEANCE CHECKS & SERVICES - As per PWS Section 6: Services

CODE: (OK= No Problem; CS=Corrected to spec;

TF=Temporary Fix; PF=Permanent Fix; NA=Not Applicable;

XP=No replacement part available; XF=FEMA Waived

Repair; XX=Uncorrectable damage)

ACTION ITEM

LEVEL OF SERVICE REQUIRED

RFP: 70FB7022R00000008

Attachment 6: Generator Maintance Profile Sheet CONUS Generator Maintenance - October 2021

BARCODE (FEMA):

Quarterly Annual

& RTS

Every 2 or 3 Years

(Annual) FEMA

Will Advise

Timeline

DRAIN & REPLACE Lube Oil P

REPLACE Fuel filter(s) P

REPLACE Fuel/Water Separator P

REPLACE Oil filter(s) P

REPLACE

Air cleaner element(s) EVERY 2 Years OR as dictated by Fleet Management P

TEST, CHANGE IF NECESSARY

Coolant EVERY 3 Years OR as dictated by Fleet

Management P

ACTION ITEM

CODE

(OK= No Problem; CS=Corrected to spec; TF=Temporary

Fix; PF=Permanent Fix; NA=Not Applicable; XP=No replacement part available; XF=FEMA Waived Repair;

XX=Uncorrectable damage)

NOTES

INSPECT Power Balance Connections P P Re-torque only if deployed/used to manufacture specifications

TEST DEF Fluid Concentration P

TEST / DRAIN / REPLACE

DEF Fluid (test new DEF Fluid concentration

PRIOR to replacing in generator) P

CHANGE During Coolant Change - Bleed EGR Coolant

CLEAN Clean out Coolant Strainer P

CLEAN DEF Filter P

REPLACE Crankcase filter

BATTERY STATUS:

ESTOP STATUS:

BATTERY REPLACEMENT DATE:

FUEL FILTER PRIMARY: CRANKCASE (TIER 4 ONLY): 1,000 hours

LUBE OIL PRIMARY: Diesel Exhaust Fluid (DEF) (TIER 4 ONLY):

AIR (Every 2 years) PRIMARY:

COOLANT (IF NEEDED) / (Every 3 Years)

PRIMARY:

FUEL / WATER SEPARATOR PRIMARY:

DEF CONCENTRATION (TIER 4 ONLY) SET POINT:

CODE: SET POINT:

Communication Test between Generator & External Tank

PASS FAIL

INSPECT: DRAIN CODE:

ACTION

VOLTAGE CONFIGURATION AT TIME

OF LOAD TEST

STARTS (HOURS):

1-PHASE BREAKER FUNCTIONALITY STOP (HOURS):

3-PHASE BREAKER FUNCTIONALITY PASS

OUTPUT VOLTAGE STABILITY FAIL

OVERALL GENERATOR READINESS

FUEL TANK (EXTERNAL COMMUNICATION) (if applicable)

GOVERNMENT FINAL Q/A INSPECTOR:

NOTE ALL NEW DAMAGE / REPAIRS/ LOAD TEST FAILURES / NO-START

LOAD TEST RESULTS (CONDUCTED AT MAX CAPACITY)

Follow guidelines as stated in Section 6 of the PWS

SIGNATURE OF CONTRACTOR AND GOVERNMENT REPRESENATIVE

CONTRACTOR FINAL Q/A INSPECTOR:

NOTES

CODE: (OK= No Problem; CS=Corrected to spec;

TF=Temporary Fix; PF=Permanent Fix; NA=Not Applicable;

XP=No replacement part available; XF=FEMA Waived

Repair; XX=Uncorrectable damage)

LOAD BANK TESTED (90 MINUTES)CODE / VOLTAGE CONFIGURATION

SECONDARY:

SECONDARY:

TIER 4 SERVICE REQUIREMENT (APPLICABLE GENERATORS)

LEVEL OF SERVICE REQUIRED

BATTERY / ESTOP STATUS COOLANT / LUBE OIL

NEW COOLANT:

Every 1,000 hours

Coolant CHANGE ONLY

FILTERS (PART & MFG) TIER 4FINAL FILTERS ONLY:

LOAD TEST DETAILS (PERFORMED & COMPLETED UPON COMPLETION OF ALL OTHER SERVICES) CAT XQ1140's will have two (2) Load Bank Sheets completed & two (2) GMP's completed

FUEL TANK (EXTERNAL) (if applicable)

Readings:

SECONDARY:

COOLANT PROTECTION (Every 90 days)

NEW LUBE OIL (15w40):

GENERATOR MAINTENACE PROFILE (CONT)

ACTION ITEM

LEVEL OF SERVICE REQUIRED

OUTPUT VOLTAGE READINGS (Every 90 days) adjust if needed

SECONDARY:

SECONDARY:

FUEL TANK (INTERNAL)

FREEZE POINT:INSPECT: DRAIN

RFP: 70FB7022R00000008

Attachment 6: Generator Maintance Profile Sheet CONUS Generator Maintenance - October 2021

Text4:
Text5:
Date2_af_date:
Dropdown3: []
Dropdown4: []
Dropdown5: []
Dropdown6: []
Dropdown7: []
Dropdown8: []
Dropdown9: []
Date9_af_date:
Dropdown10: []
Text11:
Check Box12: Off
Check Box13: Off
Check Box14: Off
Text15:
Text16:
Text17:
Text18:
Dropdown18: []
Text19:
Text20:
Text21:
Text22:
Text23:
Text24:
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Dropdown25: []
Text31:
Text32:
Text33:
Text34:
Dropdown29: []
Dropdown28: []
Dropdown30: []
Dropdown31: []
Dropdown33: []
Dropdown32: []
Dropdown34: []
Dropdown35: []
Dropdown36: []
Dropdown37: []
Dropdown38: []
Dropdown39: []
Dropdown40: []
Dropdown41: []
Dropdown42: []
Dropdown43: []
Dropdown45: []
Dropdown44: []
Dropdown46: []
Dropdown47: []
Dropdown48: []
Dropdown49: []
Dropdown50: []
Dropdown51: []
Dropdown52: []
Dropdown54: []
Dropdown53: []
Dropdown55: []
Dropdown56: []
Dropdown57: []
Dropdown58: []
Dropdown59: []
Dropdown60: []
Dropdown61: []
Dropdown62: []
Dropdown63: []
Dropdown64: []
Dropdown65: []
Dropdown66: []
Dropdown67: []
Dropdown68: []
Dropdown69: []
Dropdown70: []
Dropdown71: []
Dropdown73: []
Dropdown74: []
Check Box15: Off
Dropdown72: []
Dropdown75: []
Text35:
0:
2:
3:
4:
5:
6:
8:
9:
10:
11:
12:
13:
14:
15:
16:
17:
18:
19:
20:
21:
22:
23:
24:
25:
27:
28:
29:
1:
26:
Text36:
Text37:
Text38:
Text39:
Text40:
Text41:
Text42:
Text43:
Text44:
Text46:
Text45:
Text47:
Text48:
Text49:
Clear:
Technican Name:
Text50:
Text2:
Text3:
Size (kW):
Text51:

File details come from the government source that posted it. Updated .