2-Appendix II - MSA Sustainability Policies.pdf

PDF 1 MB Posted

Attached to
Access Controls - On-Call Services Contract
Solicitation number
26-061
Issued by
Maryland

About this file

Summary

This document is an appendix containing sustainability policies for the Maryland Stadium Authority (MSA) facilities, specifically Camden Yards Sports Complex and M&T Bank Stadium. The file comprises multiple detailed operational policies including a Solid Waste Management Policy, Sustainable Purchasing Policy, Building Exterior and Hardscape Management Plan, Indoor Air Quality Management Program, and Construction & Pre-Occupancy IAQ Management Plan. These policies establish comprehensive frameworks for environmental stewardship and occupant health across the MSA's facilities. The Solid Waste Management Policy, established in March 2012, targets diversion rates of at least 50% for ongoing consumables, 80% for batteries, 100% for mercury-containing lamps, 75% for durable goods, and 70% for facility alteration waste. The Sustainable Purchasing Policy mandates that at least 60% of ongoing consumables purchases, 40% of furniture and electronics purchases, and 50% of facility alteration purchases meet specified environmental criteria, with 90% of bulb purchases utilizing low-mercury content or NEMA partner bulbs. Jeff Provenzano, Vice President of Sports Complex Facilities, serves as the primary responsible party for implementing these policies in coordination with facility staff and contracted service providers.

The Building Exterior and Hardscape Management Plan requires chemical-free power washing for 100% of cleaning needs, sustainable equipment maintenance practices with 75% adoption targets for low-decibel blowers and mulching mowers, and environmentally preferred deicing products including magnesium chloride for snow and ice removal. All exterior paints and sealants must comply with SCAQMD Rule #1168 and Green Seal Standard GS-11 VOC content limits, with 100% adoption required. The Indoor Air Quality Management Program establishes protocols for bi-annual building walkthrough inspections, annual HVAC system baseline audits, and staff reporting procedures using EPA I-BEAM forms, with the Facilities Operations Manager overseeing program implementation and Jeff Provenzano serving as the Director of Facilities responsible for investigating and resolving IAQ concerns. The Construction & Pre-Occupancy IAQ Management Plan requires contractors to protect permanent HVAC systems, minimize mold growth potential, implement SMACNA IAQ Guidelines, use materials with limited VOC content, and perform a comprehensive flush-out procedure delivering 14,000 cubic feet of outside air per square foot of floor area before occupancy. All policies remain in effect for the life of the buildings and are subject to regular evaluation and improvement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX II - MSA SUSTAINABILITY POLICIES

Camden Yards Sports Complex LEED Existing Building:

Operations and Maintenance

Solid Waste Management Policy

Solid Waste Management Policy LEED for Existing Buildings: Operations and Maintenance

SECTION 1: POLICY SCOPE

This policy applies to the collection, sorting, diversion, and disposal of ongoing consumables, durable goods, and building materials associated with facility alterations and additions accrued in the operations of The Maryland Stadium Authority’s facilities that are within the building and site management’s control.

This policy will apply to, but is not limited to, the following types of materials:

▪ Ongoing Consumables, including but not limited to:

o Paper o Cardboard o Glass o Plastic o Metals o Landscape waste o Batteries

▪ Mercury-containing lamps

▪ Durable Goods, including but not limited to:

o Electronic equipment o Furniture

▪ Building Materials used in facility alterations and additions, including but not limited to:

o Building components and structures (wall studs, insulation, doors, windows) o Panels o Attached finishings (drywall, trim, ceiling panels) o Carpet and other flooring material o Adhesives o Sealants o Paints and coatings

SECTION 2: POLICY GOALS

To manage solid waste in a manner that will:

▪ protect the environment and public health

▪ conserve natural resources

▪ minimize landfilling and/or incineration and reduce toxicity

SECTION 3: PERFORMANCE METRIC

The successful implementation of this policy will be measured by the ongoing recycling rate achieved. The recycling rate is derived by comparing the amount of consumables diverted from the landfill to those consumables sent to the landfill over a given time period. The policy’s initial performance metric will be to achieve the reuse, recycling and/or composting of:

▪ At least 50% of the ongoing consumable waste stream (by weight or volume)

▪ At least 80% of discarded batteries

▪ 100% of all mercury-containing lamps within the building and site management’s control

▪ At least 75% of the durable goods waste stream (by weight, volume, or replacement value)

▪ At least 70% of waste (by volume) generated by facility alterations and additions

SECTION 4: PERFORMANCE EVALUATION

Monthly reports, including waste recycling and/or disposal receipts, must be provided by the waste haulers/vendors to allow for ongoing documentation, monitoring and assessment of the program results.

The responsible party will, whenever possible, compile the reports and include an evaluation of the performance, safety, cost and environmental/public health benefits achieved through source reduction, reuse, recycling and composting. Reports should also relate the progress in meeting the stated objectives of The Maryland Stadium Authority as set forth under Sections (2) and (3).

SECTION 5: RESPONSIBLE PARTY

Jeff Provenzano, Vice President Sports Complex Facilities, shall implement this policy within Camden Yards Sports Complex in coordination with other appropriate organization personnel, including but not limited to, the building’s janitorial staff and any contracted waste haulers. Jeff Provenzano shall coordinate training, education and outreach programs throughout the organization, with the aim of promoting and maintaining the goals of this policy.

Due to the nature of this building, contracts are constantly being reevaluated and new bids from other providers are always being reviewed for economic value. All requests for bids for contractors, and current contractors, specific to waste management will receive this plan and be required to adhere to the requirements.

SECTION 6: PROCEDURES AND STRATEGIES

The following table lists recyclable wastes at the building site, their disposal method and handling procedures.

Source/Consumables Disposal Method Handling Procedure Glass, Plastic, Metals (commingled)

Building occupants dispose of these recyclables in separately provided collection points periodically placed around the stadium and in suites.

Amounts are tracked and taken away by hauler on a regular basis (same schedule as current waste pickup) for recycling.

Mercury-containing Lamps Maintenance staff collects fluorescent lamps and stores the unbroken lamps for disposal.

Taken away or dropped off to an authorized hauler for safe disposal, in accordance with local regulations on disposal of products containing mercury.

Cardboard/Paper/newspapers Building occupants dispose of paper/newspapers in separately provided collection points periodically placed around the stadium and in suites.

Amounts are tracked and taken away by hauler on a regular basis (same schedule as current waste pickup) for recycling.

Batteries Building occupants deliver batteries to a specially-designated collection point for disposal.

Taken away/ dropped off to an authorized hauler on a regular basis for proper disposal.

Durable Goods (Electronic Waste and Furniture)

Building management provides a secure collection area to store durable goods that have reached the end of their life within the building but still have value and may be donated/re-used.

Amounts are tracked and taken away/ dropped off to an authorized hauler or re-use center on a regular basis for recycling.

Building Materials Building management coordinates with contractors to collect construction waste for re-use/recycling.

Amounts are tracked and taken away by an authorized hauler at the end of the demolition/construction period for recycling.

SECTION 7: TIME PERIOD

With respect to the Time Period, this Solid Waste Management Policy was established in March 2012 and is currently in effect. This plan is to remain in effect for the life of the building and to be regularly evaluated for any improvements. During the life of this policy, the Solid Waste Management Policy will, at a minimum, address the diversion of waste and toxins generated through building operations from landfills and incineration facilities that are within the building and site management’s control.

Camden Yards Sports Complex LEED Existing Building: Operations and Maintenance

Sustainable Purchasing Policy

Sustainable Purchasing Policy

SECTION 1: POLICY SCOPE

This policy applies to the sustainable purchasing at Camden Yards Sports Complex’s sites that are within the building and site management’s control.

This policy applies to sustainable purchasing of the following types of products:

▪ Ongoing Consumables

▪ Durable goods

▪ Building materials used in facility alterations and additions

▪ Mercury-containing lamps

Food and beverages are not included in the scope of this policy.

SECTION 2: POLICY GOALS

To purchase ongoing consumables in a manner that will:

▪ protect the environment and public health

▪ conserve natural resources

▪ minimize waste, including landfilling and incineration, and reduce toxicity

SECTION 3: PERFORMANCE METRIC

Sustainable Purchasing of Ongoing Consumables The Maryland Stadium Authority mandates that at least 60% of the Stadium’s total ongoing consumables purchases (by cost) are to be sustainable. Sustainable purchases are those that meet one or more of the following criteria:

▪ Purchases contain at least 10% postconsumer or 20% postindustrial material.

▪ Purchases contain at least 70% material salvaged from off-site or outside the organization.

▪ Purchases contain at least 70% material salvaged from on-site, through an internal organization materials and equipment reuse program.

▪ Purchases contain at least 50% rapidly renewable material.

▪ Purchases contain at least 50% Forest Stewardship Council (FSC) certified wood.

▪ Purchases contain at least 50% material harvested and processed or extracted and processed within 500 miles of the project.

▪ Batteries are rechargeable and contain low levels of mercury and heavy metals.

Sustainable Purchasing of Durable Goods The term “durable goods” refers to higher-cost-per-unit materials that are replaced infrequently and/or may require capital outlays to purchase. These products may include, but are not limited to: office equipment (such as computers, monitors, printers, copiers, fax machines), appliances (refrigerators, dishwashers, water coolers), external power adaptors, televisions, and furniture. The purchasing criteria for these products fall into the following two categories.

Furniture The Maryland Stadium Authority mandates that at least 40% of total purchases of furniture (by cost) must be sustainable. Sustainable purchases are those that meet one or more of the following criteria:

▪ Purchases must contain at least 10% post consumer or 20% post industrial material.

▪ Purchases must contain at least 70% material salvages from off-site or outside the organization.

▪ Purchases contain at least 70% material salvaged from on-site, through an internal organization materials and equipment reuse program.

▪ Purchases contain at least 50% rapidly renewable material.

▪ Purchases contain at least 50% Forest Stewardship Council (FSC) certified wood.

▪ Purchases contain at least 50% material harvested and processed or extracted and processed within 500 miles of the project.

Electronics and Appliances The Maryland Stadium Authority mandates that at least 40% of total purchases of electric powered equipment (by cost) must be sustainable. Sustainable purchases are those that meet one or more of the following criteria:

▪ The purchased equipment is ENERGY STAR® qualified (for product categories with developed specifications).

▪ The purchased equipment (either battery or corded) replaces conventional gas-powered equipment.

Sustainable Purchasing: Facility Alterations and Additions (when applicable) The Maryland Stadium Authority mandates that at least 50% of the Stadium’s total facility alteration purchases (by cost) are to be sustainable. Sustainable purchases are those that meet one or more of the following criteria:

▪ Adhesives and sealants have VOC content less than the current VOC content limits of SCAQMD Rule #1168, or sealants used as fillers meet or exceed the requirements of the Bay Area Air Quality Management District Regulation 8, Rule 51.

▪ Paints and coating have VOC emissions not exceeding the VOC and chemical component limits of Green Seal’s Standard GS-11 requirements.

▪ Non-carpet finished flooring is FloorScore-certified and constitutes a minimum of 25% of the finished floor area.

▪ Carpet meets the requirements of the CRI Green Label Plus Carpet Testing Program.

▪ Carpet cushion meets the requirements of the CRI Green Label Testing Program.

▪ Composite panels and agrifiber products contain no added urea-formaldehyde resins.

Sustainable Purchasing: Toxic Material Source Reduction – Reduced Mercury in Lamps To reduce the mercury level in lamps the Maryland Stadium Authority is committed to purchasing manufacture specified low mercury content or NEMA partner bulbs. 90% of the Stadium’s total bulb purchases (by cost) are to be manufacture specified low mercury content or NEMA partner bulbs.

The Responsible Party shall confirm that product purchases are sustainable and conform to the mandates of the USGBC and the Sustainable Purchasing Policy, and keep track of the purchasing orders, receipts, and product data sheets/MSDS necessary to document the extent of the sustainable purchases.

SECTION 4: PERFORMANCE EVALUATION

The Maryland Stadium Authority and/or vendor will record and track purchases on a monthly basis. The Maryland Stadium Authority personnel and/or vendor responsible for purchasing will report purchases to the appropriate Maryland Stadium Authority representative.

SECTION 5: RESPONSIBLE PARTY

The Responsible Party for implementation of this Policy and for initial measurement and evaluation of performance is Jeff Provenzano, Director of Sports Complex Facilities, and John Samoryk, Vice President of Procurement, employed by The Maryland Stadium Authority. They will, in the course of the day to day managerial duties, supervise those other individuals and teams involved in implementing the Sustainable Purchasing Policy, including tasks from placing orders for environmentally preferable Durable Goods (electronic and furniture); to monitoring Facility Additions and Alterations for compliance; to specifying reduced mercury lamps.

SECTION 6: PROCEDURES AND STRATEGIES

This policy covers purchases that are within the building and site management’s control. The Maryland Stadium Authority personnel may use any qualifying vendor to procure the products described in Section (3), and are encouraged to also consider the following areas of interest:

Packaging The Maryland Stadium Authority desires to reduce waste generated at Camden Yards Sports Complex through daily operations and recognizes that such reduction begins with the material that enters each facility/site. The Maryland Stadium Authority will request that all items purchased be packaged and delivered with minimal packaging material. The Maryland Stadium Authority reserves the right to request that vendors alter the packaging of goods delivered, when appropriate and/or possible.

Recycled Content The Maryland Stadium Authority requests that all vendors provide recycled content options for goods when available. If a product is available with recycled content, vendor will disclose that option to the appropriate Maryland Stadium Authority representative. Recycled content targets may be overridden at the discretion of the responsible party if certain products with recycled content present themselves as cost-prohibitive.

SECTION 7: TIME PERIOD

With respect to the Time Period, this Sustainable Purchasing Policy was established in March 2012 and is currently in effect. This plan is to remain in effect for the life of the building and to be regularly evaluated for any improvements. During the life of this policy, the Sustainable Purchasing Policy will, at a minimum, cover those product purchases that are within the building and site management’s control.

Camden Yards Sports Complex LEED Existing Building: Operations and Maintenance

Building Exterior and Hardscape Management Plan

Building Exterior and Hardscape Management Plan

SECTION 1: SCOPE

This plan provides guidelines for maintaining the performance of the building exterior and hardscape at Camden Yards Sports Complex located at 1101 Russell Street Baltimore, MD 21230. This plan covers the entire building exterior and hardscape at the project site.

SECTION 2: GOALS

● To minimize the impact of site management practices on the local ecosystem

● To reduce the exposure of building occupants and maintenance personnel to potentially hazardous chemical, biological, and particle contaminants.

The Plan addresses environmental best practices for:

▪ Maintenance equipment

▪ Snow and ice removal

▪ Cleaning of building exterior

▪ Paints and sealants used on the building exterior

▪ Cleaning of sidewalks, pavement and other hardscapes.

SECTION 3: RESPONSIBLE PARTIES

Jeff Provenzano, Vice President of Facilities, with support from Bart Shifler, Facilities Manager, from the Maryland Stadium Authority is responsible for developing and managing the implementation of the Building Exterior and Hardscape Management Plan. Contractors involved with various elements of the Plan shall carry out their tasks according to their contracts and report all relevant activities to the aforementioned parties. On occasion, several contractors may be engaged simultaneously in various elements of the plan at the building and grounds. To ensure an effective and coordinated effort, the building staff responsible for overseeing the Plan shall review all proposed activities before implementation.

Due to the nature of this building, contracts are constantly being reevaluated and new bids from other providers are always being reviewed for economic value. All requests for bids for contractors, and current contractors, specific to the building exterior and hardscape management will receive this plan and be required to adhere to the requirements.

SECTION 4: QUALITY CONTROL PROCESS

To ensure proper quality control the responsible party will conduct monthly inspections with the grounds keepers to verify that the sustainable measures (listed below) are being followed. A log will be maintained that lists all maintenance preformed on the building’s hardscape and exterior. This log will aid Bart Shifler in confirming that the sustainable measurers noted above are being utilized at least 75% of the time (by use). Bart Shifler will also oversee all purchasing related to grounds maintenance to ensure that sustainable methods are a priority and to also be proactive in any incremental improvements. Any deviations from this Management Plan will be handled by the responsible party accordingly.

SECTION 5: MAINTENANCE EQUIPMENT

Generally, manual methods of grounds management, electric equipment, or equipment with noise and emission controls shall be used in lieu of fossil-fuel-powered machinery, whenever possible, to reduce soil compaction, and noise and air pollution produced by gas-powered equipment.

PERFORMANCE METRICS

The practices listed below shall be implemented to the extent noted in the table. When less than complete adoption occurs, the performance metrics indicated will be used to gauge performance against the implementation target.

Maintenance Equipment Performance Metric Implementation Target Low decibel blowers 100% of blowers 75% Mulching mower 100% of mower equipment Complete adoption Manual spring cleanup 100% of occurrences needed Complete adoption Manual weeding 100% of occurrences needed Complete adoption Manual pruning 100% of occurrences needed Complete adoption

PRACTICES TO OPTIMIZE SITE MAINTENANCE EQUIPMENT

▪ When power equipment must be used, electric equipment (battery or corded), instead of conventional gas-powered equipment, shall be used wherever practical. This measure will reduce the fossil fuel use and greenhouse gas emissions produced by conventional equipment.

▪ Mulching mowers shall be used on turf areas and shall return clippings back into the lawn to recycle nutrients.

▪ Turf areas shall be hand-weeded.

▪ Low-smoke oil shall be used in all maintenance equipment.

▪ For equipment with two-cycle engines, models with advanced design features—such as direct fuel-injection engines and exhaust power valves—shall be used to reduce emissions, improve fuel efficiency, and decrease oil consumption compared to conventional two-cycle engines.

▪ During the annual site cleanup in the spring, maintenance personnel shall manually prune winter-killed plants; sweep parking lot curbs, turf areas, and corners by hand; and rake turf areas to remove debris as necessary. Manual landscape maintenance reduces the need for powered machinery and the demand for fossil fuels.

▪ Weekly, the shrub and tree beds shall be hand-weeded.

▪ Shrubs and ornamental trees shall be manually pruned.

▪ All mowers shall receive new blades annually, and belts, bearings, and bushings shall be inspected on a yearly basis and changed as needed. Regular maintenance enhances the efficiency of equipment, thereby conserving energy and fuel and minimizing entire equipment replacements.

▪ Weekly, the contractor shall change the oil and filters on all equipment. All used oil shall be recycled.

SECTION 6: SNOW REMOVAL

The Maryland Stadium Authority at Camden Yards Sports Complex eliminates the need for using harmful de-icing chemicals by applying small portions of environmentally friendly, magnesium chloride based ice melt to heavily traveled areas when a storm is in the midst and by hot water pressure washing walkways to eliminate ice and slippery conditions. The Maryland Stadium Authority implements plowing of the sidewalks and parking lots when conditions prove necessary.

PERFORMANCE METRICS

The practices listed below shall be implemented to the extent noted in the table. Where less than complete adoption occurs, the performance metrics indicated will be used to gauge performance against the implementation target.

Site Management Products/Materials Performance Metric Implementation Target

Magnesium based deicing Chemicals 100% of occurrences needed Complete adoption

Hand brushing, shoveling, and plowing 100% of occurrences needed Complete adoption

PRACTICES TO OPTIMIZE SNOW REMOVAL

▪ Deicing chemicals shall be used on parking lots and roadways only as necessary. To protect vegetation and receiving waterways, the minimum amount of deicer that is effective shall be used.

Application rates shall be tailored to match actual conditions based on pavement temperature, precipitation, and beginning concentrations of the deicer.

▪ Environmentally preferred deicing products shall be used for routine applications. Pre-approved products include those primarily comprised of:

o potassium acetate o potassium chloride o magnesium chloride.

▪ Sidewalks and parking lots shall always be plowed prior to the application of deicing agents—to limit the amount of chemicals needed and reduce the potential for harmful runoff.

▪ When possible, anti-icing measures (preemptively applying deicer before a storm) shall be performed, thereby significantly reducing the overall need for deicing chemicals.

SECTION 7: HARDSCAPE MAINTENANCE & BUILDING EXTERIOR CLEANING

The maintenance of these areas are monitored by the Maryland Stadium Authority and the Stadium’s maintenance team. The maintenance team power washes the exterior of the building, seating bowl, and sidewalks when notably needed. All sidewalks are swept and maintained for appearance, occupant safety, and comfort.

PERFORMANCE METRICS

The practices listed below shall be implemented to the extent noted in the table. Where less than complete adoption occurs, the performance metrics indicated will be used to gauge performance against the implementation target.

Site Management Products/Materials Performance Metric Implementation Target

Chemical Free Power washing 100% of occurrences needed Complete adoption If any additional chemical cleaning product or equipment is needed they will meet the standards (IEQc3.3

- 3.4) set below. Compliance will be measured by cost of compliant materials. It is the goal to never fall below 75% for sustainable practices (by use).

PRACTICES TO OPTIMIZE HARDSCAPE MAINTENACE

▪ The building exterior and hardscape cleaning is primarily performed with chemical free power washing and manual tools to maintain the walkways, pavement, and other hardscapes. The limited use of gas-powered equipment conserves fossil fuels and minimizes greenhouse gas emissions.

▪ Chemical use for building exterior and hardscape maintenance shall be minimal and, when necessary, should be based on products or practices that conserve water and utilize biodegradable, low-impact cleaning products. Environmentally safe cleaners prevent harmful chemical runoff and water pollution. MSDS sheets shall be provided.

▪ When applicable, the minimum amount of cleaning product that is effective shall be used on the building exterior and hardscape and shall meet the requirements of IEQc3.4–3.6: Green Cleaning, Sustainable Cleaning Products and Materials as listed above.

SECTION 8: PAINTS AND SEALANTS

All exterior paints and sealants shall be low-VOC, environmentally friendly products.

PERFORMANCE METRICS

This Plan shall govern all components of exterior painting and sealing at the project building. The practices identified in this Plan shall be wholly adopted and used in 100% of building exterior painting and sealing activities at Camden Yards Sports Complex.

Painting or Sealing Products Performance Metric Implementation Target SCAQMD Rule #1168 and GS- 11 Compliant Paints and Sealants

100% of occurrences needed Complete adoption

PRACTICES TO OPTIMIZE THE USE OF ENVIRONMENTALLY PREFERRED PAINTS AND

SEALANTS

▪ Paints and sealants must comply with the VOC content limits of South Coast Air Quality Management District (SCAQMD) Rule #1168 and GS-11, listed in the table below.

▪ The Maryland Stadium Authority shall incorporate VOC limits for paints and sealants in contractor bid documents to ensure that external entities working onsite follow the requirements.

Architectural Applications VOC Limit [g/L less water]

Specialty Applications VOC Limit [g/L less water]

Indoor carpet adhesives 50 PVC welding 510 Carpet pad adhesives 50 CPVC welding 490 Wood flooring Adhesives 100 ABS welding 325 Rubber floor adhesives 60 Plastic cement welding 250 Subfloor adhesives 50 Adhesive primer for plastic 550 Ceramic tile adhesives 65 Contact adhesive 80 VCT and asphalt adhesives 50 Special purpose contact adhesive 250 Drywall and panel adhesives 50 Structural wood member adhesive 140

Cove base adhesives 50 Sheet applied rubber lining operations 850

Multipurpose construction adhesives 70 Top and trim adhesive 250

Structural glazing adhesives 100

Substrate Specific Applications

VOC Limit [g/L less water]

Sealants VOC Limit [g/L less water]

Metal-to-metal 30 Architectural 250 Plastic foams 50 Non-membrane roof 300 Porous materials (except wood) 50 Roadway 250

Wood 30 Single-ply roof membrane 450 Fiberglass 80 Other 420

Sealant Primers VOC Limit [g/L less water] Architectural non-porous 250 Architectural porous 775 Other 750

Paints VOC Limit [g/L]

Exterior nonflat 200 Exterior flat 100

SECTION 9: TIME PERIOD

With respect to the Time Period, this Building Exterior and Hardscape Management Plan was created and implemented in March 2012 and is currently in effect. This plan is to remain in effect for the life of the building and to be regularly evaluated for any improvements in maintenance equipment and ice melt.

During the life of this policy, the Building Exterior and Hardscape Management Plan will, at a minimum, address the diversion of toxins and chemicals generated through building operations and maintenance that are within the building and site management’s control.

M&T Bank Stadium LEED Existing Building: Operations and Maintenance

Indoor Air Quality Management Program

This guidance document will be used by the Maryland Stadium Authority to develop and maintain a basic indoor air quality management plan that meets the EPA’s “Indoor Air Quality Building Education and Assessment Model (I-BEAM), EPA reference number 402-C-01-001, December 2002.

Table of Contents

Section Page

1. Introduction

2. Indoor Air Quality Coordinator

3. Walkthrough Inspection Building

4. Building Systems Evaluation

5. Evaluation and Resolution of IAQ Issues

6. Communication Policy

7. IAQ Concern Reporting and Response Policy

8. Emergency Response Policy

9. Preventive Maintenance and Operations Policy

10. Construction and Renovation Policy

11. Microbial Management Policy

12. Cleaning and Chemical Policy

13. Flooring and Furnishing Policy

14. Education of Staff Policy

15. Annual Review

1. INTRODUCTION

The health, comfort, and work environment of employees and staff are important aspects of the Maryland Stadium Authority’s (MSA) mission in the management of the M&T Bank Stadium. According to the EPA, indoor air quality (IAQ) is a critical component of providing a healthy and comfortable work environment.

IAQ is important for the following reasons:

1. Indoor air pollutants can “cause or contribute to short- and long-term health problems, including asthma, respiratory tract infection and disease, allergic reactions, headaches, nasal congestion, eye and skin irritations, coughing, sneezing, fatigue, dizziness, and nausea”.

2. Indoor air pollutants and extremes in temperature and humidity may cause discomfort, which can affect employees’ ability to perform.

3. Indoor air quality problems can hasten building deterioration and possibly create liability problems. The MSA has implemented an IAQ Management Plan that will help monitor and improve the quality of air in its buildings. The objectives of the IAQ Management Plan are the following:

1. Reduce the levels of indoor air pollutants through preventive measures such as routine maintenance activities, periodic building evaluations and inspections, and IAQ-specific policies.

2. Provide and maintain adequate air exchanges by repairing and maintaining ventilation equipment, which will promote a comfortable and healthy working environment.

3. Respond to IAQ related concerns and problems in a thorough and prompt manner, and to effectively communicate the progress of investigations and their resolution to all interested parties.

2. INDOOR AIR QUALITY COORDINATOR

The Facilities Operations Manager manages the Indoor Air Quality Program/Plan and monitors all activities involved in the program. The MSA is committed to providing the necessary support to meet the buildings IAQ Management Plan objectives.

The Managers responsibilities include the following:

1. Acting as the key contact person at MSA to respond to and address IAQ issues and concerns.

2. Acting as the lead MSA staff person to develop and manage this IAQ Management Plan. This includes coordinating building walkthrough inspections, coordinating the building systems evaluations, coordinating the investigations of reported IAQ issues and concerns, and modifying the IAQ Management Plan to fit the MSA’s specific needs and objectives at the M&T Bank Stadium.

3. Responding to reported IAQ concerns and issues.

4. Communicating with staff and other parties regarding the progress made with the Plan and the process of reporting IAQ concerns.

5. Coordinating the annual review of the Plan, this involves building walk-through inspections, building systems evaluations, and revising the Plan to include the new information obtained.

3. WALKTHROUGH INSPECTION OF MSA BUILDING

An MSA Building Operations staff person must perform bi-annual IAQ walkthrough inspection of all the functional spaces in the building. The walkthrough inspections involve observations that assess the factors that affect indoor air quality, through the use of general human senses (sight, smell, touch, hearing). During the walkthrough, all physical components that affect the air quality of functional spaces are to be examined, including the flooring or carpet, walls, ceiling, furniture, air intake, building entrances, mechanical rooms, and the roof and exterior. The walkthrough inspections provide some insight regarding the type, location, and magnitude of apparent IAQ related issues and problems. The EPA I-BEAM form A-1 and A-3 are used during the walkthrough inspections. All observations, recommendations and comments received from staff during the walkthrough inspection are noted using the EPA I-BEAM forms A1 and A3. All forms are signed and dated by the staff performing the walkthrough inspections. Copies of the checklists and associated notes are kept with the IAQ Management Plan. IAQ issues identified during the walkthrough inspections are noted and addressed by The Director of Administrative and Customer Services. Where appropriate, potential and existing problems are investigated and resolved; this is described in the “Evaluation and Resolution of Potential Problems” section 6 of the Plan.

4. BUILDING SYSTEMS EVALUATION

The building engineering staff continually monitor building systems to identify and evaluate potential IAQ issues that may be associated with building system or operational failures. The building engineers perform annual baseline IAQ audits on the HVAC system by using the EPA I-BEAM A2.1: OUTDOOR AIR

INTAKE AND DAMPERS IN AHU.

Occupant complaints are documented using the EPA I-BEAM D2.: Indoor Air Quality Complaint Form and the D3: Indoor Air Quality Interview Form. All forms are kept in IAQ folder in the Building Operations Department. During the evaluation of the checklists, obvious or likely IAQ problems are identified and the Director of Administrative and Customer Services establishes specific policies or procedures to correct the problems. The same checklists or equivalent evaluations are completed annually to assess the changing IAQ issues and concerns. When contracting building systems evaluations or other IAQ investigations with environmental Contractors, the building engineers and the Director of Administrative and Customer services will review the contract to make sure it is in accordance with the work that is necessary to achieve MSA’s IAQ objectives.

5. EVALUATION AND RESOLUTION OF IAQ ISSUES

Walkthrough Inspection and Building System Evaluations Findings:

During the walkthrough inspections and building systems evaluations, IAQ problems and issues are documented. The issues identified are addressed by the Director of Administrative and Customer services and remediated by appropriate personnel. Items may be determined to be deferred by the Director.

Issues are deferred if:

• they are suspected to take more than six months to resolve;

• they are “big ticket” item(s) that require re-appropriation of money; or

Resolving Problems reported to the Director of Facilities:

Problems are reported to the Director through the EPA I-BEAM Forms D2 and D3. Jeff Provenzano, the Director of Facilities documents all IAQ concerns, performs an initial investigation, and documents and communicates the resolution to all interested parties. All concerns are investigated and documented, reflecting the MSA’s commitment to addressing all IAQ related concerns. If the problem cannot be identified, or persists despite the MSA’s efforts to identify and remediate it, the Jeff Provenzano will determine whether a contracted service provider is needed.

When the problem is successfully identified, Jeff Provenzano decides whether an immediate response is necessary, communicates with the relevant parties, documents the action taken, and keeps copies of the relevant documents. When the problem is not urgent but requires a policy change, the Jeff Provenzano will develop and recommend specific policy changes. All new or revised policies are added to the existing IAQ Management Plan. All interested parties are informed about the measures taken to resolve the problem and of any policy changes.

6. COMMUNICATION POLICY

Communication is a critical element to successfully manage IAQ issues. Jeff Provenzano tries to limit misinformation and confusion through the use of effective communication. The IAQ Coordinator, Bart Shifler and other district employees communicate with relevant parties in a prompt, courteous, and consistent manner until the issue is resolved to the greatest extent possible. It is the goal of MSA to develop and maintain the trust of the staff.

Every time a concern is addressed or resolved, Jeff Provenzano reports the measures taken and the resolution of the identified concern to the appropriate parties. This will ensure that all interested parties know what action(s) have been taken.

7. IAQ CONCERN REPORTING AND RESPONSE POLICY

The MSA encourages the reporting of IAQ concerns, regardless of how trivial the issue may seem. The prompt reporting and resolution of IAQ issues has the potential to prevent serious problems from developing, which should prevent potential health effects, discomfort, and unnecessary costs. This makes the investigation of all reported concerns worthwhile.

Bart Shifler will require the concerned staff to submit their IAQ concern in writing. A written description of the concern should reduce misunderstanding and create a history that can be referred to at a future date.

The EPA I-BEAM D-2 IAQ iOccupant Complaint Form has been made available to the staff.

This form should be completed and sent to Jeff Provenzano to initiate an official IAQ concern reporting process. Jeff Provenzano investigates the concern and the resolution of the issue will be documented and the interested parties will be informed in writing about the measures taken. IAQ documents and associated documents are located in Building Operations Department. Information collected is processed and stored according to the MSA’s records retention policy.

8. EMERGENCY RESPONSE POLICY

Emergencies are defined as situations that require immediate action. This includes situations that are potentially life threatening, such as:

• complaints of headaches, nausea, and combustion odors;

• diagnosed Legionnaire’s disease or tuberculosis; and

• spills of hazardous materials.

In addition, emergencies include situations where there is limited time available to prevent serious property damage or health problems, such as flooding in a carpeted area.

It is up to the discretion of the Jeff Provenzano to determine emergencies on a case-by-case basis, using the above definition as a general guideline only. If doubt exists about whether exposure to a specific hazard constitutes an emergency, a precautionary approach may be used where the matter is handled as an emergency. Non-emergency situations are addressed according to the “Concern Reporting and Response Policy”, section 8. Jeff Provenzano or his designee will respond to emergencies immediately. If the problem cannot be resolved with in-house resources, external help will be requested. If a hazard poses an immediate health threat to the staff, the affected building areas will be evacuated. All avenues of communication will be utilized to warn and inform interested parties in a prompt manner (see Communication Policy, section 6).

9. PREVENTIVE MAINTENANCE AND OPERATIONS POLICY

Preventive maintenance means the routine inspection, adjustment, and repair of building structures and systems, including the heating, ventilating, and air conditioning system (HVAC),unit ventilators, local exhaust, fresh air intakes, and flooring. Preventive maintenance plays a major role in maintaining the quality of air, by assuring that the building systems are operating effectively and efficiently. Moreover, it helps to maintain a comfortable temperature and humidity in occupied spaces.

10. CONSTRUCTION AND RENOVATION POLICY

The MSA considers indoor air quality when planning construction and renovation projects. Jeff Provenzano evaluates major structural changes that may impact IAQ. The findings from the walkthrough inspections and building systems evaluations are considered when planning renovations.

To the extent possible, major renovations are performed when staff is not in the building (ie weekends, holidays). If renovation projects must be performed while staff are present, the return air from any area being renovated is isolated from the main ventilation system. Engineering controls are used to contain and minimize the distribution of dust and other contaminants produced by construction activities. Cleaning operations are more frequent during and after renovation. Please see the M&T Bank Stadium Construction Management Plan for further details.

11. MICROBIAL MANAGEMENT POLICY

Microbials, such as fungi (for example, mold), bacteria, and viruses, are a significant cause of illness, health symptoms, and discomfort. Because the easiest way to control microbial growth is to control moisture, staff emphasizes moisture control to manage microbial growth.

The MSA pays close attention to water intrusion and microbial growth during the walkthrough inspections, buildings systems evaluations, and other efforts. The maintenance staff has been informed about identifying damaged buildings systems and components that cause water leaks and water condensation. Engineering staff is expected to make the necessary repairs and adjustments in a prompt manner. Materials damaged by water are replaced when possible. Materials that cannot be replaced and must be kept (this could include carpets, padding, ceiling tiles, sheet rock, and insulation) are dried, preferably within 24 hours, but no later than 48 hours. Materials contaminated with microbials are promptly cleaned or replaced. Mold growth is removed from non-porous surfaces with a strong brush and non-ammonia containing detergent and then by thorough drying.

Remediation projects that cannot be handled by engineering/cleaning staff are contracted to a professional.

Large-scale remediation projects follow the guidelines in the “Construction and Renovation Policy” section 10, and additional control and protection measures may be necessary.

12. CLEANING AND CHEMICALS POLICY

Regular and thorough cleaning is an important means for the removal of air pollutant sources, however the use of cleaning products may also contribute to indoor air pollution. To ensure that cleaning practices remove pollutant sources while using cleaning products appropriately, cleaning guidelines have been created (reference the M&T Bank Stadium High Performance Green Cleaning Program).

13. FLOORING AND FURNISHING POLICY

Flooring can be a trap for allergens, and can be a source of potentially hazardous gases called “volatile organic compounds”, especially following installation. Carpets can be more difficult to properly maintain than hard flooring, and as a result carpets may accumulate more pollutants. When performing building systems evaluations, walkthrough inspections, and reviewing concern reports, the possibility of the carpet acting as the primary source of pollutant is considered.

14. EDUCATION OF STAFF POLICY

All MSA employees play an important role in maintaining and improving air quality since their behavior can affect the quality of the air present in MSA’s buildings. For example, placing heavy objects on unit ventilators, adjusting the room thermostats, or turning off noisy unit ventilators can worsen the quality of air in a room. An educated employee is more likely to take steps that maintain good air quality. In addition, an employee with an understanding of IAQ is more likely to report IAQ concerns quickly and accurately.

For these reasons, the MSA staff is informed about IAQ documentation processes through internal meetings.

15. ANNUAL REVIEW

The MSA performs an annual review in order to make changes to the IAQ Management Plan. The annual review is necessary because changes may occur in the building systems, components, and occupants.

The annual review involves:

• building systems evaluations;

• walkthrough inspections;

• reviewing IAQ Complaint Forms and other information;

• discussing new issues

• changing the IAQ Management Plan as needed.

A brief description of the changes to the Plan is written and included in all future versions of the Plan. This creates a history of IAQ that should reduce the likelihood of repeating policies and procedures that were ineffective or inefficient.

Maryland Stadium Authority

Alteration and Addition Construction & Pre-Occupancy Indoor Air Quality (IAQ) Management Plan

Scope: The Maryland Stadium Authority (MSA) will implement this IAQ Management Plan prior to any alteration or addition to the building and space occupancy as specified for EQ Credit 1.5 of USGBC’s Green Building Operations and Maintenance 2009 edition. This IAQ plan will establish goals and procedures to be implemented by the MSA and will be followed by all job site personnel. The Owner’s objective is to reduce indoor air quality problems resulting from the construction/renovation process in order to help sustain the comfort and well-being of construction workers and ultimately the building occupants. The project is also pursuing LEED certification from the US Green Building Council (USGBC) and as such is required to establish this plan and document its progress through the renovated space’s occupancy. The LEED credit that is being pursued with the section is EQc1.5. The Contractor is responsible for meeting all requirements necessary for obtaining this credit.

