2-ATT B Scope of Work BD26-74 Dike Maintenance FY26.pdf

PDF 3 MB Posted

Attached to
BD26-74 Wetland Dike Maintenance
Solicitation number
BD26-74
Issued by
Utah

About this file

This is a Scope of Work document issued by the State of Utah Division of Purchasing in collaboration with the Watershed Restoration Initiative and the U.S. Fish and Wildlife Service for wetland dike maintenance and bank stabilization work in Penrose, Utah. The project requires contractors to repair approximately 400 linear feet of eroding dike, restore the structural integrity and safety of the existing crest, and install protective armoring to prevent further degradation caused by livestock and wildlife. The work scope includes crest repair to a uniform 12-foot width, pipe correction and realignment, slope stabilization to a 3:1 ratio on both sides, proper compaction of fill material in 6-inch lifts with benching at the interface with existing structure, application of 4 inches of compacted 1-inch minus road base to the top surface with slight 2% crown, and installation of 6- to 10-inch fractured angular rock armoring at a minimum thickness of 12 inches extending at least 2 feet below the standard water line. Estimated material quantities include 240–260 cubic yards of fill dirt, 60–70 cubic yards of pit run road base, and 375–400 cubic yards of slope riprap. All work must be completed and invoiced by June 30, 2026, with a project performance window of May through June 2026. A pre-work conference meeting is required prior to beginning any groundwork.

Contractors must have a minimum of five years' experience performing similar work in Utah, possess or secure all necessary equipment including data logging GPS capability, maintain current insurance in the State of Utah, and demonstrate commitment to project continuity by keeping equipment mobilized and dedicated to the project until all phases are 100% complete. Contractors are responsible for material sourcing and delivery, site preparation, cleanup, and all mobilization costs. The contract award will be made to the lowest cost responsive and responsible vendor, with pricing guaranteed for the duration of the project through June 30, 2026. No specific set-aside provisions, incumbent information, or alternative funding sources are identified in the documentation.

View the file

Other files

File Type Posted
1-Vendor Prerequisites - IFB Agency.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATT B Scope of Work BD26-74 Wetland Dike Maintenance Penrose, UT

A private landowner in Penrose, UT, in collaboration with the State of Utah’s Watershed

Restoration Initiative and the U.S. Fish and Wildlife Service, is seeking qualified and experienced contractors with the ability and equipment necessary to perform essential maintenance and bank stabilization on 400 linear feet of an existing dike by June 30th, 2026. Work is required to repair significant erosion damage, restore the structural integrity and safety of the existing crest, and install protective armoring to prevent further degradation caused by livestock and wildlife. The contractor must own or be able to obtain the equipment necessary to complete the work as specified below.

Contractor will be required to have close communication with the landowner during this work and will be required to have a pre-work conference meeting prior to beginning groundwork.

Contractor Requirements:

Have at least 5 years’ experience performing similar work in Utah.

Be able to have the work completed and an invoice submitted before June 30, 2026.

Own the equipment mentioned above or be able to rent the equipment needed to complete work according to outlined specifications.

Have data logging GPS equipment capable of tracking equipment.

Be insured in the State of Utah.

Location & Project Conditions:

Location: 7400 N 11600 W Penrose, UT. See attached maps Current conditions: Eroding wetland dike - Approx. 400ft. Average top width of 8ft.

Average height of 3ft.

Environment: Wetland area. All work is to be performed as repair of a currently serviceable structure. Contractors must minimize machinery footprint outside the immediate dike footprint. Staging areas will be identified at the pre-bid meeting.

Technical Specifications:

Crest Repair: Restore and stabilize the top maintenance surface to a uniform 12-foot width.

Pipe Correction: Existing pipe will need to be reset to its’ original alignment and properly stabilized prior to backfilling.

Slope Stabilization: Both sides of the dike shall be repaired to a 3:1 slope to ensure long-term bank stability.

Compaction: Fill material used for repair must be placed in 6-inch lifts and compacted. The interface between the existing structure and new fill must be "benched" (stepped) to ensure a structural bond and prevent future sloughing.

Surface Material: The top 12' width shall be capped with 4 inches of compacted 1” minus road base. Surface shall be slightly crowned (2%) to facilitate drainage.

Slope Armoring: Both banks shall be covered with 6” to 10” fractured/angular rock at a minimum layer thickness of 12 inches. Armoring must extend at least 2 feet below the standard water line.

Estimated Quantities:

o NOTICE TO CONTRACTOR: The quantities listed below are estimates provided for bidding context. The contractor is solely responsible for verifying site dimensions and calculating the final quantities required to meet the project specifications. The contractor must ensure the delivered amount is sufficient to complete the entire 400-foot project to the specified 12-foot width and 3:1 slopes.

Fill Dirt (Estimated 240–260 cubic yards): Pit Run

Road Base (Estimated 60–70 cubic yards): 1” minus crushed rock/gravel.

Slope Riprap (Estimated 375–400 cubic yards): 6”–10” fractured/angular rock.

Contractor Responsibilities:

Project Continuity & Commitment: Once mobilization begins, the contractor and necessary equipment must remain on-site and dedicated to this project during normal working hours until all phases (earthwork, armoring, and capping) are 100% complete.

"Job hopping" or removing primary equipment before completion is not permitted.

Mobilization: Transport of all heavy equipment to the site.

Site Prep: Clearing of brush or loose debris from the existing surface before adding fill.

Material Sourcing & Delivery: Procurement and delivery of all fill, gravel, and rock.

Nearby sources are available.

Clean-up: Restoration of any access paths used by heavy machinery.

Completion: All physical work must be completed, and the final invoice must be submitted to the project manager, before June 30, 2026.

Project Performance Timeline:

• May 2026 – June 30, 2026

Wetland Dike Restoration Project Location

Legend

Legend t» Dike

Aerial view of dike

ATT B Scope of Work BD26-74
Wetland Dike Maintenance Penrose, UT
Contractor Requirements:
Location & Project Conditions:
Technical Specifications:
& Estimated Quantities:
& Fill Dirt (Estimated 240–260 cubic yards): Pit Run
Contractor Responsibilities:
Project Performance Timeline: