2.02 Attachment II Price Proposal Form N6264926RA012.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
WORK BOAT LARGE-1 (WBL-1) OVERHAUL, YOKOSUKA, JAPAN
Solicitation number
N6264926RA012
Issued by

About this file

This file is a Price Proposal Form for a naval vessel maintenance contract. The solicitation (N6264926RA012) involves an overhaul of Work Boat Large-1 (WBL-1) for Commander, Fleet Activities Yokosuka (CFAY), with a performance period from 31 March 2026 to 30 September 2026. The contract is specifically for maintenance work to be performed at a contractor's facility in Japan, and is restricted to firms authorized to operate in Japan and possessing an active U.S. MSRA/ABR as a Prime Contractor.

Key submission details include a proposal deadline of 21 January 2026 at 10:00 AM Japan Standard Time, with potential offerors required to request access to the detailed work specification package by 8 January 2026 via email. The pricing template is structured to capture labor hours, labor costs, material costs, and other direct costs (ODCs), with specific tabs for breaking down in-house and sub-contractor labor contributions. Notably, the solicitation emphasizes compliance requirements such as hazardous material identification and potential sea transportation specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA012CLIN 0001(1 SOW)0¥0¥0¥0¥0
SHIP NAME:WORK BOAT LARGE#1 (WBL-1)0¥0¥0¥0¥0
AVAILABILITY:Statement of Work (SOW) (POP: 31 March 2026 through 30 September 2026)Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)1Total Evaluated Price¥0
Growth CLIN %
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.SOW No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
1N6105426RCPR101-0WBL-1 (46WB1501) Overhaul000¥0¥0¥0¥0
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_N6105426RCPR101-0

SHIP NAME/AVAILABILITY:WORK BOAT LARGE#1 (WBL-1) - SOW (POP 31MAR2026 TO 30SEP2026)TGI 1_N6105426RCPR101-0 SUMMARY
SOLICITATION #:N6264926RA012
CFAY SOW #:1_N6105426RCPR101-0In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:WBL-1 (46WB1501) Overhaul00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .