This Statement of Work (SOW) details architectural and engineering (A/E) design services for repairing Building 1212 Air Freight Terminal at Dover Air Force Base. The project requires a 35% design phase with a 120-day period of performance, focusing on comprehensive facility improvements including bird netting installation, fire alarm replacement, electrical upgrades to LED lighting, HVAC system repairs, plumbing updates, structural roof and door repairs, pavement replacement, and interior insulation assessment.
Key deliverables include multiple design submittal stages (design charrette, 10% design, 35% design) with specific documentation requirements such as design analysis, specifications, drawings, basis of design, and preliminary cost estimates. The project has strict security protocols, requiring contractor badge policies, criminal background investigations, and compliance with Force Protection Condition (FPCON) guidelines. The design must adhere to Air Force Whole Building Design Guide, Dover Air Force Base Installation Facilities Standards, and standard specifications, with a total contract value not specified in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
STATEMENT OF WORK:
A/E Services for Design and Construction
35 % Design, TWCF Repair Roof, HVAC, LPS, Roll-Up Doors, Fire Protection, Air Freight Terminal, B1212
PROJECT NUMBER FJXT210029
27 February 2025
Contents
PART I - PROJECT SPECIFIC GUIDANCE
1. SCOPE
1.1 OBJECTIVE:
1.2 PERIOD OF PERFORMANCE:
1.3 LIMITATIONS:
1.4 LOCATION:
1.5 OBJECTIVE OF DESIGN
1.6 DETAILED SCOPE
2. POINTS OF CONTACT (POC):
3. GOVERNMENT-FURNISHED INFORMATION, EQUIPMENT, MATERIAL, AND PROPERTY
PART II – GENERIC REQUIREMENTS
1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS
2. TABLE OF DELIVERABLES
3. DESIGN DELIVERABLES
4. CONTRACT ADMINISTRATION REQUIREMENTS
5. PREPARATION OF SPECIFICATIONS AND REPORTS
6. SECURITY
7. ANTITERRORISM
8. ATTACHMENTS
PART I – PROJECT SPECIFIC GUIDANCE
1. SCOPE
1.1 OBJECTIVE:
Provide 35% architectural and engineering (A/E) design services for the repair of Building 1212 Air
Freight Terminal. Design shall adhere to Air Force Whole Building Design Guide, Dover Air Force
Base (DAFB) Installation Facilities Standards (IFS) and DAFB Design Guide and Dover Air Force
Base Standard Specifications.
The contractor shall furnish all personnel, services, equipment, materials, and any other necessary requirements necessary for the performance of work detailed in this statement of work.
Primary technical services shall be performed by individuals who are credentialed members of architectural, planning, science, and engineering professions. Disciplines include, but are not limited to, fire protection engineers, architects, landscape architects, interior designers, cost estimators, specification writers, Computer Assisted Design and Drafting (CADD) technicians, Geographic
Information System (GIS) analysts, and any other Professional Engineer (PE) disciplines.
Generally, a credentialed professional is a) is licensed (e.g. registered professional engineer) to practice in the state where the facility is located and b) commands the necessary expertise, in terms of knowledge and experience, to undertake the specified task to be identified at the task order level.
1.2 PERIOD OF PERFORMANCE:
Total period of performance for this design service is 120 days (negotiable prior to contract award).
1.3 LIMITATIONS:
The project location is within a restricted area. The contractor is responsible for ensuring coordination through the installation, facility user, and contracting officer to gain proper access to the required locations. The facility is used to store explosives. Electronic devices with the ability to transmit and receive signals are not allowed outside of the administrative area. Coordination with the facility user is required if this type of electronic device is required to be used for the execution of this contract.
Contractor may be required to vacate or evacuate the facility in case of emergency or during loading/unloading operations.
1.4 LOCATION:
The primary location of this project is building 1212 on Dover Air Force Base, Kent County the city of Dover Delaware.
1.5 OBJECTIVE OF DESIGN
A/E contractor shall develop 35% design documents including specifications, drawings, basis of design, and cost estimate for the repair of Building 1212, Air Freight Terminal. 35% design shall encompass, but is not limited to, all requirements listed in section 1.6, Detailed Scope.
1.6 DETAILED SCOPE
1.6.1 Bird Netting: Install bird netting under admin area overhand and in all three bay areas (estimated 20,000 square feet)
1.6.2 Fire Alarms: Replace existing fire alarm distribution, control, and all necessary wiring and detectors with system capable of communicating with 436 CES Fire Department D-21 Fire Alarm Reporting System. Fire alarm controls shall be located away from all water sources such as sprinkler heads or potential areas for roof leaks. Existing equipment shall be turned over to 436 CES for reuse.
1.6.3 Electrical: Replace all non-LED lighting with LED lighting in accordance with UFC 3-550-01.
1.6.4 HVAC: Replace 3 ton, 1200 CFM air handler and heat pump. Replace nonfunctional ventilation louvres. Repair exhaust fans. Repair non functional infrared heating system. Repair control system so operation is unaffected by interior temperature and whether doors are open.
1.6.5 Plumbing: Replace floor mounted water fountain.
1.6.6 Structural: Repair spray polyurethane foam roof sections A, B, and C in accordance with Attachment 1. Building 1212 Roof Report. Replace all roll up doors and ensure replacement is compatible with existing intrusion detection system. Repair uneven floor under roof section C.
1.6.7 Pavements: Replace damaged pavement sections in accordance with Attachment 2.
B1212 pavement plan. Design for heavy industrial use for parking of fully loaded tractor trailers. Design shall include soil cement stabilization and aggregate drainage layer under 12’’ of concrete. Include all necessary site preparations.
1.6.8 Interior: Propose plan to clean interior insulation or replace if necessary. Include cost estimate for both courses of action.
1.6.9
a. Supplemental Descriptions and Criteria – The information provided in the paragraphs that follow shall be used at every submittal point to produce the various elements of a complete Design Analysis. The Purpose of Design Analysis contents shall be used:
- to provide a narrative description of the key elements and features of the design
- to provide the basis for design, including assumptions, design criteria such as temperature, humidity, and loads.
- to provide the information, justification, and calculations of the design.
- to provide the designer’s thought process in the development of the design.
Basis of Design – The basis of design shall
- Describe the Scope of Work.
- Identify any violations of criteria that would occur if the project were constructed as described in the SOW/TO.
- Discuss Fire and Life Safety compliance.
- Address electrical classifications.
- Recommend phasing of construction if required to meet user needs.
- State reasons for selection of materials, components, and systems. Show actual design calculations with the appropriate discipline listed below.
- Address the maintainability of all selected equipment. Provide detailed analysis in the appropriate discipline to indicate that all clearances are sufficient to permit service, removal, and replacement.
- Address life cycle cost considerations. Where applicable, show balance of initial cost with operating and maintenance costs over the anticipated life of the facility or system.
- Address energy analysis to include, but not limited to energy use by utility, energy use profile, unmet hours report, energy cost savings, and energy use savings.
Electrical Drawings – Electrical drawings must be complete enough to thoroughly express the designer’s intentions and include the following:
- Existing Site and Demolition Plan
- Site Plan
- Single Line Diagram
- Communications plans for lighting control system
- Preliminary Design Analysis including Preliminary load calculations for utility connections.
2. POINTS OF CONTACT (POC):
POC(s) will be provided at the time of contract award.
3. GOVERNMENT-FURNISHED INFORMATION, EQUIPMENT, MATERIAL, AND
PROPERTY
INFORMATION – The Government may provide information in the form of available plans, reports, maps, and drawings as necessary to facilitate accomplishment of the work required in this
Statement of Work. The Government may furnish electronic copies of available As-Built drawings that are pertinent to the buildings involved in PDF format. However, these drawings are not warranted to show conditions as they exist. The designer shall field verify the information shown on the As-Built drawings as necessary to produce a quality-designed project.
3.1 EQUIPMENT – None provided.
3.2 MATERIAL – None provided.
3.3 PROPERTY – None provided.
PART II – GENERIC REQUIREMENTS
1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS
1.1. Department of Defense specifications and criteria located at http://wbdg.org/ffc/dod.
Including but not limited to:
1-200-01 Unified Facilities Criteria (UFC) DOD Building Code
1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard
1.2. National Fire Protection Association 70, National Electric Code (2023 Edition)
1.3. Air Force specifications and criteria located at http://wbdg.org/ffc/af-afcec.
1.4. Dover Air Force Base Installation Facilities Standards (IFS) is located at http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs.
1.5. Dover AFB specifications listed below are provided as solicitation/contract attachments:
1.5.1. Dover Air Force Base Design Guide/IFS
http://wbdg.org/ffc/dod http://wbdg.org/ffc/af-afcec http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs
2. TABLE OF DELIVERABLES
Instructions: Identified documents are mandatory, the number of copies and delivery dates are shown in the table below.
TABLE OF DELIVERABLES
Co nt ra ct in g
(C O
N S)
Ci vi l En gi ne er in g (C
ES
C A
D
F ile s El ec tr on ic
Ha rd op y
CA
DD
El ec tr on ic
Ha rd op y
A
Design Charrette
1 1 1 Within 15 calendar days after NTP.
10% Design Submittal
1 1 2 Within 30 calendar days after NTP.
35% Design
1 1 2 Within 60 calendar days after NTP.
Review Meeting
Within 75 calendar days after NTP.
Final
1 1 1 2 1 Within 90 calendar days after NTP.
Final Review Meeting
1 1 1 1 Within 105 calendar days after NTP.
Project Closeout End of PoP
120 calendar days after NTP.
The Government will provide review comments within 15 calendar days of receipt of the 35% Plans, Specs, Submittals & Costs.
Note: All electronic deliverables shall be submitted via DoD Safe. Electronic Versions shall be in native format and consolidated PDF. Hard copies shall be delivered as 3-ring binders or bound drawing sets unless specified otherwise in this statement of work.
3. DESIGN DELIVERABLES
3.1. Qualified Design – Professionals licensed architects and engineers in the inspection fields competent in their area of practice shall be assigned to this project.
3.2. Design Charrette – Due within 15 calendar days after Notice to Proceed (NTP).
3.3. 10% Design Submittal – Due 30 calendar days after Notice to Proceed (NTP). The 10% design submittal shall include.
3.3.1. Draft design analysis (Basis of Design)
3.3.2. Executive summary of the scope of all work
3.3.3. Draft Specification Table of Contents
3.3.4. Draft drawing cover sheet with table of contents.
3.4. 35% Design Submittal – Due 60 calendar days after Notice to Proceed (NTP). To include fully edited specifications, complete drawings, and Basis of Design. Design document submissions shall include the following:
3.4.1. Table of Contents
3.4.2. Executive summary of the scope of all work
3.4.3. Minutes and sign-in sheets of all meetings pertaining to the development of the design.
3.4.4. Previous Government review comments and Contractor responses
3.4.5. Design Analysis (Basis of Design) and appropriate engineering calculations
3.4.6. Design drawings and specifications
3.5. 35% Design Review Meeting – Within 75 calendar days after NTP. These meetings will include all relevant Base POCs and Contracting Personnel on an as needed basis. These meetings will cover the design review comments made on the current design submittal and will include any pertinent issues which could affect future contract progress. The following items shall be covered. The Contractor shall respond to government comments seven days after Design Review Meeting.
3.5.1. Meeting attendees and contact information.
3.5.2. Review and resolution of design review comments
3.5.3. New business
3.5.4. Schedule
3.6. 35% Design Final Submittal – Within 90 calendar days after NTP. To include fully edited specifications, complete drawings, and Basis of Design. Design document submissions shall include the following:
3.6.1. Table of Contents
3.6.2. Executive summary of the scope of all work
3.6.3. Minutes and sign-in sheets of all meetings pertaining to the development of the design
3.6.4. Preliminary cost estimate. Provide a PCE using the most recent standard Construction Specification Institute (CSI) format. The PCE shall show totals of each CSI divisional breakdown with subtotals, and below cost markups, as required. Additionally, the Contractor shall have a summary sheet illustrating all CSI divisions and an individual sheet per applicable CSI divisions, including at a minimum, a Description of Item, Quantity, Unit Type (e.g., EA, SF, LF), Unit Price, and Subtotals.
3.6.5. Previous Government review comments and Contractor responses
3.6.6. Design Analysis (Basis of Design) and appropriate engineering calculations
3.6.7. Design drawings and specifications
3.7. 35% Design Final Review Meeting Within 105 calendar days after NTP. These meetings will include all relevant Base POCs and Contracting Personnel on an as needed basis. These meetings will cover the final design review comments made on the current design submittal. The following items shall be covered. The Contractor shall respond to government comments seven days after Design Review Meeting.
4. CONTRACT ADMINISTRATION REQUIREMENTS
4.1. Progress Schedule, AF Form 3064 – The Contractor shall prepare and submit, for approval by the Contracting Officer (CO), a work breakdown structure. The work breakdown structure shall be used to report the cost and schedule status for this project. All tasks required under this type of contract shall be included in the work breakdown structure.
4.2. Progress Reports, AF Form 3065 – The Contractor shall complete biweekly Contract Progress Reports throughout the contract period. The work elements and percentages of the total job identified on the AF Form 3065 shall be identical to the work elements and percentages indicated on the AF Form 3064. Each invoice should be based on the most recent approved AF Form 3065 and will be entered through Wide Area Work Flow (WAWF). The AF Form 3064, AF Form 3065, and invoice shall all cover the same period of performance.
4.3. Notification Requirement – The Contractor is required to notify the Contracting Officer and the Project Manager of critical issues that may affect life, health, safety, contract performance, or the environment. Verbal notification should be made immediately followed by written notification as soon as practical.
4.4. Transmittal Form – The Contractor is required to use AF Form 3000 Material Approval Submittal as the transmittal form for both design and construction submittals.
4.5. Submittal Format – Provide submittals in electronic format, with the exception of material samples required for Submittal Description (SD)-04 Samples items. In addition to the electronic submittal, provide one hard copy of design submittals. Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, coordinate the file naming convention with the Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Use Portable Document Format (PDF) as the electronic format, unless otherwise specified or directed by the Contracting Officer. Generate PDF files from original documents with bookmarks so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical
Character Resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature. Email electronic submittal documents fewer than 10 MB to an email address as directed by the Contracting Officer. Provide electronic documents over through DoD Safe.
Provide hard copies of submittals when requested by the Contracting Officer. Up to three additional hard copies of any submittal may be requested at the discretion of the Contracting Officer, at no additional cost to the Government.
5. PREPARATION OF SPECIFICATIONS AND REPORTS
The A/E contractor shall provide specifications that are as brief as possible, definitive, and free of ambiguities and omissions that may result in controversy and contractor claims for additional compensation. Use of the guide specifications of the Unified Facilities Guide Specifications (UFGS) system is mandatory in preparing specifications Design-Bid-Build projects. UFGS are available at the Whole Building Design Guide website http://dod.wbdg.org/ .
Tailor the UFGS as necessary to suit the work required by the specific project, including editing for metric or inch-pound. In addition, modify and edit to reflect the latest proven technology, materials, and methods, if warranted. Use the project specification sections from the website that are current at the beginning of the 50% design. Bound copies shall be provided as required in the contract. Specifications shall also be provided on approved electronic media as approved by the CO as Microsoft Word documents and/or pdf format.
1. Format for Specifications and Reports Cover Use the standard covers for submittals, specifications, and reports.
2. General Format Concerns. Type documents (12-point, minimum) on 8-1/2" x 11" white, bond paper.
The left and right margins shall be one inch.
3. Specification Format. The text numbering system, page numbering system, index, general format, and nomenclature shall conform to the latest format of the Construction Specification Institute or MasterSpec.
4. Page Numbering. Consecutively number each page within each section beginning with page 1, at the bottom center. For example, the fifth page of Section 06100, would be "06100-5." Begin each section on a new page. Final reports shall also be consecutively numbered at the bottom center.
5. Applicable Publications. Include in the specifications only those referenced publications that are necessary to establish a biddable standard. All referenced standards must be in a format to be in clear view in the Construction Contractor's office for easy reference.
6. Nomenclature. References to the "Architect, Engineer, Owner, Client," etc., are not permissible. Use "Contracting Officer" wherever "Owner" or "Client" is referenced and use "Contractor" wherever "subcontractor" or "installer" is referenced in the specifications.
7. Grammar. Use complete sentences with correct spelling. Do not include "contract" language in specifications. Address the technical aspects of projects only.
8. Tolerances. Write specifications without words such as "match existing" or similar phrases that cannot be bid without further information and that cannot be enforced. If possible, the specifications shall state allowable tolerance.
http://dod.wbdg.org/
6. SECURITY
6.1. SECURITY:
6.1.1. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Governmental Installation shall abide by all security instructions and directives of Dover AFB. Employees are responsible for safeguarding all government property provided for contractor use.
6.1.2. At the close for each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and window secured.
6.1.3. The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general wellbeing or operational mission of the Installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Investigation
(CBI).
6.1.4. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented, or illegal aliens will be remanded to the proper authorities.
6.1.5. The contractor shall submit any request for compensation on delays to the Contracting Officer for approval. The contractor shall notify the Contracting Officer or authorized representative as soon as the contractor realizes/determines of any potential delays in accordance with the terms and conditions of this requirement.
6.1.6. All contractors and subcontractors when working in a Controlled, Restricted or other sensitive area must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.
6.2. CONTRACTOR BADGE POLICIES:
6.2.1. All requests for contractor badges will be submitted through the 436 th Contracting
Squadron and/or the requesting agencies base point of contact. The 436 th Contracting
Squadron or base point of contact will then fill out an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the Pass and Registrations section for approval IAW OPlan 31-101. As a minimum the ORM will be submitted 10-days prior to the requested date of employment.
6.2.2. All contactor employees requesting to be granted unescorted access to the Installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the Installation. Continued employment is contingent upon successful completion and favorable reporting of the CBI.
6.2.3. DAFB Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to 436 Security Forces Squadron (436 SFS), Pass and Registration for destruction. Also, before a new badge will be issued, an ORM must be resubmitted to the Pass and Registration section for approval. In the event a badge is lost or stolen, immediately contact the 436 Security Forces Squadron, Pass and Registration office. The badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436 Security Forces Squadron, Pass and Registration office and submit a new request for badge before a new badge can be reissued.
6.2.4. Base Contracting Office or base point of contact will immediately notify 436 Security Forces Squadron, Pass and Registration when a contractor’s employment has been terminated. The Site Supervisors are responsible for notifying and returning the contractor’s badge to Pass and Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial; they need to contact the Contracting Officer.
6.3. INSTALLATION ACCESS:
6.3.1. The contractor shall obtain personal contractor identification badges for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover AFB from 436 SFS, Pass and Registration, for the duration of the contract. Employees are only permitted to enter the Installation during the date and time periods indicated on their contractor badge.
6.3.2. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the Installation. All vehicles entering the DAFB Main Base, Military Family Housing or sensitive areas are subject to search. Any refusal or non-consent by an employee will result in termination of their base access and immediate confiscation of this access badge.
6.3.3. During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.
6.3.4. During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.
6.3.5. During Higher FPCONs (Charlie and Delta) the base will normally curtail non- essential operations/functions; access by non-essential Contract operations will be suspended as the direction of the Installation Commander.
6.3.6. DoD Contractors supporting a Base Service Contract (e.g., Custodial Services, Ground Maintenance, etc.) are highly encouraged to complete AT Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the―Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html for individuals without access to government Non-classified Internet Protocol Router Network (NIPRNET) computer and who do not possess a CAC card.
6.3.7. DoD Contractors or subcontractors without a CAC or who do not have access to a government Non-classified Internet Protocol Router Network (NIPRNET) computer performing construction on the installation should consider completing AT Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the― Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html http://jko.jten.mil/courses/atl1/launch.html
6.3.8. IMPORTANT: The standalone course MUST be completed on the computer in which it is started. Course progress is not transferable between computers. The standalone course does provide a completion certificate but will not be tracked on JKO and no record will be maintained. AT Awareness Level I Training should be provided by the requiring unit after contract award or the sponsoring organization.
7. Antiterrorism
7.1.1. References:
• Department of Defense Instruction O-2000.16, Volume 1 DoD Antiterrorism (AT) Standards, Standard 18
• Defense Federal Acquisition Regulation Supplement (DFARS) (Reference (r)) reflects current DoD AT security requirements for defense contractors.
• Joint Publication 3-07.2 Antiterrorism
7.1.2. Terrorism is defined as: The calculated use of unlawful violence or threat of unlawful violence to inculcate fear; intended to coerce or to intimidate governments or societies in the pursuit of goals that are generally political, religious, or ideological.
7.1.3. Antiterrorism: As a prelude and during performance of any contract, it is critical that the Contractor be supportive of all Department of Defense (DoD) requirements to protect personnel and their families, installations, facilities, information, and other resources from terrorist acts.
7.1.4. Contractors or subcontractors possessing a Common Access Card (CAC) will complete AT Awareness Level I training IAW AFI 31-145, Antiterrorism, Standard 25, by completing the―Force Protection computer based training (CBT) course through the MyLearning site. This training site is available through the AF Portal at https://lms-jets.cce.af.mil/moodle/. This site automatically records members completion of training and enables the user to print a certificate if needed by the Unit or Base Training Manager.
7.1.5. Contractors or subcontractors without a CAC or who do not have access to a government Non-classified Internet Protocol Router Network (NIPRNET) computer performing construction/services on the installation will complete AT Awareness Level I training IAW AFI 31-245, Antiterrorism, Standard 25, by completing the― Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at
7.2. Force Protection Condition (FPCON) Impact on Work Levels
7.2.1. If the DAFB FPCON is elevated to Charlie, the installation shall evaluate the need for contract services to be discontinued. At FPCON Delta, services are discontinued. Services shall resume when the FPCON level has been lowered.
7.2.2. Administrative Note: In the event of an emergency, dial 911 from any land line on the installation. The call will be routed to the ECC (302-677-6666). If a cell phone is used to dial 911, it will be routed to the county 911 dispatch. Inform the dispatcher the emergency is on DAFB and they will route the call to the DAFB ECC.
8. ATTACHMENTS
Attachment 1. Building 1212 Roof Report Attachment 2. Building 1212 Pavement Plan Attachment 3. B1212 As Built Drawings Attachment 4. B1212 Truck Leveling System Attachment 5. Floor Treatment Attachment 6. Radiant Heater Addition
STATEMENT OF WORK:
A/E Services for Design and Construction
1.1 OBJECTIVE: 3
PART I – PROJECT SPECIFIC GUIDANCE
1. SCOPE
1.1 OBJECTIVE:
1.2 PERIOD OF PERFORMANCE:
1.3 LIMITATIONS:
1.4 LOCATION:
1.5 OBJECTIVE OF DESIGN
1.6 DETAILED SCOPE
1.6.1 Bird Netting: Install bird netting under admin area overhand and in all three bay areas (estimated 20,000 square feet)
1.6.2 Fire Alarms: Replace existing fire alarm distribution, control, and all necessary wiring and detectors with system capable of communicating with 436 CES Fire Department D-21 Fire Alarm Reporting System. Fire alarm controls shall be located away ...
1.6.3 Electrical: Replace all non-LED lighting with LED lighting in accordance with UFC 3-550-01.
1.6.4 HVAC: Replace 3 ton, 1200 CFM air handler and heat pump. Replace nonfunctional ventilation louvres. Repair exhaust fans. Repair non functional infrared heating system. Repair control system so operation is unaffected by interior temperature and ...
1.6.5 Plumbing: Replace floor mounted water fountain.
1.6.6 Structural: Repair spray polyurethane foam roof sections A, B, and C in accordance with Attachment 1. Building 1212 Roof Report. Replace all roll up doors and ensure replacement is compatible with existing intrusion detection system. Repair unev...
1.6.7 Pavements: Replace damaged pavement sections in accordance with Attachment 2. B1212 pavement plan. Design for heavy industrial use for parking of fully loaded tractor trailers. Design shall include soil cement stabilization and aggregate draina...
1.6.8 Interior: Propose plan to clean interior insulation or replace if necessary. Include cost estimate for both courses of action.
1.6.9
2. POINTS OF CONTACT (POC):
3. GOVERNMENT-FURNISHED INFORMATION, EQUIPMENT, MATERIAL, AND PROPERTY
PART II – GENERIC REQUIREMENTS
1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS
1.5. Dover AFB specifications listed below are provided as solicitation/contract attachments:
2. TABLE OF DELIVERABLES
3. DESIGN DELIVERABLES
6. SECURITY
6.2. CONTRACTOR BADGE POLICIES:
6.3. INSTALLATION ACCESS:
7. Antiterrorism
Dover Air Force Base
Contact: TSgt W. Greer (302) 677-4729
RRI Roof Inspection/Maintenance
Building #: 1212
Roof Area Letter: A
Facility Picture#: 0935
Roof Area Overview Picture #: 947 - 962
Roof Area Defects Pictures #:
Date: 4-5-23
Initials of Inspectors Only: TR
Condition of Roof Area: Circle One
Green Yellow Amber Red
Roof System: SPF
Estimated Installation Date:
Interior Sensitivity: Circle One
High Medium Low
Roof Access: Circle One
Exterior ladder Lift Ladder Required
Elevation: 24’
Interior Temperature:
Interior Humidity: Circle One
Leak Comments (where, how, repair completed) and Picture locations on Drawing:
No active leaks
Missing downspout- pic 947
Voids at rising wall counterflashings- pics 949, 950, 956, 962
Holes in foam- pics 955 & 960
Rising wall masonry issues- pics 957 – 959, 961
Previous repairs- pic 951 Example
Additional Comments:
Attachment 1 - B1212 Roof Report
Roof Area Letter: B
Roof Area Overview Picture #: 963, 969, 972
Voids in rising wall counterflashings- pic 970
Holes in foam- pic 971 Example
Rising wall masonry issues- pics 964 & 973 Example
Previous repairs- pic 964 Example
Voids at perimeter edges- pics 965 & 966
Roof Area Letter: C
Roof Area Overview Picture #: 974 & 988
Previous repairs- pics 978, 979, 982
Holes in foam- pics 977, 980, 984
Voids at rising wall counterflashing- pics 975, 976, 981, 985, 986
Masonry issues- pics 987 & 991
Roof Area Letter: D
Roof Area Overview Picture #: 936 - 946
Roof System: SSM
Elevation: 15’
No issues
Roof ARoof BRoof C
Roof D
Roofing Resources, Inc.
Project
Customer
DWG. By
Date Scale
This drawing is the property of Roofing Resources, Inc.
It may not be reproduced without consent.
N.T.S
TWCF Roof Survey, B-1212
Dover, AFB
LEH
423 Mcfarlan Road Suite #100 Kennett Square, PA 19348
Tel: (610) 558-4000 Fax: (610) 388-9415
June 29, 2022
Tim
Text Box
Voids at counterflashings and masonry issues
Arrow
Line
Text Box
Holes in foam across A, B, & C
1212 Roof area A
1212 Roof area B
1212 Roof area C
1212 Roof area D
Contact sheet (35)
1212 Drawing
Attachment 2 - B1212 Pavement Plan
Attachment 3 - B1212 As-Built Drawings
Sht1001.cal
Sht1002.cal
Sht1003.cal
Sht1004.cal
Sht1005.cal
Sht1006.cal
Sht1007.cal
Sht1008.cal
Sht1009.cal
Sht1010.cal
Sht1011.cal
Sht1012.cal
Sht1013.cal
Sht1014.cal
Sht1015.cal
Sht1016.cal
Sht1017.cal
Sht1018.cal
Sht1019.cal
Sht1020.cal
Sht1021.cal
Sht1022.cal
Sht1023.cal
Sht1024.cal
Sht1025.cal
Sht1026.cal
Sht1027.cal
Sht1028.cal
Sht1029.cal
Sht1030.cal
Sht1031.cal
Sht1032.cal
Sht1033.cal
Sht1034.cal
Sht1035.cal
Sht1036.cal
Sht1037.cal
Sht1038.cal
Sht1039.cal
Sht1040.cal
Sht1041.cal
Sht1042.cal
Sht1043.cal
Sht1044.cal
Sht1045.cal
Sht1046.cal
Sht1047.cal
Attachment 4 - B1212 Truck Leveling System
Attachment 5 - B1212 Floor Treatment
Sht-01.cal
Sht-02.cal
SHT-03.CAL
DATE
07DEC04
NEW METER
EXISTING TRANSFORMER
tNFARED HEATER CONTROL PANnL;
(lYPICAL OF 3
3#8+1#10
GROUND IN
1" CDNDUrT
TO 3P.,4DA.
CIRcurr BREAKER
IN SPACE IN
EXISTING
PANEL PDP
4BOV.,3P.,6DA.
FUSED SAFElY
SWITCH
DESCRIPTION
AS BUILT
LV1 LV2
.EIJ:l=1
48DV.,3P.,3DA.
FUSED SAFElY
SWITCH-FUSED
AT 25A.
(lYPICAL)
2 #12 + 1#12 GROUND IN CONDUIT
lYP ALL AUTOLOUVERS (LV) UNrrs TO FANS, SWITCHES
AND PNL RDP CB1
LV3 LV4 LV5 LV6
(lYPICAL OF 24) £
ELECTRIC INFRARED
HEATER
:Ell::l:::1 48DV .. 3•,13.5KW EACb
0~;~~~#1D
48DV .. 3P.,3DA: 3 #8+ l #l D
NON-FUSED GROUND IN
SAFElY swrrcH 1 • CONDUrT
1" CONDUIT
~.Ell:1=1
FAN 1 TO
LV1, LV2, LV3
AIR CURTAIN MOTOR
4BOV.,3~,7.5HP
(lYPICAL OF 2)
BUILDING 1212
FAN 2 TD
LV4, LV5, LV6
PART PLAN
SCALE: NONE
BY
2 #12 + 1#12 GROUND IN CONDUIT
TYP ALL AUTOLDUVERS (LV) UNITS TO FANS, SWITCHES
LV7 LVB
(VPP2-1
FAN 3 TO
LV7, LV8, LV9
LV9
ELECTRIC ROOM
LV10 LV11 LV12
0;;J~f#1D lYPICA.L)
3#8+1#10
FAN 4 TO
LV1D. LV11, LV12
2 #12 + 1#12 GROUND IN CDNDUrT lYP ALL AUTOLDUVERS (LV) UNrrs TO FANS, SWITCHES
LV13 LV14
FAN 5 TO
LV13, LV14, LV15
LV15
<§)PP3-7
LV16 LV17 LV18
FAN 6 TO
LV16, LV17, LV18
MJZ IN ACCORDANCE WITH FAR 52 236-21 ENTITLED SPECIFICATIONS ANp
DRAWING$ FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY. COMPLETENESS. AND COMPLIANCE wrrH CONTRACT
Chugach Support Services Inc.
Building 447 Tuskeege Street
P .0. Box 2049
OAFS, OE 19902
OFFICE: (302) ; 35-5570 FAX: (302) 735-9737
TITLE:
SUBMITTED
CHIEF ENGINEER
REFERENCED NOTES:
0 EXTEND TO CIRCUIT INDICATED VIA 3 POLE, 40 AMP CDNTACTOR IN CONTROL PANEL CP- 1.
(V EXTEND TO CIRCUrT INDICATED VIA 3 POLE, 40 AMP CONTACTOR IN CONTROL PANEL CP-2.
<§> EXTEND TO CIRCUIT INDICATED VIA 3 POLE, 40 AMP CDNTACTOR IN CONTROL PANEL CP-3.
MECHANICAL NOTES:
1. ELECTRIC INFRARED RADIANT (EIH-1) HEATER SHALL BE HEAVY GAUGE, MIRROR-FINISH ALUMINUM, IMPACT-RESISTANT lYPE. PROVIDE MOUNTING BRACKETS FOR HANGING. INSTALL INFRARED ELECTRIC
HEATERS AS PER MANUFACTURER'S RECOMMENDATIONS
MANUFACTURER: AITKEN PRODUCTS, INC.
MODEL#: OH135431 OR APPROVED EQUAL.
WATTS: 13,500
VOLTS: 480
PHASE: 3
HERTZ: 60
AMPS: 16.3
MINIMUM MOUNTING HEIGHT: 12' -0"
CONTROi PANEi ·
MODEL#: N1648-A
TOTAL CAPACITY: 160 AMP
QUANTITY & RATING OF CONTACTORS: (4)40 AMP
VOLTS: 480
PHASE: 3
HERTZ: 60
MAX. KW (BALANCED 3 PHASE): 128
2. AIR DOOR CURTAIN SHALL BE DIRECT DRIVE T.E.A.O. MOTOR, GALVANIZED STEEL BLOWER WHEELS & HOUSING, ADJUSTABLE AIR DISCHARGE NOZZLE, FIBERGLASS AIR OIVERTERS ON FAN DISCHARGE, BEIGE BAKED ON ENAMEL FINISH, WELDED 14 GAUGE ALUMINUM STEEL CABINET, 1/2" MOUNTING HOLES, AMCA
CERTIFIED. INSTALLED AIR CURTAIN AS PER MANUFACTURER'S RECOMMENDATIONS,
MANUFACTURER: BERNER INTERNATIONAL CORP.
MODEL#: CFA-1-12DA, 10 FT LONG
NOZZLE WIDTH: 11 7"
MAX. VEL/DUTLET VEL (FPM): 4500/3627
AIR VOLUME: 12,526 CFM
MOTOR @ HP: 1117.5
POWER RATING (KW): 4.8
NET WEIGHT: 705 LBS.
REMOTE MOUNTED MOTOR CONTROL PANEL FDR 2 MOTOR @7-)i HP-MODEL#903AAHCFDD7 DOOR swrrcH (PLUNGER lYPE): MDDEL#9503SD020-P REMOTE MOUNTED HAND/ON/OFF SWrTCH: MOOEL#9505HOAR
WALL SUPPORT BRACKET (2 PER AIR CURTAIN): MDDEL#66CF-WNB
EXTENSION BRACKET (2 PER AIR CURTAIN): MODEL#66CF-012EB
ENffiT Century Engineering, Inc.
32 We•l Road Tennon, Maryland 21204 Voice (4,10) 823-6070 Fax (,UO) 823-211:W
AIR MOBILITY COMMAND
DOVER AIR FORCE BASE, DELA\./ARE
BUILDING 1212
FLOOR PLAN - MECHANICAL/ELECTRICAL
APPROVED
CHIEF ENGINEER
APPROVED
COMMANDER
ME-1 ~~g/16/oV~
DATE: PROJECT NUMBER:
NOTED
DRA\./N BY:
JUNE 2, 2004 41066 / D0#5033 RAV SHEET OF 2
Attachment 6 - B1212 Radiant Heater Addition
ELECTRICAL LEGEND -D
PANELBOARD, AS NOTED, MOUNT AT 6'-6" A.F.F. TO TOP
EQUIPMENT CABINET, AS NOTED, MOUNT AT 6'-6" A.F.F. TO TOP
SAFETY DISCONNECT SWITCH
MOTOR CONNECTION
CONDUIT AND WIRE, CONCEALED IN WALLS OR ABOVE CEILINGS
' • • HOMERUN TO PANELBOARD:
"11-1,3 ARROWS INDICATE QUANTITY OF CIRCUITS
CROSSLINES INDICATE QUANTITY OF CONDUCTORS
CONDUITS SHOWN WITHOUT CROSSLINES SHALL BE 2#12 AND 1#12
GROUND IN 3/4" CONDUIT UNLESS NOTED OTHERWISE
NOTATION INDICATES PANELBOARD AND CIRCUIT NUMBER TO WHICH
CIRCUITS ARE TO BE EXTENDED
REFER TO BRANCH CIRCUIT WIRE SIZING CHART FOR SIZING OF
CONDUCTORS FOR LONG DISTANCE CIRCUITS
ELECTRICAL ABBREVIATIONS
A AMPERE(S) MLO MAIN LUGS ONLY
I
BRANCH CIRCUIT WIRE SIZ~MG
(20 AMPERE SINGLE PHASE CIRCUITS) 1
I LENGTH OF RUN I HOMERUN SIZE~2~ I CIRCUIT WIRE S1ZE~32 I
J 120 VOLT SYSTEM
o· - 100' I #12 I #12 100· - 150' I #10 I #12 150' - 250' I #8 I #10
J 208 OR 240 VOLT SYSTEM
o· - 175' I #12 I #12 115· - 250' I #10 I #12 250' - 400' I #8 I #10
J 277 VOLT SYSTEM
I o· - 200' I #12 I #12 I 200' - 300' I #10 I #12
300' - 500' I #8 I #10
NOTES
0 WIRING FDR BRANCH CIRCUITS PROTECTED BY 20 AMPERE
OVERCURRENT PROTECTIVE DEVICES SHALL BE SIZED IN
ACCORDANCE WITH THE ABOVE TABLE. WIRING FOR OTHER BRANCH
CIRCUITS SHALL BE SIZED AS SHOWN ON DRAWINGS, EQUIPMENT
GROUNDING CONDUCTOR SHALL BE SIZED THE SAME AS THE
HOMERUN/CIRCUrr CONDUCTOR.
I
AIC AMPERES INTERRUPTING CAPACITY NFSS NON-FUSED SAFETY SWITCH (V HOMERUN LENGTH SHALL BE FROM THE PANELBDARO TO THE CLOSEST OUTLET. DEVICE OR FIXTURE ON THE CIRCUIT. ATS AUTOMATIC TRANSFER SWITCH ¢ PHASE
AWG AMERICAN WIRE GAUGE p POLE
C CONDUIT
PNL PANELBOARD
C/B CIRCUIT BREAKER
PRI PRIMARY
SEC SECONDARY
CKT CIRCUIT
SYM SYMMETRICAL
CONT CONTINUATION
!:, DELTA CONNECTED
TYP TYPICAL
DISC DISCONNECT
UG UNDERGROUND
DWG DRAWING
UNO UNLESS NOTED
EX EXISTING V VOLTS
FSS FUSED SAFETY SWITCH w WIRE, WATTS lsc SHORT CIRCUIT INTERRUPING CAPACITY y WYE CONNECTED
(RMS SYMMETRICAL AMPERES)
Kcmil THOUSAND CIRCULAR MILLS
KV KILOVOLTS
KVA KILO-VOLT-AMPERES
KW KILOWATTS
MCB MAIN CIRCUIT BREAKER
PANEL PP1 <4-80/277 VOLT-3 PHASE-4 WIRE
225 AUPERE. MAIN WGS ONLY
lsc=14 ODO A.LC. SYM. SURFACE MOUNTED ENCLOSURE
1~~-1 SERVING ~ICKT.I SERVING POLE AMP NO. ~ POL AMP
1 INFRARED HEATERS C2l
INFRARED HEATERS (2)
13 SPARE
19 SPACE
21 SPACE
23 SPACE
PANEL PP2
lsc=14 000 A.I.C. SYM.
1~~-1 SERVING
INFRARED HEATERS C2l
7 CNFRAREO HEATERS C2l
13 SPACE
15 SPACE
17 SPACE
19 SPACE
21 SPACE
23 SPACE
3 40 2
3 40 8
40 14
INFRARED HEATERS (2) 3 40
INFRARED HEATERS (2) 3 40
RADIAL SAW
RADIAL SAW
RADIAL SAW
SPACE
SPACE
SPACE
'> 3 20
480/277 VOLT-3 PHASE-4 WIRE
225 AMPERE, MAIN LUGS ONLY
SURFACE MOUNTED ENCLOSURE
~ICKT.I SERVING
~.No ..
3 40 2 INFRARED HEATERS (2) 3 40
4, 40 B SPARE 3 40
14 SPACE
16 SPACE
18 SPACE
20 SPACE
22 SPACE
24 SPACE
~ CIRCUIT LENGTH SHALL BE FROM THE CLOSEST TO THE FARTHEST
ourrLET. DEVICE DR FlXTURE.
OTHERWISE
PANEL PP3 4B0/277 VOLT-J PHASE-4 WIRE
225 AMPERE. 1/AIN WGS ONLY
lsc-14 000 A.I.C. SYM. SURFACE I.IOUNTED ENCLOSURE
I ~~-I SERVING ~ICKT.I SERVING POL AMP NO. ~ POL AMP
1 INFRARED HEATERS (2) 3 40 2 INFRARED HEATERS C2) 3 40
3 4 5 6
7 INFRARED HEATERS (2) 40 8 SPARE 3 40
9 --- 10 11 12
13 SPACE 14 SPACE
15 SPACE 16 SPACE
17 SPACE 18 SPACE
19 SPACE 20 SPACE
21 SPACE 22 SPACE
23 SPACE 24 SPACE
GENERAL NOTES - ELECTRICAL WORK
A. DRAWINGS SHALL NOT BE SCALED.
B. f~rlii'f~t/f/J9~7 J~E1iSENJf\'g ;E ~~~~LEfJ%~~T~~L RRa°uUfHH_,~N ~il~w~i,;L(~~PLY
TO ALL EQUIPMENT, WHETHER rr IS TO BE INSTALLED BY THE CONTRACTOR OR BY THE
OWNER.
C. PRIOR TO PURCHASE ANO INSTALLATION OF ANY MOTOR CONTROL EQUIPMENT (STARTERS,
ETC.), THE CONTRACTOR SHALL VERIFY THE ACTUAL MOTOR ELECTRICAL CHARACTERISTICS.
STARTER OVERLOADS SHALL BE SIZED IN ACCORDANCE wrrH THE ACTUAL MOTOR RUNNING
LOAD AMPERES.
o. PROVIDE EQUIPMENT GROUNDING CONDUCTORS FOR ALL FEEDERS ANO CIRCurrs.
E. WHERE CIRCUrr ANO HDMERUN LINES ARE NOT SHOWN, PROVIDE MINIMUM 2#12+1#12
GROUND IN 3/ 4" CONDUIT. FDR CIRCUITS WITH SHARED NEUTRAL. PROVIDE NO MORE THAN
3#12 (PHASE), 1#12 (NELirrRAL) ANO 1#12 GROUND IN 3/4" CONOUrf. REFER TO BRANCH CIRCUrf WIRE SIZING CHART FOR SIZING OF CONDUCTORS FOR LONG CIRCUITS.
F. PROVIDE TYPED CIRCUrf DIRECTORIES FOR ALL PANELBOARDS TO INDICATE TYPE OF LOAD
SERVED ANO AREA SERVED (E.G. RECEPTACLES-OFFICE 201).
EXIST SOQKVA PAD MOI/NT t:, /ADDEO SECONDARY METERING
TRANSFORMER AT TRANSFORMER
12.4KV PRIMA;;;---
4B0/277V. SECONDARY T
-=- M
EXIST. ENCLOSED C/B
4BOV,3P,BOOA
PROVISIONS FOR
PORTABLE
GENERATOR----rn
EXISTING L\!NJML h JRANSFrn SWITCH .ITTS~
4BOV.,3P.,BOOA.
EXISTING 48D/277V.,
PANEL MOP 3• 4W.
BODA MLO ! ! l
EXi) EXi) i)2DOA.
EXISTING LOADS
~~~t1 1N
E.lfil].
2-1/2" CONOUrf .Ee.1
PROVIDED NEW C/B IN
EX. SPACE IN PANEL
(TYP. OF 3).
lsc=22 000 A.I.C.
l)1soA. l/)1soA.
ff 4#1/0+1#6
2" CDNOUrf
E.lfill. =
SINGLE LINE DIAGRAM
NO SCALE
ENffiT Century Engineering, Inc.
32 lfe•l Road T0"1'111DU, 14.uyland 21204 Voice (-4:-10) 823-8070 Fu: {410) 823-2164-
1"------------------------\1,,------------------~ /---------------------~\/,----------------------------------..._\(,-------------
DATE DESCRIPTION BY
07 DEC 04 AS BUILT MJZ IN ACCORDANCE WITH fAR 52 236 21 ENTITLED SPECIFICATIONS ANQ
DRAWINGS FOR CONSTRI/CTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY. COMPLETENESS. ANO COMPLIANCE wrrH CONTRACT
REQUIREMENTS.
fflJ!~.,, i,IJO ~/6~
PROJECT MANAGER
Yl.:..I Y \.JI ~\LJ1.:..11vi: v v ui.;.1;;;:, u rui.;.u 1L,.,10V•
Chugach Support Services Inc.
Building 447 Tuskeege Street
P .0. Box 2049
DAFB, DE 19902
OFFICE: (302) 735-5570 FAX: (302) 735-9737
AIR MOBILITY COMJ\1AND
DOVER AIR FORCE BASE, DELA\./ARE
TITLE: BUILDING 1212
LEGEND, ABBREVIATIONS AND NOTES
SUBMITTED I APPROVED I APPROVED
CHIEF ENGINEER CHIEF ENGINEER COMMANDER
BY: DATE: I PROJECT NUMBER: I SCALE: AS NOTED IDRA\./N
JUNE 2, 2004 41066 / D0#5033 RAV \.~---~---'-------------~--------~------~
_ _,...._... ' ,.,.. •I,,,-_,,......, r,A
:llllllJl..j .L . .1.£. .Lll.'.:3LCIII IIC:CL ::,u.:::.Lt:111 llll.lCJl.:::.IL IIIUIIILIUJJ::)j ,l-111..l '111'-'-'V'"-" UUlll.."::>\l'JL.-.1. U/ ..._..._..._. v •'-'
,u.u,. ,..., ME-2
SHEET 2 OF 2 \.~---------