2.1.1 26Q0463 Attachment III - SOW (38DJ231105_00_A01) Redacted.pdf

PDF 306 KB Posted

Attached to
Fairbanks Morse SSDG Parts and Repairs
Solicitation number
N0040626Q0463
Issued by

About this file

This is a Statement of Work (SOW) for non-nuclear ship repair, maintenance, overhauls, and conversions west of the 108th meridian to be performed at Sasebo, Japan.

The contractor shall provide all labor required to accomplish the Job Specification 38DJ231105-A01, which is attached as an enclosure. Work shall be completed on-site in Sasebo, Japan, with the on-site work period to be specified through contract delivery information on DD Form 1155. The contractor must coordinate the work schedule with the Government Technical Point of Contact (POC) to ensure all requirements are met by the contract expiration date. All references in paragraph 2 of the Job Specification apply, and Category-I of NSI standards must be invoked regardless of whether NSI is listed. Reports required by the Job Specification must be submitted in accordance with the specification's reference requirements.

The contractor is responsible for providing all necessary material, equipment, and services (such as air, power, and water) unless specifically listed as Government Furnished Material (GFM). Technical manuals, equipment operation manuals, Planned Maintenance System materials, and Allowance Parts List information will be provided by the Ship's Force or Government Technical POC. Safety and environmental compliance are mandatory, including OSHA requirements, proper personnel protective equipment, and coordination with the Safety Department. The contractor bears sole responsibility for employee safety and environmental compliance, and must report all accidents to the Station Safety Department. Foreign nationals or persons affiliated with foreign-owned companies require prior written approval from Commander, Naval Sea Systems Command for access to the Receiving Activities Operations Area or Industrial Area. All contractor labor hours, including subcontractor hours, must be reported via the ECMRA secure data collection site, with inputs due no later than October 31 of each calendar year beginning in 2013.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .