This document is a complete drawing set for the Raw Sewage Pump Replacement Project prepared by KLH Engineers, Inc. for Rostraver Township Sewage Authority in Westmoreland County, Pennsylvania. The project involves the replacement of four existing raw sewage pumps with new pumps, associated piping, valves, and related mechanical and electrical systems within the wastewater treatment plant's operations building. The drawing set consists of 12 sheets including site plans, demolition plans for basement, intermediate, and first floor levels, proposed installation plans, sections, details, and comprehensive electrical plans. The project is divided into two contracts: Contract No. 2026-07A for General & Mechanical work and Contract No. 2026-07B for Electrical work. Sealed bids were to be received electronically via PennBid until Thursday, October 29, 2026, at 10:00 A.M. local time, with public opening at the Township Office located at 201 Municipal Drive, Rostraver Township, PA 15012. The project has an expected duration of 365 days.
The drawing set provides detailed specifications for demolition of existing equipment including four raw sewage pump motors, associated piping systems, valves, and a duplex seal water system, along with proposed installation of replacement equipment meeting identical connection points and specifications. The drawings indicate that four raw sewage pumps (P121, P122, P123, P124) will be replaced with corresponding new units, supported by new 12-inch ductile iron discharge piping, 10-inch and 14-inch plug valves, check valves, eccentric reducers, and 2-inch air release valves. Electrical work includes installation of new variable frequency drives (VFDs), disconnect switches, solenoid valves for the seal water system, control conduits and cables, and integration with the existing motor control center and operator's panel. Contractor responsibilities include verification of all existing connection points through field measurements, design and installation of all piping supports in accordance with manufacturer recommendations, furnishing and installing pump drive shaft protection guards, and proper coordination with other trades to avoid conflicts with HVAC systems, doors, and access hatches.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing No.
Sheet No.
WESTMORELAND COUNTY, PENNSYLVANIA
SCALE: 1" = 2000'
PROJECT LOCATION
G1 Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide.
No part of this document may be reproduced or transmitted in any form, by any means without written permission, except for brief excerpts in reviews or analysis.
TITLE SHEET
EXISTING SITE PLAN
OPERATIONS BUILDING BASEMENT DEMOLITION PLANS
OPERATIONS BUILDING INTERMEDIATE & FIRST FLOOR DEMOLITION PLANS
OPERATIONS BUILDING DEMOLITION SECTIONS
G1 C1 M1 M2 M3 M4 of 12
Order No.
ROSTRAVER TOWNSHIP
DESCRIPTIONDWG. NO.SHEET NO.
RELEASED FOR BID
OCTOBER 2026
DRAWING LIST
LOCATION MAP
CONTRACT No. 2026-07A GENERAL & MECHANICAL CONTRACT No. 2026-07B ELECTRICAL
RAW SEWAGE PUMP REPLACEMENT PROJECT
288-119
N
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g G .d w g
:4
P M
P lo tt e d
B y:
C o n n o r B u ll
CALL BEFORE YOU DIG!
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR
CONSTRUCTION PHASE
AND 10 WORKING DAYS
IN DESIGN STAGE-STOP CALL
1-800-242-1776
PE
NN
SY
LV
ANIA ONE CALL SYSTEM
, INC
STOP -CALL BEFORE YOU D
IG
7 of 12 M5 8 of 12 M6
OPERATIONS BUILDING BASEMENT PROPOSED PLANS
OPERATIONS BUILDING INTERMEDIATE & FIRST FLOOR PROPOSED PLANS
OPERATIONS BUILDING PROPOSED SECTIONS
5313 Campbells Run Road, Suite 100 Pittsburgh, PA 15205
Phone: 412.494.0510 Fax: 412.494.0426 info@klhengineers.com
KLH
ENGINEERS, INC
9 of 12 DT1 DETAILS 10 of 12 E1 ELECTRICAL LEGEND, ROADMAP AND NOTES 11 of 12 E2 ELECTRICAL DEMOLITION PLANS, DETAILS AND NOTES 12 of 12 E3 PROPOSED ELECTRICAL PLANS, DETAILS AND NOTES
8" C M P
Ae ro bic
Di ge st er s
Co nc
C M P
8" C M P
Cul ver t
Cu lve rt
Mh
N/F
Tha nna
S.
Co le
Lou ise
H.
Col e
D.B .V.
7 P g.
Tax Pa rce l
56- 3-
56- 2-9
D.B
.V.
0 P g.
Ris chit elli Gra y L ine
Com pan y, Inc.
Tax Pa rce l
N/F
Ris chit elli Gra y L ine
Com pan y, Inc.
D.B .V.
0 P g.
Tax Pa rce l
56- 2-9
N/F
Bl oc k
Ga ra ge
Op er at ion s
Bu ild ing
C O ver hea d
W est
Pe nn
P owe r
E lect ric Line sL
C O ver hea d
W est
Pe nn
P owe r
E lect ric Line sL
PL
PL
PL
PL
PL
P L
P L
PL
PL
PL
PL
SB
R
Co nt ro l
Bu ild ing
Ch lor ine
Co nt ac t
Ta nk s
S eq u en ti a l B a tc h
R ea ct o rs
Ae ro bic
Di ge st er s
S B R
Ta n k
N O
S B R
Ta n k
N O
S B R
Ta n k
N O
S B R
Ta n k
N O
Ma nh ole
Wa st ew at er
Sa m ple r
C hlorine
M onorail
So lid s
De wa te rin g
Bu ild ing
Wa lk
Pl an te r x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxx
Ca nt ile ve re d
Ty pe G at e
Co nc
Du m ps te r
Pa d
ST
ST
ST
ST
ST
ST
ST
ST
Pollock Run
Po llo ck R un
Co nc re te L oa din g Do ck
Mh
Mh
Mh
RAW SEWAGE PUMP
PROJECT LOCATION
C1
E X
IS
T
IN
G
S
IT
E P
LA
N
N
D A
C D
A C
D A
C
JD
A
EXISTING SITE PLAN
SCALE: 1"=20' Order No.
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g C .d w g
:2
A M
P lo tt e d
B y:
C o n n o r B u ll
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
W
E S
T M
O R
E
LA
N D
C O
U N
T Y
, P E
N N
S Y
LV
A
N
IA
R O
S T
R A
V E
R T
O W
N S
H
IP
S E
W A
G E
A U
T H
O R
IT
Y
D ra w n
B y:
D at e Is su ed
F or
D at e R ev is io ns
/2
R el ea se d Fo r B id
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C
SCALE: 1"=20'
20' 40'020'
AutoCAD SHX Text
COAL HOLLOW ROAD S.R. 3023
AutoCAD SHX Text x
AutoCAD SHX Text x
F.D.
Finish Floor El.758.33
Concrete Curb Sump Pit
Sump Pump 4" D.I. Sump Pump Discharge
Wet Well
Duplex Seal Water System
Effluent Water Hydropnuematic Tank
4" Plug Valve
Effluent Water Pump No.1
Effluent Water Pump No.2
℄ El.759.50 4" Discharge
D .I
D .I
6" D.I. Effluent Water Pump Suction
6" Plug Valve
4" D.I.
14"X8" Eccentric Reducer (Typ.)
14" Plug Valve (Typ.)
14" D.I.
Raw Sewage Pump #1
Raw Sewage Pump #2
Raw Sewage Pump #3
Raw Sewage Pump #4
℄ El.759.50
℄ El.759.50
℄ El.759.50
℄ El.759.50
Effluent Water Pump Control Panel
Drywell Pump Room Finish Floor El.758.33
14"x14" Self-Contained Flange Mounted Sluice Gate
Up
Up
Access Hatchway (Shown Reflected)
℄ El.759.50 14" D.I.
℄ El.759.50 14" D.I.
℄ El.759.50 14" D.I.
℄ El.759.50 14" D.I.
10"x6" SR. 90° Reducing Bend (Typ.)
4" 90° D.I. Bend
6"
6"
6"
6"
M 3-
A
M 3-
B
M 3-
A
M 3-
B
M3-C M3-C
14" D.I. 45° Bend
14" D.I. 45° Bend
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
F.D.
F.D.
Finish Floor El.758.33
Concrete Curb Sump Pit
Sump Pump 4" D.I. Sump Pump Discharge
Wet Well
Duplex Seal Water System
Effluent Water Hydropnuematic Tank
4" Plug Valve
Effluent Water Pump No.1
Effluent Water Pump No.2
D .I
D .I
6" D.I. Effluent Water Pump Suction
6" Plug Valve
4" D.I.
14"X8" D.I.
Eccentric Reducer (Typ.)
14" Plug Valve (Typ.)
14" D.I.
Raw Sewage Pump #1
Raw Sewage Pump #2
Raw Sewage Pump #3
Raw Sewage Pump #4
℄ El.759.50
℄ El.759.50
℄ El.759.50
℄ El.759.50
Effluent Water Pump Control Panel
Drywell Pump Room Finish Floor El.758.33
14"x14" Self-Contained Flange Mounted Sluice Gate
Up
Up
Access Hatchway (Shown Reflected)
M 3-
A
M 3-
B
M 3-
A
M 3-
B
M3-C
M3-C
D .I
D .I
D .I
10" Plug Valve (Typ.)
2" Air Release Valve (Typ.)
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
Pressure Relief Valve
Pressure Gauge
112"
112"
112"
Duplex Seal Water System
1" To Drain
1" Overflow
Potable Water Connection
Solenoid Valve (Typ.)
To
R a w
S e w a g e
P u m p
N o
To
R a w
S e w a g e
P u m p
N o
To
R a w
S e w a g e
P u m p
N o
To
R a w
S e w a g e
P u m p
N o
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
RE
M
O
VE
RE
M
O
VE
RE
M
O
VE
RE
M
O
VE
M1
O P
E R
A T
IO
N
S B
U
IL
D
IN
G B
A S
E M
E N
T D
E M
O
LI
T
IO
N P
LA
N
S
D A
C
JM
G D
A C
JD
A
OPERATIONS BUILDING BASEMENT
DEMOLITION PLAN M1-A @ EL. 761.00
SCALE: 1/4" = 1'-0"
LEGEND
= ITEMS FOR DEMOLITION AND OR REMOVAL ON THIS DRAWING
SCALE: 1/4" = 1'-0"
4' 8'04'
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g M .d w g
:2
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
A
A N
D
6-
B
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
/2
R el ea se d
Fo r B id
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
OPERATIONS BUILDING BASEMENT
DEMOLITION PLAN M1-B @ EL. 765.00
SCALE: 1/4" = 1'-0"
RAW SEWAGE PUMP SEAL WATER DEMOLITION SCHEMATIC
NOT TO SCALE
REMOVE
Raw Sewage Pump Seal Water System
Raw Sewage Pump No.1
REMOVE
Raw Sewage Pump No.3
REMOVE
Raw Sewage Pump No.2REMOVE
Raw Sewage Pump No.1REMOVE
Raw Sewage Pump No.4
PHOTO NO.1
PHOTO NO.2 PHOTO NO.3
1 = PHOTO LOCATION & NUMBER
REMOVE
2" Air Release Valve
REMOVE
14" Plug Valve (Typ. of 4)
REMOVE
10" Plug Valve (Typ. of 4)
REMOVE
10" Check Valve (Typ. of 4)
REMOVE
10" Check Valve (Typ. of 4)
TO REMAIN
Pump Pad (Typ. of 4)
TO REMAIN
Pump Pad (Typ. of 4)
NOTES:
1. ELEVATIONS LISTED ARE FROM EXISTING
RECORD DRAWINGS. ALL ELEVATIONS ARE
PROVIDED AS REFERENCE ONLY. CONTRACTOR
SHALL COMPLETE HIS OWN MEASUREMENTS
AND DETERMINATIONS TO ENSURE ALL PUMPS,
PIPE, FITTINGS, VALVES, ETC. REPLACED IN KIND
FIT TO EXISTING CONNECTION POINTS.
REMOVE
REMOVE
10" Check Valve (Typ. of 4)
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
S
Up
U p
Handrail
UpDn
Up
F.D. F.D.
Locker/Toilet Room
Bench
B e n c h
Shower
Motor Room
℄ Raw Sewage Pump Motor #2
℄ Raw Sewage Pump Motor #1
℄ Raw Sewage Pump Motor #3
℄ Raw Sewage Pump Motor #4
Tank Dewatering Pump
G G
G G
G G
G G
G G
G 2" Gas Service
1"
1" Gas Up to HVAC Unit
18"x7" HVAC Supply Duct
18"x7" HVAC Supply Duct
Unit Heater
Handrail
Handrail
W W
W
2" Potable Water To Remote Buildings
2" Copper Potable Water Supply
2" Backflow Preventer
Meter By Water Authority 2" Ball Valve
To Potable Water Piping
Sluice Gate Operating Stand Mounted On Wall Bracket
Electric Driven Channel Grinder
Electric Driven Channel Grinder
Grinder Room
℄ El.771.00 12" Raw Sewage To SBR
2" Air Release Valve
℄ El.768.50 6" D.I. Tank Drain
6"
6"
6" D.I.
Blind Flange
Chlorine Contact Tank No.2 Drain Valve4" Effluent Water From Basement
Chlorine Contact Tank No.1 Drain Valve
℄ El.768.50 Effluent Water Suction From Chlorine Contact Tanks
℄ El.967.67 4" D.I. Sump Pump Discharge
℄ El.776.00
1" PVC Vent From Air Relief Valve
D .I
10" D.I Blind Flange
4 " Effluent Water Hose Bib
4 " Effluent Water
℄ El.772.50 4" D.I. Effluent Water
Finish Floor El.767.00
℄ El.768.50
℄ El.768.50
℄ El.768.50
℄ El.768.50
Access Hatchway
M 3-
A
M 3-
B
M 3-
A
M 3-
B
M3-C
M3-C
O p e ra to rs
P a n e l
V F D
P a n e l
2" Air Release Valve
2" Air Release Valve
2" Air Release Valve
2" Air Release Valve
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
TO REMAIN
F.D.
F.D.
Down
Down
Laboratory
Superintendant's Office
Electric Control Room Foyer
Restroom Storage Room
Lunch Room
Finish Floor El.779.00
Kitchen Unit
Gas Tight Hatchway
Refrigerator Incubator
18"x15" Heating/Cooling Supply Duct
Emergency Eyewash & Shower
Cleaning Basin
24"x48 Work Table
48" Desk W/File Cabinet
Sink
Grab Bar
Sink
Urinal
Gate Operating Floor Stand
Down
Hatchway
M 3-
A
M 3-
B
M 3-
A
M 3-
B
M3-C M3-C
M2
O P
E R
A T
IO
N
S B
U
IL
D
IN
G I
N T
E R
M E
D
IA
T E
F
IR
S
T F
LO
O
R D
E M
O
LI
T
IO
N P
LA
N
S
D A
C D
A C
D A
C
JD
AOPERATIONS BUILDING
INTERMEDIATE DEMOLITION PLAN M2-A
SCALE: 1/4" = 1'-0"
= ITEMS FOR DEMOLITION AND OR REMOVAL ON THIS DRAWING
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g M .d w g
:2
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
A
A N
D
6-
B
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
/2
R el ea se d
Fo r B id
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
OPERATIONS BUILDING
FIRST FLOOR PLAN M2-B
SCALE: 1/4" = 1'-0"
LEGEND
1 = PHOTO LOCATION & NUMBER
REMOVE
Raw Sewage Pump Motor No.4
Raw Sewage Pump Motor No.3
REMOVE
REMOVE
Raw Sewage Pump Motor No.1
REMOVE
Raw Sewage Pump Motor No.2
PHOTO NO. 1
NOTES:
1. FIRST FLOOR PLAN M2-B IS SHOWN TO
REFERENCE LOCATIONS OF EXTERIOR DOOR
ACCESS & EQUIPMENT HATCHWAY LOCATION.
2. ELEVATIONS LISTED ARE FROM EXISTING
RECORD DRAWINGS. ALL ELEVATIONS ARE
PROVIDED AS REFERENCE ONLY. CONTRACTOR
SHALL COMPLETE HIS OWN MEASUREMENTS
AND DETERMINATIONS TO ENSURE ALL PUMPS,
PIPE, FITTINGS, VALVES, ETC. REPLACED IN KIND
FIT TO EXISTING CONNECTION POINTS.
REMOVE
2" Air Release Valves
2" Air Release ValveTO REMAIN
El.758.33
El.767.00
El.779.00
HVAC Supply Duct
HVAC Supply Duct
Raw Sewage Pump Motor #1
Raw Sewage Pump Motor #2
Raw Sewage Pump Motor #3
Raw Sewage Pump Motor #4
14"X8" Eccentric Reducer
14" Plug Valve
14" D.I. 45° Bend
Pump Pad(Typ. of 4)
10"x6" SR. 90° Reducing Bend (Typ. of 4)
12" D.I. 90° Base Bend
10" D.I. 90° Bend (Typ. of 4)
12" Check Valve (Typ. of 4)
12" D.I. 12" D.I. 12" D.I.
El.764.47
El.759.50
℄ El.771.00 12" Raw Sewage To SBR
2" Air Relief Valve
℄ El.776.00 Sump Pump Discharge
D .I
12" Flow Meter
Drywell Pump Room
Motor Room D .I
℄ El.776.50 12" 90° D.I. Bend
12" 90° D.I. Bend
Hallway Hallway
Suspended Ceiling Suspended Ceiling
D .I
2" Air Release Valve To Air Release (Typ. of 4)
REMOVEREMOVE REMOVE REMOVE
REMOVE
REMOVE
REMOVE
TO REMAIN
REMOVE
REMOVE
REMOVE REMOVE
El.758.33
El.767.00
El.779.00
HVAC Supply Duct
HVAC Supply Duct
℄ El.776.50 12" 90° D.I. Bend
2" Air Relief Valve
D .I
12" Flow Meter
D .I
12" D.I. 90° Base Bend
℄ El.764.47 10" 90° D.I. Bend (Typ.)
℄ El.762.66
12"x12"x10" D.I. Tee (Typ.)
℄ El.759.50 14" D.I.Suction From Wet Well
Drywell Pump Room
Motor Room
℄ El.776.00 Sump Pump Discharge
Hallway Hallway
Suspended CeilingSuspended Ceiling
2" Air Release Valve
2" Air Release Valve
2" Air Release Valve 2" Air Release Valve
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
Storage Room Restroom Laboratory
Hallway
Suspended Ceiling
Suspended Ceiling
Suspended Ceiling
Gate Operating Floor Stand
Electric Driven Channel Grinder
Effluent Water Pump Control Panel
Hatchway
Hatchway
Motor Room
Drywell Pump Room
℄ El.759.50 14" D.I.
℄ El.764.47 10" D.I.
Bend
℄ El.762.66
10" Plug Valve
14" Plug Valve
14"X8" D.I.
Eccentric Reducer
10"x6" SR. 90° Reducing Bend (Typ.)
10" Check Valve
10"
Raw Sewage Pump Motor #2
El.758.33
2" Air Release Valve
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
M3
O P
E R
A T
IO
N
S B
U
IL
D
IN
G D
E M
O
LI
T
IO
N S
E C
T
IO
N S
D A
C
JM
G D
A C
JD
A
OPERATIONS BUILDING
DEMOLITON SECTION M3-A
SCALE: 1/4" = 1'-0"
LEGEND
= ITEMS FOR DEMOLITION AND OR REMOVAL ON THIS DRAWING
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g M .d w g
:2
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
A
A N
D
6-
B
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
/2
R el ea se d
Fo r B id
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
OPERATIONS BUILDING
DEMOLITION SECTION M3-B
SCALE: 1/4" = 1'-0"
OPERATIONS BUILDING
DEMOLITION SECTION M3-C
SCALE: 1/4" = 1'-0"
NOTES:
1. ELEVATIONS LISTED ARE FROM EXISTING RECORD
DRAWINGS. ALL ELEVATIONS ARE PROVIDED AS
REFERENCE ONLY. CONTRACTOR SHALL COMPLETE HIS
OWN MEASUREMENTS AND DETERMINATIONS TO ENSURE
ALL PUMPS, PIPE, FITTINGS, VALVES, ETC. REPLACED IN
KIND FIT TO EXISTING CONNECTION POINTS.
Finish Floor El.758.33
Concrete Curb Sump Pit
Sump Pump 4" D.I. Sump Pump Discharge
Wet Well
Effluent Water Hydropnuematic Tank
4" Plug Valve
Effluent Water Pump No.1
Effluent Water Pump No.2
℄ El.759.50 4" Discharge
D .I
D .I
6" D.I. Effluent Water Pump Suction
6" Plug Valve
4" D.I.
14" D.I.
RAW SEWAGE
PUMP #1
RAW SEWAGE
PUMP #2
RAW SEWAGE
PUMP #3
RAW SEWAGE
PUMP #4
℄ El.759.50
℄ El.759.50
℄ El.759.50
℄ El.759.50
Effluent Water Pump Control Panel
Drywell Pump Room Finish Floor El.758.33
14"x14" Self-Contained Flange Mounted Sluice Gate
Up
Up
Access Hatchway (Shown Reflected)
℄ El.759.50 14" D.I.
℄ El.759.50 14" D.I.
℄ El.759.50 14" D.I.
℄ El.759.50 14" D.I.
4" 90° D.I. Bend
6"
6"
6"
6"
M 6-
A
M 6-
B
M 6-
A
M 6-
B
M6-C M6-C
14" D.I. 45° Bend
14" D.I. 45° Bend
SEAL
WATER
SYSTEM
F.D.
F.D.
Finish Floor El.758.33
Concrete Curb Sump Pit
Sump Pump 4" D.I. Sump Pump Discharge
Wet Well
Effluent Water Hydropnuematic Tank
4" Plug Valve
Effluent Water Pump No.1
Effluent Water Pump No.2
D .I
D .I
6" D.I. Effluent Water Pump Suction
6" Plug Valve
4" D.I.
14" D.I.
RAW SEWAGE
PUMP #1
RAW SEWAGE
PUMP #2
RAW SEWAGE
PUMP #3
RAW SEWAGE
PUMP #4
℄ El.759.50
℄ El.759.50
℄ El.759.50
℄ El.759.50
Effluent Water Pump Control Panel
Drywell Pump Room
Finish Floor El.758.33
14"x14" Self-Contained Flange Mounted Sluice Gate
Up
Up
Access Hatchway (Shown Reflected)
M 6-
A
M 6-
B
M 6-
A
M 6-
B
M6-C
M6-C
D .I
D .I
D .I
6 4
TO 2" AIR
RELEASE VALVE
(TYP. OF 4)
SEAL
WATER
SYSTEM
PIPE DESCRIPTIONSYMBOL
1 10"x6" D.I. REDUCING 90° BEND
14"x8" D.I. ECCENTRIC REDUCER
10" PLUG VALVE
10" D.I. 45° BEND
14" PLUG VALVE
10" D.I. 90° BEND
10" D.I. SPOOL PIPE
10" CHECK VALVE
1 1 4 " SOLENOID VALVE (TYP.)
TO
R
AW
S
EW
AG
E
PU
M P
NO
. 1
TO
R
AW
S
EW
AG
E
PU
M P
NO
. 2
TO
R
AW
S
EW
AG
E
PU
M P
NO
. 3
TO
R
AW
S
EW
AG
E
PU
M P
NO
. 4
DUPLEX
SEAL WATER
SYSTEM
1 1 4 " TO DRAIN
1 1 4 " SCH. 80 PVC
1 1 4 " EFFLUENT WATER
CONNECTION
1 1 4 " PLUG VALVE VALVE (TYP.)
M4
O P
E R
A T
IO
N
S B
U
IL
D
IN
G B
A S
E M
E N
T P
R O
P O
S E
D P
LA
N
S
D A
C
JM
G D
A C
JD
A
OPERATIONS BUILDING BASEMENT
PROPOSED PLAN M4-A @ EL. 761.00
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
4' 8'04'
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g M .d w g
:2
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
A
A N
D
6-
B
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
/2
R el ea se d
Fo r B id
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
OPERATIONS BUILDING BASEMENT
PROPOSED PLAN M4-B @ EL. 765.00
SCALE: 1/4" = 1'-0"
NOTES:
1. ELEVATIONS LISTED ARE FROM EXISTING RECORD
DRAWINGS. ALL ELEVATIONS ARE PROVIDED AS
REFERENCE ONLY. CONTRACTOR SHALL COMPLETE HIS
OWN MEASUREMENTS AND DETERMINATIONS TO ENSURE
ALL PUMPS, PIPE, FITTINGS, VALVES, ETC. REPLACED IN
KIND FIT TO EXISTING CONNECTION POINTS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND
INSTALLATION OF ALL PIPING SUPPORTS AS REQUIRED
TO SUPPORT THE PIPING SYSTEM AND CONTROL PIPING
SYSTEM VIBRATIONS IN ACCORDANCE WITH PIPING
MANUFACTURER RECOMMENDATIONS AND AS REQUIRED
TO ENSURE A STRUCTURALLY SOUND AND STABLE
INSTALLATION. CONTRACTOR SHALL BE RESPONSIBLE TO
ADDRESS ANY QUESTIONS OR CONCERNS WITH THE
ENGINEER PRIOR TO SYSTEM TESTING AND STARTUP. IN
NO CASE SHALL THE CONTRACTOR PROCEED WITH
STARTUP OF EQUIPMENT IF THERE ARE CONCERNS WITH
PIPING SYSTEM SUPPORTS. IF IT IS DETERMINED BY THE
ENGINEER DURING OR AFTER STARTUP THAT PIPING
SUPPORTS ARE INSUFFICIENT, THEN THE CONTRACTOR
SHALL ADD ADDITIONAL SUPPORTS AT THEIR EXPENSE.
RAW SEWAGE PUMP SEAL
WATER SCHEMATIC M4-C
NOT TO SCALE
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
S
Up
U p
Handrail
UpDn
Up
F.D. F.D.
Locker/Toilet Room
Bench
B e n c h
Shower
Motor Room
℄ RAW SEWAGE
PUMP MOTOR #2
℄ RAW SEWAGE
PUMP MOTOR #1
℄ RAW SEWAGE
PUMP MOTOR #3
℄ RAW SEWAGE
PUMP MOTOR #4
Tank Dewatering Pump
G G
G G
G G
G G
G G
G 2" Gas Service
1"
1" Gas Up to HVAC Unit
18"x7" HVAC Supply Duct
18"x7" HVAC Supply Duct
Unit Heater
Handrail
W W
W
2" Potable Water To Remote Buildings
2" Copper Potable Water Supply
2" Backflow Preventer
Meter By Water Authority 2" Ball Valve
To Potable Water Piping
Sluice Gate Operating Stand Mounted On Wall Bracket
Electric Driven Channel Grinder
Grinder Room
℄ El.771.00 12" Raw Sewage To SBR
2" Air Release Valve
℄ El.768.50 6" D.I. Tank Drain
6"
6"
6" D.I.
Blind Flange
Chlorine Contact Tank No.2 Drain Valve4" Effluent Water From Basement
Chlorine Contact Tank No.1 Drain Valve
℄ El.768.50 Effluent Water Suction From Chlorine Contact Tanks
℄ El.967.67 4" D.I. Sump Pump Discharge
℄ El.776.00
1" PVC Vent From Air Relief Valve
D .I
10" D.I Blind Flange
4 " Effluent Water Hose Bib
4 " Effluent Water
℄ El.772.50 4" D.I. Effluent Water
Finish Floor El.767.00
℄ El.768.50
℄ El.768.50
℄ El.768.50
℄ El.768.50
Access Hatchway
M 6-
A
M 6-
B
M 6-
A
M 6-
B
M6-C
M6-C
O p e ra to rs
P a n e l
V F D
P a n e l
2" AIR RELEASE VALVE
2" AIR RELEASE VALVE
2" AIR RELEASE VALVE
2" AIR
RELEASE
VALVE
Handrail
Electric Driven Channel Grinder
F.D.
F.D.
Down
Down
Laboratory
Superintendant's Office
Electric Control Room Foyer
Restroom Storage Room
Lunch Room
Finish Floor El.779.00
Kitchen Unit
Gas Tight Hatchway
Refrigerator Incubator
18"x15" Heating/Cooling Supply Duct
Emergency Eyewash & Shower
Cleaning Basin
24"x48 Work Table
48" Desk W/File Cabinet
Sink
Grab Bar
Sink
Urinal
Gate Operating Floor Stand
Down
Hatchway
M 3-
A
M 3-
B
M 3-
A
M 3-
B
M3-C M3-C
PIPE DESCRIPTIONSYMBOL
1 10"x6" D.I. REDUCING 90° BEND
14"x8" D.I. ECCENTRIC REDUCER
10" PLUG VALVE
10" D.I. 45° BEND
14" PLUG VALVE
10" D.I. 90° BEND
10" D.I. SPOOL PIPE
10" CHECK VALVE
M5
O P
E R
A T
IO
N
S B
U
IL
D
IN
G I
N T
E R
M E
D
IA
T E
F
IR
S
T F
LO
O
R P
R O
P O
S E
D P
LA
N
S
D A
C
JM
G D
A C
JD
AOPERATIONS BUILDING
INTERMEDIATE PROPOSED PLAN M5-A
SCALE: 1/4" = 1'-0"
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g M .d w g
:2
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
A
A N
D
6-
B
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
/2
R el ea se d
Fo r B id
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
OPERATIONS BUILDING
FIRST FLOOR PLAN M5-B
SCALE: 1/4" = 1'-0"GENERAL NOTES:
1. FIRST FLOOR PLAN M5-B IS SHOWN TO REFERENCE LOCATIONS OF
EXTERIOR DOOR ACCESS & EQUIPMENT HATCHWAY LOCATION.
2. ELEVATIONS LISTED ARE FROM EXISTING RECORD DRAWINGS. ALL
ELEVATIONS ARE PROVIDED AS REFERENCE ONLY. CONTRACTOR SHALL
COMPLETE HIS OWN MEASUREMENTS AND DETERMINATIONS TO ENSURE
ALL PUMPS, PIPE, FITTINGS, VALVES, ETC. REPLACED IN KIND FIT TO
EXISTING CONNECTION POINTS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND INSTALLATION OF
ALL PIPING SUPPORTS AS REQUIRED TO SUPPORT THE PIPING SYSTEM AND
CONTROL PIPING SYSTEM VIBRATIONS IN ACCORDANCE WITH PIPING
MANUFACTURER RECOMMENDATIONS AND AS REQUIRED TO ENSURE A
STRUCTURALLY SOUND AND STABLE INSTALLATION. CONTRACTOR SHALL
BE RESPONSIBLE TO ADDRESS ANY QUESTIONS OR CONCERNS WITH THE
ENGINEER PRIOR TO SYSTEM TESTING AND STARTUP. IN NO CASE SHALL
THE CONTRACTOR PROCEED WITH STARTUP OF EQUIPMENT IF THERE ARE
CONCERNS WITH PIPING SYSTEM SUPPORTS. IF IT IS DETERMINED BY THE
ENGINEER DURING OR AFTER STARTUP THAT PIPING SUPPORTS ARE
INSUFFICIENT, THEN THE CONTRACTOR SHALL ADD ADDITIONAL SUPPORTS
AT THEIR EXPENSE.
El.758.33
El.767.00
El.779.00
HVAC Supply Duct
HVAC Supply Duct
RAW SEWAGE
PUMP MOTOR #1
RAW SEWAGE
PUMP MOTOR #2
RAW SEWAGE
PUMP MOTOR #3
RAW SEWAGE
PUMP MOTOR #4
14" D.I. 45° Bend
12" D.I. 12" D.I. 12" D.I.
℄ El.771.00 12" Raw Sewage To SBR
2" Air Relief Valve
℄ El.776.00 Sump Pump Discharge
D .I
12" Flow Meter
Drywell Pump Room
Motor Room D .I
℄ El.776.50 12" 90° D.I. Bend
12" 90° D.I. Bend
Hallway Hallway
Suspended Ceiling Suspended Ceiling
D .I
SEE
NOTE #1
SEE
NOTE #2
TO AIR RELEASE
(TYP. OF 4)
2" AIR RELEASE
VALVE
Pump Pad (Typ. of 4)
℄ El.762.66 12" D.I. 90° Base Bend
El.758.33
El.767.00
El.779.00
HVAC Supply Duct
HVAC Supply Duct
℄ El.776.50 12" 90° D.I. Bend
2" Air Relief Valve
D .I
12" Flow Meter
D .I
12" D.I. 90° Base Bend
℄ El.764.47
℄ El.762.66
12"x12"x10" D.I. Tee (Typ.)
℄ El.759.50 14" D.I.Suction From Wet Well
Drywell Pump Room
Motor Room
℄ El.776.00 Sump Pump Discharge
Hallway Hallway
Suspended CeilingSuspended Ceiling
12" D.I. 12" D.I. 12" D.I.
2" AIR RELEASE
VALVE
2" AIR RELEASE VALVE
2" AIR RELEASE VALVE
2" AIR RELEASE VALVE
22 2
SEE
NOTE #3
Storage Room Restroom Laboratory
Hallway
Suspended Ceiling
Suspended Ceiling
Suspended Ceiling
Gate Operating Floor Stand
Electric Driven Channel Grinder
Effluent Water Pump Control Panel
Hatchway
Hatchway
Motor Room
Drywell Pump Room
℄ El.759.50 14" D.I.
