2_Bid Schedule_B1212 Rpr Air Freight Term_35 Pct Design.xlsx

XLSX spreadsheet 544 KB Posted

Attached to
A&E 35% Design to Repair Air Terminal Facility B1212
Solicitation number
FA449725R0020
Issued by

About this file

This is a construction cost estimate spreadsheet for a project at Dover Air Force Base, Delaware, dated December 31, 1999. The document is a comprehensive breakdown of potential construction costs across 49 different divisions, ranging from general requirements to specialized equipment and infrastructure. However, the spreadsheet contains numerous "#REF!" errors, indicating incomplete or unresolved calculation fields, which limits the precise financial insights that can be drawn from the document.

The cost estimate appears to be associated with the architectural and engineering design solicitation (FA449725R0020) for repairing Building 1212 Air Freight Terminal, which requires 35% design services. The spreadsheet is structured to capture labor and material costs across multiple construction divisions, with sections for location-specific factors like fiscal year escalation and Dover Area Cost Factor. Despite the technical layout, the actual cost values are not populated, rendering the financial details of the potential construction project indeterminate in this version of the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

CONSTRUCTION COST ESTIMATE DATE

COMPANY ESTIMATOR

PROJECT [PROJECT TITLE] CHECKED BY

LOCATION Dover AFB, DE PROJECT NO.

DIVISION DESCRIPTION % by Division Division Total

DIVISION 01GENERAL REQUIREMENTSERROR:#REF!- 0
DIVISION 02EXISTING CONDITIONSERROR:#REF!- 0
DIVISION 03CONCRETE WORKERROR:#REF!- 0
DIVISION 04MASONRYERROR:#REF!- 0
DIVISION 05METALSERROR:#REF!- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITESERROR:#REF!- 0
DIVISION 07THERMAL AND MOISTURE PROTECTIONERROR:#REF!- 0
DIVISION 08OPENINGSERROR:#REF!- 0
DIVISION 09FINISHESERROR:#REF!- 0
DIVISION 10SPECIALTIESERROR:#REF!- 0
DIVISION 11EQUIPMENTERROR:#REF!- 0
DIVISION 12FURNISHINGSERROR:#REF!- 0
DIVISION 13SPECIAL CONSTRUCTIONERROR:#REF!- 0
DIVISION 14CONVEYING EQUIPMENTERROR:#REF!- 0
DIVISION 15RESERVEDERROR:#REF!ERROR:#REF!
DIVISION 16RESERVEDERROR:#REF!- 0
DIVISION 20RESERVEDERROR:#REF!- 0
DIVISION 21FIRE SUPRESSIONERROR:#REF!- 0
DIVISION 22PLUMBINGERROR:#REF!- 0
DIVISION 23HEATING, VENTILATING AND A/CERROR:#REF!- 0
DIVISION 24RESERVEDERROR:#REF!ERROR:#REF!
DIVISION 25INTEGRATED AUTOMATIONERROR:#REF!- 0
DIVISION 26ELECTRICALERROR:#REF!- 0
DIVISION 27COMMUNICATIONSERROR:#REF!- 0
DIVISION 28ELECTRONIC SAFETY AND SECURITYERROR:#REF!- 0
DIVISION 29RESERVEDERROR:#REF!ERROR:#REF!
DIVISION 30RESERVEDERROR:#REF!ERROR:#REF!
DIVISION 31EARTHWORKERROR:#REF!- 0
DIVISION 32EXTERIOR IMPROVEMENTSERROR:#REF!- 0
DIVISION 33UTILITIESERROR:#REF!- 0
DIVISION 34TRANSPORTATIONERROR:#REF!- 0
DIVISION 35WATERWAYS AND MARINE CONSTRUCTIONERROR:#REF!- 0
DIVISION 36RESERVEDERROR:#REF!ERROR:#REF!
DIVISION 37RESERVEDERROR:#REF!ERROR:#REF!
DIVISION 38RESERVEDERROR:#REF!ERROR:#REF!
DIVISION 39RESERVEDERROR:#REF!- 0
DIVISION 40PROCESS INTEGRATIONERROR:#REF!- 0
DIVISION 41MATERIAL PROCESING AND HANDLING EQUIPMENTERROR:#REF!- 0
DIVISION 42PROCESS HEATING, COOLING AND DRYING EQUIPMENTERROR:#REF!- 0
DIVISION 43PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENTERROR:#REF!- 0
DIVISION 44POLLUTION CONTROL EQUIPMENTERROR:#REF!- 0
DIVISION 45INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENTERROR:#REF!- 0
DIVISION 46RESERVEDERROR:#REF!- 0
DIVISION 47RESERVEDERROR:#REF!ERROR:#REF!
DIVISION 48ELECTRICAL POWER GENERATIONERROR:#REF!- 0
DIVISION 49RESERVEDERROR:#REF!ERROR:#REF!

HARD COST TOTAL ERROR:#REF! ERROR:#REF!

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)ERROR:#REF!ERROR:#REF!
SUBTOTALERROR:#REF!
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)ERROR:#REF!ERROR:#REF!
SUBTOTALERROR:#REF!
DESIGNERROR:#REF!
SUBTOTALERROR:#REF!
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)ERROR:#REF!ERROR:#REF!
CONTRACT TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

&P of &N

Div1

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div2

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div3

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div4

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MASONRY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div5

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div6

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div7

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div8

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div9

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div10

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIALTIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div11

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div12

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div13

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div14

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div15

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div16

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div20

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div21

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div22

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div23

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div24

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div25

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INTEGRATED AUTOMATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div26

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div27

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div28

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div29

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div30

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div31

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div32

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div33

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
UTILITIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div34

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
TRANSPORTATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div35

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WATERWAYS AND MARINE CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div36

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div37

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div38

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div39

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div40

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS INTEGRATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div41

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MATERIAL PROCESING AND HANDLING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div42

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS HEATING, COOLING AND DRYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div43

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div44

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
POLLUTION CONTROL EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div45

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div46

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div47

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

Div48

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL POWER GENERATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0

TOTAL $ - 0

&"Verdana,Bold"Construction Cost Estimate

Div49

CONSTRUCTION COST ESTIMATEDATE
12/31/99
PROJECTBASIS FOR ESTIMATE
[PROJECT TITLE]CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
Dover AFB, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
0- 0
DRAWING NO.ESTIMATORCHECKED BY
- 0- 0
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
ERROR:#REF!ERROR:#REF!
FY Escalation RateERROR:#REF!ERROR:#REF!
Dover Area Cost FactorERROR:#REF!ERROR:#REF!
TOTALERROR:#REF!

&"Verdana,Bold"Construction Cost Estimate

File details come from the government source that posted it. Updated .