About this file

This document is a complete drawing set for the Raw Sewage Pump Replacement Project prepared by KLH Engineers, Inc. for Rostraver Township Sewage Authority in Westmoreland County, Pennsylvania. The project involves the replacement of four existing raw sewage pumps with new pumps, associated piping, valves, and related mechanical and electrical systems within the wastewater treatment plant's operations building. The drawing set consists of 12 sheets including site plans, demolition plans for basement, intermediate, and first floor levels, proposed installation plans, sections, details, and comprehensive electrical plans. The project is divided into two contracts: Contract No. 2026-07A for General & Mechanical work and Contract No. 2026-07B for Electrical work. Sealed bids were to be received electronically via PennBid until Thursday, October 29, 2026, at 10:00 A.M. local time, with public opening at the Township Office located at 201 Municipal Drive, Rostraver Township, PA 15012. The project has an expected duration of 365 days.

The drawing set provides detailed specifications for demolition of existing equipment including four raw sewage pump motors, associated piping systems, valves, and a duplex seal water system, along with proposed installation of replacement equipment meeting identical connection points and specifications. The drawings indicate that four raw sewage pumps (P121, P122, P123, P124) will be replaced with corresponding new units, supported by new 12-inch ductile iron discharge piping, 10-inch and 14-inch plug valves, check valves, eccentric reducers, and 2-inch air release valves. Electrical work includes installation of new variable frequency drives (VFDs), disconnect switches, solenoid valves for the seal water system, control conduits and cables, and integration with the existing motor control center and operator's panel. Contractor responsibilities include verification of all existing connection points through field measurements, design and installation of all piping supports in accordance with manufacturer recommendations, furnishing and installing pump drive shaft protection guards, and proper coordination with other trades to avoid conflicts with HVAC systems, doors, and access hatches.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing No.

Sheet No.

WESTMORELAND COUNTY, PENNSYLVANIA

SCALE: 1" = 2000'

PROJECT LOCATION

G1 Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide.

No part of this document may be reproduced or transmitted in any form, by any means without written permission, except for brief excerpts in reviews or analysis.

TITLE SHEET

EXISTING SITE PLAN

OPERATIONS BUILDING BASEMENT DEMOLITION PLANS

OPERATIONS BUILDING INTERMEDIATE & FIRST FLOOR DEMOLITION PLANS

OPERATIONS BUILDING DEMOLITION SECTIONS

G1 C1 M1 M2 M3 M4 of 12

Order No.

ROSTRAVER TOWNSHIP

DESCRIPTIONDWG. NO.SHEET NO.

RELEASED FOR BID

OCTOBER 2026

DRAWING LIST

LOCATION MAP

CONTRACT No. 2026-07A GENERAL & MECHANICAL CONTRACT No. 2026-07B ELECTRICAL

RAW SEWAGE PUMP REPLACEMENT PROJECT

288-119

N

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g G .d w g

:4

P M

P lo tt e d

B y:

C o n n o r B u ll

CALL BEFORE YOU DIG!

PENNSYLVANIA LAW REQUIRES

3 WORKING DAYS NOTICE FOR

CONSTRUCTION PHASE

AND 10 WORKING DAYS

IN DESIGN STAGE-STOP CALL

1-800-242-1776

PE

NN

SY

LV

ANIA ONE CALL SYSTEM

, INC

STOP -CALL BEFORE YOU D

IG

7 of 12 M5 8 of 12 M6

OPERATIONS BUILDING BASEMENT PROPOSED PLANS

OPERATIONS BUILDING INTERMEDIATE & FIRST FLOOR PROPOSED PLANS

OPERATIONS BUILDING PROPOSED SECTIONS

5313 Campbells Run Road, Suite 100 Pittsburgh, PA 15205

Phone: 412.494.0510 Fax: 412.494.0426 info@klhengineers.com

KLH

ENGINEERS, INC

9 of 12 DT1 DETAILS 10 of 12 E1 ELECTRICAL LEGEND, ROADMAP AND NOTES 11 of 12 E2 ELECTRICAL DEMOLITION PLANS, DETAILS AND NOTES 12 of 12 E3 PROPOSED ELECTRICAL PLANS, DETAILS AND NOTES

8" C M P

Ae ro bic

Di ge st er s

Co nc

C M P

8" C M P

Cul ver t

Cu lve rt

Mh

N/F

Tha nna

S.

Co le

Lou ise

H.

Col e

D.B .V.

7 P g.

Tax Pa rce l

56- 3-

56- 2-9

D.B

.V.

0 P g.

Ris chit elli Gra y L ine

Com pan y, Inc.

Tax Pa rce l

N/F

Ris chit elli Gra y L ine

Com pan y, Inc.

D.B .V.

0 P g.

Tax Pa rce l

56- 2-9

N/F

Bl oc k

Ga ra ge

Op er at ion s

Bu ild ing

C O ver hea d

W est

Pe nn

P owe r

E lect ric Line sL

C O ver hea d

W est

Pe nn

P owe r

E lect ric Line sL

PL

PL

PL

PL

PL

P L

P L

PL

PL

PL

PL

SB

R

Co nt ro l

Bu ild ing

Ch lor ine

Co nt ac t

Ta nk s

S eq u en ti a l B a tc h

R ea ct o rs

Ae ro bic

Di ge st er s

S B R

Ta n k

N O

S B R

Ta n k

N O

S B R

Ta n k

N O

S B R

Ta n k

N O

Ma nh ole

Wa st ew at er

Sa m ple r

C hlorine

M onorail

So lid s

De wa te rin g

Bu ild ing

Wa lk

Pl an te r x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxx

Ca nt ile ve re d

Ty pe G at e

Co nc

Du m ps te r

Pa d

ST

ST

ST

ST

ST

ST

ST

ST

Pollock Run

Po llo ck R un

Co nc re te L oa din g Do ck

Mh

Mh

Mh

RAW SEWAGE PUMP

PROJECT LOCATION

C1

E X

IS

T

IN

G

S

IT

E P

LA

N

N

D A

C D

A C

D A

C

JD

A

EXISTING SITE PLAN

SCALE: 1"=20' Order No.

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g C .d w g

:2

A M

P lo tt e d

B y:

C o n n o r B u ll

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

W

E S

T M

O R

E

LA

N D

C O

U N

T Y

, P E

N N

S Y

LV

A

N

IA

R O

S T

R A

V E

R T

O W

N S

H

IP

S E

W A

G E

A U

T H

O R

IT

Y

D ra w n

B y:

D at e Is su ed

F or

D at e R ev is io ns

/2

R el ea se d Fo r B id

C am pb el ls R un R oa d, S ui te

Pi tts bu rg h, P A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs .c om

K L H

E N

G

IN

E E R

S

IN

C

SCALE: 1"=20'

20' 40'020'

AutoCAD SHX Text

COAL HOLLOW ROAD S.R. 3023

AutoCAD SHX Text x

AutoCAD SHX Text x

F.D.

Finish Floor El.758.33

Concrete Curb Sump Pit

Sump Pump 4" D.I. Sump Pump Discharge

Wet Well

Duplex Seal Water System

Effluent Water Hydropnuematic Tank

4" Plug Valve

Effluent Water Pump No.1

Effluent Water Pump No.2

℄ El.759.50 4" Discharge

D .I

D .I

6" D.I. Effluent Water Pump Suction

6" Plug Valve

4" D.I.

14"X8" Eccentric Reducer (Typ.)

14" Plug Valve (Typ.)

14" D.I.

Raw Sewage Pump #1

Raw Sewage Pump #2

Raw Sewage Pump #3

Raw Sewage Pump #4

℄ El.759.50

℄ El.759.50

℄ El.759.50

℄ El.759.50

Effluent Water Pump Control Panel

Drywell Pump Room Finish Floor El.758.33

14"x14" Self-Contained Flange Mounted Sluice Gate

Up

Up

Access Hatchway (Shown Reflected)

℄ El.759.50 14" D.I.

℄ El.759.50 14" D.I.

℄ El.759.50 14" D.I.

℄ El.759.50 14" D.I.

10"x6" SR. 90° Reducing Bend (Typ.)

4" 90° D.I. Bend

6"

6"

6"

6"

M 3-

A

M 3-

B

M 3-

A

M 3-

B

M3-C M3-C

14" D.I. 45° Bend

14" D.I. 45° Bend

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

F.D.

F.D.

Finish Floor El.758.33

Concrete Curb Sump Pit

Sump Pump 4" D.I. Sump Pump Discharge

Wet Well

Duplex Seal Water System

Effluent Water Hydropnuematic Tank

4" Plug Valve

Effluent Water Pump No.1

Effluent Water Pump No.2

D .I

D .I

6" D.I. Effluent Water Pump Suction

6" Plug Valve

4" D.I.

14"X8" D.I.

Eccentric Reducer (Typ.)

14" Plug Valve (Typ.)

14" D.I.

Raw Sewage Pump #1

Raw Sewage Pump #2

Raw Sewage Pump #3

Raw Sewage Pump #4

℄ El.759.50

℄ El.759.50

℄ El.759.50

℄ El.759.50

Effluent Water Pump Control Panel

Drywell Pump Room Finish Floor El.758.33

14"x14" Self-Contained Flange Mounted Sluice Gate

Up

Up

Access Hatchway (Shown Reflected)

M 3-

A

M 3-

B

M 3-

A

M 3-

B

M3-C

M3-C

D .I

D .I

D .I

10" Plug Valve (Typ.)

2" Air Release Valve (Typ.)

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

Pressure Relief Valve

Pressure Gauge

112"

112"

112"

Duplex Seal Water System

1" To Drain

1" Overflow

Potable Water Connection

Solenoid Valve (Typ.)

To

R a w

S e w a g e

P u m p

N o

To

R a w

S e w a g e

P u m p

N o

To

R a w

S e w a g e

P u m p

N o

To

R a w

S e w a g e

P u m p

N o

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

RE

M

O

VE

RE

M

O

VE

RE

M

O

VE

RE

M

O

VE

M1

O P

E R

A T

IO

N

S B

U

IL

D

IN

G B

A S

E M

E N

T D

E M

O

LI

T

IO

N P

LA

N

S

D A

C

JM

G D

A C

JD

A

OPERATIONS BUILDING BASEMENT

DEMOLITION PLAN M1-A @ EL. 761.00

SCALE: 1/4" = 1'-0"

LEGEND

= ITEMS FOR DEMOLITION AND OR REMOVAL ON THIS DRAWING

SCALE: 1/4" = 1'-0"

4' 8'04'

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g M .d w g

:2

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

A

A N

D

6-

B

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

/2

R el ea se d

Fo r B id

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

OPERATIONS BUILDING BASEMENT

DEMOLITION PLAN M1-B @ EL. 765.00

SCALE: 1/4" = 1'-0"

RAW SEWAGE PUMP SEAL WATER DEMOLITION SCHEMATIC

NOT TO SCALE

REMOVE

Raw Sewage Pump Seal Water System

Raw Sewage Pump No.1

REMOVE

Raw Sewage Pump No.3

REMOVE

Raw Sewage Pump No.2REMOVE

Raw Sewage Pump No.1REMOVE

Raw Sewage Pump No.4

PHOTO NO.1

PHOTO NO.2 PHOTO NO.3

1 = PHOTO LOCATION & NUMBER

REMOVE

2" Air Release Valve

REMOVE

14" Plug Valve (Typ. of 4)

REMOVE

10" Plug Valve (Typ. of 4)

REMOVE

10" Check Valve (Typ. of 4)

REMOVE

10" Check Valve (Typ. of 4)

TO REMAIN

Pump Pad (Typ. of 4)

TO REMAIN

Pump Pad (Typ. of 4)

NOTES:

1. ELEVATIONS LISTED ARE FROM EXISTING

RECORD DRAWINGS. ALL ELEVATIONS ARE

PROVIDED AS REFERENCE ONLY. CONTRACTOR

SHALL COMPLETE HIS OWN MEASUREMENTS

AND DETERMINATIONS TO ENSURE ALL PUMPS,

PIPE, FITTINGS, VALVES, ETC. REPLACED IN KIND

FIT TO EXISTING CONNECTION POINTS.

REMOVE

REMOVE

10" Check Valve (Typ. of 4)

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

S

Up

U p

Handrail

UpDn

Up

F.D. F.D.

Locker/Toilet Room

Bench

B e n c h

Shower

Motor Room

℄ Raw Sewage Pump Motor #2

℄ Raw Sewage Pump Motor #1

℄ Raw Sewage Pump Motor #3

℄ Raw Sewage Pump Motor #4

Tank Dewatering Pump

G G

G G

G G

G G

G G

G 2" Gas Service

1"

1" Gas Up to HVAC Unit

18"x7" HVAC Supply Duct

18"x7" HVAC Supply Duct

Unit Heater

Handrail

Handrail

W W

W

2" Potable Water To Remote Buildings

2" Copper Potable Water Supply

2" Backflow Preventer

Meter By Water Authority 2" Ball Valve

To Potable Water Piping

Sluice Gate Operating Stand Mounted On Wall Bracket

Electric Driven Channel Grinder

Electric Driven Channel Grinder

Grinder Room

℄ El.771.00 12" Raw Sewage To SBR

2" Air Release Valve

℄ El.768.50 6" D.I. Tank Drain

6"

6"

6" D.I.

Blind Flange

Chlorine Contact Tank No.2 Drain Valve4" Effluent Water From Basement

Chlorine Contact Tank No.1 Drain Valve

℄ El.768.50 Effluent Water Suction From Chlorine Contact Tanks

℄ El.967.67 4" D.I. Sump Pump Discharge

℄ El.776.00

1" PVC Vent From Air Relief Valve

D .I

10" D.I Blind Flange

4 " Effluent Water Hose Bib

4 " Effluent Water

℄ El.772.50 4" D.I. Effluent Water

Finish Floor El.767.00

℄ El.768.50

℄ El.768.50

℄ El.768.50

℄ El.768.50

Access Hatchway

M 3-

A

M 3-

B

M 3-

A

M 3-

B

M3-C

M3-C

O p e ra to rs

P a n e l

V F D

P a n e l

2" Air Release Valve

2" Air Release Valve

2" Air Release Valve

2" Air Release Valve

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

TO REMAIN

F.D.

F.D.

Down

Down

Laboratory

Superintendant's Office

Electric Control Room Foyer

Restroom Storage Room

Lunch Room

Finish Floor El.779.00

Kitchen Unit

Gas Tight Hatchway

Refrigerator Incubator

18"x15" Heating/Cooling Supply Duct

Emergency Eyewash & Shower

Cleaning Basin

24"x48 Work Table

48" Desk W/File Cabinet

Sink

Grab Bar

Sink

Urinal

Gate Operating Floor Stand

Down

Hatchway

M 3-

A

M 3-

B

M 3-

A

M 3-

B

M3-C M3-C

M2

O P

E R

A T

IO

N

S B

U

IL

D

IN

G I

N T

E R

M E

D

IA

T E

F

IR

S

T F

LO

O

R D

E M

O

LI

T

IO

N P

LA

N

S

D A

C D

A C

D A

C

JD

AOPERATIONS BUILDING

INTERMEDIATE DEMOLITION PLAN M2-A

SCALE: 1/4" = 1'-0"

= ITEMS FOR DEMOLITION AND OR REMOVAL ON THIS DRAWING

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g M .d w g

:2

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

A

A N

D

6-

B

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

/2

R el ea se d

Fo r B id

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

OPERATIONS BUILDING

FIRST FLOOR PLAN M2-B

SCALE: 1/4" = 1'-0"

LEGEND

1 = PHOTO LOCATION & NUMBER

REMOVE

Raw Sewage Pump Motor No.4

Raw Sewage Pump Motor No.3

REMOVE

REMOVE

Raw Sewage Pump Motor No.1

REMOVE

Raw Sewage Pump Motor No.2

PHOTO NO. 1

NOTES:

1. FIRST FLOOR PLAN M2-B IS SHOWN TO

REFERENCE LOCATIONS OF EXTERIOR DOOR

ACCESS & EQUIPMENT HATCHWAY LOCATION.

2. ELEVATIONS LISTED ARE FROM EXISTING

RECORD DRAWINGS. ALL ELEVATIONS ARE

PROVIDED AS REFERENCE ONLY. CONTRACTOR

SHALL COMPLETE HIS OWN MEASUREMENTS

AND DETERMINATIONS TO ENSURE ALL PUMPS,

PIPE, FITTINGS, VALVES, ETC. REPLACED IN KIND

FIT TO EXISTING CONNECTION POINTS.

REMOVE

2" Air Release Valves

2" Air Release ValveTO REMAIN

El.758.33

El.767.00

El.779.00

HVAC Supply Duct

HVAC Supply Duct

Raw Sewage Pump Motor #1

Raw Sewage Pump Motor #2

Raw Sewage Pump Motor #3

Raw Sewage Pump Motor #4

14"X8" Eccentric Reducer

14" Plug Valve

14" D.I. 45° Bend

Pump Pad(Typ. of 4)

10"x6" SR. 90° Reducing Bend (Typ. of 4)

12" D.I. 90° Base Bend

10" D.I. 90° Bend (Typ. of 4)

12" Check Valve (Typ. of 4)

12" D.I. 12" D.I. 12" D.I.

El.764.47

El.759.50

℄ El.771.00 12" Raw Sewage To SBR

2" Air Relief Valve

℄ El.776.00 Sump Pump Discharge

D .I

12" Flow Meter

Drywell Pump Room

Motor Room D .I

℄ El.776.50 12" 90° D.I. Bend

12" 90° D.I. Bend

Hallway Hallway

Suspended Ceiling Suspended Ceiling

D .I

2" Air Release Valve To Air Release (Typ. of 4)

REMOVEREMOVE REMOVE REMOVE

REMOVE

REMOVE

REMOVE

TO REMAIN

REMOVE

REMOVE

REMOVE REMOVE

El.758.33

El.767.00

El.779.00

HVAC Supply Duct

HVAC Supply Duct

℄ El.776.50 12" 90° D.I. Bend

2" Air Relief Valve

D .I

12" Flow Meter

D .I

12" D.I. 90° Base Bend

℄ El.764.47 10" 90° D.I. Bend (Typ.)

℄ El.762.66

12"x12"x10" D.I. Tee (Typ.)

℄ El.759.50 14" D.I.Suction From Wet Well

Drywell Pump Room

Motor Room

℄ El.776.00 Sump Pump Discharge

Hallway Hallway

Suspended CeilingSuspended Ceiling

2" Air Release Valve

2" Air Release Valve

2" Air Release Valve 2" Air Release Valve

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

Storage Room Restroom Laboratory

Hallway

Suspended Ceiling

Suspended Ceiling

Suspended Ceiling

Gate Operating Floor Stand

Electric Driven Channel Grinder

Effluent Water Pump Control Panel

Hatchway

Hatchway

Motor Room

Drywell Pump Room

℄ El.759.50 14" D.I.

℄ El.764.47 10" D.I.

Bend

℄ El.762.66

10" Plug Valve

14" Plug Valve

14"X8" D.I.

Eccentric Reducer

10"x6" SR. 90° Reducing Bend (Typ.)

10" Check Valve

10"

Raw Sewage Pump Motor #2

El.758.33

2" Air Release Valve

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

REMOVE

M3

O P

E R

A T

IO

N

S B

U

IL

D

IN

G D

E M

O

LI

T

IO

N S

E C

T

IO

N S

D A

C

JM

G D

A C

JD

A

OPERATIONS BUILDING

DEMOLITON SECTION M3-A

SCALE: 1/4" = 1'-0"

LEGEND

= ITEMS FOR DEMOLITION AND OR REMOVAL ON THIS DRAWING

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g M .d w g

:2

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

A

A N

D

6-

B

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

/2

R el ea se d

Fo r B id

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

OPERATIONS BUILDING

DEMOLITION SECTION M3-B

SCALE: 1/4" = 1'-0"

OPERATIONS BUILDING

DEMOLITION SECTION M3-C

SCALE: 1/4" = 1'-0"

NOTES:

1. ELEVATIONS LISTED ARE FROM EXISTING RECORD

DRAWINGS. ALL ELEVATIONS ARE PROVIDED AS

REFERENCE ONLY. CONTRACTOR SHALL COMPLETE HIS

OWN MEASUREMENTS AND DETERMINATIONS TO ENSURE

ALL PUMPS, PIPE, FITTINGS, VALVES, ETC. REPLACED IN

KIND FIT TO EXISTING CONNECTION POINTS.

Finish Floor El.758.33

Concrete Curb Sump Pit

Sump Pump 4" D.I. Sump Pump Discharge

Wet Well

Effluent Water Hydropnuematic Tank

4" Plug Valve

Effluent Water Pump No.1

Effluent Water Pump No.2

℄ El.759.50 4" Discharge

D .I

D .I

6" D.I. Effluent Water Pump Suction

6" Plug Valve

4" D.I.

14" D.I.

RAW SEWAGE

PUMP #1

RAW SEWAGE

PUMP #2

RAW SEWAGE

PUMP #3

RAW SEWAGE

PUMP #4

℄ El.759.50

℄ El.759.50

℄ El.759.50

℄ El.759.50

Effluent Water Pump Control Panel

Drywell Pump Room Finish Floor El.758.33

14"x14" Self-Contained Flange Mounted Sluice Gate

Up

Up

Access Hatchway (Shown Reflected)

℄ El.759.50 14" D.I.

℄ El.759.50 14" D.I.

℄ El.759.50 14" D.I.

℄ El.759.50 14" D.I.

4" 90° D.I. Bend

6"

6"

6"

6"

M 6-

A

M 6-

B

M 6-

A

M 6-

B

M6-C M6-C

14" D.I. 45° Bend

14" D.I. 45° Bend

SEAL

WATER

SYSTEM

F.D.

F.D.

Finish Floor El.758.33

Concrete Curb Sump Pit

Sump Pump 4" D.I. Sump Pump Discharge

Wet Well

Effluent Water Hydropnuematic Tank

4" Plug Valve

Effluent Water Pump No.1

Effluent Water Pump No.2

D .I

D .I

6" D.I. Effluent Water Pump Suction

6" Plug Valve

4" D.I.

14" D.I.

RAW SEWAGE

PUMP #1

RAW SEWAGE

PUMP #2

RAW SEWAGE

PUMP #3

RAW SEWAGE

PUMP #4

℄ El.759.50

℄ El.759.50

℄ El.759.50

℄ El.759.50

Effluent Water Pump Control Panel

Drywell Pump Room

Finish Floor El.758.33

14"x14" Self-Contained Flange Mounted Sluice Gate

Up

Up

Access Hatchway (Shown Reflected)

M 6-

A

M 6-

B

M 6-

A

M 6-

B

M6-C

M6-C

D .I

D .I

D .I

6 4

TO 2" AIR

RELEASE VALVE

(TYP. OF 4)

SEAL

WATER

SYSTEM

PIPE DESCRIPTIONSYMBOL

1 10"x6" D.I. REDUCING 90° BEND

14"x8" D.I. ECCENTRIC REDUCER

10" PLUG VALVE

10" D.I. 45° BEND

14" PLUG VALVE

10" D.I. 90° BEND

10" D.I. SPOOL PIPE

10" CHECK VALVE

1 1 4 " SOLENOID VALVE (TYP.)

TO

R

AW

S

EW

AG

E

PU

M P

NO

. 1

TO

R

AW

S

EW

AG

E

PU

M P

NO

. 2

TO

R

AW

S

EW

AG

E

PU

M P

NO

. 3

TO

R

AW

S

EW

AG

E

PU

M P

NO

. 4

DUPLEX

SEAL WATER

SYSTEM

1 1 4 " TO DRAIN

1 1 4 " SCH. 80 PVC

1 1 4 " EFFLUENT WATER

CONNECTION

1 1 4 " PLUG VALVE VALVE (TYP.)

M4

O P

E R

A T

IO

N

S B

U

IL

D

IN

G B

A S

E M

E N

T P

R O

P O

S E

D P

LA

N

S

D A

C

JM

G D

A C

JD

A

OPERATIONS BUILDING BASEMENT

PROPOSED PLAN M4-A @ EL. 761.00

SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

4' 8'04'

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g M .d w g

:2

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

A

A N

D

6-

B

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

/2

R el ea se d

Fo r B id

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

OPERATIONS BUILDING BASEMENT

PROPOSED PLAN M4-B @ EL. 765.00

SCALE: 1/4" = 1'-0"

NOTES:

1. ELEVATIONS LISTED ARE FROM EXISTING RECORD

DRAWINGS. ALL ELEVATIONS ARE PROVIDED AS

REFERENCE ONLY. CONTRACTOR SHALL COMPLETE HIS

OWN MEASUREMENTS AND DETERMINATIONS TO ENSURE

ALL PUMPS, PIPE, FITTINGS, VALVES, ETC. REPLACED IN

KIND FIT TO EXISTING CONNECTION POINTS.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND

INSTALLATION OF ALL PIPING SUPPORTS AS REQUIRED

TO SUPPORT THE PIPING SYSTEM AND CONTROL PIPING

SYSTEM VIBRATIONS IN ACCORDANCE WITH PIPING

MANUFACTURER RECOMMENDATIONS AND AS REQUIRED

TO ENSURE A STRUCTURALLY SOUND AND STABLE

INSTALLATION. CONTRACTOR SHALL BE RESPONSIBLE TO

ADDRESS ANY QUESTIONS OR CONCERNS WITH THE

ENGINEER PRIOR TO SYSTEM TESTING AND STARTUP. IN

NO CASE SHALL THE CONTRACTOR PROCEED WITH

STARTUP OF EQUIPMENT IF THERE ARE CONCERNS WITH

PIPING SYSTEM SUPPORTS. IF IT IS DETERMINED BY THE

ENGINEER DURING OR AFTER STARTUP THAT PIPING

SUPPORTS ARE INSUFFICIENT, THEN THE CONTRACTOR

SHALL ADD ADDITIONAL SUPPORTS AT THEIR EXPENSE.

RAW SEWAGE PUMP SEAL

WATER SCHEMATIC M4-C

NOT TO SCALE

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

S

Up

U p

Handrail

UpDn

Up

F.D. F.D.

Locker/Toilet Room

Bench

B e n c h

Shower

Motor Room

℄ RAW SEWAGE

PUMP MOTOR #2

℄ RAW SEWAGE

PUMP MOTOR #1

℄ RAW SEWAGE

PUMP MOTOR #3

℄ RAW SEWAGE

PUMP MOTOR #4

Tank Dewatering Pump

G G

G G

G G

G G

G G

G 2" Gas Service

1"

1" Gas Up to HVAC Unit

18"x7" HVAC Supply Duct

18"x7" HVAC Supply Duct

Unit Heater

Handrail

W W

W

2" Potable Water To Remote Buildings

2" Copper Potable Water Supply

2" Backflow Preventer

Meter By Water Authority 2" Ball Valve

To Potable Water Piping

Sluice Gate Operating Stand Mounted On Wall Bracket

Electric Driven Channel Grinder

Grinder Room

℄ El.771.00 12" Raw Sewage To SBR

2" Air Release Valve

℄ El.768.50 6" D.I. Tank Drain

6"

6"

6" D.I.

Blind Flange

Chlorine Contact Tank No.2 Drain Valve4" Effluent Water From Basement

Chlorine Contact Tank No.1 Drain Valve

℄ El.768.50 Effluent Water Suction From Chlorine Contact Tanks

℄ El.967.67 4" D.I. Sump Pump Discharge

℄ El.776.00

1" PVC Vent From Air Relief Valve

D .I

10" D.I Blind Flange

4 " Effluent Water Hose Bib

4 " Effluent Water

℄ El.772.50 4" D.I. Effluent Water

Finish Floor El.767.00

℄ El.768.50

℄ El.768.50

℄ El.768.50

℄ El.768.50

Access Hatchway

M 6-

A

M 6-

B

M 6-

A

M 6-

B

M6-C

M6-C

O p e ra to rs

P a n e l

V F D

P a n e l

2" AIR RELEASE VALVE

2" AIR RELEASE VALVE

2" AIR RELEASE VALVE

2" AIR

RELEASE

VALVE

Handrail

Electric Driven Channel Grinder

F.D.

F.D.

Down

Down

Laboratory

Superintendant's Office

Electric Control Room Foyer

Restroom Storage Room

Lunch Room

Finish Floor El.779.00

Kitchen Unit

Gas Tight Hatchway

Refrigerator Incubator

18"x15" Heating/Cooling Supply Duct

Emergency Eyewash & Shower

Cleaning Basin

24"x48 Work Table

48" Desk W/File Cabinet

Sink

Grab Bar

Sink

Urinal

Gate Operating Floor Stand

Down

Hatchway

M 3-

A

M 3-

B

M 3-

A

M 3-

B

M3-C M3-C

PIPE DESCRIPTIONSYMBOL

1 10"x6" D.I. REDUCING 90° BEND

14"x8" D.I. ECCENTRIC REDUCER

10" PLUG VALVE

10" D.I. 45° BEND

14" PLUG VALVE

10" D.I. 90° BEND

10" D.I. SPOOL PIPE

10" CHECK VALVE

M5

O P

E R

A T

IO

N

S B

U

IL

D

IN

G I

N T

E R

M E

D

IA

T E

F

IR

S

T F

LO

O

R P

R O

P O

S E

D P

LA

N

S

D A

C

JM

G D

A C

JD

AOPERATIONS BUILDING

INTERMEDIATE PROPOSED PLAN M5-A

SCALE: 1/4" = 1'-0"

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g M .d w g

:2

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

A

A N

D

6-

B

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

/2

R el ea se d

Fo r B id

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

OPERATIONS BUILDING

FIRST FLOOR PLAN M5-B

SCALE: 1/4" = 1'-0"GENERAL NOTES:

1. FIRST FLOOR PLAN M5-B IS SHOWN TO REFERENCE LOCATIONS OF

EXTERIOR DOOR ACCESS & EQUIPMENT HATCHWAY LOCATION.

2. ELEVATIONS LISTED ARE FROM EXISTING RECORD DRAWINGS. ALL

ELEVATIONS ARE PROVIDED AS REFERENCE ONLY. CONTRACTOR SHALL

COMPLETE HIS OWN MEASUREMENTS AND DETERMINATIONS TO ENSURE

ALL PUMPS, PIPE, FITTINGS, VALVES, ETC. REPLACED IN KIND FIT TO

EXISTING CONNECTION POINTS.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND INSTALLATION OF

ALL PIPING SUPPORTS AS REQUIRED TO SUPPORT THE PIPING SYSTEM AND

CONTROL PIPING SYSTEM VIBRATIONS IN ACCORDANCE WITH PIPING

MANUFACTURER RECOMMENDATIONS AND AS REQUIRED TO ENSURE A

STRUCTURALLY SOUND AND STABLE INSTALLATION. CONTRACTOR SHALL

BE RESPONSIBLE TO ADDRESS ANY QUESTIONS OR CONCERNS WITH THE

ENGINEER PRIOR TO SYSTEM TESTING AND STARTUP. IN NO CASE SHALL

THE CONTRACTOR PROCEED WITH STARTUP OF EQUIPMENT IF THERE ARE

CONCERNS WITH PIPING SYSTEM SUPPORTS. IF IT IS DETERMINED BY THE

ENGINEER DURING OR AFTER STARTUP THAT PIPING SUPPORTS ARE

INSUFFICIENT, THEN THE CONTRACTOR SHALL ADD ADDITIONAL SUPPORTS

AT THEIR EXPENSE.

El.758.33

El.767.00

El.779.00

HVAC Supply Duct

HVAC Supply Duct

RAW SEWAGE

PUMP MOTOR #1

RAW SEWAGE

PUMP MOTOR #2

RAW SEWAGE

PUMP MOTOR #3

RAW SEWAGE

PUMP MOTOR #4

14" D.I. 45° Bend

12" D.I. 12" D.I. 12" D.I.

℄ El.771.00 12" Raw Sewage To SBR

2" Air Relief Valve

℄ El.776.00 Sump Pump Discharge

D .I

12" Flow Meter

Drywell Pump Room

Motor Room D .I

℄ El.776.50 12" 90° D.I. Bend

12" 90° D.I. Bend

Hallway Hallway

Suspended Ceiling Suspended Ceiling

D .I

SEE

NOTE #1

SEE

NOTE #2

TO AIR RELEASE

(TYP. OF 4)

2" AIR RELEASE

VALVE

Pump Pad (Typ. of 4)

℄ El.762.66 12" D.I. 90° Base Bend

El.758.33

El.767.00

El.779.00

HVAC Supply Duct

HVAC Supply Duct

℄ El.776.50 12" 90° D.I. Bend

2" Air Relief Valve

D .I

12" Flow Meter

D .I

12" D.I. 90° Base Bend

℄ El.764.47

℄ El.762.66

12"x12"x10" D.I. Tee (Typ.)

℄ El.759.50 14" D.I.Suction From Wet Well

Drywell Pump Room

Motor Room

℄ El.776.00 Sump Pump Discharge

Hallway Hallway

Suspended CeilingSuspended Ceiling

12" D.I. 12" D.I. 12" D.I.

2" AIR RELEASE

VALVE

2" AIR RELEASE VALVE

2" AIR RELEASE VALVE

2" AIR RELEASE VALVE

22 2

SEE

NOTE #3

Storage Room Restroom Laboratory

Hallway

Suspended Ceiling

Suspended Ceiling

Suspended Ceiling

Gate Operating Floor Stand

Electric Driven Channel Grinder

Effluent Water Pump Control Panel

Hatchway

Hatchway

Motor Room

Drywell Pump Room

℄ El.759.50 14" D.I.

℄ El.762.66

10"

EL.764.47

El.758.33

RAW SEWAGE

PUMP MOTOR #2

SEE

NOTE #2

2" AIR RELEASE VALVE

SEE

NOTE #1

Pump Pad (Typ. of 4)

PIPE DESCRIPTIONSYMBOL

1 10"x6" D.I. REDUCING 90° BEND

14"x8" D.I. ECCENTRIC REDUCER

10" PLUG VALVE

10" D.I. 45° BEND

14" PLUG VALVE

10" D.I. 90° BEND

10" D.I. SPOOL PIPE

10" CHECK VALVE

M6

O P

E R

A T

IO

N

S B

U

IL

D

IN

G P

R O

P O

S E

D S

E C

T

IO

N S

D A

C

JM

G D

A C

JD

A

OPERATIONS BUILDING

PROPOSED SECTION M6-A

SCALE: 1/4" = 1'-0"

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g M .d w g

:2

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

A

A N

D

6-

B

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

/2

R el ea se d

Fo r B id

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

OPERATIONS BUILDING

PROPOSED SECTION M6-B

SCALE: 1/4" = 1'-0"

OPERATIONS BUILDING

PROPOSED SECTION M6-C

SCALE: 1/4" = 1'-0"

GENERAL NOTES:

1. CONTRACTOR TO FURNISH & INSTALL PUMP DRIVE SHAFT PROTECTION GUARD (TYP. OF 4)

2. CONTRACTOR TO FABRICATE & INSTALL GUARDS ON ALL MOTOR OPENINGS (TYP. OF 4)

3. CONTRACTOR TO INSTALL AIR RELEASE VALVES WITH DISCHARGE HOSING SUCH THAT

DISCHARGE IS PLUMBED TO FLOOR DRAINS (TYP. OF 4)

4. ELEVATIONS LISTED ARE FROM EXISTING RECORD DRAWINGS. ALL ELEVATIONS ARE

PROVIDED AS REFERENCE ONLY. CONTRACTOR SHALL COMPLETE HIS OWN MEASUREMENTS

AND DETERMINATIONS TO ENSURE ALL PUMPS, PIPE, FITTINGS, VALVES, ETC. REPLACED IN

KIND FIT TO EXISTING CONNECTION POINTS.

5. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND INSTALLATION OF ALL PIPING

SUPPORTS AS REQUIRED TO SUPPORT THE PIPING SYSTEM AND CONTROL PIPING SYSTEM

VIBRATIONS IN ACCORDANCE WITH PIPING MANUFACTURER RECOMMENDATIONS AND AS

REQUIRED TO ENSURE A STRUCTURALLY SOUND AND STABLE INSTALLATION. CONTRACTOR

SHALL BE RESPONSIBLE TO ADDRESS ANY QUESTIONS OR CONCERNS WITH THE ENGINEER

PRIOR TO SYSTEM TESTING AND STARTUP. IN NO CASE SHALL THE CONTRACTOR PROCEED

WITH STARTUP OF EQUIPMENT IF THERE ARE CONCERNS WITH PIPING SYSTEM SUPPORTS.

IF IT IS DETERMINED BY THE ENGINEER DURING OR AFTER STARTUP THAT PIPING

SUPPORTS ARE INSUFFICIENT, THEN THE CONTRACTOR SHALL ADD ADDITIONAL SUPPORTS

AT THEIR EXPENSE.

DT1

D E

T A

IL

S

D A

C D

A C

D A

C

JD

A

Order No.

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved WorldwideS

A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g D T2 .d w g

:2

A M

P lo tt e d

B y:

C o n n o r B u ll

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

W

E S

T M

O R

E

LA

N D

C O

U N

T Y

, P E

N N

S Y

LV

A

N

IA

R O

S T

R A

V E

R T

O W

N S

H

IP

S E

W A

G E

A U

T H

O R

IT

Y

D ra w n

B y:

D at e Is su ed

F or

D at e R ev is io ns

/2

R el ea se d Fo r B id

C am pb el ls R un R oa d, S ui te

Pi tts bu rg h, P A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs .c om

K L H

E N

G

IN

E E R

S

IN

C

Motor Control Center (Existing)

Lighting Panel A (Circuits #35 , #37, and #39)

(Existing)

Raw Sewage Pump No.1 VFD

(VFD-P121)

Raw Sewage Pump No.2 VFD

(VFD-P122)

RAW SEWAGE

PUMP No.1

DISCONNECT SWITCH

(DS-P121)

RAW SEWAGE

PUMP No.2

DISCONNECT SWITCH

(DS-P122)

RAW SEWAGE

PUMP No.1

(P121)

RAW SEWAGE

PUMP No.2

(P122)

VFD Cabinet (Existing)

Raw Sewage Pump No.3 VFD

(VFD-P123)

RAW SEWAGE

PUMP No.3

DISCONNECT SWITCH

(DS-P123)

RAW SEWAGE

PUMP No.3

(P123)

Raw Sewage Pump No.4 VFD

(VFD-P124)

RAW SEWAGE

PUMP No.4

DISCONNECT SWITCH

(DS-P124)

RAW SEWAGE

PUMP No.4

(P124)

Operator's Panel (Existing)

Raw Sewage Pump No.1 VFD

(VFD-P121)

Raw Sewage Pump No.2 VFD

(VFD-P122)

RAW SEWAGE

PUMP No.1

(P121)

RAW SEWAGE

PUMP No.2

(P122)

VFD Cabinet (Existing)

Raw Sewage Pump No.3 VFD

(VFD-P123)

RAW SEWAGE

PUMP No.3

(P123)

Raw Sewage Pump No.4 VFD

(VFD-P124)

RAW SEWAGE

PUMP No.4

(P124)

DUPLEX SEAL WATER

SYSTEM CONTROL PANEL

(SWS-CP-001)

1" CONDUIT

1-3/C #8 XHHW-2

1-1/C #10 XHHW-2 GND

P01

1" CONDUIT

1-3/C #8 XHHW-2

1-1/C #10 XHHW-2 GND

P04

1" CONDUIT

1-3/C #8 XHHW-2

1-1/C #10 XHHW-2 GND

P07

1" CONDUIT

1-3/C #8 XHHW-2

1-1/C #10 XHHW-2 GND

P10

1- 3/C #8 XLPE

VFD CABLEP02 P05 P08 P11

P03 P06 P09 P12

3/4" CONDUIT

4-1/C #12 XHHW-2P13 1" CONDUIT

18-1/C #14 XHHW-2C09 1" CONDUIT

16-1/C #14 XHHW-2C01 C03 C05 C07

C02 C04 C06 C08

RAW SEWAGE

PUMP No.1

AIR RELIEF VALVE

RAW SEWAGE

PUMP No.2

AIR RELIEF VALVE

RAW SEWAGE

PUMP No.3

AIR RELIEF VALVE

RAW SEWAGE

PUMP No.4

AIR RELIEF VALVE

SEAL WATER

PUMP No.1

SEAL WATER

PUMP No.2

1" CONDUIT

16-1/C #14 XHHW-2

1" CONDUIT

16-1/C #14 XHHW-2

1" CONDUIT

16-1/C #14 XHHW-2

3/4" CONDUIT

4-1/C #14 XHHW-2

3/4" CONDUIT

4-1/C #14 XHHW-2

3/4" CONDUIT

4-1/C #14 XHHW-2

3/4" CONDUIT

4-1/C #14 XHHW-2

1- 3/C #8 XLPE

VFD CABLE

1- 3/C #8 XLPE

VFD CABLE

1- 3/C #8 XLPE

VFD CABLE

1 1/4" CONDUIT

1- 3/C #8 XLPE

VFD CABLE

1 1/4" CONDUIT

1- 3/C #8 XLPE

VFD CABLE

1 1/4" CONDUIT

1- 3/C #8 XLPE

VFD CABLE

1 1/4" CONDUIT

1- 3/C #8 XLPE

VFD CABLE

E1

E

LE

C T

R

IC

A L

R O

A D

M A

P , L

E G

E N

D

N O

T E

S

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g E .d w g

:5

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

B

E

LE

C T

R

IC

A L

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

/2

R el ea se d Fo r B id

1. ALL PENETRATIONS THROUGH THE FOUNDATION WALLS SHALL BE

SEALED WITH TWO LINK-SEALS, AN INNER AND AN OUTER SEAL.

2. WHERE UNDERGROUND CONDUIT ENTERS INTO A BUILDING OR

STRUCTURE EACH CONDUIT SHALL BE SEALED TO PREVENT WATER

FROM ENTERING INTO THE BUILDING. EACH CONDUIT, WITH OR

WITHOUT CABLES, SHALL BE FITTED WITH AN INFLATABLE FLEXIBLE

METALLIC LAMINATE BLADDER SYSTEM. SEE SPECIFICATION

SECTION 16111.

3. EMBEDDED CONDUIT SHALL BE GROUPED TOGETHER AS MUCH AS

POSSIBLE TO MINIMIZE THE EMBEDDED FOOTPRINT. EACH AND

EVERY EMBEDDED CONDUIT SHALL BE ACCURATELY DEPICTED ON

THE RECORD DRAWINGS.

4. ALL CONDUITS LISTED AS SPARE THAT ARE NOT ROUTED TO A

SPECIFIC PIECE OF EQUIPMENT IN THE CONDUIT AND CABLE

SCHEDULES, SHALL TERMINATE IN A BUILDING VAULT, MANHOLE,

EQUIPMENT MOUNTING BACKBOARD, ETC. THE CONDUIT SHALL

EXTEND UP 6 INCHES ABOVE THE FINISHED GRADE, FLOOR, OR INTO

A SPACE THROUGH A WALL. CONDUIT SHALL BE CAPPED AND

TAGGED AS “SPARE”.

5. ALL CONDUITS SHALL BE INSTALLED AS PER THE CONDUIT AND

CABLE SCHEDULE OR AS SHOWN ON THE CONTRACT DRAWINGS.

UNLESS SHOWN, NO CONDUITS SHALL BE ROUTED OR CONCEALED

IN CONCRETE SLABS, STRUCTURES, WALLS, ETC., WITHOUT

APPROVAL FROM THE ENGINEER. INDIVIDUAL CONDUITS THAT ARE

ROUTED TO THE SAME AREA SHALL NOT BE COMBINED INTO

LARGER CONDUITS WITHOUT APPROVAL OF THE ENGINEER.

6. THE PLANS AND SCHEMATIC DRAWINGS SHOW THE REQUIRED

CONTROL CONNECTIONS AND INTERFACES BETWEEN THE VARIOUS

CONTROL PANELS AND DEVICES, HOWEVER DURING CONSTRUCTION

SOME PRODUCTS MAY BE SUBSTITUTED BY THE

GENERAL/MECHANICAL CONTRACTOR. THE MANUFACTURER MAY

CHANGE HIS PRODUCT, ETC.

7. ALL CONDUIT RUNS ARE SHOWN IN THE HOME RUN FORMAT ONLY.

EXACT LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR.

8. CONDUITS SHALL BE ROUTED TO AVOID INTERFERENCE WITH HVAC,

PIPING, DOORS & ACCESS HATCHES.

9. THE SPECIFICATIONS AND ACCOMPANYING DRAWINGS ARE

MUTUALLY EXPLANATORY AND ANYTHING REQUIRED BY ONE BUT

NOT BY THE OTHER SHALL BE CONSIDERED AS REQUIRED BY BOTH.

WHERE THE REQUIREMENTS DIFFER OR ARE CONTRADICTORY

BETWEEN THE VARIOUS PARTS OF THE SPECIFICATIONS, DIFFERENT

DRAWINGS OR PARTS OF DRAWINGS, OR BETWEEN THE DRAWINGS

AND SPECIFICATION, THE MORE RESTRICTIVE (LARGER SIZE,

GREATER RATING, MORE OPTIONS, ETC.) SHALL APPLY.

10. THE ELECTRICAL CONTRACTOR SHALL VERIFY DOOR SWINGS AND

THE EXACT LOCATION AND HEIGHTS OF ALL DEVICES, ETC., WITH

THE ENGINEER BEFORE INSTALLATION. ANY WORK INSTALLED

CONTRARY TO OR WITHOUT APPROVAL OF THE ENGINEER SHALL BE

SUBJECT TO CHANGE AS DIRECTED BY THE ENGINEER WITH NO

EXTRA COMPENSATION.

11. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE DESIRED

ARRANGEMENT AND THE APPROXIMATE LOCATION OF PRINCIPLE

CONDUIT, WIRING, APPARATUS AND EQUIPMENT. RUNS OF CONDUIT,

AND LOCATIONS OF EQUIPMENT ARE SHOWN DISTORTED ON

DRAWINGS TO AVOID CONFUSION. THE CONTRACTOR SHALL VERIFY

MEASUREMENTS, ACCESS OPENING DIMENSIONS, EQUIPMENT SPACE

REQUIREMENTS, ETC., ON THE JOB SITE. THE ENTIRE INSTALLATION

SHALL BE MADE IN A MANNER TO AVOID OBSTRUCTIONS, TO

PRESERVE HEADROOM, KEEP OPENINGS CLEAR AND TO OVERCOME

LOCAL DIFFICULTIES AND INTERFERENCE WITH STRUCTURAL

CONDITIONS AND WITH OTHER TRADES.

12. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING WITH THE GENERAL/MECHANICAL CONTRACTOR AND

FOR REVIEWING ALL SUBMITTALS TO VERIFY THAT THEY CONFORM

TO THE ELECTRICAL REQUIREMENTS OF OTHER DEVICES WHICH

THEY ARE CONNECTED.

13. SURFACE MOUNTED PANEL BOXES, JUNCTION BOXES, CONDUIT, ETC.,

SHALL BE SUPPORTED BY SPACERS TO PROVIDE A CLEARANCE

(APPROXIMATELY ¼”) BETWEEN THE WALL/BACKPANEL AND THE

EQUIPMENT.

14. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL

REQUIRED CONDUITS, CONDUCTORS, ENCLOSURES, ETC., IN ORDER

TO MAKE A COMPLETE ELECTRICAL SYSTEM READY FOR OPERATION.

15. THE ELECTRICAL CONTRACTOR SHALL SUPPLY ALL AUXILIARY

EQUIPMENT, FRAMES, SUPPORTS, CONNECTORS, TERMINALS, ACCESS

PANELS, AND OTHER DEVICES REQUIRED FOR PROPER INSTALLATION

AND OPERATION OF EQUIPMENT FURNISHED AND INSTALLED BY HIM.

16. EQUIPMENT LOCATIONS SHOWN ON THE DRAWINGS MAY CHANGE

DUE TO INTERFERENCE PROBLEMS, EQUIPMENT DESIGN, ETC.. THE

ELECTRICAL CONTRACTOR SHALL VERIFY THE LOCATIONS OF

DEVICES AND EQUIPMENT INSTALLED BY OTHER CONTRACTORS

PRIOR TO FINAL ROUGH IN, AND ADJUST CONDUIT LAYOUTS AS

REQUIRED TO COMPENSATE FOR CHANGES.

17. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE

NATIONAL ELECTRIC CODE, NFPA, UL, BUILDING STANDARDS, AND

ALL OTHER GOVERNING AGENCIES HAVING JURISDICTIONS.

18. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER AND

SHALL PRESENT A NEAT MECHANICAL APPEARANCE WHEN

COMPLETED.

19. ALL RACEWAYS FOR FEEDERS, BRANCH AND CONTROL CIRCUITS

SHALL CONTAIN A SEPARATE INSULATED EQUIPMENT GROUNDING

CONDUCTOR SIZED IN ACCORDANCE WITH ARTICLE 250 OF THE

NATIONAL ELECTRIC CODE. ALL 120V BRANCH CIRCUITS SHALL

CONTAIN A FULL SIZE SEPARATE NEUTRAL PER CIRCUIT. SHARING

OF NEUTRALS IS NOT PERMISSIBLE.

20. ALL RECEPTACLES AND SWITCHES SHALL BE INSTALLED IN TYPE

“FD” BOXES WITH THREADED HUBS. REFER TO SPECIFICATION 16130

FOR ADDITIONAL INFORMATION.

21. PROVIDE AN ALUMINUM DRIP SHIELD ABOVE ANY ELECTRICAL

EQUIPMENT THAT IS LOCATED UNDER A DRAIN / PROCESS PIPE.

GENERAL NOTES:

D A

C

JV

F C

JB

M

A S

LIT LEVEL INDICATING TRANSMITTER

P PUMP

HOT WATER HEATERHW

MANUAL MOTOR STARTERMMS

ALARMAL

PUSH BUTTONPB

MOTOR OPERATED VALVEMOV

PS PRESSURE SWITCH

LEVEL TRANSMITTERLT

SC SCREEN

MOTORMTR

MOTOR CIRCUIT PROTECTORMCP

MOLDED CASE CIRCUIT BREAKERMCCB

HOISTHS

SURGE SUPPRESSOR

TRANSIENT VOLTAGETVSS

CD CONTROL DAMPER

PUSH TO TESTPTT

RECEPTACLEREC

VARIABLE FREQUENCY DRIVEVFD

TRANSFORMERXFMR

O/L OVERLOAD

FULL VOLTAGE NON-REVERSINGFVNR

LOUVERLV

HORSEPOWERHP

EXHAUST FANEF

DWG DRAWING

AMERICAN WIRE GAUGEAWG

CP CONTROL PANEL

ALTERNATING CURRENT

CIRCUIT BREAKER

LIGHTING PANEL

MOTOR CONTROL CENTER

MOTOR STARTER

VOLTS

WIREW

V

MS

MCC

LP

CB

AC

ABBREVIATIONS

RGS RIGID GALVANIZED STEEL

POLY VINYL CHLORIDEPVC

mA MILLI-AMPERES

JB JUNCTION BOX

A AMPERES

DIRECT CURRENTDC

DB DUCT BANK

DISCONNECT SWITCHDS

FU FUSE

GROUNDGND

H HOT

THOUSAND CIRCULAR MILSKCMIL

LFMC LIQUIDTIGHT FLEXIBLE

METAL CONDUIT

N NEUTRAL

PH PHASE

THERMOSTATTH

UH UNIT HEATER

GROUND FAULT CIRCUITGFCI

INTERRUPTER

WP WEATHER PROOF

EX EXPLOSION PROOF

FIBER OPTICF/O

X

LIQUIDTIGHT FLEXIBLE METAL CONDUIT

OR EXPLOSION PROOF COUPLING

GROUND ROD CONNECTION

ELECTRICAL LEGEND

SINGLE POLE SWITCH

(PILOT GLOWS WHEN SWITCH IS ON) P

T

SINGLE POLE SWITCH

(TIME CONTROLLED)

T

J

DB##

F

DM

S

ETHERNET RECEPTACLE

TELEPHONE RECEPTACLE

FAX MACHINE RECEPTACLE

SMOKE DETECTOR / ALARM

DIMMER SWITCH

THREE WAY SWITCH

SINGLE POLE SWITCH

240V SINGLE RECEPTACLE

208V SINGLE RECEPTACLE

120V SINGLE RECEPTACLE

120V DUPLEX RECEPTACLE

120V QUAD RECEPTACLE

THERMOSTAT

JUNCTION BOX

CONDUIT DESIGNATION NUMBER SEE

SPECIFICATION SECTION 16150

DUCT BANK CALLOUT SEE DUCT BANK

DETAILS

CONDUIT ELBOW, TURNING UPWARD

CONDUIT ELBOW, TURNING DOWNWARD

ABOVEGROUND CONDUIT

UNDERGROUND CONDUIT

UNDERGROUND DUCT BANK

CONDUIT STUB-UP

OCCUPANCY SENSOR

KEYPAD KYPD

HHORN

CDOOR CONTACT

HDMI RECEPTACLE

PICTURE LOCATION

ELECTRICAL ROAD MAP

NOT TO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Access Hatch

Lunch Room

Storage Room

Restroom

Down

Electrical Control Room

Motor Control Center (MCC) (Existing) SEE DEMOLITION NOTES No.5, 7 & 8

SEE PHOTO REFERENCE D

Lighting Panel A (Existing) SEE DEMOLITION NOTES No.6 & No.14

SEE PHOTO REFERENCE C

Sump Pit

Sump Pump

Effluent Water Hydropneumatic Tank

Effluent Water Pump No. 1

Effluent Water Pump No. 2

Up

Up

Dry Well Pump Room Finish Floor El.

758.33

REMOVE

Duplex Seal Water System

SEE DEMOLITION NOTES

No.13 THRU 16

SEE PHOTO REFERENCE A

REMOVE

Raw Sewage Pump No.1

SEE DEMOLITION NOTES

No.11 & No.12 Solenoid Valve SEE DEMOLITION NOTE No.16

REMOVE

Raw Sewage Pump No.2

SEE DEMOLITION NOTES

No.11 & No.12 Solenoid Valve SEE DEMOLITION NOTE No.16

REMOVE

Raw Sewage Pump No.3

SEE DEMOLITION NOTES

No.11 & No.12 Solenoid Valve SEE DEMOLITION NOTE No.16

REMOVE

Raw Sewage Pump No.4

SEE DEMOLITION NOTES

No.11 & No.12 Solenoid Valve SEE DEMOLITION NOTE No.16

G G

G G

G G

G G

G G

G

W W

W

Up

Up

Down Motor Room

Finish Floor El. 767.00

Locker/Toilet Room Finish Floor El. 767.00

Tank Dewatering Pump

Access Hatch

REMOVE

Raw Sewage Pump No.1 Motor

SEE DEMOLITION NOTES

No.11 & No.12

REMOVE

Raw Sewage Pump No.2 Motor

SEE DEMOLITION NOTES

No.11 & No.12

REMOVE

Raw Sewage Pump No.3 Motor

SEE DEMOLITION NOTES

No.11 & No.12

REMOVE

Raw Sewage Pump No.4 Motor

SEE DEMOLITION NOTES

No.11 & No.12

VFD Panel (Existing)

SEE DEMOLITION NOTES

No.8, No.9, No.10, & No.12

SEE PHOTO REFERENCE A

Operator's Panel (Existing) SEE DEMOLITION NOTES No.9 & No.16

ELECTRICAL DEMOLITION NOTES:

1) FOR VFD CABINET, SEE PHOTO REFERENCE A.

2) FOR DUPLEX SEAL WATER SYSTEM, SEE PHOTO REFERENCE B.

3) FOR PANEL A, SEE PHOTO REFERENCE C.

4) FOR MOTOR CONTROL CENTER (MCC), SEE PHOTO REFERENCE D.

5) ELECTRICAL CONTRACTOR IS TO DETERMINE LOCATION OF MOTOR

CONTROL CENTER (EXISTING) IN ELECTRICAL CONTROL ROOM. THE

LOCATION SHOWN ON THE DRAWING IS FOR INFORMATION ONLY.

6) ELECTRICAL CONTRACTOR IS TO DETERMINE LOCATION OF PANEL A

(EXISTING) IN ELECTRICAL CONTROL ROOM. THE LOCATION SHOWN

ON THE DRAWING IS FOR INFORMATION ONLY.

7) ELECTRICAL CONTRACTOR IS TO DE-ENERGIZE POWER IN (EXISTING)

MOTOR CONTROL CENTER (MCC) FOR RAW SEWAGE PUMPS.

DE-ENERGIZING PROCESS MUST ENSURE THAT WET WELL PUMPING

REMAINS OPERATIONAL DURING CONSTRUCTION.

8) ELECTRICAL CONTRACTOR IS TO DISCONNECT AND REMOVE POWER

CONDUIT & CABLES BETWEEN MCC AND RAW SEWAGE PUMP VFDS.

9) ELECTRICAL CONTRACTOR IS TO DISCONNECT AND REMOVE

CONTROL CONDUITS & CABLES BETWEEN OPERATOR'S PANEL AND

VFD CABINET.

10) ELECTRICAL CONTRACTOR IS TO REMOVE RAW SEWAGE PUMP

DISCONNECT SWITCHES FROM VFD CABINET.

11) ELECTRICAL CONTRACTOR IS TO DISCONNECT ALL POWER &

CONTROL CONDUITS & CABLES FROM RAW SEWAGE PUMPS AND

MOTORS.

12) ELECTRICAL CONTRACTOR IS TO REMOVE ALL POWER & CONTROL

CONDUITS & CABLES BETWEEN RAW SEWAGE PUMPS AND VFD

CABINET.

13) ELECTRICAL CONTRACTOR IS TO DISCONNECT ALL POWER &

CONTROL CONDUITS & CABLES FROM DUPLEX SEAL WATER SYSTEM.

14) ELECTRICAL CONTRACTOR IS TO REMOVE ALL CONDUITS & CABLE

BETWEEN DUPLEX SEAL WATER SYSTEM AND LIGHTING PANEL A.

15) ELECTRICAL CONTRACTOR IS TO REMOVE ALL CONDUITS & CABLE

BETWEEN DUPLEX SEAL WATER SYSTEM AND OPERATORS PANEL.

16) ELECTRICAL CONTRACTOR IS TO DISCONNECT AND REMOVE ALL

POWER & CONTROL CONDUITS & CABLES ON THE SEAL WATER

SOLENOID VALVE ATTACHED TO EACH RAW SEWAGE PUMP.

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g E .d w g

:5

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

B

E

LE

C T

R

IC

A L

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

/2

R el ea se d Fo r B id

E

LE

C T

R

IC

A L

D E

M O

LI

T

IO

N

P

LA

N S

, D E

T A

IL

S

A N

D N

O T

E S

E2

D A

C

JV

F C

JB

M

A S

OPERATIONS BUILDING

BASEMENT ELECTRICAL PLAN E3-A

SCALE: 1/4" = 1'-0"

OPERATIONS BUILDING

INTERMEDIATE ELECTRICAL PLAN E3-B

SCALE: 1/4" = 1'-0"

OPERATIONS BUILDING

FIRST FLOOR ELECTRICAL PLAN E3-C

SCALE: 1/4" = 1'-0"

PHOTO REFERENCE C

PANEL A

PHOTO REFERENCE D

MOTOR CONTROL CENTER (MCC)

PHOTO REFERENCE B

Duplex Seal Water System

PHOTO REFERENCE A

VFD CABINET

Motor Control Center (MCC) (Existing)

SEE INSTALLATION NOTES

No.3, No.4, & No.5

P01 P07P04 P10

Lighting Panel A (Existing)

SEE INSTALLATION NOTES

No.2, No.11 & No.12

P13

Access Hatch

Lunch Room

Storage Room

Restroom

Down

Electrical Control Room

Effluent Water Pump Control Panel

RAW SEWAGE PUMP No.1 SEE INSTALLATION NOTE No.8

SOLENOID VALVE

SEE INSTALLATION NOTES No.13 & 14

RAW SEWAGE PUMP No.2 SEE INSTALLATION NOTE No.8

SOLENOID VALVE

SEE INSTALLATION NOTES No.13 & 14

RAW SEWAGE PUMP No.3 SEE INSTALLATION NOTE No.8

SOLENOID VALVE

SEE INSTALLATION NOTES No.13 & 14

RAW SEWAGE PUMP No.4 SEE INSTALLATION NOTE No.8

SOLENOID VALVE

SEE INSTALLATION NOTES No.13 & 14

SEAL WATER SYSTEM

SEE INSTALLATION NOTE No.11

Sump Pit

Sump Pump

Effluent Water Hydropneumatic Tank

Effluent Water Pump No. 1

Effluent Water Pump No. 2

Up

Up

Dry Well Pump Room Finish Floor El.

758.33

SEAL WATER SYSTEM

CONTROL PANEL

SEE INSTALLATION NOTES

No.11 & 14

P13

C09

G G

G G

G G

G G

G G

G

W W

W

RAW SEWAGE PUMP No.1 MOTOR SEE INSTALLATION NOTE No.8

RAW SEWAGE PUMP No.2 MOTOR SEE INSTALLATION NOTE No.8

RAW SEWAGE PUMP No.3 MOTOR SEE INSTALLATION NOTE No.8

RAW SEWAGE PUMP No.4 MOTOR SEE INSTALLATION NOTE No.8

Up

Up

Down Motor Room

Finish Floor El. 767.00

Locker/Toilet Room Finish Floor El. 767.00

Tank Dewatering Pump

Access Hatch

P13

C09

P12C08

P09C06

P03C02

RAW SEWAGE PUMP No.4

AIR RELIEF VALVE

RAW SEWAGE PUMP No.3

AIR RELIEF VALVE

RAW SEWAGE PUMP No.1

AIR RELIEF VALVE

RAW SEWAGE PUMP No.2

AIR RELIEF VALVE

VFD Panel (Existing)

SEE INSTALLATION NOTES

No.1, 4, 6, 7, 9, & 10 Operator's Panel (Existing)

SEE INSTALLATION NOTES

No.1, 4 & 6

P06C04

SEE ENLARGED

DETAIL E3-D

ELECTRICAL INSTALLATION NOTES:

1) FOR VFD CABINET, SEE PHOTO REFERENCE A.

2) FOR PANEL A, SEE PHOTO REFERENCE B.

3) FOR MOTOR CONTROL CENTER (MCC), SEE PHOTO

REFERENCE C.

4) ELECTRICAL CONTRACTOR IS TO INSTALL POWER CONDUIT

& CABLES BETWEEN MOTOR CONTROL CENTER AND RAW

SEWAGE PUMP VFDS.

5) ELECTRICAL CONTRACTOR IS TO RE-ENERGIZE POWER IN

MOTOR CONTROL CENTER (MCC) FOR RAW SEWAGE PUMPS.

RE-ENERGIZING PROCESS MUST ENSURE THAT WET WELL

PUMPING REMAINS OPERATIONAL DURING CONSTRUCTION.

6) ELECTRICAL CONTRACTOR IS TO INSTALL NEW POWER &

CONTROL CONDUITS & CABLES BETWEEN OPERATOR'S

PANEL AND VFD CABINET.

7) ELECTRICAL CONTRACTOR IS TO INSTALL NEW DISCONNECT

SWITCHES (FOR RAW SEWAGE PUMPS) IN VFD CABINET.

8) ELECTRICAL CONTRACTOR IS TO INSTALL NEW POWER &

CONTROL CONDUITS & CABLES BETWEEN RAW SEWAGE

PUMPS AND MOTORS.

9) ELECTRICAL CONTRACTOR IS TO INSTALL NEW POWER &

CONTROL CONDUITS & CABLES BETWEEN RAW SEWAGE

PUMP MOTORS AND DISCONNECT SWITCHES, LOCATED IN

VFD CABINET.

10) ELECTRICAL CONTRACTOR IS TO INSTALL NEW CONTROL

CONDUITS & CABLES BETWEEN OPERATORS CONTROL

PANEL AND EACH RAW SEWAGE PUMP VFD.

11) ELECTRICAL CONTRACTOR IS TO INSTALL POWER CONDUIT

AND CABLES FROM PANEL A (LOCATED IN ELECTRICAL

CONTROL ROOM) AND NEW DUPLEX SEAL WATER SYSTEM

(LOCATED IN DRY WELL PUMP ROOM.

12) ELECTRICAL CONTRACTOR IS TO FURNISH A NEW 3 POLE

20A BREAKER IN CIRCUITS #35 , #37, and #39 OF LIGHTING

PANEL A TO POWER NEW DUPLEX SEAL WATER SYSTEM.

13) ELECTRICAL CONTRACTOR IS TO INSTALL NEW CONTROL

CONDUITS & CABLE BETWEEN DUPLEX SEAL WATER

SYSTEM AND OPERATORS PANEL.

14) ELECTRICAL CONTRACTOR IS TO INSTALL NEW POWER &

CONTROL CONDUITS & CABLES BETWEEN SEAL WATER

SOLENOID VALVES (ATTACHED TO EACH RAW SEWAGE

PUMP) AND THE NEW DUPLEX SEAL WATER SYSTEM

CONTROL PANEL.

C07

C05

C03

C01

C08

P12 C06

P09 C04

P06

C02

P03

P01

P11

P04

P07

P10

P08

P05

P02

VFD UNITS

No.1 THRU No.4 In VFD Cabinet (Existing)

Operator's Panel (Existing)

Order No.

Drawing No.

Sheet No.

of 12Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide

ITEMS IDENTIFIED WITH UPPER CASE TEXT ARE PROPOSED.

Items Identified with Mixed Case Text are Existing.

NOTE:

D at e Is su ed

F or

D at e R ev is io ns

S A c ti ve

C lie n ts

R o st ra ve r To w n sh ip

S e w a g e

A u th o ri ty

R a w

S e w a g e

P u m p s\ D w g E .d w g

:5

A M

P lo tt e d

B y:

C o n n o r B u ll

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

288-119

O ct ob er

R A

W S

E W

A G

E P

U M

P R

E P

LA

C

E M

E N

T P

R O

JE

C

T C

O N

T R

A C

T N

O . 2

6-

B

E

LE

C T

R

IC

A L

W E

S T

M O

R E

LA

N

D C

O U

N T

Y , P

E N

N S

Y

LV

A N

IA

R

O S

T R

A V

E R

T O

W N

S H

IP

D ra w n B y:

C am pb el ls

R un

R oa d, S ui te

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C

/2

R el ea se d Fo r B id

P R

O P

O S

E D

E

LE

C T

R

IC

A L

P

LA

N S

, D E

T A

IL

S

N

O T

E S

E3

D A

C

JV

F C

JB

M

A S

OPERATIONS BUILDING

BASEMENT ELECTRICAL PLAN E3-A

SCALE: 1/4" = 1'-0"

OPERATIONS BUILDING

INTERMEDIATE ELECTRICAL PLAN E3-B

SCALE: 1/4" = 1'-0"

OPERATIONS BUILDING

FIRST FLOOR ELECTRICAL PLAN E3-C

SCALE: 1/4" = 1'-0"

PHOTO REFERENCE B

PANEL A

PHOTO REFERENCE C

MOTOR CONTROL CENTER

(MCC)

PHOTO REFERENCE A

VFD CABINET

ENLARGED DETAIL E3-D

SCALE: 1/2" = 1'-0"

Sheets and Views
1 G288-119-001 - G1
2 C288-119-001 - C1
3 M288-119-001 - M1
4 M288-119-002 - M2
5 M288-119-003 - M3
6 M288-119-004 - M4
7 M288-119-005 - M5
8 M288-119-006 - M6
9 DT288-119-001 - DT1
10 E288-119-001 - E1
11 E288-119-002 - E2
12 E288-119-003 - E3

File details come from the government source that posted it. Updated .