℄ El.762.66
10"
EL.764.47
El.758.33
RAW SEWAGE
PUMP MOTOR #2
SEE
NOTE #2
2" AIR RELEASE VALVE
SEE
NOTE #1
Pump Pad (Typ. of 4)
PIPE DESCRIPTIONSYMBOL
1 10"x6" D.I. REDUCING 90° BEND
14"x8" D.I. ECCENTRIC REDUCER
10" PLUG VALVE
10" D.I. 45° BEND
14" PLUG VALVE
10" D.I. 90° BEND
10" D.I. SPOOL PIPE
10" CHECK VALVE
M6
O P
E R
A T
IO
N
S B
U
IL
D
IN
G P
R O
P O
S E
D S
E C
T
IO
N S
D A
C
JM
G D
A C
JD
A
OPERATIONS BUILDING
PROPOSED SECTION M6-A
SCALE: 1/4" = 1'-0"
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g M .d w g
:2
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
A
A N
D
6-
B
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
/2
R el ea se d
Fo r B id
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
OPERATIONS BUILDING
PROPOSED SECTION M6-B
SCALE: 1/4" = 1'-0"
OPERATIONS BUILDING
PROPOSED SECTION M6-C
SCALE: 1/4" = 1'-0"
GENERAL NOTES:
1. CONTRACTOR TO FURNISH & INSTALL PUMP DRIVE SHAFT PROTECTION GUARD (TYP. OF 4)
2. CONTRACTOR TO FABRICATE & INSTALL GUARDS ON ALL MOTOR OPENINGS (TYP. OF 4)
3. CONTRACTOR TO INSTALL AIR RELEASE VALVES WITH DISCHARGE HOSING SUCH THAT
DISCHARGE IS PLUMBED TO FLOOR DRAINS (TYP. OF 4)
4. ELEVATIONS LISTED ARE FROM EXISTING RECORD DRAWINGS. ALL ELEVATIONS ARE
PROVIDED AS REFERENCE ONLY. CONTRACTOR SHALL COMPLETE HIS OWN MEASUREMENTS
AND DETERMINATIONS TO ENSURE ALL PUMPS, PIPE, FITTINGS, VALVES, ETC. REPLACED IN
KIND FIT TO EXISTING CONNECTION POINTS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND INSTALLATION OF ALL PIPING
SUPPORTS AS REQUIRED TO SUPPORT THE PIPING SYSTEM AND CONTROL PIPING SYSTEM
VIBRATIONS IN ACCORDANCE WITH PIPING MANUFACTURER RECOMMENDATIONS AND AS
REQUIRED TO ENSURE A STRUCTURALLY SOUND AND STABLE INSTALLATION. CONTRACTOR
SHALL BE RESPONSIBLE TO ADDRESS ANY QUESTIONS OR CONCERNS WITH THE ENGINEER
PRIOR TO SYSTEM TESTING AND STARTUP. IN NO CASE SHALL THE CONTRACTOR PROCEED
WITH STARTUP OF EQUIPMENT IF THERE ARE CONCERNS WITH PIPING SYSTEM SUPPORTS.
IF IT IS DETERMINED BY THE ENGINEER DURING OR AFTER STARTUP THAT PIPING
SUPPORTS ARE INSUFFICIENT, THEN THE CONTRACTOR SHALL ADD ADDITIONAL SUPPORTS
AT THEIR EXPENSE.
DT1
D E
T A
IL
S
D A
C D
A C
D A
C
JD
A
Order No.
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved WorldwideS
A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g D T2 .d w g
:2
A M
P lo tt e d
B y:
C o n n o r B u ll
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
W
E S
T M
O R
E
LA
N D
C O
U N
T Y
, P E
N N
S Y
LV
A
N
IA
R O
S T
R A
V E
R T
O W
N S
H
IP
S E
W A
G E
A U
T H
O R
IT
Y
D ra w n
B y:
D at e Is su ed
F or
D at e R ev is io ns
/2
R el ea se d Fo r B id
C am pb el ls R un R oa d, S ui te
Pi tts bu rg h, P A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs .c om
K L H
E N
G
IN
E E R
S
IN
C
Motor Control Center (Existing)
Lighting Panel A (Circuits #35 , #37, and #39)
(Existing)
Raw Sewage Pump No.1 VFD
(VFD-P121)
Raw Sewage Pump No.2 VFD
(VFD-P122)
RAW SEWAGE
PUMP No.1
DISCONNECT SWITCH
(DS-P121)
RAW SEWAGE
PUMP No.2
DISCONNECT SWITCH
(DS-P122)
RAW SEWAGE
PUMP No.1
(P121)
RAW SEWAGE
PUMP No.2
(P122)
VFD Cabinet (Existing)
Raw Sewage Pump No.3 VFD
(VFD-P123)
RAW SEWAGE
PUMP No.3
DISCONNECT SWITCH
(DS-P123)
RAW SEWAGE
PUMP No.3
(P123)
Raw Sewage Pump No.4 VFD
(VFD-P124)
RAW SEWAGE
PUMP No.4
DISCONNECT SWITCH
(DS-P124)
RAW SEWAGE
PUMP No.4
(P124)
Operator's Panel (Existing)
Raw Sewage Pump No.1 VFD
(VFD-P121)
Raw Sewage Pump No.2 VFD
(VFD-P122)
RAW SEWAGE
PUMP No.1
(P121)
RAW SEWAGE
PUMP No.2
(P122)
VFD Cabinet (Existing)
Raw Sewage Pump No.3 VFD
(VFD-P123)
RAW SEWAGE
PUMP No.3
(P123)
Raw Sewage Pump No.4 VFD
(VFD-P124)
RAW SEWAGE
PUMP No.4
(P124)
DUPLEX SEAL WATER
SYSTEM CONTROL PANEL
(SWS-CP-001)
1" CONDUIT
1-3/C #8 XHHW-2
1-1/C #10 XHHW-2 GND
P01
1" CONDUIT
1-3/C #8 XHHW-2
1-1/C #10 XHHW-2 GND
P04
1" CONDUIT
1-3/C #8 XHHW-2
1-1/C #10 XHHW-2 GND
P07
1" CONDUIT
1-3/C #8 XHHW-2
1-1/C #10 XHHW-2 GND
P10
1- 3/C #8 XLPE
VFD CABLEP02 P05 P08 P11
P03 P06 P09 P12
3/4" CONDUIT
4-1/C #12 XHHW-2P13 1" CONDUIT
18-1/C #14 XHHW-2C09 1" CONDUIT
16-1/C #14 XHHW-2C01 C03 C05 C07
C02 C04 C06 C08
RAW SEWAGE
PUMP No.1
AIR RELIEF VALVE
RAW SEWAGE
PUMP No.2
AIR RELIEF VALVE
RAW SEWAGE
PUMP No.3
AIR RELIEF VALVE
RAW SEWAGE
PUMP No.4
AIR RELIEF VALVE
SEAL WATER
PUMP No.1
SEAL WATER
PUMP No.2
1" CONDUIT
16-1/C #14 XHHW-2
1" CONDUIT
16-1/C #14 XHHW-2
1" CONDUIT
16-1/C #14 XHHW-2
3/4" CONDUIT
4-1/C #14 XHHW-2
3/4" CONDUIT
4-1/C #14 XHHW-2
3/4" CONDUIT
4-1/C #14 XHHW-2
3/4" CONDUIT
4-1/C #14 XHHW-2
1- 3/C #8 XLPE
VFD CABLE
1- 3/C #8 XLPE
VFD CABLE
1- 3/C #8 XLPE
VFD CABLE
1 1/4" CONDUIT
1- 3/C #8 XLPE
VFD CABLE
1 1/4" CONDUIT
1- 3/C #8 XLPE
VFD CABLE
1 1/4" CONDUIT
1- 3/C #8 XLPE
VFD CABLE
1 1/4" CONDUIT
1- 3/C #8 XLPE
VFD CABLE
E1
E
LE
C T
R
IC
A L
R O
A D
M A
P , L
E G
E N
D
N O
T E
S
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g E .d w g
:5
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
B
E
LE
C T
R
IC
A L
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
/2
R el ea se d Fo r B id
1. ALL PENETRATIONS THROUGH THE FOUNDATION WALLS SHALL BE
SEALED WITH TWO LINK-SEALS, AN INNER AND AN OUTER SEAL.
2. WHERE UNDERGROUND CONDUIT ENTERS INTO A BUILDING OR
STRUCTURE EACH CONDUIT SHALL BE SEALED TO PREVENT WATER
FROM ENTERING INTO THE BUILDING. EACH CONDUIT, WITH OR
WITHOUT CABLES, SHALL BE FITTED WITH AN INFLATABLE FLEXIBLE
METALLIC LAMINATE BLADDER SYSTEM. SEE SPECIFICATION
SECTION 16111.
3. EMBEDDED CONDUIT SHALL BE GROUPED TOGETHER AS MUCH AS
POSSIBLE TO MINIMIZE THE EMBEDDED FOOTPRINT. EACH AND
EVERY EMBEDDED CONDUIT SHALL BE ACCURATELY DEPICTED ON
THE RECORD DRAWINGS.
4. ALL CONDUITS LISTED AS SPARE THAT ARE NOT ROUTED TO A
SPECIFIC PIECE OF EQUIPMENT IN THE CONDUIT AND CABLE
SCHEDULES, SHALL TERMINATE IN A BUILDING VAULT, MANHOLE,
EQUIPMENT MOUNTING BACKBOARD, ETC. THE CONDUIT SHALL
EXTEND UP 6 INCHES ABOVE THE FINISHED GRADE, FLOOR, OR INTO
A SPACE THROUGH A WALL. CONDUIT SHALL BE CAPPED AND
TAGGED AS “SPARE”.
5. ALL CONDUITS SHALL BE INSTALLED AS PER THE CONDUIT AND
CABLE SCHEDULE OR AS SHOWN ON THE CONTRACT DRAWINGS.
UNLESS SHOWN, NO CONDUITS SHALL BE ROUTED OR CONCEALED
IN CONCRETE SLABS, STRUCTURES, WALLS, ETC., WITHOUT
APPROVAL FROM THE ENGINEER. INDIVIDUAL CONDUITS THAT ARE
ROUTED TO THE SAME AREA SHALL NOT BE COMBINED INTO
LARGER CONDUITS WITHOUT APPROVAL OF THE ENGINEER.
6. THE PLANS AND SCHEMATIC DRAWINGS SHOW THE REQUIRED
CONTROL CONNECTIONS AND INTERFACES BETWEEN THE VARIOUS
CONTROL PANELS AND DEVICES, HOWEVER DURING CONSTRUCTION
SOME PRODUCTS MAY BE SUBSTITUTED BY THE
GENERAL/MECHANICAL CONTRACTOR. THE MANUFACTURER MAY
CHANGE HIS PRODUCT, ETC.
7. ALL CONDUIT RUNS ARE SHOWN IN THE HOME RUN FORMAT ONLY.
EXACT LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR.
8. CONDUITS SHALL BE ROUTED TO AVOID INTERFERENCE WITH HVAC,
PIPING, DOORS & ACCESS HATCHES.
9. THE SPECIFICATIONS AND ACCOMPANYING DRAWINGS ARE
MUTUALLY EXPLANATORY AND ANYTHING REQUIRED BY ONE BUT
NOT BY THE OTHER SHALL BE CONSIDERED AS REQUIRED BY BOTH.
WHERE THE REQUIREMENTS DIFFER OR ARE CONTRADICTORY
BETWEEN THE VARIOUS PARTS OF THE SPECIFICATIONS, DIFFERENT
DRAWINGS OR PARTS OF DRAWINGS, OR BETWEEN THE DRAWINGS
AND SPECIFICATION, THE MORE RESTRICTIVE (LARGER SIZE,
GREATER RATING, MORE OPTIONS, ETC.) SHALL APPLY.
10. THE ELECTRICAL CONTRACTOR SHALL VERIFY DOOR SWINGS AND
THE EXACT LOCATION AND HEIGHTS OF ALL DEVICES, ETC., WITH
THE ENGINEER BEFORE INSTALLATION. ANY WORK INSTALLED
CONTRARY TO OR WITHOUT APPROVAL OF THE ENGINEER SHALL BE
SUBJECT TO CHANGE AS DIRECTED BY THE ENGINEER WITH NO
EXTRA COMPENSATION.
11. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE DESIRED
ARRANGEMENT AND THE APPROXIMATE LOCATION OF PRINCIPLE
CONDUIT, WIRING, APPARATUS AND EQUIPMENT. RUNS OF CONDUIT,
AND LOCATIONS OF EQUIPMENT ARE SHOWN DISTORTED ON
DRAWINGS TO AVOID CONFUSION. THE CONTRACTOR SHALL VERIFY
MEASUREMENTS, ACCESS OPENING DIMENSIONS, EQUIPMENT SPACE
REQUIREMENTS, ETC., ON THE JOB SITE. THE ENTIRE INSTALLATION
SHALL BE MADE IN A MANNER TO AVOID OBSTRUCTIONS, TO
PRESERVE HEADROOM, KEEP OPENINGS CLEAR AND TO OVERCOME
LOCAL DIFFICULTIES AND INTERFERENCE WITH STRUCTURAL
CONDITIONS AND WITH OTHER TRADES.
12. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING WITH THE GENERAL/MECHANICAL CONTRACTOR AND
FOR REVIEWING ALL SUBMITTALS TO VERIFY THAT THEY CONFORM
TO THE ELECTRICAL REQUIREMENTS OF OTHER DEVICES WHICH
THEY ARE CONNECTED.
13. SURFACE MOUNTED PANEL BOXES, JUNCTION BOXES, CONDUIT, ETC.,
SHALL BE SUPPORTED BY SPACERS TO PROVIDE A CLEARANCE
(APPROXIMATELY ¼”) BETWEEN THE WALL/BACKPANEL AND THE
EQUIPMENT.
14. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL
REQUIRED CONDUITS, CONDUCTORS, ENCLOSURES, ETC., IN ORDER
TO MAKE A COMPLETE ELECTRICAL SYSTEM READY FOR OPERATION.
15. THE ELECTRICAL CONTRACTOR SHALL SUPPLY ALL AUXILIARY
EQUIPMENT, FRAMES, SUPPORTS, CONNECTORS, TERMINALS, ACCESS
PANELS, AND OTHER DEVICES REQUIRED FOR PROPER INSTALLATION
AND OPERATION OF EQUIPMENT FURNISHED AND INSTALLED BY HIM.
16. EQUIPMENT LOCATIONS SHOWN ON THE DRAWINGS MAY CHANGE
DUE TO INTERFERENCE PROBLEMS, EQUIPMENT DESIGN, ETC.. THE
ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATIONS OF
DEVICES AND EQUIPMENT INSTALLED BY OTHER CONTRACTORS
PRIOR TO FINAL ROUGH IN, AND ADJUST CONDUIT LAYOUTS AS
REQUIRED TO COMPENSATE FOR CHANGES.
17. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE
NATIONAL ELECTRIC CODE, NFPA, UL, BUILDING STANDARDS, AND
ALL OTHER GOVERNING AGENCIES HAVING JURISDICTIONS.
18. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER AND
SHALL PRESENT A NEAT MECHANICAL APPEARANCE WHEN
COMPLETED.
19. ALL RACEWAYS FOR FEEDERS, BRANCH AND CONTROL CIRCUITS
SHALL CONTAIN A SEPARATE INSULATED EQUIPMENT GROUNDING
CONDUCTOR SIZED IN ACCORDANCE WITH ARTICLE 250 OF THE
NATIONAL ELECTRIC CODE. ALL 120V BRANCH CIRCUITS SHALL
CONTAIN A FULL SIZE SEPARATE NEUTRAL PER CIRCUIT. SHARING
OF NEUTRALS IS NOT PERMISSIBLE.
20. ALL RECEPTACLES AND SWITCHES SHALL BE INSTALLED IN TYPE
“FD” BOXES WITH THREADED HUBS. REFER TO SPECIFICATION 16130
FOR ADDITIONAL INFORMATION.
21. PROVIDE AN ALUMINUM DRIP SHIELD ABOVE ANY ELECTRICAL
EQUIPMENT THAT IS LOCATED UNDER A DRAIN / PROCESS PIPE.
GENERAL NOTES:
D A
C
JV
F C
JB
M
A S
LIT LEVEL INDICATING TRANSMITTER
P PUMP
HOT WATER HEATERHW
MANUAL MOTOR STARTERMMS
ALARMAL
PUSH BUTTONPB
MOTOR OPERATED VALVEMOV
PS PRESSURE SWITCH
LEVEL TRANSMITTERLT
SC SCREEN
MOTORMTR
MOTOR CIRCUIT PROTECTORMCP
MOLDED CASE CIRCUIT BREAKERMCCB
HOISTHS
SURGE SUPPRESSOR
TRANSIENT VOLTAGETVSS
CD CONTROL DAMPER
PUSH TO TESTPTT
RECEPTACLEREC
VARIABLE FREQUENCY DRIVEVFD
TRANSFORMERXFMR
O/L OVERLOAD
FULL VOLTAGE NON-REVERSINGFVNR
LOUVERLV
HORSEPOWERHP
EXHAUST FANEF
DWG DRAWING
AMERICAN WIRE GAUGEAWG
CP CONTROL PANEL
ALTERNATING CURRENT
CIRCUIT BREAKER
LIGHTING PANEL
MOTOR CONTROL CENTER
MOTOR STARTER
VOLTS
WIREW
V
MS
MCC
LP
CB
AC
ABBREVIATIONS
RGS RIGID GALVANIZED STEEL
POLY VINYL CHLORIDEPVC
mA MILLI-AMPERES
JB JUNCTION BOX
A AMPERES
DIRECT CURRENTDC
DB DUCT BANK
DISCONNECT SWITCHDS
FU FUSE
GROUNDGND
H HOT
THOUSAND CIRCULAR MILSKCMIL
LFMC LIQUIDTIGHT FLEXIBLE
METAL CONDUIT
N NEUTRAL
PH PHASE
THERMOSTATTH
UH UNIT HEATER
GROUND FAULT CIRCUITGFCI
INTERRUPTER
WP WEATHER PROOF
EX EXPLOSION PROOF
FIBER OPTICF/O
X
LIQUIDTIGHT FLEXIBLE METAL CONDUIT
OR EXPLOSION PROOF COUPLING
GROUND ROD CONNECTION
ELECTRICAL LEGEND
SINGLE POLE SWITCH
(PILOT GLOWS WHEN SWITCH IS ON) P
T
SINGLE POLE SWITCH
(TIME CONTROLLED)
T
J
DB##
F
DM
S
ETHERNET RECEPTACLE
TELEPHONE RECEPTACLE
FAX MACHINE RECEPTACLE
SMOKE DETECTOR / ALARM
DIMMER SWITCH
THREE WAY SWITCH
SINGLE POLE SWITCH
240V SINGLE RECEPTACLE
208V SINGLE RECEPTACLE
120V SINGLE RECEPTACLE
120V DUPLEX RECEPTACLE
120V QUAD RECEPTACLE
THERMOSTAT
JUNCTION BOX
CONDUIT DESIGNATION NUMBER SEE
SPECIFICATION SECTION 16150
DUCT BANK CALLOUT SEE DUCT BANK
DETAILS
CONDUIT ELBOW, TURNING UPWARD
CONDUIT ELBOW, TURNING DOWNWARD
ABOVEGROUND CONDUIT
UNDERGROUND CONDUIT
UNDERGROUND DUCT BANK
CONDUIT STUB-UP
OCCUPANCY SENSOR
KEYPAD KYPD
HHORN
CDOOR CONTACT
HDMI RECEPTACLE
PICTURE LOCATION
ELECTRICAL ROAD MAP
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Access Hatch
Lunch Room
Storage Room
Restroom
Down
Electrical Control Room
Motor Control Center (MCC) (Existing) SEE DEMOLITION NOTES No.5, 7 & 8
SEE PHOTO REFERENCE D
Lighting Panel A (Existing) SEE DEMOLITION NOTES No.6 & No.14
SEE PHOTO REFERENCE C
Sump Pit
Sump Pump
Effluent Water Hydropneumatic Tank
Effluent Water Pump No. 1
Effluent Water Pump No. 2
Up
Up
Dry Well Pump Room Finish Floor El.
758.33
REMOVE
Duplex Seal Water System
SEE DEMOLITION NOTES
No.13 THRU 16
SEE PHOTO REFERENCE A
REMOVE
Raw Sewage Pump No.1
SEE DEMOLITION NOTES
No.11 & No.12 Solenoid Valve SEE DEMOLITION NOTE No.16
REMOVE
Raw Sewage Pump No.2
SEE DEMOLITION NOTES
No.11 & No.12 Solenoid Valve SEE DEMOLITION NOTE No.16
REMOVE
Raw Sewage Pump No.3
SEE DEMOLITION NOTES
No.11 & No.12 Solenoid Valve SEE DEMOLITION NOTE No.16
REMOVE
Raw Sewage Pump No.4
SEE DEMOLITION NOTES
No.11 & No.12 Solenoid Valve SEE DEMOLITION NOTE No.16
G G
G G
G G
G G
G G
G
W W
W
Up
Up
Down Motor Room
Finish Floor El. 767.00
Locker/Toilet Room Finish Floor El. 767.00
Tank Dewatering Pump
Access Hatch
REMOVE
Raw Sewage Pump No.1 Motor
SEE DEMOLITION NOTES
No.11 & No.12
REMOVE
Raw Sewage Pump No.2 Motor
SEE DEMOLITION NOTES
No.11 & No.12
REMOVE
Raw Sewage Pump No.3 Motor
SEE DEMOLITION NOTES
No.11 & No.12
REMOVE
Raw Sewage Pump No.4 Motor
SEE DEMOLITION NOTES
No.11 & No.12
VFD Panel (Existing)
SEE DEMOLITION NOTES
No.8, No.9, No.10, & No.12
SEE PHOTO REFERENCE A
Operator's Panel (Existing) SEE DEMOLITION NOTES No.9 & No.16
ELECTRICAL DEMOLITION NOTES:
1) FOR VFD CABINET, SEE PHOTO REFERENCE A.
2) FOR DUPLEX SEAL WATER SYSTEM, SEE PHOTO REFERENCE B.
3) FOR PANEL A, SEE PHOTO REFERENCE C.
4) FOR MOTOR CONTROL CENTER (MCC), SEE PHOTO REFERENCE D.
5) ELECTRICAL CONTRACTOR IS TO DETERMINE LOCATION OF MOTOR
CONTROL CENTER (EXISTING) IN ELECTRICAL CONTROL ROOM. THE
LOCATION SHOWN ON THE DRAWING IS FOR INFORMATION ONLY.
6) ELECTRICAL CONTRACTOR IS TO DETERMINE LOCATION OF PANEL A
(EXISTING) IN ELECTRICAL CONTROL ROOM. THE LOCATION SHOWN
ON THE DRAWING IS FOR INFORMATION ONLY.
7) ELECTRICAL CONTRACTOR IS TO DE-ENERGIZE POWER IN (EXISTING)
MOTOR CONTROL CENTER (MCC) FOR RAW SEWAGE PUMPS.
DE-ENERGIZING PROCESS MUST ENSURE THAT WET WELL PUMPING
REMAINS OPERATIONAL DURING CONSTRUCTION.
8) ELECTRICAL CONTRACTOR IS TO DISCONNECT AND REMOVE POWER
CONDUIT & CABLES BETWEEN MCC AND RAW SEWAGE PUMP VFDS.
9) ELECTRICAL CONTRACTOR IS TO DISCONNECT AND REMOVE
CONTROL CONDUITS & CABLES BETWEEN OPERATOR'S PANEL AND
VFD CABINET.
10) ELECTRICAL CONTRACTOR IS TO REMOVE RAW SEWAGE PUMP
DISCONNECT SWITCHES FROM VFD CABINET.
11) ELECTRICAL CONTRACTOR IS TO DISCONNECT ALL POWER &
CONTROL CONDUITS & CABLES FROM RAW SEWAGE PUMPS AND
MOTORS.
12) ELECTRICAL CONTRACTOR IS TO REMOVE ALL POWER & CONTROL
CONDUITS & CABLES BETWEEN RAW SEWAGE PUMPS AND VFD
CABINET.
13) ELECTRICAL CONTRACTOR IS TO DISCONNECT ALL POWER &
CONTROL CONDUITS & CABLES FROM DUPLEX SEAL WATER SYSTEM.
14) ELECTRICAL CONTRACTOR IS TO REMOVE ALL CONDUITS & CABLE
BETWEEN DUPLEX SEAL WATER SYSTEM AND LIGHTING PANEL A.
15) ELECTRICAL CONTRACTOR IS TO REMOVE ALL CONDUITS & CABLE
BETWEEN DUPLEX SEAL WATER SYSTEM AND OPERATORS PANEL.
16) ELECTRICAL CONTRACTOR IS TO DISCONNECT AND REMOVE ALL
POWER & CONTROL CONDUITS & CABLES ON THE SEAL WATER
SOLENOID VALVE ATTACHED TO EACH RAW SEWAGE PUMP.
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g E .d w g
:5
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
B
E
LE
C T
R
IC
A L
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
/2
R el ea se d Fo r B id
E
LE
C T
R
IC
A L
D E
M O
LI
T
IO
N
P
LA
N S
, D E
T A
IL
S
A N
D N
O T
E S
E2
D A
C
JV
F C
JB
M
A S
OPERATIONS BUILDING
BASEMENT ELECTRICAL PLAN E3-A
SCALE: 1/4" = 1'-0"
OPERATIONS BUILDING
INTERMEDIATE ELECTRICAL PLAN E3-B
SCALE: 1/4" = 1'-0"
OPERATIONS BUILDING
FIRST FLOOR ELECTRICAL PLAN E3-C
SCALE: 1/4" = 1'-0"
PHOTO REFERENCE C
PANEL A
PHOTO REFERENCE D
MOTOR CONTROL CENTER (MCC)
PHOTO REFERENCE B
Duplex Seal Water System
PHOTO REFERENCE A
VFD CABINET
Motor Control Center (MCC) (Existing)
SEE INSTALLATION NOTES
No.3, No.4, & No.5
P01 P07P04 P10
Lighting Panel A (Existing)
SEE INSTALLATION NOTES
No.2, No.11 & No.12
P13
Access Hatch
Lunch Room
Storage Room
Restroom
Down
Electrical Control Room
Effluent Water Pump Control Panel
RAW SEWAGE PUMP No.1 SEE INSTALLATION NOTE No.8
SOLENOID VALVE
SEE INSTALLATION NOTES No.13 & 14
RAW SEWAGE PUMP No.2 SEE INSTALLATION NOTE No.8
SOLENOID VALVE
SEE INSTALLATION NOTES No.13 & 14
RAW SEWAGE PUMP No.3 SEE INSTALLATION NOTE No.8
SOLENOID VALVE
SEE INSTALLATION NOTES No.13 & 14
RAW SEWAGE PUMP No.4 SEE INSTALLATION NOTE No.8
SOLENOID VALVE
SEE INSTALLATION NOTES No.13 & 14
SEAL WATER SYSTEM
SEE INSTALLATION NOTE No.11
Sump Pit
Sump Pump
Effluent Water Hydropneumatic Tank
Effluent Water Pump No. 1
Effluent Water Pump No. 2
Up
Up
Dry Well Pump Room Finish Floor El.
758.33
SEAL WATER SYSTEM
CONTROL PANEL
SEE INSTALLATION NOTES
No.11 & 14
P13
C09
G G
G G
G G
G G
G G
G
W W
W
RAW SEWAGE PUMP No.1 MOTOR SEE INSTALLATION NOTE No.8
RAW SEWAGE PUMP No.2 MOTOR SEE INSTALLATION NOTE No.8
RAW SEWAGE PUMP No.3 MOTOR SEE INSTALLATION NOTE No.8
RAW SEWAGE PUMP No.4 MOTOR SEE INSTALLATION NOTE No.8
Up
Up
Down Motor Room
Finish Floor El. 767.00
Locker/Toilet Room Finish Floor El. 767.00
Tank Dewatering Pump
Access Hatch
P13
C09
P12C08
P09C06
P03C02
RAW SEWAGE PUMP No.4
AIR RELIEF VALVE
RAW SEWAGE PUMP No.3
AIR RELIEF VALVE
RAW SEWAGE PUMP No.1
AIR RELIEF VALVE
RAW SEWAGE PUMP No.2
AIR RELIEF VALVE
VFD Panel (Existing)
SEE INSTALLATION NOTES
No.1, 4, 6, 7, 9, & 10 Operator's Panel (Existing)
SEE INSTALLATION NOTES
No.1, 4 & 6
P06C04
SEE ENLARGED
DETAIL E3-D
ELECTRICAL INSTALLATION NOTES:
1) FOR VFD CABINET, SEE PHOTO REFERENCE A.
2) FOR PANEL A, SEE PHOTO REFERENCE B.
3) FOR MOTOR CONTROL CENTER (MCC), SEE PHOTO
REFERENCE C.
4) ELECTRICAL CONTRACTOR IS TO INSTALL POWER CONDUIT
& CABLES BETWEEN MOTOR CONTROL CENTER AND RAW
SEWAGE PUMP VFDS.
5) ELECTRICAL CONTRACTOR IS TO RE-ENERGIZE POWER IN
MOTOR CONTROL CENTER (MCC) FOR RAW SEWAGE PUMPS.
RE-ENERGIZING PROCESS MUST ENSURE THAT WET WELL
PUMPING REMAINS OPERATIONAL DURING CONSTRUCTION.
6) ELECTRICAL CONTRACTOR IS TO INSTALL NEW POWER &
CONTROL CONDUITS & CABLES BETWEEN OPERATOR'S
PANEL AND VFD CABINET.
7) ELECTRICAL CONTRACTOR IS TO INSTALL NEW DISCONNECT
SWITCHES (FOR RAW SEWAGE PUMPS) IN VFD CABINET.
8) ELECTRICAL CONTRACTOR IS TO INSTALL NEW POWER &
CONTROL CONDUITS & CABLES BETWEEN RAW SEWAGE
PUMPS AND MOTORS.
9) ELECTRICAL CONTRACTOR IS TO INSTALL NEW POWER &
CONTROL CONDUITS & CABLES BETWEEN RAW SEWAGE
PUMP MOTORS AND DISCONNECT SWITCHES, LOCATED IN
VFD CABINET.
10) ELECTRICAL CONTRACTOR IS TO INSTALL NEW CONTROL
CONDUITS & CABLES BETWEEN OPERATORS CONTROL
PANEL AND EACH RAW SEWAGE PUMP VFD.
11) ELECTRICAL CONTRACTOR IS TO INSTALL POWER CONDUIT
AND CABLES FROM PANEL A (LOCATED IN ELECTRICAL
CONTROL ROOM) AND NEW DUPLEX SEAL WATER SYSTEM
(LOCATED IN DRY WELL PUMP ROOM.
12) ELECTRICAL CONTRACTOR IS TO FURNISH A NEW 3 POLE
20A BREAKER IN CIRCUITS #35 , #37, and #39 OF LIGHTING
PANEL A TO POWER NEW DUPLEX SEAL WATER SYSTEM.
13) ELECTRICAL CONTRACTOR IS TO INSTALL NEW CONTROL
CONDUITS & CABLE BETWEEN DUPLEX SEAL WATER
SYSTEM AND OPERATORS PANEL.
14) ELECTRICAL CONTRACTOR IS TO INSTALL NEW POWER &
CONTROL CONDUITS & CABLES BETWEEN SEAL WATER
SOLENOID VALVES (ATTACHED TO EACH RAW SEWAGE
PUMP) AND THE NEW DUPLEX SEAL WATER SYSTEM
CONTROL PANEL.
C07
C05
C03
C01
C08
P12 C06
P09 C04
P06
C02
P03
P01
P11
P04
P07
P10
P08
P05
P02
VFD UNITS
No.1 THRU No.4 In VFD Cabinet (Existing)
Operator's Panel (Existing)
Order No.
Drawing No.
Sheet No.
of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide
ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.
Items Identified with Mixed Case Text are Existing.
NOTE:
D at e Is su ed
F or
D at e R ev is io ns
S A c ti ve
C lie n ts
R o st ra ve r To w n sh ip
S e w a g e
A u th o ri ty
R a w
S e w a g e
P u m p s\ D w g E .d w g
:5
A M
P lo tt e d
B y:
C o n n o r B u ll
D es ig ne d B y:
C he ck ed B y:
A pp ro ve d
B y:
D at e:
288-119
O ct ob er
R A
W S
E W
A G
E P
U M
P R
E P
LA
C
E M
E N
T P
R O
JE
C
T C
O N
T R
A C
T N
O . 2
6-
B
E
LE
C T
R
IC
A L
W E
S T
M O
R E
LA
N
D C
O U
N T
Y , P
E N
N S
Y
LV
A N
IA
R
O S
T R
A V
E R
T O
W N
S H
IP
D ra w n B y:
C am pb el ls
R un
R oa d, S ui te
Pi tts bu rg h, P
A
Ph on e:
.4
.0
Fa x:
.4
.0 in fo kl he ng in ee rs
.c om
K L H
E N
G
IN
E E R
S
IN
C
/2
R el ea se d Fo r B id
P R
O P
O S
E D
E
LE
C T
R
IC
A L
P
LA
N S
, D E
T A
IL
S
N
O T
E S
E3
D A
C
JV
F C
JB
M
A S
OPERATIONS BUILDING
BASEMENT ELECTRICAL PLAN E3-A
SCALE: 1/4" = 1'-0"
OPERATIONS BUILDING
INTERMEDIATE ELECTRICAL PLAN E3-B
SCALE: 1/4" = 1'-0"
OPERATIONS BUILDING
FIRST FLOOR ELECTRICAL PLAN E3-C
SCALE: 1/4" = 1'-0"
PHOTO REFERENCE B
PANEL A
PHOTO REFERENCE C
MOTOR CONTROL CENTER
(MCC)
PHOTO REFERENCE A
VFD CABINET
ENLARGED DETAIL E3-D
SCALE: 1/2" = 1'-0"
| Sheets and Views |
| 1 G288-119-001 - G1 |
| 2 C288-119-001 - C1 |
| 3 M288-119-001 - M1 |
| 4 M288-119-002 - M2 |
| 5 M288-119-003 - M3 |
| 6 M288-119-004 - M4 |
| 7 M288-119-005 - M5 |
| 8 M288-119-006 - M6 |
| 9 DT288-119-001 - DT1 |
| 10 E288-119-001 - E1 |
| 11 E288-119-002 - E2 |
| 12 E288-119-003 - E3 |
File details come from the government source that posted it. Updated .