2.03 RFQ N6883623Q0202.pdf

PDF 994 KB Posted

Attached to
Lenel Access Control System Federal contract opportunity
Solicitation number
N6883623Q0202
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This request for quotation from the Department of the Navy solicits offers for the installation of Lenel access control systems and annual maintenance services at multiple buildings on Naval Air Station Pensacola. The solicitation requires the installation of Lenel card readers, controllers, servers, and software at three buildings. Offerors must demonstrate Lenel vendor certification and pricing is requested for the base year of installation and four option years of annual maintenance. Quotes are due by July 18, 2023. Award will be made to the lowest priced technically acceptable offer based on meeting the certification requirement. The resulting contract will have a one year base period of performance from August 2023 to July 2024 and four one-year options for continued annual maintenance.

View the file

Other files for this federal contract opportunity

Other files attached to Lenel Access Control System, newest first.
File Type Posted
2.05 N6883623Q0202 Amendment 0002.pdf PDF
Attachment - 4142 Floor plan - 2 readers.pdf PDF
Attachment BLDG 633 2nd floor_Redacted.pdf PDF
Attachment - BLDG 633 1st floor - 11 readers.pdf PDF
2.05 N6883623Q0202 Amendment 01.pdf PDF
Attachment - 3828 Floor Plan - 6 readers.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

N6883623Q0202 07-Jul-2023

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

10:00 AM 18 Jul 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N688369. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

PHILLIP E. JACKSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N6222923RCCACRD

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

NAVSUP FLC JACKSONVILLE CONTRACTS DIV

PHILLIP JACKSON

110 YORKTOWN AVE 3RD FLOOR

JACKSONVILLE FL 32212

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE N62229 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

NAVAL AVIATION SCHOOLS COMMAND

JOHN CRAWFORD

NAVAL AVIATION SCHOOLS OF COMMAND

181 CHAMBERS AVENUE

SUITE C BLDG 633

PENSACOLA FL 32508

TEL: 931-624-2372 FAX: 850-452-3060

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$25,000,000

NAICS:

561621

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF57

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

N6883623Q0202

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Lenel Access Control System

FFP

Provide and install Lenel stand alone Access Control System within building 633, and provide full system test function and annual service and maintenance plan in accordance with the PWS.

FOB: Destination

MILSTRIP: N6222923RCCACRD

PURCHASE REQUEST NUMBER: N6222923RCCACRD

PSC CD: J063

NET AMT

0002 1 Each Lenel Access Control System

FFP

Provide and install Lenel stand alone Access Control System within building 4142, and provide full system test function and annual service and maintenance plan in accordance with the PWS.

FOB: Destination

MILSTRIP: N6222923RCCACRD

0003 1 Each Lenel Access Control System

FFP

Provide and install Lenel stand alone Access Control System within building 3828, and provide full system test function and annual service and maintenance plan in accordance with the PWS.

FOB: Destination

MILSTRIP: N6222923RCCACRD

1001 12 Months OPTION Lenel Access Control System Maintenance

FFP

Provide annual service and maintenance for Lenel Stand alone Access Control System within building 633, 4142 and 3828 in accordance with the PWS.

FOB: Destination

MILSTRIP: N6222923RCCACRD

2001 12 Months OPTION Lenel Access Control System Maintenance

FFP

Provide annual service and maintenance for Lenel stand alone Access Control System within building 633, 4142 and 3828 in accordance with the PWS FOB: Destination

MILSTRIP: N6222923RCCACRD

3001 12 Months OPTION Lenel Access Control System Maintenance

FFP

Provide annual service and maintenance for Lenel stand alone Access Control System within building 633, 4142 and 3828 in accordance with the PWS.

FOB: Destination

MILSTRIP: N6222923RCCACRD

4001 12 Months OPTION Lenel Acess Control System Maintenance

FFP

Provide annual service and maintenance for Lenel stand alone Access Control System within building 633, 4142 and 3828 in accordance with the PWS FOB: Destination

MILSTRIP: N6222923RCCACRD

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS) for

Lenel Access Control Systems Installation and Services

Part 1 General Information

1. GENERAL: This is a non-personal services contract to provide personnel, equipment, material, supplies, tools, transportation, supervision, and other items and/ or services necessary to provide and install stand-alone Lenel Access Control Systems (ACS) in BLDGs 633, 4142, and 3828 in accordance with (IAW) the building layouts/specifications and as defined in the PWS. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, and other items and/ or services necessary to provide and install stand-alone ACS systems in BLDGs 633, 4142, and 3828 IAW the building layouts/specifications and as defined in the PWS. The contractor shall perform to the standards in this contract and IAW the PWS, specifications/layouts, Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, UFC 4-021-02 Electronic Security Systems (ESS), Federal Government Advanced Encryption Standard (AES) and all applicable National Fire Protection Association (NFPA) codes with an emphasis on NFPA 80 “Fire Doors and Other Opening Protectives” and NFPA 101 “Life Safety Code” and all other safety, security, and building codes/regulations.

1.2. Scope: The Contractor shall provide and install stand-alone Access Security Control Systems within building 633, 4142, and 3828 and provide full system test function, and annual service and maintenance plan. The system requirements are listed below for each building:

Building 633

- Install one (1), Lenel dual factor card readers at each of the following locations:

Southwest Corner Entry Door South Entry Door Quarterdeck Entry Door 2nd Floor Elevator Access Door North Handicap Entry Door

Northwest Stairwell Entry Door Northwest Interior Entry Door Northeast Entry Door Northeast Exterior Entry Door

- Install two (2), Lenel dual factor card readers at each of the following locations:

2nd Floor Hallway Northeast Hallway Entry Door

- Provide emergency lockdown button in quarterdeck/room 136

- Provide badging system to include one dual sided with security over-laminate printer, badging camera and tripod, Lenel badging licensing and management client within Quarterdeck/room 136

- Provide system administration training

- Full system integration/functionality test

- Perform Annual maintenance during period of performance

- Install (1) rack mounted Lenel server

Building 3828

- Replace the existing Lenel workstation including and upgrade Lenel software

- Replace the three (3) existing/out of compliance Lenel controllers

- Install one (1), Lenel dual factor card reader at the following location:

Main Entry Door

- Replace the existing card reader with one (1), Lenel dual factor card reader at each of the following locations:

Interior Stairwell Door Upstairs Office A Door Upstairs Office B Door Rear Entry Door Northwest Rear Entry Door

- Provide system administration training

- Full system integration/functionality test

- Perform Annual maintenance during period of performance

Building 4142

- Replace the one (1) existing/out of compliance Lenel controllers

- Install one (1), Lenel dual factor card reader at the following location:

East Pool Area Entry Door South Pool Area Entry Door

- Replace the existing card reader with one (1), Lenel dual factor card reader at each of the following locations:

Main Entry Door West Pool Area Entry Door

- Provide system administration training

- Full system integration/functionality test

- Annual maintenance during period of performance

1.3. Period of Performance: Period of performance shall be base year and four (4) options years.

Base year: 1 August 2023 – 31 July 2024 Option year I: 1 August 2024 – 31 July 2025 Option year II: 1 August 2025 – 31 July 2026 Option year III: 1 August 2026 – 31 July 2027 Option year IV: 1 August 2027 – 31 July 2028

1.4. General Information

1.4.1. Recognized Holidays: The contractor is not required to perform services on holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Day Christmas Day Independence Day

1.4.2. Hours of Operation: The contractor is responsible for conducting business, between the hours of 07:30 am to 4:30 pm, Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.4.3. The Contractor shall provide four (4) hour response time for urgent/priority service calls. Urgent/priority calls include, but are not limited to, total failure of one or more systems either site-wide or within any secure buuilding(s).

1.4.4. The Contractor shall provide 72-hour response time for routine service calls.

1.4.5. Quality Control: The Contractor shall implement a complete Quality Control Program (QCP) that identifies potential and actual problem areas in the providing requirements of the contract as specified, and results in corrective action throughout the life of the contract. The QCP shall be provided to the Contracting Officer or designated representative for review and acceptance within ten (10) working days after the contract is awarded.

Change to the QCP shall be submitted to the Contracting Officer not later than ten (10) calendar days prior to the effective date of the change. The basis of the plan is that the Contractor is responsible for quality. All methods, procedures, and forms shall support this concept.

1.4.6. Contractor Discrepancy Report (CDR): When the Contractor's performance is unsatisfactory, a CDR will be issued. The Contractor shall reply in writing within five (5) work days from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.4.7. Place of Performance: The work to be performed under this contract shall be performed at Navy Air Station (NAS) Building 633, 4142, and 3828 Pensacola, FL.

1.4.8. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the end of each work day government facilities, equipment, and material shall be secured.

1.4.8.1. Gate Access Requirements: IAW NAS Pensacola, FL base access requirements all personnel desiring unescorted access to NAS Pensacola, FL will enter the installation through an authorized Entry Control Point (ECP) and be vetted using the National Crime Information Center (NCIC) interstate Identification Index (III) via a DD 5512 vetting form. The Installation Commander will, in the absence of a waiver deny uncleared contractor, subcontractor and visitors unescorted access to the installation based on the results of the NCIC-III check that contains credible derogatory information.

Such derogatory information includes, but is not limited to the following:

1.4.8.1.1. Access Denial Waiver Process: In case where unclear contractor or subcontractor are denied access based on derogatory information obtained from an NCIC or NCIC III check, the Installation Commander shall offer an Access Denial Wavier Application packet only if the individual request a waiver.

1.4.8.2. Access to Secure Facilities: Special requirements are required to gain access to a secure facility including but not limited to being a US Citizen or documented legal resident alien. Access to secure facilities on NAS Pensacola, FL and Building 633 requires coordination with the Contracting Officer’s Representative. Requests for access must be filed 15 days in advance in order to obtain necessary clearances. The Contractor shall provide all required personal data on personnel requiring access with the application. Upon completion of work the contractor shall surrender all issued security passes. Final contract payment will be withheld until all passes have been returned. The contractor is required to work with the Contracting Officer's Representative to meet the individual security requirements for that facility in order to gain access. The normal processing time for access is approximately 14 calendar days from the receipt of a complete vetting form (FD 190-13). Vetting forms must be legible. Incomplete or illegible forms will be returned to the contractor for resubmission and will delay access to the installation.

1.4.8.3. Anti-terrorism Security Requirements: The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government Technical POC). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.4.8.4. Defense Biometric Identification System (DBIDS): DBIDS increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point. If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:

• Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center representative.

• The Visitor Control Center (VCC) will pull up your information in the computer, ensuring all information is current and correct.

• Once your information is validated, a temporary DBIDS credential is provided.

• Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 180 days).

• For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.

• The representative will enter base access authorization and then you may proceed to work.

If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:

• Present a letter or official document from my government sponsoring organization that provides the purpose for your access.

• Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

• Present a completed copy of the SECNAV 5512/1 form to obtain your background check.

• Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.

• You may now proceed to base.

For additional questions about obtaining a DBIDS card, contact your local base visitor control center.

1.4.9. Special Qualifications: Contractor shall provide technician with the following skills:

Technician qualifications:

Technical personnel must be fully qualified and certified to perform installation, maintenance, and repair services in accordance with the standards established by the equipment manufacturer.

Required Certifications Include:

1. Lenel Federal Government VAR Certification – Lenel certification shall be current and shall be maintained as current throughout the life of the contract.

Contractor shall provide Lenel Federal Government VAR Certificated as part of the offer.

1.4.10. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

These meetings shall be at no additional cost to the government.

1.4.11. Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract;

perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.4.12. Key Personnel: The following contractor personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer by the contract start date. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0900 – 1700 Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Key personnel are listed below:

Project Lead/Supervisor: Within 5 days after contract award the Contractor shall provide the Contracting Officer & the Contracting Officer’s Representative (COR) in writing the name of the assigned Supervisor who will be responsible for ensuring that the requirements of the contract are performed. The Supervisor will oversee the quality of work and be the point of contact for the authorized government representative (COR).

1.4.13. Identification of Contractor Employees: When contractor personnel perform the services required in this contract on a Government installation they are required to possess and wear an identification badge that displays his or her name and the name of the Company. The contractor shall ensure that contractor personnel identify themselves as contractors when attending meetings, answering Government telephones, providing any type of written correspondence, or working in situations where their actions could be construed as official Government acts.

They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.4.14. Contractor Travel: N/A

1.4.15. Other Direct Costs N/A

1.4.16. Data Rights: The Government has unlimited rights to all documents/material produced under this contract.

All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

Not Applicable. This requirement will not utilize Contactor Technical data or data rights as defined by FAR Subpart 27.4.

1.4.17. Organizational Conflict of Interest (OCI): The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.16. Safety. The contractor shall follow all safety regulations and other appropriate safety rules at all times while performing under the contract. The contractor shall ensure safe operations at all NASC venues, offices, and all other facilities.

14.17. Occupational Safety and Health Agency (OSHA) Compliance. The contractor shall comply with all OSHA and other regulatory requirements.

PART 2

DEFINITIONS & ACRONYMS

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.10. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.11. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.1.13. ACRONYMS:

AT Antiterrorism ATO Antiterrorism Officer CAC Common Access Card CDR Contractor Discrepancy Report CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer NDA Non-disclosure Agreement OCI Organizational Conflict of Interest ODC Other Direct Costs OPSEC Operations Security PIPO Phase In/Phase Out POC Point of Contact PoP Period of Performance PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QC Quality Control QCP Quality Control Plan TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will remove and dispose of all existing equipment, provide personnel to unlock doors, access panels, electrical panels, and password, as needed.

3.2. Facilities: No facilities, workspaces, or storage space will be provided.

3.3. Utilities: The Government will provide all utilities in the facility where the services are being performed.

3.4. Equipment: No equipment will be provided.

3.5. Materials: No Materials will be provided.

3.6. Return of Government Furnished Items: N/A

3.7. Missing, Stolen, Lost, and Recovered Property: N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all supplies, equipment, services and Project Lead required to perform work under this contract.

4.2. Equipment: The Contractor shall furnish all equipment, material and equipment required to perform work under this contract.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, and other items and/ or services necessary to provide and install stand-alone ACS systems in BLDGs 633, 4142, and 3828 IAW the building layouts/specifications and as defined in the PWS. The contractor shall perform to the standards in this contract and IAW the PWS, specifications/layouts, Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, UFC 4-021-02 Electronic Security Systems (ESS), Federal Government Advanced Encryption Standard (AES) and all applicable National Fire Protection Association (NFPA) codes with an emphasis on NFPA 80 “Fire Doors and Other Opening Protectives” and NFPA 101 “Life Safety Code” and all other safety, security, and building codes/regulations.

The Contractor shall provide full system test function for all systems/equipment, training annual service and maintenance plan.

5.2. Annual Service Maintenance services. The Contractor shall provide annual preventive maintenance for the stand-alone ACS systems in BLDGs 633, 4142, and 3828 and equipment/parts, software upgrades as required and any other items and services described herein.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule

7.3. https://www.nfpa.org/Codes-and-Standards/All-Codes-and-Standards/List-of-Codes-and-Standards

7.4. https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Element

Performance Requirement

Surveillance Method

Frequency Acceptable Quality Level

Part 5 Specific Tasks

The contactor shall install all Access Control Systems equipment and

IAW PWS 5.1

Inspection by the COR or Technical Representative

The contractor shall ensure system/equipment is 100% operational within 60 days.

100% inspection

The contactor shall perform system verification testing and orientation/system training. PWS 5.1

Inspection by the COR or Technical Representative

Upon completion of equipment installation

The contactor shall provide annual maintenance check/service. PWS 5.2

Inspection by the COR or Technical Representative

Upon completion of equipment installation

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

1.4.7. List of Technical

Personnel information

15 Days prior to commencement of work

1 Copy By email Technical

POC

Deliverable Frequency # of Copies Medium/Format Submit To

1.4.10. Project

Lead/Supervisor

Contract Start Date 1 Copy By email Technical

POC

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-AUG-2023 TO

31-JUL-2024

N/A NAVAL AVIATION SCHOOLS COMMAND

JOHN CRAWFORD

NAVAL AVIATION SCHOOLS OF

COMMAND

181 CHAMBERS AVENUE

SUITE C BLDG 633

PENSACOLA FL 32508

931-624-2372 FOB: Destination

N62229

0002 POP 01-AUG-2023 TO

31-JUL-2024

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 01-AUG-2023 TO

31-JUL-2024

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 01-AUG-2024 TO

31-JUL-2025

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-AUG-2025 TO

31-JUL-2026

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-AUG-2026 TO

31-JUL-2027

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-AUG-2027 TO

31-JUL-2028

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY FULL TEXT

THE FOLLOWING NAVSUP LOCAL TEXT IS HEREBY MADE PART OF THE STATEMENT OF

WORK/PERFORMANCE WORK STATEMENT.

AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER

(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.

(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.

(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is:

NAME: FLCJ Contracting Officer ADDRESS: BLDG 110 Yorktown Ave, Jacksonville FL 32212 EMAIL: cynthia.ortiz21.civ@us.navy.mil

SUPTXT204-9400(4-22) CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED

FACILITIES, SENSITIVE INFORMATION, INFORMATION TECHNOLOGY SYSTEMS OR PROTECTED

HEALTH INFORMATION

The following shall be inserted in full text in all solicitations and contracts (including commercial acquisitions) which require contractor unclassified access to federally controlled facilities, sensitive information, Information Technology (IT) systems or protected health information. For commercial acquisitions, this text shall be incorporated into either the SOW or PWS.

The security text does not apply in cases where the contractor/vendor does not have access to Navy Marine Corps Intranet (NMCI) computers, is not issued a Common Access Card (CAC) and is involved in training or other short term duties of less than 30 days duration that allow for the use of a visitor request. In these cases, the government employee must submit a Visitor Access Request (VAR) to the main gate or applicable processing entity for your facility and assume responsibility to escort those without CAC Credentials.

This local text does not apply to non-United States (U.S.) Nationals (foreign nationals) who are contactor employees performing work overseas. The local text is applicable to the U.S. Nationals living in the U.S. or overseas who are performing work on a Navy contract.

The investigation of a non-U.S. national at a foreign location must be consistent with a National Agency Check with Written Inquiries (NACI), to the extent possible and include a fingerprint check against the Federal Bureau of Investigation (FBI) criminal history database, an FBI investigations file (name check) search and a name check against the terrorist screening database. Also, the above cited reference notes that Foreign Nationals may not be granted CAC credentials until completion of their investigation and not in the interim.

Per Department of Defense Memorandum (DoDM) 5200.2, Department of Defense (DoD) components must initiate and ensure completion of a background investigation before applying the credentialing standards to a non-U.S.

national at a foreign location. The background investigation must be favorably adjudicated before a CAC can be issued to a non-U.S. national at a foreign location. The type of background investigation may vary based on standing reciprocity treaties concerning identity assurance and information exchanges that exist between the U.S. and its allies or agency agreements with the host country.

CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE

INFORMATION, IT SYSTEMS OR PROTECTED HEALTH INFORMATION

Executive Order 13467, Reforming Processes Related to Suitability for Government Employee, Fitness for Contractor Employees and Eligibility for Access to Classified National Security Information, Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The 5 CFR 32 Part 157 in concert with DoD Manual 1000.13, Vol 1, implements the Federal Standards.

APPLICABILITY

This text applies to all DoD sponsored individuals who require CAC eligibility (or login and P/W if acceptable per contract) for: Physical access to DoD facilities or non-DoD facilities on behalf of DoD; Logical access to information systems (whether on site or remotely); or remote access to DoD networks that use only the CAC logon for user authentication, or access to sensitive and protected information. This applies to the Office of the Secretary of Defense (OSD), the Military Departments, the Office of the Chairman of the Joint Chiefs of Staff and the Joint Staff, the Combatant Commands, the Office of the Inspector General of the DoD, the Defense Agencies, the DoD Field Activities and all other organizational entities within the DoD (hereinafter referred to collectively as the "DoD Components").

Each contractor employee providing services at a Navy command under this contract is required to obtain a DoD CAC. Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.

ACCESS TO FEDERAL FACILITIES

Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command's Security Manager (CSM) upon arrival to the command and shall out-process prior to their departure at the completion of the individual's performance under the contract.

START-UP PERIOD

All contractor resource onboarding documents must be submitted via the prime contractor. The prime contractor shall make all necessary preparations to assume full responsibility for productive performance as of the performance start date.

Definition of "productive":

a. Visit Authorization Request (VAR)

b. Contractor Information Sheet (CIS)

c. FD-258 Fingerprint Card

d. Completed Electronic Investigation (EQIP)

e. All contractor resource(s) must have an active Joint Personnel Adjudication System (JPAS) profile

f. Common Access Card(CAC)

Note (1): Invoicing by the contractor will begin as of the commencement of the performance period of services and no reimbursement will be paid by the government for efforts expended during the start-up period.

Note (2): Foreign Nationals are not allowed access to the functional/system side of Enterprise Resource Planning

(ERP).

ACCESS TO DOD INFORMATION TECHNOLOGY (IT) SYSTEM

In Accordance With (IAW) Secretary of the Navy (SECNAV) M-5510.30, contractor employees who require access to Department of the Navy (DoN) or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to sensitive information. Sensitive information includes information protected under the Privacy Act, to include PHI. All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT- II. IT Levels are determined by the requiring activity's Command Information System Security Manager (ISSM)/Information Assurance Manager (IAM).

Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation, which is a higher level investigation than the National Agency Check (NAC) with Law and Credit (NACLC)/T3/T3R described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required.

Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance (IA) Technical Level 1, and must be trained and certified on the Operating System (OS) or Computing Environment (CE) they are required to maintain.

Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee's duties, such employees shall in-process with the Navy CSM and ISSM/IAM manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual's performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy IT resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the Contracting Officers Representative (COR) shall sign the SAAR-N as the supervisor.

The SAAR-N shall be forwarded to the CSM at least thirty (30) days prior to the individual's start date. Failure to provide the required documentation at least thirty (30) days prior to the individual's start date may result in delaying the individual's start date.

When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Cyber Awareness training, and maintain a current requisite background investigation. The contractor's security representative shall contact the CSM for guidance when reinvestigations are required.

INTERIM ACCESS

The CSM may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.

DENIAL OR TERMINATION OF ACCESS

The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.

CONTRACTOR'S SECURITY REPRESENTATIVE

The contractor shall designate an employee to serve as the contractor's security representative. Within three (3) work days after contract award, the contractor shall provide to the requiring activity's Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the contractor's security representative. The contractor's security representative shall be the primary point of contact on any security matter.

The contractor's security representative shall not be replaced or removed without prior notice to the Contracting Officer and CSM.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR

CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE

DUTIES

Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non- Critical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and PHI, provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions.

At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:

- SF-86 Questionnaire for National Security Positions (or equivalent Office of Personnel Management (OPM) investigative product)

- Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission

- Original Signed Release Statements Failure to provide the required documentation at least thirty (30) days prior to the individual's start date shall result in delaying the individual's start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than ten (10) years) throughout the contract performance period. The contractor's security representative shall contact the CSM for guidance when reinvestigations are required.

Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the CSM upon arrival to the command and shall out-process prior to their departure at the completion of the individual's performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy command's ISSM/IAM. Completion and approval of a SAAR-N form is required for all individuals accessing Navy IT resources. The SAAR-N shall be forwarded to the Navy CSM at least thirty (30) days prior to the individual's start date. Failure to provide the required documentation at least thirty (30) days prior to the individual's start date shall result in delaying the individual's start date.

The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Cyber Awareness training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the CSM. The CSM will review the submitted documentation for completeness prior to submitting it to the OPM; Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The CSM will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.

If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a VAR via the JPAS or a hard copy VAR directly from the contractor's security representative. Although the contractor will take JPAS owning role over the contractor employee, the Navy command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract.

The contractor shall include the IT position category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee's performance under the contract.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR

CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES

Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:

- Must be either a U.S. citizen or a U.S. permanent resident with a minimum of 3 years of legal residency in the U.S. (as required by the Deputy Secretary of Defense DTM 08-006 or its subsequent DoD Instruction (INST)) and

- Must have a favorably completed NACI or T1 investigation equivalent including a FBI fingerprint check prior to installation access.

To be considered for a favorable trustworthiness determination, the CSR must submit for all employees each of the following:

- SF-85 Questionnaire for Non-Sensitive Positions

- Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

- Original Signed Release Statements

The contractor shall ensure each individual employee has a current favorably completed NACI or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM.

Failure to provide the required documentation at least thirty (30) days prior to the individual's start date may result in delaying the individual's start date.

* Consult with your CSM and ISSM/IAM for local policy when…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .