2-Composting Facility Operator-Bid Form.pdf

PDF 108 KB Posted

Attached to
Organics Composting Facility Operator and Operational Advisory Services - DCSWA Transfer Station 1
Solicitation number
US.263039
Issued by
Delaware County, Pennsylvania

About this file

This is a bid form for the Delaware County Solid Waste Authority (DCSWA) soliciting proposals for an organics composting facility operator to provide operational planning, design advisory services, commissioning, startup, stabilization, and ongoing operations at DCSWA Transfer Station 1 in Chester Township, Pennsylvania. The project, funded by a $5 million Solid Waste Infrastructure for Recycling (SWIFR) Grant from the U.S. Environmental Protection Agency (EPA) awarded to the Delaware County Office of Sustainability, aims to expand local organic-material processing capacity and increase diversion of organic materials from disposal. The facility will process source-separated food waste, yard waste, and other approved organic materials using an aerated static pile (ASP) or comparable active-aeration composting process. The initial design operating capacity is 50 tons per day with potential future expansion up to 150 tons per day, operating 260 days annually for 8 hours per day. The contract term is three years of long-term operating services plus two optional one-year extensions, with the initial year covering pre-construction and implementation services including operational planning, engineering and design advisory, operation plan preparation, construction support, commissioning and startup, and initial stabilization.

The bid form requests pricing for pre-construction services on an hourly or lump-sum basis, with estimated quantities including 20 hours for operational planning, 40 hours for engineering and design advisory, 1 lump-sum operation plan, 80 hours for construction support, 90 days for commissioning and startup, and 120 days for initial stabilization. Long-term operating services pricing is structured with a monthly base fee and per-ton processing fees for years one through three, with year one and two based on 50 tons per day and years three through five (optional) increasing to 100 and 150 tons per day respectively. Additional unit prices and optional services are requested for on-site supervisor and equipment operator hourly rates, compost support personnel, food waste inspection and processing, residual contamination handling, yard waste processing with grinding, subcontractor markups, and a Chester Township drop-off program. Bidders are required to identify any services, materials, equipment, or other costs excluded from their proposals.

View the file

Other files

File Type Posted
1-Composting Facility Operator RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DELAWARE COUNTY SOLID WASTE AUTHORITY

TRANSFER STATION 1 ORGANICS COMPOSTING FACILITY

OPERATOR AND OPERATIONAL ADVISORY SERVICES - BID FORM

1. BIDDER INFORMATION

Item Proposer Information

Company Name

Address

Telephone / Email

2. PRE-CONSTRUCTION / IMPLEMENTATION SERVICES

Bid Item Basis Estimated Qty.

Unit Price

Extended Price

Operational Planning / Pre-Construction Advisory

Hourly 20

Engineering & Design Advisory Services

Hourly 40

Preparing Operation Plan Lump Sum

Construction Support / Operational Readiness

Hourly 80

Commissioning and Startup Per Day 90 days

Initial Stabilization Per Day 120 days

SUBTOTAL

3. LONG-TERM OPERATING SERVICES (After Start Up and Stabilization)

Service Year Monthly

Base Fee

Per Ton Fee

Processing Material

Annual Tons/Day

Intake

Comparison Total

Long-Term Facility Operations

Year 1 50

Long-Term Facility Operations

Year 2 50

Long-Term Facility Operations

Year 3 100

Long-Term Facility Operations

Optional Year 4

Long-Term Facility Operations

Optional Year 5

TOTAL

Pricing Assumption DCSWA Bid Basis Initial design operating capacity 50 tons/day

Potential future capacity Up to 150 tons/day

Annual Days Opened 260 days

Normal Operating hours/day 8 hours/day

Operating Term 3 years + two 1-year extensions

Feedstocks Food waste, yard waste, source-separated organics and other approved organics

Primary process Aerated static pile (ASP) or comparable system

Engineering/design responsibility Separate Design Consultant; Operator provides operational/design input

Monthly Base Fee Management, baseline staffing, administration, reporting, and other costs that continue regardless of tonnage, per RFP

Per Ton Processing Material Receiving material, inspection, mixing, composting, curing, screening, testing, and finished product handling per RFP

Contamination Fee Dispose of contaminated material at Transfer Station- No disposal Cost

Grinding Brush and Woody Yard Waste

Include grinder operator, support equipment, fuel and routine maintenance.

4. REQUIRED ADDITIONAL UNIT PRICES / OPTIONAL SERVICES

Cost Item Pricing Unit Unit Price Conditions /

Notes

On-Site Supervisor Hourly

On-Site Equipment Operator Hourly

On-Site Compost Support Personnel Hourly

Food Waste Inspection/Processing Per Ton

Residual Contamination handling / disposal Per Ton

Yard Waste Processing - Grinding Per Ton

Yard Waste Processing – Grinding % Mark up on Subcontractor

Chester Township Drop Off Program (include hauling, container rental, washing and replacement)

Per Container

5. LIST ANY SERVICES, MATERIAL, EQUIPMENT OR OTHER COST EXCLUDED FROM THIS

PROPOSAL.