2-20260522 BID drawings.pdf
PDF 294 KB Posted
- Attached to
- Mechanicsburg High School Sanitary Sewer
- Solicitation number
- Not on record
- Issued by
- Cumberland County, Masontown Borough, Pennsylvania
About this file
Summary
This is a plumbing bid drawing set for the Mechanicsburg Area School District's Sanitary Sewer Replacement project located at 500 South Broad Street, Mechanicsburg, Pennsylvania 17055. The project scope involves replacing an existing underslab sanitary main with a new sanitary main featuring revised routing and reconnecting existing active sanitary branches to the new main within Unit C of the high school facility. The work encompasses multiple rooms including art labs, production labs, storage areas, and corridors on the first floor, requiring demolition and reconfiguration of existing piping, installation of new 4-inch sanitary piping below slab, and creation of new floor cleanouts (FCO1 units). The plumbing contractor is responsible for complete coordination with all trades, field verification of existing conditions, proper sloping and support of piping, concrete slab cutting and repair, floor finish restoration (including polished concrete, luxury vinyl tile, and epoxy resin finishes), removal and reinstallation of existing storefront systems, and submission of as-built drawings. Sealed bids are due June 5, 2026, with a mandatory pre-bid meeting scheduled for May 27, 2026, at 10:00 a.m. at the project site, and bidders may submit questions until 3:00 p.m. on May 29, 2026.
All materials and equipment removed become the property of the contractor for legal disposal off-site, and the contractor must provide complete permits, inspections, and approvals from authorities having jurisdiction while adhering to current adopted International Plumbing Code standards. The plumbing contractor must guarantee all materials, equipment, and workmanship for one year from acceptance, maintain OSHA compliance and a clean work environment, and notify the facility director at least three days prior to any service interruptions or powered equipment use for excavation or demolition. The contract requires a 10% bid bond payable to Mechanicsburg Area School District with a corporate surety authorized to do business in Pennsylvania, and successful bidders must furnish a 100% performance bond. Pennsylvania Prevailing Wage Rates apply to the contract, and the school district reserves the right to accept or reject any or all bids or portions thereof and to withhold award for up to sixty days.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-X
X
P-X
X
140°HWR
G
FCW
ID
AIR
SAN
GW
PD
IW
VAC
AW
AV
140°HW
RWC
OSD
SSD
XX
XX
EXISTING PIPING NOTED AS CAPPED AND PORTION REMOVED
EXISTING PIPING TO REMAIN - SERVICE IS SAME DESIGNATION AS NEW
EXISTING PIPING TO BE REMOVED
XXX
WALL HYDRANT (NON-FREEZE)
HOSE BIBB
0'-0"
AD
DISTANCE FROM FLOOR TO BOTTOM OF OBJECT
CONNECT TO EXISTING
ACCESS DOOR IN WALL OR CEILING
SANITARY
AIR
NATURAL GAS
RAIN/STORM WATER
INDIRECT DRAIN
VENT
DOMESTIC HOT WATER RETURN (120° F)
DOMESTIC HOT WATER (120° F)
POTABLE DOMESTIC COLD WATER
TEE UP
PUMP
CONTINUATION BREAK
PIPE CAP
FLOW ARROW
ELBOW UP
TEE DOWN
ELBOW DOWN
EXPANSION COMPENSATOR
FLEXIBLE CONNECTION
AS
PRESSURE GAUGE WITH GAUGE COCK
TEMPERATURE/PRESSURE TEST PLUG
PIPE ANCHOR
THERMOMETER
PIPE GUIDE
UNION
VENTURI FLOW MEASURING DEVICE
PRESSURE REGULATING VALVE
AIR SEPARATOR
SAFETY RELIEF VALVE
STRAINER
S
THREE-WAY CONTROL VALVE
TWO-WAY CONTROL VALVE
CALIBRATED BALANCING SHUT-OFF VALVE & GPM SETTING
SOLENOID VALVE
PLUG VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
CIRCULATOR PUMP
WATER HAMMER ARRESTER
CLEANOUT IN HORIZONTAL RUN
FLOOR CLEANOUT FLUSH WITH FINISH FLOOR
CO
FCO
FLOOR DRAIN
ROOF DRAIN
GLOBE VALVE
ANGLE VALVE
PARTIAL PLAN / DETAIL MARKER
SECTION MARKER
CONCRETE THRUST BLOCK
TB
FD-#
WHA
RD-#
YARD CLEANOUT FLUSH IN GRASS OR PAVED AREAYCO
CP-#
HB
NFWH
CP-#
RISER TYPE: S:SANITARY/W:WASTE/V:VENT/CW:COLD WATER/HW:HOT WATER
RISER NUMBER
GREASE LADEN WASTE
PUMP DISCHARGE
ROOF HYDRANT (NON-FREEZE)NFRH
INDIRECT WASTE
OVERFLOW (SECONDARY) RAIN/STORM DRAIN
GPM
AREA DRAIN (STORM WATER)AD-#
CLEANOUT IN VERTICAL DROP EXPOSEDVCO
CLEANOUT IN VERTICAL DROP WITH EXTENSION THROUGH WALLWCO
FILTERED COLD WATER
LIMIT OF DEMOLITION
VACUUM
DOMESTIC HOT WATER RETURN (140° F)
DOMESTIC HOT WATER (140° F)
SIPHONIC RAIN/STORM DRAIN SYSTEM
ACID WASTE
ACID VENT
PIPE TRANSITION
AD ACCESS DOOR
ADA AMERICAN DISABILITY ACT
AFF ABOVE FINISH FLOOR
AMB AMBIENT
AMP AMPERE
AV ACID VENT
AW ACID WASTE
BLDG BUILDING
BOT BOTTOM
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CA COMPRESSED AIR
CAP CAPACITY
CD CONDENSATE DRAIN
CI CAST IRON
CLG CEILING
CO CLEAN OUT
CP CONDENSATE PUMP
CW COLD WATER
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DN DOWN
DWG DRAWING
E.C ELECTRICAL CONTRACTOR
EFF EFFICIENCY
EL ELEVATION
EQUIP EQUIPMENT
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
FC FLEXIBLE CONNECTION
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FT FEET
FPM FEET PER MINUTE
FS FLOOR SINK
G GAS
GAL GALLON
GC GENERAL CONTRACTOR
GR GREASE WASTE LINE
GPM GALLONS PER MINUTE
HB HOSE BIBB
HP HORSE POWER
HR HOUR
HT HEIGHT
HW HOT WATER
HWR HOT WATER RETURN
IN INCH
IN WC INCHES, WATER COLUMN
INV INVERT
KEC KITCHEN EQUIPMENT CONTRACTOR
L LENGTH
LB POUND
LF LINEAR FEET
LVR LOUVER
ABBREVIATIONS
EXISTING PIPING SYMBOLS
PLUMBING SYMBOLS GENERAL SYMBOLS
PLUMBING LINE TYPES
ETR EXISTING TO REMAIN
CW
HW
HWR
V
SPRK SPRINKLER
NOTE:
NOT ALL ABBREVIATIONS AND
SYMBOLS INDICATED MAY APPEAR ON
THESE CONTRACT DRAWINGS. THIS IS
FOR REFERENCE ONLY.
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTUH x 1000
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MIN MINIMUM
MTD MOUNTED
NC NORMALLY CLOSED
NFRH NON-FREEZE ROOF HYDRANT
NFWH NON-FREEZE WALL HYDRANT
NIC NOT IN CONTRACT
OC ON CENTER
P PUMP
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PLBG PLUMBING
PRES PRESSURE
PSIG POUNDS PER SQUARE INCH GAUGE
PVC POLYVINYL CHLORIDE
RD ROOF DRAIN
RH RELATIVE HUMIDITY
RM ROOM
RPM REVOLUTIONS PER MINUTES
RWC RAINWATER CONDUCTOR
SRWC SECONDARY ROOF DRAIN
SAN SANITARY
SD STORM DRAIN
SHT SHEET
SPEC SPECIFICATIONS
TEMP TEMPERATURE
TYP TYPICAL
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
V VENT
VTR VENT THROUGH ROOF
VCO VERTICAL CLEANOUT
W WASTE
WCO WALL CLEANOUT
WPD WATER PRESSURE DROP
WTR WATER
W/ WITH
W/O WITHOUT
LVT LUXURY VINYL TILE
1. UNLESS SPECIFICALLY NOTED OTHERWISE, THE ENTIRE PROJECT WORK SCOPE IS THE
RESPONSIBILITY OF THE PLUMBING CONTRACTOR.
2. PROVIDE COMPLETE AND WORKING SYSTEMS WITH ALL NECESSARY PERMITS AND
APPROVALS FROM AUTHORITIES HAVING JURISDICTION.
3. INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH CURRENT
ADOPTED I.P.C., ALL PERTINENT CODES, LAWS, ORDINANCES, REGULATIONS, AND
RESPECTIVE MANUFACTURER'S WRITTEN INSTRUCTIONS. IF A CONFLICT OCCURS, THE
MORE STRINGENT REQUIREMENT SHALL APPLY.
4. COORDINATE PLUMBING WORK WITH THE WORK OF ALL OTHER CONTRACTORS, OWNER,
AND STRUCTURAL AND ARCHITECTURAL FEATURES.
5. PLUMBING DRAWINGS ARE DIAGRAMMATIC IN NATURE AND FIELD VERIFICATION MUST BE
PERFORMED. FOLLOW THE DRAWINGS AS CLOSELY AS VERIFIED CONDITIONS PERMIT.
ACTUAL LINE LOCATIONS SHALL BE DETERMINED BY THE P.C. IN THE FIELD. HOWEVER, THE
PLUMBING CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION OF
ALL MATERIALS AND EQUIPMENT REQUIRED FOR A COMPLETE INSTALLATION WITHIN THE
INTENT AND MEANING OF THE CONTRACT DOCUMENTS.
6. THE PLUMBING CONTRACTOR SHALL ARRANGE THE PROGRESS OF HIS WORK SO AS TO
ADVANCE THE PROGRESS OF ALL TRADES AND SHALL COMPLETE THE ENTIRE
INSTALLATION AS SOON AS CONDITIONS OF THE PROJECT WILL PERMIT.
7. ALL ITEMS OF LABOR, MATERIAL, AND EQUIPMENT NOT SPECIFICALLY DESCRIBED HEREIN
NOR DETAILED ON THE DRAWINGS BUT INCIDENTAL TO OR NECESSARY FOR THE
COMPLETION OF THE WORK, SHALL BE CONSIDERED AS INCLUDED WITHOUT EXTRA COST.
UNLESS NOTED OTHERWISE, CONSTRUCTION MATERIAL AND EQUIPMENT REMOVED SHALL
BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE LEGALLY DISPOSED OF OFF THE
SITE.
8. PROVIDE NECESSARY EARTHWORK (EXCAVATION, BEDDING, BACKFILL, ETC.) TO PROPERLY
PITCH AND SUPPORT PIPING.
9. CHECK AND VERIFY ALL EXISTING CONDITIONS AT THE SITE, INCLUDING BUT NOT LIMITED
TO PIPE ROUTING, SIZES AND INVERTS; ROOM DIMENSIONS; FIXTURE / EQUIPMENT /
CASEWORK LOCATIONS, UNDERGROUND SERVICES AND UTILITIES.
FAILURE TO VISIT AND INSPECT THE EXISTING CONDITIONS SHALL NOT BE VALID REASON
FOR AUTHORIZATION OF A CHANGE ORDER. PLUMBING CONTRACTOR SHALL BE FULLY
RESPONSIBLE FOR ALL DAMAGES WHICH MAY OCCUR BY THE FAILURE TO PRECISELY
LOCATE AND PRESERVE / PROTECT EXISTING-TO-REMAIN INSTALLATIONS.
10. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE IN WRITING ALL MATERIALS,
EQUIPMENT, AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF
ACCEPTANCE BY OWNER.
11. THE PLUMBING CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER AS-BUILT
DRAWINGS OF HIS WORK SCOPE.
12. WHEN MAKING CONNECTION OF NEW SANITARY MAIN TO EXISTING BRANCH LINES, MATCH
EXISTING BRANCH PIPE SIZE, EXCEPT MINIMUM SIZE OF SANITARY PIPING BELOW GRADE
INSIDE BUILDING SHALL BE 2".
13. THE CONTRACTOR SHALL MAINTAIN A CLEAN AND SAFE WORK AREA AT ALL TIMES. SAFETY
PROCEDURES AND ENFORCEMENT THEREOF IS THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL CONFORM TO ALL OSHA STANDARDS.
14. CONTRACTOR SHALL PAY FOR AND OBTAIN ALL FEES, PERMITS AND INSPECTIONS.
15. EXCEPT WHERE OTHERWISE INDICATED, ALL CUTTING, EXCAVATION, FILL, AND PATCHING
REQUIRED FOR THE PLUMBING WORK SHALL BE BY THE PLUMBING CONTRACTOR.
16. DO NOT CUT STRUCTURAL MEMBERS.
17. SLOPE REPLACEMENT SANITARY PIPING TO MATCH PIPING BEING REPLACED SO THAT
REPLACEMENT PIPING MAY CONNECT TO EXISTING PIPING TO REMAIN.
18. PLUMBING CONTRACTOR IS REQUIRED TO NOTIFY FACILITY DIRECTOR NOT LESS THAN 3
DAYS PRIOR TO INTERRUPTION OF BUILDING SANITARY WASTE SERVICE. DO NOT PROCEED
WITH SERVICE INTERRUPTION WITHOUT FACILITY DIRECTOR'S WRITTEN PERMISSION.
19. PLUMBING CONTRACTOR IS REQUIRED TO NOTIFY FACILITY DIRECTOR NOT LESS THAN 3
DAYS PRIOR TO EXCAVATION OR DEMOLITION WORK WHEN USING POWERED EQUIPMENT
ON PUBLIC OR PRIVATE PROPERTY.
GENERAL NOTES:
DSGN:
JOB:
CHK:
DRAWN: APPRD:
DATE:
SCALE:
P MGR:
COPYRIGHT 2026
SHEET:
F
IL
E N
A M
E
AB
R E
V
IS
IO
N
S D
A T
E
A u to d e s k D o c s /1
.0
M e c h a n ic s b u rg H ig h
S c h o o l_ S a n it a ry
S e w e r/
M E
P
.0
M e c h a n ic s b u rg
H ig h
S c h o o l_
S a n it a ry
S e w e r_
R
.r v t
NO SCALE
P L
U M
B
IN
G I
N F
O R
M A
T
IO
N S
H E
E T
M E
C H
A N
IC
S
B U
R G
A R
E A
H
IG
H S
C H
O O
L S
E W
E R
R E
P L
A C
E M
E N
T
MBQ
MBQ5/22/2026
1034520.006
P0.0
JBL
JBL
M E
C H
A N
IC
S
B U
R G
A R
E A
S C
H O
O L
D
IS
T R
IC
T
S
O U
T H
B R
O A
D S
T R
E E
T M
E C
H A
N
IC
S B
U R
G
P A
PLUMBING DRAWING LIST
P0.0 PLUMBING INFORMATION SHEET
P1.0 FIRST FLOOR PLAN - UNIT C - SANITARY
P2.0 PLUMBING DETAILS AND SCHEDULES
KEY PLAN
PROJECT
AREA
AB
D
NORTH
C E
F G
H
2D ART LAB
C111
STORAGE
C146
STORAGE
C145
OFFICE
C106
CORRIDOR
C112
KILN
C108
CLAY STORAGE
C109
FINISHING
C144
CORRIDOR
C110
(E) FCO
IDF
C147
6" SAN
EX. 3" VTR
ELECTRICAL
C144A
NEW 4" SAN WITH
(2) 45 ELBOWSNEW
FCO1
EX 2"
SAN
EX 2"
V
CAP &
ABANDON
EX. 4" SAN
IN PLACE
2" SAN
NEW 4" SAN
BLW SLAB
NEW 4" SAN BLW
SLAB, CENTERED
IN CORRIDOR
EX SINK
EX SINK
EX 2"
SAN
EX 3"
SAN
S A
N
S
A N
S A
N
EX SINK
EX SINK
3"
S A
N
S
A N
NEW 4" SAN BLW
SLAB, CENTERED
IN CORRIDOR
NEW
FCO1 4"
DO NOT DISTURB EX 6" SAN MAIN
BURIED IN CORRIDOR C112
6" SAN
FLOOR:
POLISHED CONCRETE
FLOOR:
LVT ON CONCRETE
FLOOR:
POLISHED CONCRETE
EX FD
FLOOR:
LVT ON CONCRETE
CAP &
ABANDON
EX. 4" SAN
IN PLACE
CAP &
ABANDON
EX. 4" SAN
IN PLACE
APPROX OUTLINE OF
FLOORING REMOVAL,
SLAB CUT & TRENCHING.
EXACT EXTENTS AS REQ'D
BY VERIFIED CONDITIONS.
(TYPICAL)
3D ART LAB
C107
FLOOR:
POLISHED CONCRETE
NEW
FCO1
(2-WAY)
NEW
FCO1
(2-WAY)
NEW 4" SAN WITH
(2) 45 ELBOWS
PRODUCTION LAB
C143
FLOOR:
EPOXY RESIN ON CONCRETE
DSGN:
JOB:
CHK:
DRAWN: APPRD:
DATE:
SCALE:
P MGR:
COPYRIGHT 2026
SHEET:
F
IL
E N
A M
E
AB
R E
V
IS
IO
N
S D
A T
E
A u to d e s k D o c s /1
.0
M e c h a n ic s b u rg H ig h
S c h o o l_ S a n it a ry
S e w e r/
M E
P
.0
M e c h a n ic s b u rg
H ig h
S c h o o l_
S a n it a ry
S e w e r_
R
.r v t
1/8" = 1'-0"
F
IR
S T
F L
O O
R P
L A
N
U N
IT
C
S
A N
IT
A
R Y
M E
C H
A N
IC
S
B U
R G
A R
E A
H
IG
H S
C H
O O
L S
E W
E R
R E
P L
A C
E M
E N
T
MBQ
MBQ5/22/2026
1034520.006
P1.0
JBL
JBL
M E
C H
A N
IC
S
B U
R G
A R
E A
S C
H O
O L
D
IS
T R
IC
T
S
O U
T H
B R
O A
D S
T R
E E
T M
E C
H A
N
IC
S B
U R
G
P A
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - UNIT C - SANITARY1
AB
D
NORTH
C E
F G
H
PROJECT
AREA
GENERAL NOTES - THIS SHEET
(THIS DRAWING ONLY)
INDICATES PORTION OF EXISTING PIPING WHICH MUST BE REMOVED
TO ALLOW NEW INSTALLATIONS. COORDINATE EXACT EXTENT WITH
FIELD-VERIFIED CONDITIONS.
EXISTING PLUMBING SYSTEMS SHALL REMAIN INTACT AND FULLY
OPERATIONAL UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS.
GENERAL PROJECT SCOPE: REPLACE AN EXISTING UNDERSLAB SANITARY
MAIN WITH A NEW SANITARY MAIN WITH REVISED ROUTING, AND RECONNECT
EXISTING ACTIVE SANITARY BRANCHES TO THE NEW MAIN.
LOCATIONS, DIMENSIONS, SIZES INDICATED ON THE DRAWINGS ARE
APPROXIMATE ONLY. VERIFY ALL EXISTING CONDITIONS NECESSARY TO
PERFORM THE WORK SCOPE IN THE FIELD AND COORDINATE FINAL
INSTALLATION TO ACCOMMODATE FIELD-VERIFIED CONDITIONS.
NOTES BY SYMBOL: #
(THIS DRAWING ONLY)
1 VIF EXISTING UNDERSLAB SAN PIPING INTERSECTION; DEMOLISH
EX FCO & RECONFIGURE WITH NEW FCO & PIPING AS REQUIRED FOR
PROPER ACCESS FOR CLEANING.
VERIFY SERVICE OF EXISTING 2" BRANCH LINE. IF ACTIVE, RECONNECT
TO NEW SANITARY MAIN AS SHOWN. IF INACTIVE, CAP AND ABANDON IN
PLACE.
TWO SINKS IN 3D ART LAB ARE COLLECTED TO SINGLE CONNECTION TO
EX SANITARY MAIN. INTERCEPT COLLECTED WASTE BELOW SLAB AND
RECONNECT TO NEW SANITARY MAIN.
TWO SINKS IN 2D ART LAB AND ADDITIONAL FIXTURES UPSTREAM ARE
COLLECTED WITH 3" TO CONNECT TO EX SANITARY MAIN. INTERCEPT
3" COLLECTED SAN BELOW SLAB AND RECONNECT TO NEW SANITARY
MAIN.
CONNECT NEW 4" SAN MAIN TO EX. 4" SAN MAIN BELOW SLAB IN
CORRIDOR C112. DO NOT DISTURB AND PROTECT FROM DAMAGE THE
EXISTING 6" UNDERSLAB SANITARY MAIN ROUTING NEARBY.
FOR AREAS WITH EXISTING LUXURY VINYL TILE (LVT) INSTALLATION,
CONTRACTOR SHALL COORDINATE SCHOOL DISTRICT'S REMOVAL AND
REINSTALLATION OF EXISTING LVT. CONTRACTOR SHALL CUT
CONCRETE FLOOR SLAB (APPROXIMATE EXTENTS SHOWN WITH DASH-
DOT LINES), EXCAVATE NEW TRENCH, PROVIDE PIPE UNDERLAYMENT
AND SUPPORT, INSTALL PIPING, BACKFILL TRENCH, REPAIR CONCRETE
SLAB, PREPARE SLAB SURFACE PER FINISH / FINISH FLOORING
MANUFACTURER'S REQUIREMENTS. FOR AREAS WITH EXISTING
EXPOSED CONCRETE SLAB, CONTRACTOR SHALL PROVIDE CONCRETE
POLISH / FINISH TO MATCH EXISTING.
CONTRACTOR SHALL ARRANGE FOR THE MANUFACTURER TO REMOVE
THE EXISTING RESINOUS FLOORING / BASE (APPROXIMATE EXTENTS
SHOWN WITH DASH-DOT LINES). CONTRACTOR SHALL CUT CONCRETE
FLOOR SLAB, EXCAVATE NEW TRENCH, PROVIDE PIPE UNDERLAYMENT
AND SUPPORT, INSTALL PIPING, BACKFILL TRENCH, REPAIR CONCRETE
SLAB, PREPARE SLAB SURFACE PER FINISH / FINISH FLOORING
MANUFACTURER'S REQUIREMENTS, AND ARRANGE FOR THE FLOORING
MANUFACTURER TO PROVIDE NEW RESINOUS FLOORING / BASE.
EXISTING FINISHES / FINISH FLOORING SHALL BE MATCHED AS CLOSELY
AS POSSIBLE. MANUFACTURER SHALL PROVIDE PHYSICAL COLOR /
FLAKE SAMPLES TO OWNER FOR APPROVAL IF REQUESTED.
EXISTING RESINOUS FLOORING MANUFACTURER:
PALMA, INC.
GREG MANTON
628 RT 10W, UNITS 2/3
WHIPPANY, NJ 07981
PHONE: (973) 429-1490
FAX: (973) 429-2149
TO ACCOMMODATE CORRIDOR PLUMBING WORKSCOPE, CONTRACTOR
SHALL ARRANGE FOR THE MANUFACTURER TO REMOVE THE EXISTING
METAL / GLASS STOREFRONT / DOOR AND STORE IN A LOCATION
DESIGNATED BY THE SCHOOL DISTRICT. AFTER COMPLETION OF
PLUMBING WORK, SLAB AND FINISH FLOORING REPAIRS, ARRANGE FOR
THE STOREFRONT MANUFACTURER TO REINSTALL METAL / GLASS
STOREFRONT / DOORS.
EXISTING STOREFRONT MANUFACTURER:
ALUMAGLASS & GLAZE
SEAN WHELAN, PROJECT MANAGER
985 MT. ZION ROAD, SUITE 1
LEBANON, PA 17046
PHONE: (717) 454-0411
CELL: (717) 798-0743
swhelan@alumagg.biz
NOTES:
1. DRAINAGE AND CLEANOUT ITEMS SHALL BE BY MANUFACTURER NOTED, OR APPROVED EQUAL BY JAY R SMITH OR WATTS.
12"
IN NON-TRAFFIC
AREAS: ORIGINAL TRENCH
MATERIALS COMPACTED
IN 12" LAYERS MAX.
REMOVE ALL ORGANIC
MATERIAL AND STONES
LARGER THAN 8"
2A MOD STONE
COMPACTED IN
4" LAYERS
TRENCH WIDTH
AS REQUIRED
4" MIN TO
BARREL
UNDISTURBED
EARTH
CONCRETE
SLAB
FINISHED FLOOR
DIRECTION
OF FLOW
LONG SWEEP ELBOW AT END
OR TURN OF RUN
COMBINATION WYE AND EIGHTH
BEND IN RUN; REDUCING TYPE
IF REQ'D; ENTER TOP OF PIPE
D E
P T
H O
F S
E W
E R
A S
R E
Q U
IR
E
D F
O R
DIRECTION
OF FLOW
SANITARY SEWER PIPE
SAME SIZE AS
SEWER UP TO
4" MAXIMUM
(PIPE FITTINGS MAY VARY FROM THAT DEPICTED BASED ON PIPE MATERIAL
AND JOINING METHOD SPECIFIED.)
ROUND GASKETED NICKEL BRONZE ADJUSTABLE TOP WITH "CO" CAST IN
COVER. PROVIDE CLEANOUT TOP (HEAVY DUTY) WITH VARIATIONS
SUITABLE FOR FLOOR COVERING (MARKER FOR CARPET, RECESSED FOR
TILE, SCORIATED FOR UNFINISHED FLOORS). PROVIDE GASKETED PLASTIC
PLUG IN CAST IRON BODY. CLEAN THE TOP OF EXPOSED FCO AFTER
INSTALLATION. LOCATE AT BUILDING EXIT, AT ENDS OF RUNS, AT TURNS OF
PIPE GREATER THAN 45 DEGREES, AT 50' INTERVALS ON STRAIGHT RUNS,
AND WHERE SHOWN ON PLANS. LOCATE CLEANOUTS WITH 18" CLEAR
AROUND.
FINISHED FLOOR
DIRECTION
OF FLOW
LONG SWEEP TWO-WAY
CLEANOUT FITTING
D E
P T
H O
F S
E W
E R
A S
R E
Q U
IR
E
D F
O R
DIRECTION
OF FLOW
SANITARY SEWER PIPE
SAME SIZE AS
SEWER UP TO
4" MAXIMUM
(PIPE FITTINGS MAY VARY FROM THAT DEPICTED BASED ON PIPE MATERIAL
AND JOINING METHOD SPECIFIED.)
ROUND GASKETED NICKEL BRONZE ADJUSTABLE TOP WITH "CO" CAST IN
COVER. PROVIDE CLEANOUT TOP (HEAVY DUTY) WITH VARIATIONS
SUITABLE FOR FLOOR COVERING (MARKER FOR CARPET, RECESSED FOR
TILE, SCORIATED FOR UNFINISHED FLOORS). PROVIDE GASKETED PLASTIC
PLUG IN CAST IRON BODY. CLEAN THE TOP OF EXPOSED FCO AFTER
INSTALLATION. LOCATE WHERE SHOWN ON THE PLANS. LOCATE
CLEANOUTS WITH 18" CLEAR AROUND.
DSGN:
JOB:
CHK:
DRAWN: APPRD:
DATE:
SCALE:
P MGR:
COPYRIGHT 2026
SHEET:
F
IL
E N
A M
E
AB
R E
V
IS
IO
N
S D
A T
E
A u to d e s k D o c s /1
.0
M e c h a n ic s b u rg H ig h
S c h o o l_ S a n it a ry
S e w e r/
M E
P
.0
M e c h a n ic s b u rg
H ig h
S c h o o l_
S a n it a ry
S e w e r_
R
.r v t
NO SCALE
P L
U M
B
IN
G D
E T
A
IL
S A
N D
S C
H E
D U
L E
S
M E
C H
A N
IC
S
B U
R G
A R
E A
H
IG
H S
C H
O O
L S
E W
E R
R E
P L
A C
E M
E N
T
MBQ
MBQ5/22/2026
1034520.006
P2.0
JBL
JBL
M E
C H
A N
IC
S
B U
R G
A R
E A
S C
H O
O L
D
IS
T R
IC
T
S
O U
T H
B R
O A
D S
T R
E E
T M
E C
H A
N
IC
S B
U R
G
P A
SCALE:NO SCALE
SANITARY PIPE TRENCH DETAIL1
SCALE:NO SCALE
FLOOR CLEANOUT (FCO) DETAIL2
DRAIN AND CLEANOUT SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL
OUTLET OR
PIPE SIZE
STRAINER /
GRATE SIZE COMMENTS
FCO1 FLOOR CLEANOUT ZURN ZB1400-BZ1 4" - ABS PLUG; POLISHED BRONZE TOP (FLUSH WITH FINISHED FLOOR)
SCALE:NO SCALE
TWO-WAY FLOOR CLEANOUT (FCO) DETAIL3
| Sheets |
| P0.0 - PLUMBING INFORMATION SHEET |
| P1.0 - FIRST FLOOR PLAN - UNIT C - SANITARY |
| P2.0 - PLUMBING DETAILS AND SCHEDULES |
File details come from the government source that posted it. Updated .