2.01 Attachment II Price Proposal Form N6264926RA046.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
USS MCCAMPBELL (DDG-85) CONTINUOUS MAINTENANCE (6CM), YOKOSUKA, Japan
Solicitation number
N6264926RA046
Issued by

About this file

This is a Price Proposal Form for solicitation N6264926RA046 regarding maintenance and repair services for the USS MCCAMPBELL (DDG-85) at Yokosuka Naval Base, Japan. The form is designed to capture labor costs (both in-house and sub-contractor man-hours), material costs, and Other Direct Costs (ODCs) for three Technical Group Items (TGIs) across two Contract Line Items (CLINs): CLIN 0001 covering three TGIs and CLIN 0002 serving as a growth CLIN. The three specific work items listed are F/O - Accomplish Lube Oil Flush of No. One MRG (4-174-0-E), F/O - Replace Nonskid System on 02 Level Catwalk Area Port, and F/O - Replace Deck Covering in 1-268-0-C. All pricing is to be provided in Japanese Yen (JPY).

The template requires offerors to input data in highlighted orange cells, including labor hour breakdowns by skill category (Shipfitter, Insulator, Welder, Sheet Metal Worker, Rigger, Painter, Electrician, Pipefitter, Quality Assurance, and Others), number of personnel, hours per day, number of days, and cost per man-hour. The form automatically links summary totals from detailed TGI tabs. Offerors must be duly authorized to operate in Japan with an active U.S. MSRA/ABR certification as a Prime Contractor and must submit proposals by 17 April 2026 at 10:00 AM Japan Standard Time. The period of performance runs from 20 May 2026 to 31 July 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA046CLIN 0001(3 TGIs)0¥0¥0¥0¥0
SHIP NAME:USS MCCAMPBELL (DDG-85)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:Emergent Maintenance (6EM) and Continuous Maintenance (6CM)Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)3Total Evaluated Price¥0
Growth CLIN %0.00%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
138CGA24101-A01_T08F/O - ACCOMPLISH LUBE OIL FLUSH OF NO. ONE MRG, 4-174-0-E000¥0¥0¥0¥0
238CGA15303-A01F/O - REPLACE NONSKID SYSTEM ON 02 LEVEL CATWALK AREA PORT000¥0¥0¥0¥0
338CGA65405-A01F/O - REPLACE DECK COVERING IN 1-268-0-C000¥0¥0¥0¥0
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_38CGA24101-A01_T08

SHIP NAME/AVAILABILITY:USS MCCAMPBELL (DDG-85) - Emergent Maintenance (6EM) and Continuous Maintenance (6CM)TGI 1_38CGA24101-A01_T08 SUMMARY
SOLICITATION #:N6264926RA046
SRF-JRMC TGI #:1_38CGA24101-A01_T08In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - ACCOMPLISH LUBE OIL FLUSH OF NO. ONE MRG, 4-174-0-E00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

2_38CGA15303-A01

SHIP NAME/AVAILABILITY:USS MCCAMPBELL (DDG-85) - Emergent Maintenance (6EM) and Continuous Maintenance (6CM)TGI 2_38CGA15303-A01 SUMMARY
SOLICITATION #:N6264926RA046
SRF-JRMC TGI #:2_38CGA15303-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPLACE NONSKID SYSTEM ON 02 LEVEL CATWALK AREA PORT00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

3_38CGA65405-A01

SHIP NAME/AVAILABILITY:USS MCCAMPBELL (DDG-85) - Emergent Maintenance (6EM) and Continuous Maintenance (6CM)TGI 3_38CGA65405-A01 SUMMARY
SOLICITATION #:N6264926RA046
SRF-JRMC TGI #:3_38CGA65405-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPLACE DECK COVERING IN 1-268-0-C00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .