2--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- SLCo FAC125305 ADC Lobby Turnstiles - CONST
- Solicitation number
- SLCo FAC125305 ADC Lobby Turnstiles - CONST
- Issued by
- Utah
About this file
This document is a Schedule of Values spreadsheet for the Utah State FAC125305 ADC Lobby Turnstiles construction project, involving renovation of the Adult Detention Center's inner lobby. The project aims to create a second security zone by implementing minor demolition, millwork, cabinetry, countertops, security gates, and turnstiles, including electrical renovations and flooring. The spreadsheet provides a template for bidders to itemize costs across different project divisions and alternates, with designated columns for Base Bid, Alternate 1, Alternate 2, and Alternate 3.
The Schedule of Values document indicates that bidders must complete the spreadsheet with precise cost breakdowns, including categories for Payment & Performance Bond, Insurance & Builder's Risk, and General Conditions. The total for the base bid and each alternate must match entries in the Online Solicitation System (OSS). While specific pricing details are not populated in this template, the document serves as a structured framework for contractors to detail their proposed project costs across various work scopes and potential alternative approaches to the renovation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 2 - Document 3.0 | ||||||||
| Schedule Of Values | ||||||||
| Project: FAC125305 ADC Lobby Turnstiles | ||||||||
| Divisions of Work | Base Bid | Alternate 1 | Alternate 2 | Alternate 3 | ||||
| (Specify entire work scope; examples are listed below) | Alternate 1 | Alternate B | Alternate C | Total | ||||
| Payment & Performance Bond | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Insurance & Builder's Risk | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Division 01-General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Totals (Enter in OSS) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS). |
| The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS) |
| Name of Company Bidding ________________________________ |