1-Composting Facility Operator RFP.pdf

PDF 274 KB Posted

Attached to
Organics Composting Facility Operator and Operational Advisory Services - DCSWA Transfer Station 1
Solicitation number
US.263039
Issued by
Delaware County, Pennsylvania

About this file

This is a Request for Proposals (RFP) issued by the Delaware County Solid Waste Authority (DCSWA) in partnership with the Delaware County Office of Sustainability (DCOS) for an Organics Composting Facility Operator to provide operational planning, design advisory services, commissioning, startup, stabilization, and ongoing operations of a food waste and yard waste composting facility located at DCSWA Transfer Station 1 in Chester Township, Pennsylvania. The selected operator will serve a one-year operational planning and design advisory phase beginning February 1, 2027, followed by three years of ongoing facility operations with a one-year possible extension. The facility will be a medium-scale commercial operation with an initial processing capacity of approximately 50 tons per day, expandable to 150 tons per day, utilizing an aerated static pile (ASP) or comparable active-aeration composting process for source-separated food waste and yard waste from local residential and commercial customers. The RFP was issued November 20, 2026, with site visits and questions accepted through December 18, 2026, proposals due December 29, 2026, selection scheduled for January 20, 2027, and contract award by February 1, 2027. A mandatory site visit to the proposed facility location is required prior to proposal submission.

The project is funded through a $5 million Solid Waste Infrastructure for Recycling (SWIFR) Grant from the U.S. Environmental Protection Agency, with the County approving work and issuing payments from the grant while DCSWA retains ownership and overall control. The RFP does not specify pricing terms or amounts in the available excerpts; proposers are required to submit completed bid forms with pricing schedules consistent with RFP assumptions. Evaluation criteria include Relevant Composting Operating Experience (25%), Technical/Process Expertise (20%), Proposed Operating Approach (20%), Design Advisory/Operability Approach (15%), Key Personnel/Comparable Projects/References (10%), and Cost/Overall Value (10%). The operator must comply with all applicable federal, state, county, and township requirements, including federal contract provisions associated with the SWIFR award, nondiscrimination requirements, labor standards, and domestic preferences. No incumbent operator or set-asides are identified in the RFP.

View the file

Other files

File Type Posted
2-Composting Facility Operator-Bid Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals (RFP)

DCSWA Organics Composting Facility Operator and Operational Advisory Services

1. PROJECT OVERVIEW

The Delaware County Solid Waste Authority (DCSWA) is soliciting proposals from qualified and experienced organics-processing operators to provide one (1) year of operational planning, design advisory, commissioning, startup, stabilization, and three (3) years of ongoing operation of a food waste and yard waste composting facility with a one (1) year possible extension. The facility is to be developed at DCSWA Transfer Station 1 on Incinerator Road in Chester Township, Pennsylvania.

The project is a partnership between Delaware County Office of Sustainability (DCOS), who was awarded a $5M Solid Waste Infrastructure for Recycling (SWIFR) Grant from the U.S. Environmental Protection Agency (EPA) and who will fund the facility development, and the DCSWA who will manage the project. The intent is to expand local organic-material processing capacity, increase diversion of organic materials from disposal, improve access to composting, support beneficial use of finished compost, and establish a reliable local organics-management system.

The proposed facility will be located at DCSWA’s existing transfer station at 10 Incinerator Rd, Chester, PA 19013. It will be a medium-scale commercial operation designed to process source-separated food waste, yard waste, and other organic materials sourced from local residential and commercial customers. Initial processing capacity of ~50 tons per day is planned, with potential future increases up to 150 tons/day as collection and diversion increase.

An aerated static pile ("ASP") or comparable active-aeration composting process will be used with the specific process technology, facility configuration, equipment, capacity, and operating systems to be determined through a separate engineering and design process that the selected vendor will participate and assist in developing.

2. PURPOSE AND OBJECTIVES

Through this RFP, DCSWA and the County seek to retain an experienced composting operator capable of providing practical, medium-scale commercial operational expertise throughout the planning, development, and operation of the proposed facility. The selected Proposer will be expected to help DCSWA establish an operating model that is safe, efficient, environmentally responsible, financially sustainable, and capable of expanding as the volume of organic materials increases.

During planning expected to begin in early 2027, the Operator will advise DCSWA and a separately procured Engineering/Design Consultant regarding the operational requirements of the facility. The Operator will assist in identifying appropriate process configurations, equipment, staffing, maintenance requirements, traffic flow, safety considerations, process controls, odor-management practices, and future expansion requirements.

The SWIFR grant has already been accepted by the County, therefore, DCSWA will be designing and permitting the facility in early 2027 with construction to begin as soon as bids can be obtained (late 2027). The selected Operator will take over the facility as soon as possible thereafter.

Following completion of the facility, the selected vendor will provide operating services for up to 5 years (one (1) planning year, three (3) years of operations and one (1) year extension). The Operator will be responsible for commissioning, startup, stabilization, and day-to-day operation of the facility. The Operator will be expected to establish effective operating procedures, manage incoming feedstocks, address contamination issues, maintain process control, produce finished compost and assist with marketing and finding beneficial uses, manage residuals, address odor and environmental issues, maintain equipment, train personnel, maintain records, and provide performance reports to DCSWA.

The SWIFR grant includes 5 years of organics collection services for Chester Township, PA using self-serve commercial containers at locations in the township that have yet to be determined. The Composting Operator shall be responsible for servicing the designated food waste collection points located throughout Chester Township, including the collection and transportation of all collected material to the processing facility at DCSWA Transfer Station 1. Other Delaware County municipalities are beginning to offer curbside service and all the county residents can subscribe to private sector haulers. Attempts to obtain organics from these and other local sources is underway, and the selected Operator is expected to be an integral partner in finding more material.

The Operator will also be expected to support development and expansion of food and organics collection systems and marketing and beneficial use for finished compost and to identify opportunities for continuous improvement of facility performance.

3. RFP Proposal Submission Requirements Check List

Section Submittal Requirements

1. Qualifications & Experience

Describe the firm’s organizational structure, years in business, relevant capabilities, financial capacity, and experience providing composting or comparable organics-processing services. Identify at least one (1) comparable project. For each, provide facility location, size/capacity, technology/process, annual throughput, feedstocks, services performed, role of the Proposer, project dates, and references.

2. Proposed Approaches Describe the proposed approach to equipment commissioning, startup, initial feedstock introduction, process stabilization, operator training, performance testing, troubleshooting, and transition to routine operations. Describe the Proposer’s experience and proposed approach for compost product development, quality management, customer development, marketing, sales, distribution, beneficial use, and management of finished-product inventory.

3. Completed Bid Form Submit a completed DCSWA Cost Proposal/Bid Form attached in Appendix A and all required pricing schedules.

Pricing shall be consistent with the assumptions and requirements stated in the RFP. Bidders are encouraged to include a rate sheet with their proposal outlining anticipated costs, fees, and applicable unit rates associated with the services described in this RFP.

4. References Provide three (3) references for comparable project, including client name, contact person, telephone number, email address, project location, services performed, and dates of service. DCSWA may contact references as part of its evaluation.

5. Mandatory Site Visit Proposers shall schedule a mandatory site visit with Connor Reardon, Waste Diversion Manager at creardon@dcswa.net or (610) 892-9620 ext. 104 to inspect the proposed facility location prior to submitting a proposal. All questions regarding the RFP, including questions arising from the site visit, must be submitted through PennBid. Responses to questions will be provided through PennBid.

mailto:creardon@dcswa.net

4. PROJECT DELIVERY AND RESPONSIBILITIES

DCSWA and the County anticipate that the project will be delivered through separate contracts for Engineering/Design services and for facility operations. Subject to details being established between DCSWA and the County the selected vendors will be required to enter into contracts with both DCSWA and the County to comply with federal and local requirements, with the DCSWA approving the scope of work and the County issuing payments.

DCSWA will retain ownership and overall control of the project and facility. The DCSWA will be responsible for procurement, capital decisions, facility policies, final approvals, and contract administration. The County will approve of work and issue payments from the SWIFR grant. DCSWA will retain final authority regarding the acceptance of operational recommendations and the approval of the final facility design.

The Engineering/Design Consultant will be responsible for engineering calculations, plans and specifications, permitting, CQA, construction documents, professional engineering services, and Engineer-of-Record responsibilities.

The Operator will review work performed by the Engineering/Design Consultant and provide appropriate operational comments regarding the planning, engineering, and design phases and will provide commissioning, startup, stabilization, and ongoing operations to the extent included in the final contract. The Operator will review proposed designs from the standpoint of operability, maintainability, safety, staffing, process efficiency, equipment reliability, and other operational considerations. The Operator's review of design documents will constitute an operational review only and will not relieve the Engineering/Design Consultant of their professional engineering responsibilities.

5. SCOPE OF SERVICES

5.1 Operational Planning

The Operator shall assist DCSWA in establishing the operational requirements that should be incorporated into the design of the proposed facility. The Operator shall evaluate anticipated feedstock quantities and characteristics, seasonal variations, operating days and hours, peak throughput, receiving requirements, material storage, contamination management, bulking-material requirements, processing and mixing, aeration, curing, screening, finished-product storage and loading, residual management, staffing, equipment, maintenance, safety, odor management, process controls, and future expansion.

The Operator shall review all operational details and identify those that could materially affect the facility's capital & operating costs, site layout, equipment selection, staffing requirements, or future expansion capability. The Operator shall document these assumptions and provide recommendations to DCSWA and the Engineering/Design Consultant. The Operator's work under this task shall consist of an operational analysis and recommendations for improvement, and shall not constitute final engineering or design.

5.2 Engineering and Design Advisory Services

The Operator shall participate in meetings with the engineering and design consultants, DCSWA and the County as an expert in the field of compost operations and offer advisor input on all areas of the design. The Operator shall review design concepts and provide written recommendations concerning the ability of the proposed facility to be safely, efficiently, and economically operated.

The Operator's review shall address, as applicable, facility layout, process flow, receiving and tipping areas, feedstock storage, processing areas, aerated static pile configuration, curing areas, screening, contaminant removal, finished-product storage, traffic access & circulation, equipment selection & maintenance, safety, fire protection, odor control, utilities, facility controls & instrumentation, staffing, equipment reliability, redundancy, and provisions for future expansion.

DCSWA anticipates that the Operator will participate in design reviews at major milestones from conceptual to 30%-60%-90% design as established by DCSWA and the Engineering/Design Consultant and as needed. The Operator shall provide written comments and recommendations within time periods established by DCSWA.

The Operator shall identify potential operational conflicts, deficiencies, or inefficiencies that it believes should be addressed during each stage of design. DCSWA will retain final authority concerning whether recommendations are incorporated into the project, and the Engineering/Design Consultant will retain responsibility for final engineering and design.

5.3 Equipment Selection Support

The Operator shall provide operational input regarding the selection and configuration of major process and mobile equipment. The Operator's review shall provide written recommendations considering equipment capacity, reliability, maintainability, operator safety, accessibility, vendor support, spare-parts availability, lifecycle considerations, and compatibility with the proposed operating plan.

Equipment considered under this task may include receiving equipment, grinders, mixers, blowers, aeration systems, screening equipment, loaders, conveyors, controls, instrumentation, automation, and other major process equipment. The Operator shall identify equipment features or redundancies that it believes are necessary to support reliable facility operations.

5.4 Construction and Pre-Startup Support

The Operator shall provide routine on-site operational support during construction as requested by DCSWA. Such support may include participation in construction and coordination meetings, review of installed equipment and operational areas, identification of access or maintenance issues, pre-startup inspections, operational-readiness reviews, and input on punch-list development and inspection.

The Operator's participation during construction shall be limited to operational matters. Unless expressly authorized under the final contract, the Operator shall not be responsible for construction administration, construction inspection, engineering certification, or other professional engineering services.

5.5 Commissioning and Startup

The Operator shall assist DCSWA and the Engineering/Design consultant in commissioning and startup of the completed facility. The Operator shall draft a commissioning and startup plan within 90 days of project completion that provides for systematic testing of equipment and systems before the facility begins routine commercial operations.

The commissioning process shall include, as appropriate, equipment testing, dry and wet testing, controlled introduction of feedstock, verification of material flow, process monitoring, aeration optimization, temperature and moisture management, troubleshooting, operator training, and documentation of deficiencies and corrective actions. The startup plan will include a controlled ramp-up process that allows throughput to increase as operating personnel gain experience and the composting process becomes stable. The Operator shall identify conditions that must be satisfied before increasing throughput.

The Operator shall prepare a Commissioning and Startup Plan, appropriate startup checklists, and a Commissioning/Startup Report documenting the results of the startup process.

5.6 Initial Stabilization

Following startup, the Operator shall assist DCSWA in establishing stable commercial operation of the facility. The stabilization period shall be used to refine operating procedures, optimize feedstock recipes, establish process controls, verify staffing levels, implement preventive-maintenance procedures, monitor throughput and product quality, and address operational deficiencies.

The Operator shall document significant startup and stabilization issues and provide recommendations for corrective actions. At the conclusion of the stabilization period, the Operator shall provide DCSWA with a Stabilization Report summarizing facility performance and identifying any remaining construction or operational issues.

6. LONG-TERM FACILITY OPERATIONS

The Operator shall be responsible for the day-to-day operation and management of the completed facility in accordance with DCSWA requirements, applicable permits, approved operating procedures, and this RFP which will represent the scope-of-work covered in the final executed contract.

6.1 Receiving and Feedstock Management

The Operator shall manage the receipt of approved organic materials and shall implement DCSWA's established feedstock acceptance criteria. The Operator shall inspect all incoming loads, identify contamination, direct unloading, maintain receiving areas, document rejected loads, and maintain records sufficient to track incoming materials by source and material type. The Operator’s inspection process will include methods to appropriately reject contaminated loads and materials and identify and contact the generator (when possible).

The Operator shall manage feedstock storage and handling in a manner that minimizes operational, environmental, odor, and safety risks. The Operator shall also manage bulking materials and establish appropriate procedures for blending and preparation of feedstocks for composting.

6.2 Composting Operations

The Operator shall manage the composting process from feedstock preparation through completion of the finished products. Operations shall include grinding and/or size reduction, mixing, formulation of feedstock recipes, addition of bulking materials, construction and management of composting piles, aeration, temperature and moisture monitoring, curing, screening, and preparation of finished compost.

The Operator shall maintain process conditions necessary to produce a stable and marketable finished product and shall adjust operating procedures as necessary based on feedstock characteristics, seasonal conditions, process monitoring, product-quality results, and customer preferences.

6.3 Finished Compost

The Operator shall manage finished compost from completion of the composting process through storage, testing, marketing, sale, distribution, or beneficial use. The Operator shall maintain appropriate product-quality records and shall coordinate with DCSWA regarding the use of finished compost at County facilities, parks, or other approved locations.

The Operator shall develop and maintain reliable end markets and make all reasonable efforts to generate finished compost products that promote the sale and/or reuse and maximize diversion.

The Operator shall provide DCSWA with information concerning market demand, inventory, pricing, sales, and beneficial-use opportunities.

6.4 Residuals

The Operator shall identify, manage, and quantify contaminants, rejected loads, and other process residuals in accordance with applicable requirements and DCSWA procedures. The Operator shall maintain records of residual quantities and disposition and shall provide DCSWA with monthly reports on residuals. The Operator will load and/or deliver removed contaminants to Transfer Station 1 where DCSWA will accept and dispose of materials.

7. OPERATIONS MANAGEMENT

7.1 Draft Operating Plan — Prior to submitting Permit Application

The Operator will prepare a Draft Operating Plan (“Plan”) within 30 days of contract execution with DCSWA and review it with staff and the Engineering/Design Consultant. The draft should establish and account for:

• Establish rates for inbound and outbound products

• Operating hours/days and staffing levels

• Daily startup and shutdown procedures

• Acceptable feedstocks (and percentages of each)

• Feedstock acceptance/rejection criteria

• Contamination limits

• Receiving and weighing procedures

• De-packaging/pre-processing procedures

• Mixing/blending requirements and ratios

• Loading processes and rates

• Composting process parameters

• Aeration requirements

• Moisture management

• Temperature monitoring

• Leachate management

• Odor-control procedures

• Screening and curing processes

• Finished-product management

• Equipment inspection and preventive maintenance

• SCADA and/or manual control procedures

• Alarm, Emergency, and Spill/fire response procedures

• Environmental monitoring, recordkeeping, and reporting

• Regulatory compliance procedures

• Quality-control procedures

The key is that these are proposed operating requirements, not necessarily assumed final settings.

7.2 Staffing

The Operator shall provide a written staffing plan identifying the personnel necessary to safely and effectively operate the facility. The plan shall identify management, supervisory, operating, maintenance, environmental/compliance, administrative, and other personnel required for the proposed operation based on scheduled weekly operating hours.

7.3 Operations Manual and Standard Operating Procedures

The Operator shall prepare and maintain an Operations Manual containing standard operating procedures necessary for safe, consistent, and efficient facility operation and be in alignment with the Draft Operating Plan. The Procedures shall address receiving, load inspection, contamination management, processing, mixing, compost-pile construction, aeration, temperature and moisture monitoring, curing, screening, finished-product handling, cleaning, maintenance, odor response, fire and elevated-temperature response, equipment failure, emergency shutdown, severe weather, and incident reporting.

The Operations Manual shall be maintained throughout the contract term and updated annually and as operating conditions, equipment, procedures, or regulatory requirements change.

7.4 Maintenance

The Operator shall establish and implement a written preventive-maintenance program with reviewable records for facility equipment and systems under the Operator's responsibility. The program shall provide for routine inspection, preventive maintenance, cleaning, lubrication, corrective maintenance, spare-parts management, vendor coordination, warranty coordination, equipment downtime tracking, and maintenance recordkeeping.

The Operator shall immediately notify DCSWA of equipment failures or maintenance conditions that could materially affect facility operations. Capital repairs, major equipment replacement, and other expenditures designated as capital by DCSWA shall be subject to the approval requirements established in the final agreement.

8. SAFETY, ENVIRONMENTAL, AND ODOR MANAGEMENT

The Operator shall review all regulatory requirements and maintain a written comprehensive safety and environmental-management program with reviewable records designed to protect employees, visitors, the public, the facility, and the surrounding environment. The program shall address hazards associated with heavy equipment, vehicle traffic, dust, biological materials, chemical exposure, elevated temperatures, fire, odors, vectors, and emergency situations.

The Operator shall provide appropriate training, maintain required records, investigate incidents, implement corrective actions, and operate the site in compliance with all applicable regulations.

The Operator shall immediately notify DCSWA of significant safety or environmental incidents in accordance with procedures established in the final contract.

The Operator shall also develop and implement an Odor Management Plan appropriate for the facility and its surrounding environment. The plan shall establish preventive operating practices, monitoring procedures, complaint-response procedures, documentation requirements, and corrective actions. Any odor events and/or odor complaints shall be promptly reported to DCSWA.

9. COMPOST QUALITY AND MARKETING

The Operator shall establish and maintain a written quality-control program designed to produce consistent, stable, and marketable finished compost. The program shall address feedstock quality, process controls, temperature, moisture, process duration, maturity, sampling, laboratory testing, product specifications, recordkeeping, and corrective action.

Final product specifications shall be established by DCSWA in accordance with applicable regulatory requirements and the intended markets for the finished product.

The Operator shall develop a marketing strategy for finished compost and shall demonstrate its experience developing markets for compost or similar products. The strategy shall address potential municipal, landscaping, nursery, agricultural, retail, wholesale, institutional, and other approved markets. The Operator shall also address management of seasonal fluctuations and excess finished-product inventory.

10. DATA, REPORTING, AND PERFORMANCE

The Operator shall establish and maintain a data-management and reporting system sufficient to allow DCSWA to evaluate facility performance and comply with applicable grant, regulatory, and reporting requirements.

At a minimum, the Operator shall track incoming material quantities and sources, feedstock types, contamination, rejected loads, tons processed, finished compost production, residuals, finished-product inventory, compost sales and beneficial use, equipment operating hours, maintenance, labor, utilities, odor complaints, safety incidents, and environmental incidents.

The Operator shall submit monthly operating reports to DCSWA and shall provide an annual performance summary. DCSWA expects to establish performance measures addressing throughput, diversion, contamination, product quality, odor, equipment availability, safety, regulatory compliance, operating costs, and reporting.

Final performance standards, key performance indicators, reporting requirements, and remedies for failure to meet applicable standards will be established in the final agreement.

11. REGULATORY AND GRANT COMPLIANCE

The Operator shall perform all activities and services in compliance with all applicable federal, state, County, and Township requirements and with all permits and approvals applicable to the facility. The operator shall also provide all certifications, disclosures, affidavits, conflict-of-interest statements, debarment or suspension certifications, and other forms required by DCSWA, the County, or SWIFR grant requirements.

Federal Grant Requirements. Because this project is funded in part through an EPA Solid Waste Infrastructure for Recycling (SWIFR) grant, the Operator shall comply with all applicable federal laws, regulations, executive orders, grant conditions, and federal contract provisions incorporated into or applicable to the SWIFR award. The Operator shall comply with all applicable requirements identified by DCSWA, Delaware County, the U.S. Environmental Protection Agency, or other authorized federal agencies, including requirements governing procurement, labor standards, domestic preferences, environmental compliance, nondiscrimination, recordkeeping, reporting, and audit access, to the extent applicable to the services provided under this contract. The Operator shall provide all certifications, documentation, records, and other information reasonably required to demonstrate compliance and shall cooperate with DCSWA and Delaware County in connection with federal monitoring, inspections, audits, and grant reporting. Any applicable federal requirements included in the SWIFR award or Federal Contract Provisions shall be incorporated into the final contract and shall apply to the Operator and its subcontractors, as applicable.

The final RFP and contract will include applicable federal contract provisions associated with the SWIFR award.

12. FUTURE EXPANSION AND PROGRAM IMPROVEMENT

The Operator shall assist DCSWA in evaluating future expansion of the facility as organic-material diversion increases. The Operator shall provide operational recommendations concerning increased throughput, staffing, equipment, receiving capacity, processing capacity, composting and curing capacity, screening, finished-product storage, sale and re-use of materials, traffic, utilities, site and facility maintenance, and operating costs while participating in meetings and decisions.

The Operator shall also evaluate and report on facility performance quarterly and identify opportunities to improve efficiency, reliability, product quality, diversion, odor control, labor utilization, equipment availability, and operating costs.

13. TRANSITION

At the conclusion of the contract, the Operator shall provide an orderly transition of facility operations to DCSWA or a successor operator. The Operator shall provide operating records, SOPs, maintenance records, equipment information, vendor information, feedstock records, customer and market information, product records, and other information reasonably required by DCSWA.

The Operator will maintain copies of all records for the duration of the contract and provide them to DCSWA at the conclusion of the contract.

The Operator shall cooperate with DCSWA in developing a transition schedule and shall maintain normal facility operations throughout the transition period unless otherwise directed by DCSWA.

All equipment, machinery, tools, vehicles, materials, supplies, records, and other property owned by the Delaware County Solid Waste Authority (DCSWA) or Delaware County and made available to or utilized by the Operator in connection with this Contract shall remain the property of DCSWA or Delaware County, as applicable. Upon expiration or termination of the Contract, or upon written request by DCSWA, the Operator shall return all such property in good, safe, and fully functional working condition, ordinary wear and tear excepted.

14. OPERATOR QUALIFICATIONS

The successful Proposer shall demonstrate substantial experience in the operation and management of commercial-scale composting or comparable organics-processing facilities.

Proposers should demonstrate experience related to food waste, yard waste, source-separated organics, aerated static pile or comparable composting systems, facility management, odor management, compost quality, equipment maintenance, safety, regulatory compliance, and facility startup.

15. KEY PERSONNEL

The Proposer shall identify the personnel who will be responsible for providing the services described in this RFP. At a minimum, the proposed team should identify a Project Manager, senior composting or operations specialist, Facility Manager, lead operator personnel, and maintenance personnel. One person can serve in multiple capacities if need be.

Resumes shall be provided for key personnel and shall describe relevant education, training, certifications, and experience with commercial-scale composting and organics-processing facilities.

DCSWA reserves the right to require approval of substitutions for designated key personnel during the contract term.

16. CONTRACT REQUIREMENTS AND PRICING

The final contract documents will establish applicable requirements concerning insurance, indemnification, bonding or performance security, personnel, subcontractors, regulatory compliance, records, audits, public records, grant requirements, performance standards, compensation, changes in scope, capital expenditures, emergency repairs, termination, transition, The final pricing form will be issued by DCSWA as part of the procurement and contract package.

The SWIFR grant application is available upon request.

17. EVALUATION CRITERIA

DCSWA anticipates evaluating proposals based on the following criteria:

Evaluation Criterion Weight

Relevant Composting Operating Experience 25%

Technical / Process Expertise 20%

Proposed Operating Approach 20%

Design Advisory / Operability Approach 15%

Key Personnel / Comparable Projects / References 10%

Cost / Overall Value 10%

TOTAL 100%

DCSWA reserves the right to modify the evaluation criteria and weights in the best overall offering.

18. PRELIMINARY PROJECT SCHEDULE

Milestone Date

RFP Issued 11/20/26

Site Visit and Questions 11/20/26 – 12/18/26

Questions Due 12/18/26

Proposals Due 12/29/26

Interviews, if required 12/29/26 -1/8/27

Selection 1/20/27

Contract Award 2/1/27

Notice to Proceed 2/1/27

Operational Planning 2/1/27

Design Advisory February 2027 to June 2027

Milestone Date

Construction Support June 2027 to June 2028

Commissioning [TBD]

Startup [TBD]

Long-Term Operations [TBD]