This is a Request for Bid (RFB) document issued by the City of St. Pete Beach, Florida, for the renovation of the Hurley Park Public Restrooms located at 1501 Gulf Way, St. Pete Beach, FL 33706. The project seeks qualified contractors to provide all labor, materials, equipment, supervision, permits, and incidentals necessary to renovate the existing public restroom facility serving a high-use, coastal park environment. The scope of work includes ADA compliance upgrades, demolition and interior renovation, installation of commercial-grade touchless plumbing fixtures, electrical improvements to support touchless operation, seamless epoxy flooring installation, moisture-resistant wall finishes, waterproof toilet partitions and accessories, corrosion-resistant doors and hardware suitable for coastal conditions, and ventilation system upgrades. A mandatory pre-bid meeting is scheduled for July 15, 2026, at 8:30 AM EST on-site. Bidders must submit written questions by July 29, 2026, at 10:00 AM EST, with responses provided at the City's discretion via addendum. Sealed bids must be submitted electronically via Bonfire by August 6, 2026, at 9:00 AM EST, with bid opening occurring at 9:30 AM the same day. The project must be completed within six months or 180 calendar days from the notice to proceed, with work hours between 7:30 AM and 6:00 PM, Monday through Saturday.

Bidders must provide a signed/notarized Contractor's Bid Submittal, a detailed fee schedule, professional references (minimum three within the past five years), contractor's license, insurance certificates, a Public Entity Criminal Affidavit, and a Non-Collusion Affidavit. The City reserves the right to review and approve all fixture selections prior to installation and has the option to purchase certain items and materials directly to save applicable sales tax in compliance with Florida law. The contractor is responsible for obtaining all necessary permits and associated fees, providing port-a-potties during construction for crew and public use, and furnishing accurate measurements and detailed fee schedules at a pre-construction meeting following award. Contractors must maintain comprehensive insurance coverage including $1,000,000 Commercial General Liability and Comprehensive General Liability, $1,000,000 Personal Injury, $1,000,000 Automobile Liability, and workers' compensation as required by Florida law. A performance bond of 100 percent of the contract amount is required. Liquidated damages are assessed at $500 per calendar day for delays beyond the completion date. The City reserves the right to reject any or all bids, waive irregularities, and award the contract to the responsible proposer submitting the most advantageous bid in the City's best interest.

View the file

Other files

File Type Posted
3-Addendum 1-Bid walk time clarification.docx DOCX document
2-Bid Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of St Pete Beach

Request for Bid

Bids due on or before 8/6/2026 at 9:00 AM EST(Deadline)

City Hall, St. Pete Beach, FL

Hurley Park Bathroom Renovations v020222

I. CONTENTS

I. CONTENTS

II. CONTRACTOR’S BID SUBMITTAL

III. BID LIST

IV. GENERAL CONTRACT TERMS

V. REFERENCES & MINIMUM QUALIFICATIONS

VI. PUBLIC ENTITY CRIMINAL AFFIDAVIT

VII. NON-COLLUSION AFFADAVIT

VIII. SPECIFICATIONS

IX. SAMPLE AGREEMENT

Event Date Time Publication of Bid 07/08/2026 8:00 AM Pre-Bid Meeting (MANDATORY) 07/15/2026 8:30 AM Deadline for Question Submission 07/29/2026 10:00 AM Bid Receiving Deadline 08/06/2026 9:00 AM Bid Opening 08/06/2026 9:30 AM

II. CONTRACTOR’S BID SUBMITTAL

The company that is submitting a bid declares that it has extensive experience in Commercial Bathroom Renovations.

The undersigned, as Bidder, hereby declares that the only person or persons interested in the Bid as principal or principals are named herein, and that no person other than herein mentioned has any interest in the Bid or in the Agreement to be entered into; that this Bid or Agreement is made without connection with any other person, company, or parties making a Bid; and that it is in all respects fair and in good faith without collusion or fraud.

The Bidder further declares that they have examined the site of the work and informed themselves fully in regard to all conditions pertaining to the place where the work is to be done; that they have examined the Plans and Specifications for the work and Contract Documents relative thereto, and have read all special provisions furnished prior to the opening of bids; and that they have satisfied themselves relative to the materials to be supplied and work to be performed.

The Bidder proposes and agrees, if the Bid is accepted, to contract with the City of St. Pete Beach, Florida, in the form of an Agreement specified for “Commercial Bathroom Renovations” in St. Pete Beach, Florida, in full and complete accordance with the shown, noted, described, and reasonably intended requirements of the Plans, Specifications, and Contract Documents, to the full and entire satisfaction of the City of St. Pete Beach, Florida.

The successful bidder shall be required to utilize the template Agreement in this Request for Bids (RFB) and any questions regarding the Agreement must be addressed during the RFB process before submittal.

The City reserves the right to respond or not respond to questions in the form of an addendum.

The Bidder proposes to furnish all materials, equipment, labor, and perform the work submitted in their bid schedule for the City of St. Pete Beach “Commercial Bathroom Renovations”.

COMPANY: DATE:

ADDRESS: PHONE:

BIDDER: ____________________________ NAME:

(SIGNATURE) (PRINT NAME & TITLE)

STATE OF FLORIDA

COUNTY OF ____________________

The foregoing instrument was sworn to (or affirmed), subscribed, and acknowledged before me by means of ☐ physical presence or ☐ online notarization, this ____ day of ___________________________, 2026, by _____________________, who is personally known to me or has produced ________________________________ as identification.

(SEAL) ______________________________

Notary Public – State of Florida

(Print, Type, Stamp, or Commissioned Name of Notary Public)

SUBMIT BID TO:

Electronically only via Bonfire

III. Bid List

I.

HURLEY PARK BATHROOM RENOVATIONS

DUE 8/6/2026 AT 9:00 AM (EST) VIA BONFIRE

Item Quantity

Amount Total

ADA Compliancy-Assessible Lavatories/Mounting Heights-Accessible Toilet Compartments

Layout and Design (ADA)

ADA compliant grab bars

Accessible Door Hardward and opening clearance

Demolition and Interior Renovations

Remove existing toilets, Sinks, Partitions and accessories

Removal of Existing Flooring and Wall Finishes

Repair/Replace Damaged wall, floor and Ceiling Substrates

Repair/Replace deteriorated plumbing and electrical System as necessary

Plumbing Fixtures-Commercial-Grade Fixtures capable of Withstanding Heavy Public Use-Corrosion-Resistant Materials Suitable for coastal and salt-air environments-Fixtures shall be easy to maintain and readily serviceable-Water Conserving fixtures meeting current effieciency standards.***

Touchless Flush Valve Toilets in all Restrooms

Touchless Lavatory Faucets

***Please also quote standard Flush toilets and lavatory faucets that meet the above standards-The City reserves the right to review and approve all fixture selections prior to installation.

Electrical Improvements-All electrical work shall comply with the lates Code Requirements

Installation of Electrical Power for touchless toilets/faucets where required

New Wiring, conduits, outlets, transformers, and controls as necessary

Upgrades to electrical panels or circuits if existing capacity if insufficient

Energy-efficient LED Lighting Fixtures

Occupancy sensors where appropriate

GFCI Protection and code-Compliant electrical installations throughout the facility.

Flooring-City prefers Seamless Epoxy Flooring throughout the restoom facility. - Commercial-grade Epoxy Flooring System-Slip-Resistant finish suitable for wet environments-waterproof and non-porous surface-Reistant to sand, salt, chemicals and heavy foot traffic-Easy too clean and Maintain-Integral coved base where practicl to faciltiate cleaning and sanitation.

Flooring-LF

Cove-LF

Walls and Finishes-Moisture-resistant wall systems and finishes-Impact-resistant surfaces capable of withstanding heavy public use-graffiti-resistant finishes where applicable-Materials resistant to mold, mildew and corrosion- Finsihes suitable for continuous exposure to coastal environmental conditions

Walls LF

Finishes LF

Toilets and Partitions-All Restroom partitions and accessories shall be designed for high-use public facilities-Waterproof, non-corrosive partition systems-Materials resistant to rust, delamination and salt-air exposure-Heavy duty mounting hardware-ADA-compliant compartment configurations -dispensers, grab bars and accessories-vandal-resistant accessory mounting systems

Partitions

Grab Bars

Dispensers accessories?

Ventilation-Contractor shall inspect and upgrade trhe ventilations ystem as necessary-Improved air circulation and moisture control-Installation of corrosive-resistant exhaust fans

Exhaust Fans

Total

II.

V020922

IV. GENERAL CONTRACT TERMS

REQUEST FOR BID

The City of St. Pete Beach is submitting this RFB for bids on the Renovations of the Hurley Park Public Restrooms.

LOCATIONS

The City of St. Pete Beach is soliciting bids from qualified Contractors for Hurley Park Restrooms located at 1501 Gulf Way, St. Pete Beach, FL 33706.

BID SUBMITTALS

Bid documents must include a signed/notarized Contractor’s Bid Submittal (Page 3), Fee Schedule, References, Contractor’s license and insurance certificates, and Public Entity Criminal Affidavit. The Contractor shall submit one electronic bid via Bonfire only.

BIDDER INFORMATION

All Contractors must contact the City’s Procurement Manager, in writing via e-mail (jtaylor@stpetebeach.org), with their intention to bid, along with their company name and contact information at least five (5) business days before the bid package is due. The City is not responsible for any Addendums or other supplementary information that is not received due to non-submittal of the aforementioned information. Please refer back to the city website (http://www.stpetebeach.org/news-and-links/city-projects.html) for additional project information as it becomes available. The City reserves the right to decide whether to answer addendums or not. The City is not required to provide any additional information.

MANDATORY PRE-BID MEETING

A MANDATORY pre-bid meeting will be held on 7/15/2026 at 2:00 PM EST On-Site at 1501 Gulf Way, St. Pete Beach, FL 33706.

WRITTEN REQUESTS FOR INTERPRETATIONS/CLARIFICATIONS

No oral interpretations will be made to any firms as to the meaning of the scope of work or any other contract documents included in this RFB. All questions pertaining to the terms and conditions or scope of work of this Request for Bid (RFB) must be sent in writing (e-mail is acceptable) to the City Procurement Manager and shall be received no later than 10:00 EST on 07/29/2026 Responses to questions may be handled as an Addendum if the response would provide clarification to the requirements of the RFB. All such Addenda shall become a part of the contract documents. The City will not be responsible for any other explanation or interpretation of the proposed RFB made or given prior to the award of the contract. The City will not respond to questions received after the specified deadline. The City reserves the right to respond to any and all questions but is not required to do so.

BID PACKAGES

Sealed bids will be accepted Via Bonfire until 8/6/2026 at 9:00 AM EST (Deadline). No bids shall be http://www.stpetebeach.org/news-and-links/city-projects.html http://www.stpetebeach.org/news-and-links/city-projects.html accepted by the City after this deadline – NO EXCEPTIONS. Bid Packages must be electronic submitted via Bonfire. All Bidders are invited to attend this bid opening.

Clearly marked as: “Hurley Park Restroom Renovations”

CONTACT INFORMATION

John Taylor – Procurement Manager Mailing Address - 155 Corey Avenue, St. Pete Beach, Florida 33706 Office Phone - (727) 363-9279 E-mail - purchasing@stpetebeach.org

SCOPE OF WORK

The city is seeking qualified contractors to provide all labor, materials, equipment, supervision, permits, and incidentals necessary to renovate an existing public restroom facility located within a public park directly across from a public beach. The restroom is a high-use public facility that is exposed to a coastal environment, including salt air, moisture, sand, and heavy pedestrian traffic. The renovated facility shall provide a durable, low-maintenance, ADA-compliant restroom designed for long-term serviceability and ease of cleaning.

The renovation shall remain within the existing building footprint. No building expansion is anticipated unless specifically required by applicable codes and approved by the city.

ADA Compliance

The renovated restroom facility shall be designed and constructed to fully comply with current ADA Accessibility Guidelines (ADAAG), Florida Building Code Accessibility requirements, and all applicable accessibility standards.

Work shall include, but not be limited to:

• ADA-compliant restroom layouts.

• Required clear floor spaces and maneuvering clearances.

• Accessible toilet compartments and fixtures.

• ADA-compliant grab bars and accessories.

• Accessible lavatories and mounting heights.

• Accessible door hardware and opening clearances.

• Required signage and accessibility markings.

The Contractor shall verify all dimensions and accessibility requirements during design and construction.

Demolition and Interior Renovation

The Contractor shall remove existing restroom fixtures, partitions, accessories, doors, finishes, and other components necessary to complete the renovation.

Work may include:

• Removal of existing toilets, sinks, partitions, and accessories.

• Removal of existing flooring and wall finishes as required.

• Repair or replacement of damaged wall, floor, and ceiling substrates.

• Repair or replacement of deteriorated plumbing and electrical systems as necessary.

Plumbing Fixtures mailto:purchasing@stpetebeach.org

All plumbing fixtures shall be commercial-grade, vandal-resistant, and designed specifically for high-traffic public facilities.

Requirements include:

• Touchless flush valve toilets in all restroom stalls.

• Touchless lavatory faucets.

• Commercial-grade fixtures capable of withstanding heavy public use.

• Corrosion-resistant materials suitable for coastal and salt-air environments.

• Fixtures shall be easy to maintain and readily serviceable.

• Water-conserving fixtures meeting current efficiency standards.

The City reserves the right to review and approve all fixture selections prior to installation.

Electrical Improvements

The Contractor shall evaluate existing electrical service and provide all electrical modifications necessary to support touchless restroom operation.

Work shall include:

• Installation of electrical power for touchless toilets and faucets where required.

• New wiring, conduits, outlets, transformers, and controls as necessary.

• Upgrades to electrical panels or circuits if existing capacity is insufficient.

• Energy-efficient LED lighting fixtures.

• Occupancy sensors where appropriate.

• GFCI protection and code-compliant electrical installations throughout the facility.

All electrical work shall comply with the latest Code requirements.

Flooring

The City prefers seamless epoxy flooring throughout the restroom facility.

Flooring requirements include:

• Commercial-grade epoxy flooring system.

• Slip-resistant finish suitable for wet environments.

• Waterproof and non-porous surface.

• Resistant to sand, salt, chemicals, and heavy foot traffic.

• Easy-to-clean and low-maintenance finish.

• Integral coved base where practical to facilitate cleaning and sanitation.

Walls and Finishes

Interior finishes shall be selected for durability, moisture resistance, and ease of maintenance.

Requirements include:

• Moisture-resistant wall systems and finishes.

• Impact-resistant surfaces capable of withstanding heavy public use.

• Graffiti-resistant finishes where applicable.

• Materials resistant to mold, mildew, and corrosion.

• Finishes suitable for continuous exposure to coastal environmental conditions.

Toilet Partitions and Accessories

All restroom partitions and accessories shall be designed for high-use public facilities.

Requirements include:

• Waterproof, non-corrosive partition systems.

• Materials resistant to rust, delamination, and salt-air exposure.

• Heavy-duty mounting hardware.

• ADA-compliant compartment configurations.

• Commercial-grade mirrors, dispensers, grab bars, and accessories.

• Vandal-resistant accessory mounting systems.

Phenolic-core partitions or equivalent materials specifically designed for wet environments are preferred.

Doors and Hardware

All restroom entrance doors and stall doors shall be designed for durability in a coastal environment.

Requirements include:

• Waterproof and salt-resistant door materials.

• Corrosion-resistant hinges, hardware, and fasteners.

• Heavy-duty commercial-grade construction.

• ADA-compliant hardware and operation.

• Materials capable of withstanding frequent use, humidity, and direct exposure to salt air.

HDPE, marine-grade aluminum, or equivalent corrosion-resistant materials are preferred.

Ventilation

The Contractor shall inspect and upgrade the ventilation system as necessary.

Work may include:

• Installation of corrosion-resistant exhaust fans.

• Improved air circulation and moisture control.

Final Deliverables

Upon completion, the Contractor shall provide:

• Final inspections and approvals.

• Manufacturer warranties and product documentation.

• As-built drawings reflecting any field modifications.

• Operations and maintenance manuals for all installed systems and equipment.

• Staff training, if required, for operation and maintenance of touch-less fixtures.

Contractor shall furnish all materials and equipment necessary to secure completion of the work.

Contractor will be compensated according to the quote submitted. Contractors shall include all costs, including but not limited to construction stakeout, mobilization, maintenance of traffic, erosion control, utility relocations, record survey, etc.

*The Contractor is responsible for pulling all permits and the fees associated with said fees.

*There are no floor plans available for the restrooms. Each vendor is responsible for taking accurate measurements on the day of the Pre-Bid Meeting.

*The chosen vendor will need to provide Port-a-Potty’s during construction for crew and public during the construction phase.

Once a contract is awarded, the selected vendor will be required to submit a detailed fee schedule outlining the main pay items for the project. This fee schedule will be reviewed at the pre-construction meeting and will be used to review pay applications and evaluate project progress.

DETAILED SPECIFICATIONS

III. LOCATIONS

Hurley Park is located at 1501 Gulf Way, St. Pete Beach, FL 33706

Standard work hours shall be from 7:30 AM until 6:00 PM, Monday through Saturday. No work shall take place on Sundays or on official City holidays without prior approval by the City Manager or designee at least 1 week prior to the scheduled work. A list of current official City holidays can be found on the City’s Human Resources website at http://www.stpetebeach.org/hr/holidays.html. Contractor will coordinate scheduling of work with the City’s Project Manager and City’s Inspector.

ADDITIONAL WORK DETAILS

Contractors or persons wishing to bid on this project are licensed, bondable and insured in accordance to the City's requirements. The Contractor will furnish all necessary labor, materials, tools, equipment and supplies to complete the scope of work. Bid must also include all costs for licenses, permits, and any material disposal fees.

Bidders shall bring questions, discrepancies, omissions, conflicts or doubt as to meaning of any part of Contract Documents to the attention of the City of St Pete Beach Procurement Manager at least ten (10) business days before bid submittal deadline. Clarification of intent of Contract Documents, if necessary, shall be made available to bidders in the form of an Addendum. Failure to request clarification of interpretation of Contract Documents shall not relieve bidders of their responsibilities to perform the work.

The City of St. Pete Beach reserves the right to reject any or all bids or parts of bids, or accept any bid or part thereof deemed to be in the best interests to the City of St. Pete Beach.

STATEMENT OF WORK

The Contractor shall furnish and pay the cost, including sales tax and all other applicable taxes, licenses, permits and fees, of all the necessary materials not furnished by the City and shall furnish and pay for all the superintendence, labor, tools, equipment, transportation, and perform all the work required for the execution of all services listed in the Bidder's Proposal and Bid Form attached hereto and in strict accordance with the Plans, Specifications, and requirements of the City of St. Pete Beach which are attached hereto and made a part hereof, and any amendments thereto and such supplemental Plans and Specifications which may hereafter be approved.

BEGINNING DATE

The Contractor shall, within ten (10) business days after receipt of the Notice of Award and before commencement of any operations hereunder, execute the Agreement. Additionally, the Contractor shall, within twenty (20) business days after receipt of the Notice of Award, provide all required documentation to the City. The Contractor must commence construction activities within thirty (30) business days of NTP to prepare and procure materials. Any change to the start date or the work schedule included with this bid must be submitted in writing to and approved by the City Manager or designee.

http://www.stpetebeach.org/hr/holidays.html

COMPLETION DATE

The work will be completed and ready for final inspection within 6 months or 180 calendar days from start of the project. The project shall be considered eligible for final acceptance by the City when all required work to be performed as outlined in this Agreement is complete and accepted by the City.

EXAMINATION OF SITE

Bidders may visit specific areas with advanced notice.

ASSURANCES

The responding Contractor shall provide a statement of assurance that the Contractor is not presently in violation of any statutes or regulatory rules that might have an impact on the firm’s operations. All applicable laws and regulations of the State of Florida, and ordinances and regulations of the City of St. Pete Beach will apply.

TRAFFIC CONTROL AND STAGING AREA

Contractor shall include all costs associated with vehicular and pedestrian traffic control and maintenance during the project. Contractor shall be responsible for providing a staging area. The location of this area must be approved by the City Manager or designee. The Contractor will be required to control the area including any additional fencing or barricades and Contractor will be responsible for the restoration of this and all other staging areas provided by the City.

ASSIGNMENT AND TRANSFER OF CONTRACT

The Contractor shall not assign or transfer this Agreement or any part thereof or any interest therein without consent in writing of the City and the Contractor’s Surety, and any such assignment or transfer without such written consent shall be null and void.

SUBCONTRACTS

The Contractor shall not subcontract this Agreement or any part thereof or any interest therein without consent in writing of the City and the Contractor’s Surety. Any Subcontractor approved by the City will be subject to the same standards and qualifications as stated in this Contract.

BID AND PERFORMANCE PAYMENT BOND

100 %

LIQUIDATED DAMAGES

If the work embraced by this Contract is not completed on or before the date set for completion or any extension thereof, the actual damages for the delay will be impossible to determine and in lieu thereof, the Contractor shall pay to the City fixed, agreed, and liquidated damages in the amount of either Five-Hundred Dollars ($500) per day for each calendar day of delay until the work is satisfactorily completed.

PAYMENT

Payment shall be made to the Contractor for work performed under this Contract for the quantities of work as determined in accordance with Payments for Work Completed and Payments Withheld of this Contract.

Payment for extra work will be made in accordance with the Changes in Work, Contract Amount, and Contract Time sections below.

CHANGES IN THE WORK

Without invalidating the Contract, the City may, at any time or from time to time, order additions, deletions or revisions in the work authorized by written Change Orders or directives. Upon receipt of a Change Order, the Contractor will proceed with the work involved. All such work shall be executed under the applicable conditions of the Contract documents. If any Change Order causes an increase or decrease in the Contract Amount or any extension or shortening of the Contract Time, an equitable adjustment will be made.

Additional Work performed by the Contractor without authorization of a Change Order will not entitle them to an increase in the Contract Amount or any extension of the Contract Time, except in the case of an emergency (subject to approval by City Manager or designee).

It is the Contractor's responsibility to notify their Surety of any changes affecting the general scope of the Work or change of the Contract Amount and the amount of the applicable bonds shall be adjusted accordingly, and an amended bond document furnished to the City. In the event the City directs the Contractor to make a change in the Work, and if the City and the Contractor do not arrive at a mutually acceptable increase or decrease in the Contract Amount, the contractor shall not use any such lack of mutual acceptance as a basis or cause to stop or otherwise delay the progress or the execution and completion of any of the work ordered, directed or required pursuant to the Contract Documents.

If the Contractor believes an event or situation has occurred which justifies a change in the Contract Amount or Contract Time, he shall deliver a written notice to the City Manager or designee. Each such written notice shall be delivered promptly and no later than fifteen (15) business days after the Contractor first discovered the occurrence. The Contractor shall be deemed to have waived the right to collect any and all costs incurred more than fifteen (15) business days prior to the date of delivery of the written notice and shall be deemed to have waived the right to seek an extension of the Contract Time with respect to any delay in the Progress Schedule which accrued more than fifteen (15) business days prior to the date of delivery of the written notice.

Any such notice shall include sufficient detail to explain the basis of entitlement to a claim for an adjustment to the Contract Amount of Contract Time. When requested by the City Manager or designee, the Contractor shall furnish any additional information and details as may be required to determine the facts or allegations involved, which shall be provided within fifteen (15) business days of the request unless a longer time period is allowed by the City Manager or designee.

The Contractor shall prepare bids detailing proposed adjustments to Contract Amount and/or Contract Time and submit them to the City Manager or designee within fifteen (15) business days of the City’s issuance of a proposed Change Order or the Contractor’s submitting a written notice of a change or claim for an adjustment to the Contract Amount or Contract Time. Contractor’s bids shall be irrevocable for a period of at least sixty (60) business days after receipt by the City. Any delay in the submittal of a complete, adequate and acceptable bid will not justify an increase in Contract Amount or Contract Time. Contractor agrees that it shall give the City access to any and all of Contractor’s and Subcontractors’ books, records and other materials relating to proposed Change Orders and other claims for adjustment to Contract Amount or Contract Time.

CHANGE OF CONTRACT AMOUNT

The Contract Amount constitutes the total compensation payable to the Contractor for performing the Work.

All duties, responsibilities and obligations assigned to or undertaken by the Contractor shall be at his expense without change in the Contract Amount. The Contract Amount may only be changed by written Change Order issued by the City. Any claim for an increase in the Contract Amount shall be in writing and delivered to the City Manager or designee within fifteen (15) business days of the occurrence of the event giving rise to the claim.

All claims for adjustment in the Contract Amount shall be determined by the City Manager or designee.

However, no claim for an adjustment to the Contract Amount will be considered for unforeseeable causes that were beyond the fault or negligence of the Contractor or his Subcontractors or supplier such as acts of God, floods, riots, etc. This restriction does not restrict submission of claims for additional Contract Time due to events of this nature. Any change in the Contract Amount shall be incorporated in a Change Order.

Contractor bids or claims shall cover all aspects of the Work involved and shall be fully documented and itemized as to all costs, quantities and charges for overhead and profit. Amounts for Subcontractors or Suppliers at any tier shall be similarly supported. When determining Subcontractors’ costs, the methods to be used shall be those used for the Contractor’s costs, except that the term “Subcontractor” shall replace the term “Contractor,” context permitting.

Changes in Contract Amount for extensions in Contract Time shall exclude costs that are unaffected or do not relate to the extension in Contract Time, such as: (a) operating costs of construction equipment assigned to the Work on a continuing basis, (b) operating costs and owned/rental costs of construction equipment (crane used for specific lifts, concrete pump used for specific pours, etc.), and (c) fully paid site facilities, tools, etc.

The value of any Work covered by a Change Order or of any claim for an increase or decrease in the Contract Amount where the Work involved is covered by unit prices contained in the Contract Documents shall be determined by application of unit prices to the quantities of the items involved. If the quantities originally contemplated are so changed in a proposed Change Order, that application of the Unit Prices to the quantities proposed will cause substantial inequity to the City or the Contractor, the applicable unit price(s) shall be equitably adjusted by mutual agreement.

If the value of work covered by a Change Order cannot be established or mutually agreed to utilizing previously established unit rates, the value shall be determined by the City on the basis of an estimate of the out-of-pocket cost and percentages that are acceptable to the City for overhead and profit. The out-of-pocket cost shall only include those direct costs which are needed to perform the work such as labor (including payroll taxes, fringe benefits, labor burden and workers’ insurance), materials, equipment, and other incidental out-of-pocket construction costs directly involved in the work, including but not limited to small tools, expendables and material costs but shall not include project management or project supervisory costs unless the Change Order includes an increase in the Contract time.

In such case, the Contractor will submit in the form prescribed by the City an itemized cost breakdown together with supporting data.

The amount of credit to be allowed by the Contractor to the City for any such change which results in a net decrease in cost, will be the amount of the actual net decrease as determined by the City. When both additions and credits are involved in any one change, the combined overhead and profit shall be figured on the basis of the net increase, if any.

To be eligible for consideration, the Contractor’s written claim for a change in the Contract price, including claim(s) from sub-contractors, shall include an itemized cost breakdown with supporting data as described below:

A. For labor: Provide written documentation from the Contractor and Subcontractors or others as appropriate in the form of a detailed breakdown by each labor classification involved indicating the number of hours of Work involved and the hourly payroll rate applicable to each to substantiate the basis and amount of the direct labor cost. The direct labor cost may be increased to provide an allowance for indirect payroll costs (labor burden), such as payroll taxes, fringe benefits, and workers insurance after all premium discounts, rebates and other appropriate reductions have been taken.

B. For material, supplies, equipment, furnishings, etc., to be installed or included in the Work: Provide written documentation from the Contractor and Subcontractors, suppliers, etc., to substantiate the basis and amount of the various cost items involved. Material costs shall reflect the Contractor’s reasonably anticipated net actual cost after consideration of trade discounts and volume rebates.

C. For construction equipment: Provide written documentation in the form of a detailed breakdown by each construction equipment category, indicating the applicable unit rates (i.e., dollar amount per hour, dollar amount per day etc.,) and the number of hours, days, etc. to substantiate the basis and amount of the construction equipment out-of-pocket costs.

CHANGE OF CONTRACT TIME

The Contract Time may only be changed by written Change Order. Any claim for an extension in the Contract Time shall be in writing and include an analysis of the Progress Schedule as further described in the Specifications and shall be delivered to the City Manager or designee within fifteen (15) business days of the occurrence of the event giving rise to the claim. All claims for adjustment in the Contract Time shall be determined by the City Manager or designee. Any change in the Contract Time resulting from any such claim shall be incorporated in a Change Order. The Contract Time may be extended for an amount equal to time lost due to unforeseeable causes beyond the control of the Contractor (and his Subcontractors and Suppliers) if he makes a claim therefrom. Such delays shall include, but not be restricted to, acts or neglect by any separate Contractor employed by the City; fires; floods; labor disputes; epidemics; or acts of God.

All time limits stated in the Contract Documents are of the essence to the Contract. The stated time limits are agreed to be adequate to complete the work, including the procurement, manufacture and delivery of all material and equipment required, and account for any and all potential impact, delays, disruptions and costs that may be expected.

CITY’S RIGHT TO DIRECT PURCHASE

The City has reserved the right to purchase certain items and materials for this project directly in an effort to save applicable sales tax in compliance with Florida Law.

The City will issue purchase orders directly to the vendors supplying the equipment being directly purchased by the City for this project. Each Purchase Order will be accompanied by the City's Certificate of Exemption and a Certificate of Entitlement. All direct purchase vendor invoices will be issued to the City of St. Pete Beach, and the City will issue payment to each direct purchase vendor from City funds. The City will take title to the equipment at time of delivery from the vendor and will issue a separate Certificate of Entitlement for each purchase order.

The Contractor shall assist the City with receipt of materials furnished by the City in accordance with these Special Provisions including, but not limited to, verifying correct quantities, verifying documents of orders in a timely manner, providing and obtaining all warranties and guarantees required by the Contract Documents, assist with inspection of the goods at the time of delivery and notify the City immediately of any deficiencies noted. It is understood that the owner assumes the risk of damage or loss during the time that the building materials are physically stored at the job site prior to their installation or incorporation into the project. The Contractor shall coordinate with the City regarding the delivery schedules, sequence of delivery, loading orientation, and other arrangements normally required by the Contractor for the particular material furnished.

As City Furnished Materials are delivered to the job site and accepted by the City, the City shall notify the Contractor who will assist the City to visually inspect all shipments from the suppliers. The City will approve the vendor's invoice for material delivered upon adequate inspection and recommendation of the Contractor. The City shall assure that each delivery of City Furnished Materials is accompanied by documentation adequate to identify the Purchase Order against which the purchase is made and Contract Documents including but not limited to Contract, Plans, Specifications, and approved Shop Drawings. This documentation may consist of a delivery ticket, bill of lading and an invoice from the supplier conforming to the Purchase Order together with such additional information as the City may deem necessary.

PAYMENTS FOR WORK COMPLETED

Partial payments will be made as the work progresses (if applicable) at the end of each calendar month, or as soon thereafter as practicable on estimates made by the City Manager or designee and as approved by the City, provided that the Contractor is performing the overall job in a diligent manner. In making partial payments, there shall be retained five percent (5%) on the amount of each estimate until final completion and acceptance of all work covered by the Contract. Upon completion and acceptance of the work, the City Manager or designee shall issue a certificate that the work has been completed and accepted by them under the conditions of the Contract and shall make and approve the final estimate of the work. The entire balance found to be due the Contractor, including that retained by the City, should be paid to the Contractor.

Such payment shall be conditioned, however, upon the submission by the Contractor of evidence satisfactory to the City that all claims for labor, material, and any other outstanding indebtedness in connection with the Contract have been paid. Such payment shall also be conditioned upon approval and acceptance of the construction and improvements by the City.

If after the work has been substantially completed, full completion thereof is materially delayed through no fault of the Contractor and the City Manager or designee so certifies, the City shall upon the Certificate of the City Manager or designee, and without terminating the Contract make payment for the balance due for that portion of the work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claim. If such delay occurs and payment is made under this clause, the Contractor shall nevertheless be prepared to complete the work in a timely manner upon the remedy or removal of such delay, and shall be bound under this Contract for the completion of such work unless this Contract is otherwise terminated. All payments will be made in accordance with the Local Government Prompt Payment Act, Chapter 218, Florida Statutes.

PAYMENTS WITHHELD

The City Manager or designee may withhold, or, on account of subsequently discovered evidence, nullify the whole or part of any estimate to such extent as may be necessary to protect the City from loss on account of:

a) Defective work not remedied

b) Claims and/or liens filed or reasonable evidence indicating probable filing of claims

c) Failure of the Contractor to make payments properly to Subcontractors or for material or labor

d) A reasonable doubt that the Contract can be completed for the balance then unpaid

e) Damage to another Contractor

f) Failure of the Contractor to keep their work progressing in accordance with their time schedule

FINAL PAYMENTS

Upon the completion and acceptance of the work, the City Manager or designee shall issue a certificate that designates that the whole work provided for in this Contract has been completed and accepted by him under the conditions and the terms thereof and shall make the final estimate of the work. After issuance of the certificate, the entire balance found to be due the Contractor, including said retained percentage by the City in accordance with existing state laws as may be retained lawfully by said City, shall pay excepting such sums to the Contractor.

Before the approval of the final payment, the Contractor shall submit evidence satisfactory to the City that states that all payrolls, materials, bills and outstanding indebtedness in connection with this Contract have been paid.

LIENS

If at any time there shall be evidence of any lien or claim for which the City might become liable and which is chargeable to the Contractor, the City shall have the right to retain out of any payment then due or thereafter to become due, an amount sufficient for complete indemnification against such lien or claim. In the event the City has already paid to the Contractor all sums due under this contract or the balance remaining unpaid is insufficient to protect the City, the Contractor and his Surety shall be liable to the City for any loss so sustained.

RESPONSIBILITY OF THE CITY MANAGER OR DESIGNEE

The term “City Manager or designee” wherever used in the Contract shall be the City of St. Pete Beach or its duly authorized representative. Notices of any change in the City Manager or designee shall be given in writing by the City to the Contractor. The City Manager or designee shall have full authority to interpret the Plans and Specifications and shall determine the amount, quality, and acceptance of the work and supplies to be paid for under the Contract and every question relative to the fulfillment of the terms and provisions therein. It shall be the duty of the City Manager or designee to enforce the Plans and Specifications in a fair and unbiased manner. If a variation from any requirements is allowed the City Manager or designee shall grant the same in writing with the reasons for his action outlined, and such action will not invalidate or change the Contract in any other manner.

INTENT OF PLANS AND SPECIFICATIONS

The Contractor shall keep on the job a copy of the Plans and Specifications and shall at any time give the City Manager or designee access thereto. Anything mentioned in the Specifications and not shown on the Plans or shown on the Plans and not mentioned in the Specifications, shall be of like effect as if shown or mentioned in both. The Contractor shall not take advantage of any errors, discrepancies or omissions that may exist in the Plans and Specifications but shall immediately call them to the attention of the City Manager or designee whose interpretation or correction thereof shall be conclusive. Should a conflict occur between the General Specifications and any Supplemental Specifications and/or Plans, the latter shall govern.

LICENSES AND PERMITS

The Contractor shall obtain and pay for all necessary City licenses and work permits and shall faithfully comply with all laws, ordinances and regulations, (Federal, State or local) which may be applicable to the operations to be conducted hereunder, except for those permits obtained by the City. Notwithstanding the provisions above, the contractor is responsible for non-compliance of all permit requirements, including all fines resulting from Contractor’s non-compliance of said requirements.

Chapter II, Section II-4, “Registration of Licenses Obtained From Other Municipalities:” “Persons, partnerships, corporations, or other business entities doing business with the City who are not required to obtain a City occupational license, but who must have either a State or County or Municipal occupational license from another municipality, shall register such occupational license with St. Pete Beach Community Development Department. The City may charge a fee for such registration.” The Contractor shall be responsible for obtaining all City, County, State and Federal permits required by those government agencies and must provide documentation of receipt of those permits prior to project commencement. This shall include a notice to commence work letter and the applicable fee, if required. Any sub-contractor hired by the contractor awarded the project, MUST also register their license with the City.

SUPERINTENDENCE

The Contractor shall constantly superintend all the work embraced in this Contract in person or by a responsible agent who shall have in writing, full authority to act for them and to carry out all the instructions given by the City Manager or designee.

LABOR PROVISIONS

The Contractor and his Subcontractors shall discharge, whenever ordered to do so by the City Manager or designee, any employee who is disorderly or whose conduct in the opinion of the City Manager or designee is detrimental to the prosecution of the work. No person whose age or physical condition is such as to make this employment dangerous to his/her health and safety or to the health and safety of others shall be employed on the work, and in no event shall any persons under the age of sixteen (16) years be employed.

INSURANCE

The Contractor shall procure and maintain at his/her own expense, during the life of the Contract, liability insurance as hereinafter specified. All such insurance shall be subject to the approval of the City for adequacy of protection and shall include a provision preventing cancellation without twenty (20) business days prior notice to the City in writing. The City shall be included as an additional insured on all liability insurance. The liability insurance required is as follows: Contractor’s General Public Liability and Property Damage Insurance issued to the Contractor and protecting the Contractor from all claims for personal injury, including death, and all claims for destruction of or damage to property, arising out of or in connection with any operations under this Contract, whether such operations be by the Contractor or by any Subcontractor hired by the Contractor or anyone directly or indirectly employed by the Contractor or hired by the Contractor.

The successful Contractor shall supply and maintain insurance which defends, indemnifies and holds harmless the City of St. Pete Beach, its officers, employees and agents from and against any and all liability, damage claims, demands, costs, judgments, fees, attorney’s fees or loss arising directly out of acts or omissions hereunder by the Contractor or third party under the direction or control of the Contractor. Such general and excess liability coverage shall be primary to any other coverage carried by the City of St Pete Beach. Contractor must furnish the City with Certificate of Insurance prior to commencement of work. An approved Certificate of Insurance furnished by the Contractor’s carrier to guarantee the Contractor being insured with the City of St Pete Beach must be named as a certificate holder for this contract. The following minimum coverage:

• Commercial General Liability Insurance $1,000,000.00.

• Comprehensive General Liability Insurance of $1,000,000.00 each occurrence.

• Personal Injury for $1,000,000.00 each occurrence.

• Automobile Liability $1,000,000.00.

• General Workers Compensation Insurance as required by Florida law.

• Longshore Harbor Workers Compensation Insurance

PROTECTION OF WORK AND PROPERTY

The Contractor shall continuously maintain adequate protection of all their work and materials from damage or theft and shall protect the City’s property and all adjacent property from injury or loss arising in connection with activities under their Contract. The Contractor shall make good any such damage, injury, or loss, except such as may be caused by agents or employees of the City.

The Contractor shall take, use, provide, and maintain all necessary precautions, safeguards, and protection to prevent accidents, or injury to persons or property on, about, or adjacent to the site of the work. Should the situation arise that physical security is needed the Contractor will provide security on off days and holidays. The Contractor shall be responsible for all charges incurred with such action.

The Contractor shall post danger signs warning against any hazards created by the work being done under their Contract. They shall designate a responsible member of their organization on the work, whose duty shall be the prevention of accidents, and the name of the person so designated shall be reported to the City Manager or designee and City in writing. In an emergency affecting the safety of life, or of the work or adjoining property, the Contractor, without special instruction or authorization from the City Manager or designee, or City, is hereby permitted to act, at their own discretion, to prevent such threatened loss or injury, and they must take such action if so instructed or authorized by the City Manager or designee. The Contractor shall also protect adjacent property as required by law.

PARKING

The Contractor shall arrange with City Manager or designee for temporary parking areas to accommodate construction personnel and construction equipment. Note that limited parking spaces are available in the City of St. Pete Beach. The Contractor will be asked to coordinate with the City’s representative on site on a regular basis to minimize the impact on residents and visitors.

TRANSPORTATION, HANDLING AND STORAGE

The Contractor shall transport, handle, protect and store products in accordance with manufacturer's instructions and all environmental regulatory agencies.

VEHICLES

Business vehicles shall be identified on both sides with the name of the company.

ENVIRONMENTAL PROTECTION

It shall be the Contractor’s responsibility to implement construction methods, best management practices, and erosion control methods that avoid water pollution as required by the State of Florida Department of Environmental Protection (FDEP), City of St. Pete Beach, and Pinellas County. Any Contractors in violation of the City of St. Pete Beach Regulations, Pinellas County Regulations, Florida Department of Environmental Protection Regulations, or any other regulatory agency regulations shall be the sole responsibility of the Contractor. The Contractor shall hold harmless the City of St. Pete Beach and the City Manager or designee from any fines and litigation resulting from the Contractor’s actions. The Contractor shall pay all attorneys’ fees, fines, penalties and any other such expenses resulting from the Contractor’s actions. The Contractor shall provide all necessary measures to prevent any materials whatsoever from entering the waterway except for those materials, which are shown, on the plans as completed structures.

The Contractor shall provide MSDS sheets to the City Manager or designee on all applicable materials before applying those materials. The Contractor shall secure the necessary education, certifications, licenses and permits required by state and local agencies to operate and manage a construction site, including but not limited to, FDEP requirements related to Coastal Construction Control Line. The Contractor shall abide by all rules and regulations set forth and required by the City of St. Pete Beach’s MS4 NPDES Permit.

TIMELY DEMAND FOR STAKES AND INSTRUCTIONS

The Contractor shall provide reasonable and necessary materials, opportunities, and assistance for setting stakes and making measurements, including the furnishing of a rodman, or a chainman at intermittent times during the construction period. They shall not proceed until they have received such stakes and instructions as may be necessary as the work progresses. The work shall be done in strict conformity with such stakes and instructions. The Contractor shall carefully preserve benchmarks, reference points and stakes, and in case of willful or careless destruction, they will be charged with the resulting expense and shall be responsible for any mistakes that may be caused by their unnecessary loss or disturbance.

WORKMANSHIP

The Contractor acknowledges that they have satisfied themselves as to the nature and location of the work;

the general and local conditions including but not restricted to those bearing upon transportation, disposal, handling and storage of materials; availability of labor, water, electric power, roads; and uncertainties of weather, surface conditions, subsurface conditions, tides or similar physical conditions at the site, the character of equipment and facilities required to prosecute the work.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .