Elmwood Academy Lower Level HVAC Bid Set - Mechanical and Electrical Information Sheet
This document is a mechanical and electrical information sheet and bid set for the Mechanicsburg Area School District's Elmwood Academy Lower Level HVAC Upgrade project located at 100 East Elmwood Avenue, Mechanicsburg, Pennsylvania 17055. The project involves the installation of new mechanical equipment to provide temperature and climate control for the lower-level storage space, including a heat pump air handling unit (TRANE PVA-AA24NL), a condensing unit (TRANE PUZ-AK24NLHZ 2-ton), a dehumidification unit (QUEST 4044590), two circulation fans (QUEST 4042250-06), and a condensate pump (QUEST 4022220). The contract specifications require all work to comply with the International Mechanical Code, International Plumbing Code, International Energy Code, NEC 2020, IBC 2021, and IECC 2021, with contractors responsible for shop drawings, coordination drawings, and as-built documentation. Sealed bids are due April 21, 2026, at 12:00 p.m. via PennBid, with a pre-bid meeting scheduled for April 1, 2026, at 3:00 p.m. at the project site. Questions may be submitted through PennBid until April 10, 2026, at 3:00 p.m., and bidding documents became available on March 19, 2026, at 2:00 p.m. The District reserves the right to accept or reject any or all bids and may withhold award for up to 60 days.
Bidders must submit a bid bond with corporate surety authorized to do business in Pennsylvania in the amount of 10 percent of the total bid amount, with the successful bidder required to furnish a Performance Bond equal to 100 percent of the contract value. Pennsylvania Prevailing Wage Rates apply to all work. The electrical panel load analysis indicates total connected load of 42 amps with 15.1 kVA total demand, distributed across the existing Square D NQ panelboard with specific circuit allocations for the heat pump (40-amp, 2-pole GFCI breaker), air handling unit (60-amp, 2-pole breaker), dehumidification system (20-amp, 1-pole GFCI breaker), and circulation fan receptacles (20-amp, 1-pole breaker). All equipment must be installed per manufacturer recommendations, all ductwork and piping concealed except in mechanical rooms, and all systems guaranteed for one year from acceptance. The contractor is responsible for coordination with all trades, provision of adequate clearances, proper sequencing, and delivery of complete and functional systems upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE:
NOT ALL ABBREVIATIONS AND SYMBOLS INDICATED
MAY APPEAR ON THESE CONTRACT DRAWINGS.
THIS IS FOR REFERENCE ONLY.
ABBREVIATIONS
A/C
AFF
AFG
AMB
AMP
AP
APROX
ARR
ATC
AUTO
AUX
AVG
BF
BHP
BOD
BOP
BOT
BP
BSMT
BTU
CA
CAP
CF
CFM
CL
CO
COL
CONC
CONN
CONT
CTR
D
DB
DDC
DEG
DET
DIA
DISC
DN
DWG
EA
EAT
EER
EFF
EJ
EL
ELEC
ENT
ESP
EVAP
EWT
EXH
EXP
EXST
EXT
F&T
FC
FDW
FLA
FLR
FO
FPM
FPS
FS
FT
GA
GAL
GALV
GND
GPH
GPM
GR
HD
HG
HGT
HMD
HORIZ
HP
HTD
HTR
AIR CONDITIONING
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMBIENT
AMPERE
ACCESS PANEL
APPROXIMATE
ARRANGEMENT
AUTOMATIC TEMPERATURE CONTROL
AUTOMATIC
AUXILIARY
AVERAGE
BOILER FEED
BRAKE HORSEPOWER
BOTTOM OF DUCT
BOTTOM OF PIPE
BOTTOM
BACK PRESSURE
BASEMENT
BRITISH THERMAL UNIT
COMPRESSED AIR
CAPACITY
CUBIC FOOT (FEET)
CUBIC FOOT (FEET) PER MINUTE
CENTER LINE
CLEANOUT
COLUMN
CONCRETE OR CONCENTRIC
CONNECT OR CONNECTION
CONTINUATION
CENTER
DRAIN OR DEEP
DRY BULB
DIRECT DIGITAL CONTROL
DEGREE
DETAIL
DIAMETER
DISCONNECT
DOWN
DRAWING
EACH
ENTERING AIR TEMPERATURE
ENERGY EFFICIENCY RATIO
EFFICIENCY
EXPANSION JOINT
ELEVATION
ELECTRICAL
ENTERING
EXTERNAL STATIC PRESSURE
EVAPORATOR
ENTERING WATER TEMPERATURE
EXHAUST
EXPANSION
EXISTING
EXTERNAL
FLOAT & THERMOSTATIC
FLEXIBLE CONNECTION
FEED WATER
FULL LOAD AMPS
FLOOR
FUEL OIL
FOOT (FEET) PER MINUTE
FOOT (FEET) PER SECOND
FLOW SWITCH
FOOT (FEET)
GAUGE
GALLONS
GALVANIZED
GROUND
GALLONS PER HOUR
GALLONS PER MINUTE
GRAIN
HEAD
HOT GAS
HEIGHT
HUMIDITY
HORIZONTAL
HORSEPOWER
HEATED
HEATER
Hz
INSUL
INTL
LAT
LBS
LIN
LP
LRA
LVL
LVR
LWT
MAN
MAX
MBH
MIN
MOD
MTD
MU
NA
NC
NEG
NIC
NO
NTS
OA
OED
OFCI
OV
PCR
PD
PG
PL
PNEU
PRESS
PROP
PSIG
QTY
REF
REQD
REV
RL
RM
RS
RTN
S
SCH
SD
SEC
SENS
SEP
SEQ
SER
SERV
SHT
SOL
SP
SPLY
SS
STL
SUCT
TD
TEMP
TH
THK
TSP
TYP.
UON
V
VAC
VAV
VB
VEL
VERT
VIB
VOL
VSD
VTR
W
WB
WMS
WP
HERTZ
INSULATION
INTERNAL
LEAVING AIR TEMPERATURE
POUNDS
LINEAL
LOW PRESSURE
LOCKED ROTOR AMPS
LEVEL
LOUVER
LEAVING WATER TEMPERATURE
MANUAL
MAXIMUM
THOUSAND BRITISH THERMAL UNITS PER HOUR
MINIMUM
MODEL
MOUNTED
MAKEUP
NOT APPLICABLE
NORMALLY CLOSED
NEGATIVE
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
OUTSIDE AIR
OPEN END DUCT
OWNER FURNISHED CONTRACTOR INSTALLED
OUTLET VELOCITY
PUMPED CONDENSATE RETURN
PRESSURE DROP
RESSURE GAUGE
PLATE
PNEUMATIC
PRESSURE
PROPELLER
POUNDS PER SQUARE INCH GAUGE
QUANTITY
REFERENCE
REQUIRED
REVISION
REFRIGERANT LIQUID
ROOM
REFRIGERANT SUCTION
RETURN
SWITCH
SCHEDULE
SMOKE DAMPER
SECONDARY SECONDS
SENSIBLE
SEPARATE
SEQUENCE
SERIES
SERVICE
SHEET
SOLENOID
STATIC PRESSURE
SUPPLY
STAINLESS STEEL
STEEL
SUCTION
TEMPERATURE DIFFERENTIAL
TEMPERATURE
THERMOMETER
THICK
TOTAL STATIC PRESSURE
TYPICAL
UNLESS OTHERWISE NOTED
VENT OR VOLT
VACUUM
VARIABLE AIR VOLUME
VACUUM BREAKER
VELOCITY
VERTICAL
VIBRATION
VOLUME
VARIABLE SPEED DRIVE
VENT THRU ROOF
WATT, WIDTH OR WIDE
WET BULB
WIRE MESH SCREEN
WEATHER PROOF
24x36
DOUBLE LINE
24x36
SINGLE LINE
NEW WORK
SUPPLY AIR DOWN
SUPPLY AIR UP
EXISTING TO BE REMOVED
EXISTING TO REMAIN
DESCRIPTION
EXHAUST OR RETURN AIR UP
EXHAUST OR RETURN AIR DOWN
DUCTWORK SYMBOLS
RECTANGULAR DUCT SIZE SHOWN IN
INCHES (FIRST FIGURE-SIDE SHOWN)
DUCT SMOKE DETECTOR SDT
VOLUME DAMPER
POINT OF CONNECTION-NEW TO EXISTING
DRAWING NOTE SYMBOL
REVISION SYMBOL
MISCELLANEOUS SYMBOLS
POINT OF DEMOLITION CONCLUSION
D
GENERAL MECHANICAL NOTES:
1. ALL WORK AND EQUIPMENT SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES, AND
REQUIREMENTS; OF ALL AUTHORITIES HAVING JURISDICTION, INCLUDING BUT NOT
LIMITED TO THE INTERNATIONAL MECHANICAL CODE, THE INTERNATIONAL PLUMBING
CODE, THE INTERNATIONAL ENERGY CODE, THE LOCAL FIRE MARSHALL, UNDERWRITERS
LABORATORY, IRI, FM, OSHA, AND THE NATIONAL ELECTRICAL CODE. MODIFICATIONS
REQUIRED BY THE ABOVE AUTHORITIES IN ORDER TO BRING THE PROJECT INTO CODE
COMPLIANCE SHALL BE MADE AT NO ADDITIONAL COST TO OWNER. IF CONTRACT
DOCUMENTS ARE MORE STRINGENT THAN CODE REQUIREMENTS, THE CONTRACT
DOCUMENTS SHALL GOVERN.
2. ALL SPECIFICATIONS AND DRAWINGS ARE COMPLIMENTARY AND MUST BE USED IN
COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. ANY CONFLICTING
INFORMATION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER, AND WORK
SHALL CEASE ON THAT PORTION OF THE PROJECT UNTIL CLARIFICATIONS ARE ISSUED.
3. HEATING CONTRACTOR (H.C.) AND MECHANICAL CONTRACTOR (M.C.) TERMINOLOGY IS
INTERCHANGEABLE.
4. CONTRACTOR SHALL CONFIRM THE REQUIREMENTS FOR PREMIUM TIME OR SPECIAL
PROCEDURES WITH THE OWNER. CONTRACTOR SHALL INCLUDE LONG LEAD EQUIPMENT
SUBMITTALS WITH BID PROPOSALS.
5. CONTRACTOR SHALL COORDINATE, PREPARE AND SUBMIT SHOP DRAWINGS TO THE
ARCHITECT AND ENGINEER FOR APPROVAL. SHOP DRAWINGS TO BE SUBMITTED
INCLUDE: SHEET METAL, DIFFUSERS, GRILLES, REGISTERS, FIRE DAMPERS, AND ALL
EQUIPMENT. SHEET METAL SHOP DRAWINGS SHALL BE COORDINATED AND SHOW DUCT
ELEVATIONS. INCLUDE RISES, DROPS, AND OFFSETS TO PROVIDE A COMPLETE AND
FUNCTIONAL SYSTEM. AREAS OF POTENTIAL CONFLICT SHALL BE BROUGHT TO THE
ENGINEER'S ATTENTION.
6. A SET OF MEP RECORD/COORDINATION DRAWINGS SHALL BE MAINTAINED BY THE
CONTRACTOR AT THE JOB SITE. ACTUAL LOCATIONS OF ALL EQUIPMENT, PIPING,
DUCTWORK, AND ALL OTHER ITEMS INCLUDED IN THIS CONTRACT, AND ALL DEVIATIONS
OF THE WORK FROM THAT SHOWN ON THE CONTRACT DOCUMENTS SHALL BE MARKED
ON THE RECORD/COORDINATION DRAWINGS. EACH TRADE SHALL REVIEW THE
COORDINATION DRAWINGS AND RESOLVE ANY POTENTIAL CONFLICTS WITH OTHER
TRADES PRIOR TO INSTALLING ANY PORTION OF THEIR WORK.
7. THE MECHANICAL CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER AS-BUILT
DRAWINGS AND OPERATION AND MAINTENANCE MANUALS INCLUDING ALL NAMEPLATE
DATA, WIRING DIAGRAMS, MAINTENANCE INSTRUCTIONS, AND PARTS LIST UPON PROJECT
COMPLETION.
8. WORK SHALL BE EXECUTED IN A GOOD WORKMANLIKE MANNER USING MECHANICS IN
THEIR RESPECTIVE TRADES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES FOR
COORDINATING THE WORK UNDER THIS CONTRACT. UPON COMPLETION OF
CONSTRUCTION, THE CONTRACTOR SHALL DELIVER COMPLETE AND FUNCTIONAL
SYSTEMS AS ENCOMPASSED BY THE CONTRACT. ALL EQUIPMENT SHALL BE INSTALLED
PER MANUFACTURER'S RECOMMENDATIONS AND CODE REQUIREMENTS.
9. THE HVAC CONTRACTOR SHALL ARRANGE THE PROGRESS OF HIS WORK SO AS TO
CONFORM TO THE PROGRESS OF THE TRADES AND SHALL COMPLETE THE ENTIRE
INSTALLATION AS SOON AS THE CONDITION OF THE PROJECT WILL PERMIT.
10. ALL AUTOMATIC TEMPERATURE CONTROL SYSTEM WORK AND INSPECTION SHALL BE
ACCOMPLISHED BY THIS CONTRACTOR. WIRING OF ALL MOTORIZED OPERATORS ,
REGARDLESS OF VOLTAGE, ARE THE RESPONSIBILITY OF THE MECHANICAL
CONTRACTOR.
11. FOR ALL SENSOR/DEVICES FURNISHED AND INSTALLED BY OTHERS TO INTERFACE WITH
THE BAS, BAS CONTRACTOR SHALL COORDINATE INSTALLATION LOCATIONS, AVAILABLE
INPUTS, AND SENSOR REQUIREMENTS. BAS CONTRACTOR SHALL FURNISH AND INSTALL
ALL CONTROL WIRING FROM THE DEVICE TO THE BAS CONTROLLER AND PROVIDE ALL
TERMINATIONS UNLESS NOTED OTHERWISE.
12. M.C. AND BAS CONTRACTOR SHALL COORDINATE ALL SENSOR MOUNTING LOCATIONS.
13. THE CONTRACTOR SHALL PROVIDE ADEQUATE CLEARANCE FOR ALL UNIT CONTROLS.
14. THE CONTRACTOR SHALL MAKE ALL FINAL EQUIPMENT CONNECTIONS AND PROVIDE THE
NECESSARY ADAPTERS, FITTINGS, VALVES, AND DEVICES FOR A COMPLETE OPERABLE
SYSTEM. COORDINATE REQUIREMENT FOR PROVISION OF CONTACTORS AND CONTROL
WIRING FOR PROPER FUNCTIONING SYSTEM WITH ELECTRICAL CONTRACTOR. MOTOR
STARTERS, COMBINATION MOTOR STARTERS, AND DISCONNECTS ARE TO BE PROVIDED
BY THIS CONTRACTOR FOR INSTALLATION BY OTHERS.
15. FURNISH AND INSTALL ALL EQUIPMENT ELECTRICAL DISCONNECTS UNLESS INDICATED
OTHERWISE. DISCONNECTS SHALL BE PROVIDED BY EQUIPMENT MANUFACTURER AND
SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION 262816.
16. CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE RELATION OF PIPING,
DUCTWORK, CONNECTIONS, AND EQUIPMENT. CONTRACTOR SHALL TAKE ALL
INTERFERENCES INTO CONSIDERATION. PROVIDE ALL NECESSARY OFFSETS OR
TRANSITIONS WITH EQUIVALENT AREAS TO MATCH DUCT SIZES AS INDICATED ON
DRAWINGS. ALL PIPING AND DUCTWORK TO BE CONCEALED IN CEILINGS AND WALLS,
EXCEPT IN MECHANICAL ROOMS, SPACES WITHOUT CEILINGS, OR WHERE NOTED
OTHERWISE.
17. ALL DIMENSIONS AND PIPE SIZES ARE IN INCHES UNLESS NOTED OTHERWISE.
18. BAS CONTRACTOR SHALL COORDINATE AND INSTALL ALL CONTROL PANELS. BAS SHALL
FURNISH AND INSTALL ALL MATERIALS AND PROVIDE ALL LABOR FROM THE BREAKER TO
ATC CONTROL PANEL.
19. CLEAN ALL MECHANICAL EQUIPMENT AND DUCTWORK OF ALL CONSTRUCTION DUST AT
PROJECT COMPLETION. REPLACE ALL FILTERS PRIOR TO AIR BALANCING. PROVIDE ONE
SPARE SET OF FILTERS FOR EACH PIECE OF EQUIPMENT TO OWNER. NEWLY INSTALLED
HVAC EQUIPMENT SHALL NOT BE USED AT ANY TIME FOR TEMPORARY CONDITIONING OF
THE SPACE DURING CONSTRUCTION.
20. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE IN WRITING ALL MATERIALS,
EQUIPMENT, AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF
ACCEPTANCE BY OWNER.
21. THE EXISTING CONDITIONS ON THESE DRAWINGS ARE FROM HISTORICAL DOCUMENTS.
CHECK AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AT THE SITE PRIOR TO
COMMENCING WORK. WHERE DISCREPANCY EXISTS, NOTIFY ENGINEER IN WRITING.
S
S
S
M
JB
T
30/3/NF/12
FVNR/SIZE1/3R
PANELBOARDS
EXISTING PANELBOARD
NEW PANELBOARD
CIRCUITING
JUNCTION BOX
BRANCH CIRCUIT NUMBER FOR ALL ITEMS IN THIS
ROOM UNLESS OTHERWISE INDICATED - (*)
INDICATES CONNECTION TO CIRCUIT NUMBER
SHOWN NEXT TO DEVICE
CONTROL EQUIPMENT
MANUAL MOTOR STARTER - OVERLOADS SIZED TO ACCOMMODATE
MOTOR - 4'-0" AFF UNLESS OTHERWISE NOTED
COMBINATION MOTOR STARTER - TYPE/SIZE/NEMA ENCLOSURE AS
INDICATED - MOUNT 4'-6" AFF TO CENTERLINE OF OPERATING HANDLE
PROVIDE OVERCURRENT AND OVERLOADS IN ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS FOR MOTOR HP
MOTOR - HORSEPOWER AS INDICATED
DISCONNECT SWITCH - AMPS/POLES/FUSES/NEMA ENCLOSURE AS
INDICATED - MOUNT 4'-6" AFF TO CENTERLINE OF OPERATING HANDLE
TRANSFORMER
SIGNAL SYSTEM
STANDARD MOUNTING HEIGHTS
9" BELOW
FINISHED
CEILING
WALL-MOUNTED CLOCKS, PROGRAM BELLS, (OR AS SHOWN
ON ARCHITECTURAL DETAIL)
6" ABOVE DOOR NURSE CALL DOME LIGHT
6" ABOVE FIRE
HOUSE
CABINET
RED SIGNAL LIGHT
10'-0"
BATTERY LIGHTING UNITS AND REMOTE WALL MOUNTED
LIGHT HEADS (OR 1'-0" BELOW FINISHED CEILING OF TOP
UNIT).
8'-6" PENDANT-HUNG INDUSTRIAL AND STRIP LIGHTING FIXTURES.
7'-8"+
TELEVISION OUTLET AND SERVICE RECEPTACLE-FOR
SHELF MOUNTED T.V. IN BEDROOMS.
7'-6" OR 6" BELOW FINISHED CEILING, WHICHEVER IS LOWER.
CENTER ABOVE
DOOR OR WINDOW
OPENING
WARNING AND SIGNALING FIXTURES/SIGNS.
6'-8"
OR 6" BELOW FINISHED CEILING WHICHEVER IS LOWER.
FIRE ALARM SIGNAL DEVICES AND ILLUMINATED FIRE
SIGNALS.
6'-6"
TOP OF FLUSH AND SURFACE MOUNTED ELECTRICAL
LIGHTING OR POWER PANELBOARDS AND TELEPHONE
CABINETS.
6'-3"
TOP OF BACK-MOUNTED WALL EXIT FIXTURES (NOT
MOUNTED ABOVE DOORS).
6'-0"
TOP OF HIGHEST ELECTRICAL SAFETY DISCONNECT
SWITCHES, MAGNETIC STARTERS, CONTACTORS.
4'-6"
CENTERLINE OF OPERATING HANDLE FOR WALL MOUNTED
DISCONNECT SWITCHES AND MOTOR STARTERS; WALL
MOUNTED TELEPHONE AND PAY STATIONS (3'-6" AT HANDICAP
LOCATIONS VERIFY EXACT HEIGHT PRIOR TO ROUGH IN)
3'-10"
WALL PHONE, ELECTRICAL DEVICE LIGHTING SWITCHES, MANUAL
MOTOR STARTERS, SECURITY CARD, AND GFI RECEPTACLES IN
TOILET ROOMS OR FOR SEPERATE SINKS NOT IN CASEWORK.
3'-6" FIRE ALARM PULL STATIONS
2'-0"
ELECTRICAL RECEPTACLES WITHIN MECHANICAL
SPACES, ELECTRICAL AND ELEVATOR ROOMS.
1'-6"
ELECTRICAL RECEPTACLES, TELEPHONE OUTLETS, DATA
OUTLETS, TELEPHONE/DATA OUTLETS
0" FINISHED FLOOR
CT
W
MOUNTING HEIGHT NOTES:
1. MOUNTING HEIGHTS TO CENTER OF OUTLETS UNLESS OTHERWISE NOTED. IN MASONRY
CONSTRUCTION THE ABOVE MOUNTING HEIGHTS SHALL BE USED FOR REFERENCE TO NEAREST
BLOCK OF BRICK COURSING.
2. THE ABOVE MOUNTING HEIGHTS SHALL BE ADHERED TO UNLESS SPECIFICALLY NOTED OR DETAILED
OTHERWISE ON THE DRAWING OR SPECIFICATIONS.
3. A '+' BESIDE A DEVICE INDICATES THAT DEVICE IS MOUNTED ABOVE A COUNTER OR CASEWORK.
COORDINATE WITH ARCHITECTURAL ROOM ELEVATIONS, DETAILS AND CASEWORK CONTRACTOR.
P-1
ROOM #
ROOM NAME
M
M
THE ELECTRICAL SYSTEMS PRESENTED ON THE SUBSEQUENT
DRAWINGS WERE DESIGNED IN ACCORDANCE WITH THE
FOLLOWING APPLICABLE CODES AND STANDARDS:
THE NATIONAL ELECTRICAL CODE (NEC), 2020
INTERNATIONAL BUILDING CODE (IBC), 2021
INTERNATIONAL ENERGY CONSERVATION CODE (IECC), 2021
WIRING DEVICES
DUPLEX RECEPTACLE - NEMA 5-20R, MOUNT 1'-6"
AFF UNLESS OTHERWISE NOTED
GFI DUPLEX RECEPTACLE - MOUNT AT 1'-6" AFF UNLESS
OTHERWISE NOTED
1. CONTRACTOR SHALL PROVIDE BRANCH CIRCUIT WIRING TO ALL ITEMS WHICH REQUIRE
ELECTRICAL CONNECTIONS. WHERE BRANCH CIRCUIT WIRING IS NOT SHOWN,
CONTRACTOR SHALL CONNECT ITEMS TO THE CIRCUITS INDICATED. EXACT ROUTING OF
CONDUITS AND WIRING SHALL BE DETERMINED BY THE CONTRACTOR IN ACCORDANCE
WITH THE NATIONAL ELECTRICAL CODE AND SPECIFICATIONS.
2. CONTRACTOR SHALL USE ONLY THOSE WIRING METHODS ALLOWED IN THE
SPECIFICATIONS.
3. A MAXIMUM OF 3 CIRCUITS SHALL BE RUN IN ONE CONDUIT, CIRCUITS MUST BE ON
SEPARATE PHASES. CIRCUITS SHALL NOT SHARE A COMMON NEUTRAL.
4. MINIMUM WIRE SIZE SHALL BE #12AWG. MINIMUM CONDUIT SIZE SHALL BE 3/4".
5. THE ELECTRICAL CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND
CONDITIONS AT THE SITE.
6. ALLOW CLEAR SPACE IN FRONT OF ALL PANELBOARDS, SWITCHBOARDS, ELECTRICAL
EQUIPMENT, ETC., AS REQUIRED BY NEC.
7. ELECTRICAL CONTRACTOR TO SUPPLY ALL GROUNDING & BONDING REQUIREMENTS PER
NEC.
8. ELECTRICAL CONTRACTOR TO PROVIDE ALL CUTTING AND PATCHING IN EXISTING
BUILDING RELATED TO THE NEW ELECTRICAL WORK.
9. ELECTRICAL CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE IN WRITING ALL
MATERIALS EQUIPMENT AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE
OF ACCEPTANCE BY OWNER
10. THE ELECTRICAL CONTRACTOR SHALL SUBMIT TO THE ENGINEER AS-BUILT DRAWINGS
AND OPERATION AND MAINTENANCE MANUALS INCLUDING ALL NAMEPLATE DATA,
WIRING DIAGRAMS, MAINTENANCE INSTRUCTIONS AND PARTS LIST UPON PROJECT
COMPLETION.
11. ELECTRICAL CONTRACTOR SHALL MAINTAIN A CLEAN AND SAFE WORK AREA AT ALL
TIMES. ALL SAFETY PROCEDURES AND ENFORCEMENT IS THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL CONFORM TO ALL OSHA STANDARDS.
GENERAL ELECTRICAL NOTES:
DEMOLITION DRAWING LINETYPE DESIGNATIONS
EXISTING TO REMAIN
EXISTING TO BE REMOVED
S
D
NOTE:
NOT ALL ABBREVIATIONS AND
SYMBOLS INDICATED MAY APPEAR ON
THESE CONTRACT DRAWINGS. THIS IS
FOR REFERENCE ONLY.
SMOKE DETECTOR
DUCT MOUNTED SMOKE DETECTOR
DUPLEX RECEPTACLE - NEMA 5-20R, AT CEILING OR
EXPOSED STRUCTURE, UNLESS OTHERWISE NOTED
GFI DUPLEX RECEPTACLE WITH WEATHERPROOF
WHILE IN USE COVER- MOUNT AT 2'-0" AFF/AFG UNLESS
OTHERWISE NOTED
WP
DSGN:
JOB:
CHK:
DRAWN: APPRD:
DATE:
SCALE:
P MGR:
COPYRIGHT 2026
SHEET:
F
IL
E N
A M
E
AB
R E
V
IS
IO
N
S D
A T
E
A u to d e s k D o c s /1
.0
E lm w o o d A c a d e m y L o w e r_
L e v e l_
H V
A C
R
/M E
P -1
.0
E lm w o o d
A c a d e m y
L o w e r_
L e v e l_
H V
A C
R
.r v t
NO SCALE
M E
C H
A N
IC
A
L A
N D
E L
E C
T R
IC
A
L I
N F
O R
M A
T
IO
N S
H E
E T
L O
W E
R L
E V
E L S
T O
R A
G E
H V
A C
P R
O J E
C T
F O
R
RWR/GLM
RWR/GLM03/19/2026
1011522.002
ME0.1
JBL
JBL
M E
C H
A N
IC
S
B U
R G
A R
E A
S C
H O
O L
D
IS
T R
IC
T
E
E L
M W
O O
D A
V E
M
E C
H A
N
IC
S B
U R
G
P A
E L M
W O
O D
A C
A D
E M
Y
RWR
MECHANICAL DRAWING LIST
ME0.1 MECHANICAL AND ELECTRICAL INFORMATION SHEET
ME1.1 LOWER LEVEL PLAN - UNIT A - MECHANICAL AND ELECTRICAL
T
T
T
T
T
T
STORAGE
A027
WORK CENTER
A018
ELECTRICAL
A014
PRINT CENTER
A013
IT RECEIVING
A016
CORRIDOR
A017 STAIR A3
A015
STAIR
A011
OFFICE
A022
OFFICE
A021
IT RECEIVING
A016
CORRIDOR
A017
CONFERENCE
A019
TOILET
A025
OFFICE
A020
STORAGE
A023
CUST
A024
CL
A026
CP-1
DH-1
CF-2
CF-1
AH-1
HP-1
10x6
SSR
10x6
SSR
10x6
SSR
10x6
SSR
x
12x12 x
INSTALL GRILLES IN SIDE OF DUCT
WITH 22° BLADE DEFLECTION
DOWNWARD. (TYP. 4)
INSTALL DUCTWORK AT
APPROX. 8'-0" TO CENTER
HANG FROM STRUCTURE
AT APPROX. 8'-0"
HANG FROM STRUCTURE
AT APPROX. 8'-0"
DPFLP2
PP2
WP
PP2-56
PP2-56
PP2-56
PP2-56
PP2-58
60/2/40/3R
PP2 - 65,67
60/2/NF/1
PP2 - 66,68
B
CA
DSGN:
JOB:
CHK:
DRAWN: APPRD:
DATE:
SCALE:
P MGR:
COPYRIGHT 2026
SHEET:
F
IL
E N
A M
E
AB
R E
V
IS
IO
N
S D
A T
E
A u to d e s k D o c s /1
.0
E lm w o o d A c a d e m y L o w e r_
L e v e l_
H V
A C
R
/M E
P -1
.0
E lm w o o d
A c a d e m y
L o w e r_
L e v e l_
H V
A C
R
.r v t
1/8" = 1'-0"
L O
W E
R L
E V
E L
P L
A N
U
N
IT
A
M E
C H
A N
IC
A
L A
N D
E L
E C
T R
IC
A
L
L O
W E
R L
E V
E L S
T O
R A
G E
H V
A C
P R
O J E
C T
F O
R
RWR/GLM
RWR/GLM3/19/2026
1011522.002
ME1.1
JBL
JBL
M E
C H
A N
IC
S
B U
R G
A R
E A
S C
H O
O L
D
IS
T R
IC
T
E
E L
M W
O O
D A
V E
M
E C
H A
N
IC
S B
U R
G
P A
E L M
W O
O D
A C
A D
E M
Y
RWR
SCALE: 1/8" = 1'-0"
LOWER LEVEL PLAN - UNIT A - MECHANICAL AND ELECTRICAL1
REMARKS:
1. PROVIDE UNIT WITH NEMA 5-15P POWER CORD.
2. PROVIDE WITH 5-YEAR WARRANTY.
3. SUSPEND FROM STRUCTURE ABOVE PER MANUFACTURERS WRITTEN RECOMMENDATIONS.
4. PROVIDE ACCESSORY HUMIDISTAT CONTROL AND ASSOCIATED LOW-VOLTAGE WIRING.
5. ROUTE CONDENSATE DRAIN PIPING TO CONDENSATE PUMP AT AIR HANDLER.
CONDENSATE PUMP SCHEDULE
SYMBOL MANUFACTURER MODEL
GALLONS
PER HOUR
AMPS V/P/H REMARKS
CP-1 QUEST 4022220 55 1.5 120/1/60 1,2,3
CIRCULATION FAN SCHEDULE
SYMBOL MANUFACTURER MODEL DRIVE RPM
BLADE
HEIGHT
(A.F.F.)
CONTROLS
ELECTRICAL DATA
WEIGHT
(LBS.)
REMARKS
AMPS V/P/H
CF-1 QUEST 4042250-06 DIRECT 1,015 8'-0" WALL SWITCH BY E.C. 1.1 120/1/60 16 1,2,3
CF-2 QUEST 4042250-06 DIRECT 1,015 8'-0" WALL SWITCH BY E.C. 1.1 120/1/60 16 1,2,3
CONDENSING UNIT SCHEDULE
SYMBOL MANUFACTURER MODEL
NOMINAL
TONS
TOTAL
CAPACITY
(MBH)
REFRIGERANT
AIR ON
CONDENSER
(°F)
ELECTRICAL DATA
WEIGHT (LBS) REMARKS
MCA MOP V/P/H
HP-1 TRANE PUZ-AK24NLHZ 2 24.0 R454B 95 24 39 208-230/1/60 235 1
DEHUMIDIFICATION UNIT SCHEDULE
SYMBOL MANUFACTURER MODEL
AIRFLOW
(CFM)
E.S.P. (IN.
WG.)
PINTS PER
DAY
REFRIGERANT FILTRATION
ELECTRICAL DATA
WEIGHT
(LBS.)
REMARKS
AMPS V/P/H
POWER CORD
TYPE
DH-1 QUEST 4044590 280 0.0 70 R-454B MERV-8 5.0 120/1/60 STANDARD 60 1,2,3,4,5
REMARKS:
1. INSTALL ADJACENT TO UNIT SERVED.
2. PIPE DISCHARGE TO GRADE. ROUTE TUBING WITH REFRIGERANT LINESET.
3. PROVIDE WITH 6' 3-CONDUCTOR CORD WITH GROUND.
REMARKS:
1. PROVIDE UNIT WITH NEMA 5-15P POWER CORD. E.C. SHALL PROVIDE RECEPTACLE AT CEILING CONTROLLED BY WALL SWITCH.
ONE CIRCUIT SHALL CONTROL BOTH FANS.
2. PROVIDE WITH 1-YEAR WARRANTY.
3. SUSPEND FROM STRUCTURE ABOVE PER MANUFACTURERS WRITTEN RECOMMENDATIONS.
REMARKS:
1. SET UNIT ON GRADE WITH CONCRETE HOUSEKEEPING PAD. PAD TO BE 6" LARGER THAN EQUIPMENT ON ALL SIDES.
HEAT PUMP AIR HANDLING UNIT SCHEDULE
SYMBOL MANUFACTURER MODEL
SUPPLY DATA COOLING DATA HEATING DATA ELECTRICAL DATA
WEIGHT
(LBS.)
REMARKS
CFM HP ESP (IN. WC.) TOTAL MBH LAT DB (°F) MBH LAT (°F)
AUX. HEAT
(KW)
MCA MOP V/P/H
AH-1 TRANE PVA-AA24NL 875 0.5 0.3 13.6-24.0 55.0 26.0 95.0 7.5 49.3 / 56.2 50 / 60 208-230/1/60 145 1,2,3
REMARKS:
1. PROVIDE UNIT WITH BOTTOM FILTER RACK AND FLOOR SUPPORT TO ELEVATE UNIT.
2. RETURN SHALL BE OPEN BOTTOM WITH FILTER ABOVE FLOOR.
3. ROUTE CONDENSATE DRAIN TO CONDENSATE PUMP. PUMP DISCHARGE TUBE SHALL BE ROUTED TO GRADE WITH LINESET.
TOTAL AMPS PANEL 42
TOTAL KVA PANEL 15.1
TOTAL KVA/PHASE 7.8 0.2 7.1 EXISTING SQUARE D NQ PANELBOARD TO REMAIN; # EXISTING CIRCUIT TO REMAIN;
## UTILIZE SPARE BREAKER FOR NEW CIRCUIT; ### PROVIDE NEW BREAKER IN
EXISTING SPACE(S). MATCH EXISTING PANEL AIC RATING. FIELD VERIFY.
83 PREPARED SPACE 1 -- -- -- 84
81 PREPARED SPACE 1 -- -- -- -- -- -- 1 PREPARED SPACE 82
79 PREPARED SPACE 1 -- -- -- -- -- -- 1 PREPARED SPACE 80
77 PREPARED SPACE 1 -- -- -- -- -- -- 1 PREPARED SPACE 78
75 PREPARED SPACE 1 -- -- -- -- -- -- 1 PREPARED SPACE 76
73 PREPARED SPACE 1 -- -- -- -- -- -- 1 PREPARED SPACE 74
71 PREPARED SPACE 1 -- -- -- -- -- -- 1 PREPARED SPACE 72
69 PREPARED SPACE 1 -- -- -- -- -- -- 1 PREPARED SPACE 70
67 2.2 5.0 68
### HP-1 (GFCI) 2 40 2-#8, 1-#8, 1-#10 1"
2.2 5.0
1-1/4" 2-#4, 1-#4, 1-#10 60 2 ### AH-1
63 SPARE (OFF) 1 20 -- 0.0 0.0 -- 20 1 SPARE (OFF) 64
61 SPARE (OFF) 1 20 -- 0.0 0.0 -- 20 1 SPARE (OFF) 62
59 SPARE (OFF) 1 20 -- 0.0 0.0 -- 20 1 SPARE (OFF) 60
57 SPARE (OFF) 1 20 -- 0.0 0.2 3/4" 1-#12, 1-#12, 1-#12 20 1 ## RECEPT - AT HEAT PUMP 58
55 SPARE (OFF) 1 20 -- 0.0 0.7 3/4" 1-#12, 1-#12, 1-#12 20 1 ### DEHUMIDIFICATION SYSTEM (GFCI) 56
53 # 1 20 -- 0.0 0.0 54
51 # 1 20 -- 0.0 0.0 -- 20 2 #
49 # 1 20 -- 0.0 0.0 50
47 # 1 20 -- 0.0 0.0 -- 20 2 #
45 # 1 20 -- 0.0 0.0 46
43 # 1 20 -- 0.0 0.0 -- 20 2 #
41 SPARE (OFF) 1 20 -- 0.0 0.0 42
39 # 1 20 -- 0.0 0.0 -- 20 2 #
37 # 1 20 -- 0.0 0.0 -- 20 1 # 38
35 # 1 20 -- 0.0 0.0 -- 20 1 # 36
33 0.0 0.0 34
# 2 15 --
0.0 0.0 -- 50 2 #
29 0.0 0.0 30
# 2 15 --
0.0 0.0 -- 15 2 #
25 0.0 0.0 26
# 2 15 --
0.0 0.0 -- 15 2 #
21 # 1 30 -- 0.0 0.0 22
19 0.0 0.0 -- 30 2 #
# 2 50 --
0.0 0.0 -- 20 1 # 18
15 # 1 20 -- 0.0 0.0 -- 20 1 # 16
13 # 1 20 -- 0.0 0.0 -- 20 1 # 14
11 # 1 20 -- 0.0 0.0 -- 20 1 # 12
9 # 1 20 -- 0.0 0.0 -- 20 1 # 10
7 # 1 20 -- 0.0 0.0 -- 20 1 # 8
5 # 1 20 -- 0.0 0.0 -- 20 1 # 6
3 # 1 20 -- 0.0 0.0 -- 20 1 # 4
1 # 1 20 -- 0.0 0.0 -- 20 1 # 2
NO SZ NO SZ NO SZ NO SZ NO SZ NO SZ
P AMP A B C AMP P
CKT CIRCUIT DESCRIPTION
BREAKER
WIRE GND
COND
KVA/PH
COND
WIRE GND
BREAKER
CIRCUIT DESCRIPTION CKT
MOUNTING: Surface PHASE: 3 WIRE: 4 VOLTAGE: 120/208 AIC: EXISTING
PANEL: PP2 BUS AMP: 175 A AMPS MAIN BREAKER: 175 A
| Sheets |
| ME0.1 - MECHANICAL AND ELECTRICAL INFORMATION SHEET |
| ME1.1 - LOWER LEVEL PLAN - UNIT A - MECHANICAL AND ELECTRICAL |
File details come from the government source that posted it. Updated .