IAQ Goals:

During construction the construction team will:

● Protect the permanent HVAC system from dust and odors by either keeping all openings sealed prior to operation; or then not activating it during construction or, if activated, implementing recommended control measures.

● Protect and absorptive/porous materials from fumes and odors.

● Minimize and possibility of mold growth inside the building.

IAQ Coordinator:

The Contractor will designate a staff member as IAQ coordinator to implement and monitor this plan. This person will provide reference materials regarding LEED Credit EQc1.5 at the building for Owner and subcontractor use. The coordinator will enforce the no smoking policy inside and outside the building and document implantation of this plan with photos taken at a minimum of three times throughout the construction process in the interior of the building. These photos will show the plan being implemented (covered duct ends, swept areas, covered carpeting, wrapped drywall, etc…)

IAQ Strategies:

1. IAQ activities and issues will be discussed at each subcontractor coordination/safety meeting.

2. As each new subcontractor arrives at the building for the first time, the Contractor will present him/her with a copy of the plan and discuss IAQ responsibilities of that particular subcontractor.

3. The contractor will determine if permanent HVAC equipment will be operated during the renovation or if temporary heating and ventilation will be provided. Tentative delivery dates of the equipment should be established along with the dates of initial start-up.

4. The contractor will coordinate activities necessary to meet SMACNA IAQ Guidelines for Occupied Buildings under Construction, 2nd edition 2007, ANSI/SMACNA 008-2008 (Chapter 3).

5. The contractor will coordinate delivery, on site storage and installation of materials with weather and site conditions to limit the possibility of mold growth. Wet materials will not be used and all installed materials will be adequately protected from moisture.

6. Absorptive/porous materials stored on site or installed will be protected from dust and odors by isolating them from contaminated areas or sequencing installation well after contamination could occur.

7. All ductwork will arrive on site protected and remain as such until immediately before installation.

All exposed edges of fiberglass duct insulation will be sealed with mastic before installation of ductwork and all openings in ducts will remain sealed until immediately before start up of equipment.

SMACNA Guidelines:

This standard provides specific measures to protect the HVAC system and ensure acceptable indoor air quality during construction. These measures are organized in five categories: HVAC Protection, Source Control, Pathway Interruption, Housekeeping and Scheduling.

1. HVAC Protection –If the system is used during construction all grilles and openings must be fitted for temporary filters of a MERV (Minimum Efficiency Reporting Value) of at least 8. Ductwork must also be protected before installation to prevent dust contamination. All filtration media must be replaced immediately before occupancy with filters having a MERV rating of 13.

2. Source Control – The project is required to use building materials and products with limited VOC (Volatile Organic Compounds) content. Fossil fuel burning equipment should be limited to use on exterior of the building away from intake louvers.

3. Pathway Interruption – This measure provides ways to isolate areas where harmful dust and/or odors are being generated from other areas of the building. Temporary barriers such as dust curtains are effective for this use. Pressurizing appropriate areas can also limit flow of contaminants as well as using 100% outside air for ventilation. Location of pollutant sources should be considered whether inside the building or on the exterior if near an intake louver.

4. Housekeeping – Increasing cleaning frequency of the jobsite helps to reduce collection of dust and potential for mold growth. HEPA vacuums should be used inside the building as well as wetting agents for dust control. All cleaning agents should be chosen and used with caution to avoid introducing additional harmful fumes unto the building.

5. Scheduling – Off hours work should be considered if any construction activity generates an unacceptable level of harmful dust or odor.

6. Flush-Out Procedure – A flush out of the renovated space will be performed after all construction work has been completed including punch list items and prior to occupancy of the space. If the space’s central HVAC system is being used to perform the flush-out, remove any temporary filters and duct coverings installed per the measures listed above. Install MERV 13 filtration where needed prior to the flush-out. Outside air is used to dilute and remove off-gassed contaminants.

The quantity of outside air that must be introduced to the project space for the flush out is 14,000 cubic feet of air per square foot of floor area. The rate of outside air should not cause the interior temperature to drop below 60°F and the relative humidity should not exceed 60%. The initial flush out phase is complete when 3,500 cubic feet of air per square foot has been replaced. Occupants my move in after this initial flush out has been performed. The flush-out phase is complete once all 14,000 cubic feet of air per square foot has been supplied, at that time the HVAC system can be switched to its normal mode of operation.

7.

Adhesives, Sealants, Paints and Coatings Purchasing Protocols

1. ALL adhesives and sealants used in the interior of the building (defined as inside the weatherproofing system and applied on site) must comply with the following reference standards:

Adhesives, Sealants and Sealant Primers: South Coast Air Quality Management District Rule #1168. VOC limits correspond to an effective date of July 1, 2005 and rule amendment date of January 7, 2005.

2. All Paints and coatings used in the interior of the building (defined as inside the weatherproofing system and applied on site) must comply with the following referenced standards:

Architectural paints, coatings and primers – Do not exceed VOC content limits established in: Green Seal Standard GS-11, Paints, First Edition, May 20, 1993.

Anti corrosive and Anti-rust paints applied to interior ferrous metal substrates – Do not exceed the VOC content limit of 250 g/l established in: Green Seal Standard GS-03, Anti- Corrosive Paints, Second Edition, January 7, 1997.

Clear wood finishes, floor coatings, stains, shellacs applied to interior elements – Do not exceed the VOC content limits established in: the South coast Air Quality Management District (SCAQMD) Rule 1113, Architectural Coatings, rules in effect January 1, 2004.

File details come from the government source that posted it. Updated .