2-Bid Sheet.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Hurley Park Bathroom Renovations
- Solicitation number
- HurleyBath 2026
- Issued by
- Pinellas County, Florida
About this file
This is a bid sheet for the City of St. Pete Beach, Florida, for renovations of the Hurley Park Public Restrooms. The project encompasses comprehensive bathroom upgrades across multiple categories including ADA compliance, demolition and interior renovations, plumbing fixtures, electrical improvements, flooring, walls and finishes, toilets and partitions, and ventilation systems. Bids are due on August 6, 2026, at 9:00 AM EST via Bonfire. The scope requires contractors to provide pricing for specific line items across each category, with detailed specifications for commercial-grade, corrosion-resistant fixtures suitable for coastal environments, touchless plumbing fixtures, energy-efficient LED lighting with occupancy sensors, seamless epoxy flooring systems, moisture-resistant wall finishes, waterproof partition systems, and upgraded ventilation with corrosion-resistant exhaust fans.
The bid sheet is structured as a line-item format with quantity and amount columns, though all pricing fields are currently blank, indicating this is a template for bidder submissions. The City reserves the right to review and approve all fixture selections prior to installation and requests that contractors provide quotes for both touchless and standard flush fixtures. Key specifications emphasize materials resistant to salt-air corrosion, heavy public use, and mold and mildew, reflecting the facility's coastal location and high-traffic public use environment. The project prioritizes water conservation, energy efficiency, accessibility compliance, and ease of maintenance and sanitation throughout the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Addendum 1-Bid walk time clarification.docx | DOCX document | |
| 1-Hurley Park Restroom Rentovations 2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| HURLEY PARK BATHROOM RENOVATIONS | |||
| DUE 8/6/2026 AT 9:00 AM (EST) VIA BONFIRE | |||
| Item | Quantity | Amount | Total |
| ADA Compliancy-Assessible Lavatories/Mounting Heights-Accessible Toilet Compartments | |||
| Layout and Design (ADA) | $ - 0 | ||
| ADA compliant grab bars | $ - 0 | ||
| Accessible Door Hardward and opening clearance | $ - 0 | ||
| Demolition and Interior Renovations | |||
| Remove existing toilets, Sinks, Partitions and accessories | $ - 0 | ||
| Removal of Existing Flooring and Wall Finishes | $ - 0 | ||
| Repair/Replace Damaged wall, floor and Ceiling Substrates | $ - 0 | ||
| Repair/Replace deteriorated plumbing and electrical System as necessary | $ - 0 |
| Plumbing Fixtures-Commercial-Grade Fixtures capable of Withstanding Heavy Public Use-Corrosion-Resistant Materials Suitable for coastal and salt-air environments-Fixtures shall be easy to maintain and readily serviceable-Water Conserving fixtures meeting current effieciency standards.*** | |
| Touchless Flush Valve Toilets in all Restrooms | $ - 0 |
| Touchless Lavatory Faucets | $ - 0 |
| ***Please also quote standard Flush toilets and lavatory faucets that meet the above standards-The City reserves the right to review and approve all fixture selections prior to installation. | |
| Electrical Improvements-All electrical work shall comply with the lates Code Requirements | |
| Installation of Electrical Power for touchless toilets/faucets where required | $ - 0 |
| New Wiring, conduits, outlets, transformers, and controls as necessary | $ - 0 |
| Upgrades to electrical panels or circuits if existing capacity if insufficient | $ - 0 |
| Energy-efficient LED Lighting Fixtures | $ - 0 |
| Occupancy sensors where appropriate | $ - 0 |
| GFCI Protection and code-Compliant electrical installations throughout the facility. | $ - 0 |
| Flooring-City prefers Seamless Epoxy Flooring throughout the restoom facility. - Commercial-grade Epoxy Flooring System-Slip-Resistant finish suitable for wet environments-waterproof and non-porous surface-Reistant to sand, salt, chemicals and heavy foot traffic-Easy too clean and Maintain-Integral coved base where practicl to faciltiate cleaning and sanitation. | |
| Flooring-LF | $ - 0 |
| Cove-LF | $ - 0 |
| Walls and Finishes-Moisture-resistant wall systems and finishes-Impact-resistant surfaces capable of withstanding heavy public use-graffiti-resistant finishes where applicable-Materials resistant to mold, mildew and corrosion-Finsihes suitable for continuous exposure to coastal environmental conditions | |
| Walls LF | $ - 0 |
| Finishes LF | $ - 0 |
| Toilets and Partitions-All Restroom partitions and accessories shall be designed for high-use public facilities-Waterproof, non-corrosive partition systems-Materials resistant to rust, delamination and salt-air exposure-Heavy duty mounting hardware-ADA-compliant compartment configurations - dispensers, grab bars and accessories-vandal-resistant accessory mounting systems | |
| Partitions | $ - 0 |
| Grab Bars | $ - 0 |
| Dispensers | $ - 0 |
| accessories? | $ - 0 |
| Ventilation-Contractor shall inspect and upgrade trhe ventilations ystem as necessary-Improved air circulation and moisture control-Installation of corrosive-resistant exhaust fans | |
| Exhaust Fans | $ - 0 |
| Total | $ - 0 |
File details come from the government source that posted it. Updated .