This is a Scope of Work document issued by the State of Utah Division of Facilities Construction and Management (DFCM) for the Bear Lake Marina Expansion Project, managed by Whitaker Construction Company as CMGC with Kimley-Horn as the lead engineer. The project involves construction of two new buildings in Garden City, Utah: a Fee Station building containing a staff office and accessible unisex restroom, and a Restroom Building with men's and women's restrooms, multiple showers, janitor closet, and utility room. Bidders may submit either turn-key bids for complete construction of both buildings or individual trade-specific sub-quotes broken out by trade for each building. The prebid meeting is scheduled for June 2, 2026 at 10 AM, with sealed bids due June 11, 2026 at 5 PM. Award determination is targeted for June 30, 2026, with a Notice to Proceed and mobilization in Spring 2027 and anticipated substantial completion in Fall 2027. All work must comply with the 2021 Utah Building Code, DFCM standards, and applicable federal, state, and local regulations per the Permit Set of Construction Documents dated September 9, 2024 including Addendum 01.
Bidders must submit pricing for both buildings on the provided Excel Bid Schedule, with all lump sum prices including labor, materials, equipment, permits, and incidentals required to complete the scope. The general contractor is responsible for earthwork, sitework, surveying, temporary sanitary facilities, materials testing, building permits, temporary fencing, dumpster services, and erosion control, while subcontractors are responsible for temporary power and water, their own labor and materials, submittals, testing and commissioning, warranties, and trade-specific compliance. The State of Utah DFCM and Whitaker Construction reserve the right to reject any or all bids and accept bids deemed in the best interest of the project. Questions regarding the project should be directed to Cole Fronk at Whitaker Construction Company (cole.fronk@whitcon.com, 435-723-2921), and complete bid documents are available at whitcon.com under the Bid Opportunities tab.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-1-DA26049-Invitation to Bid-Bear Lake Marina Fee Station and Restroom.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEAR LAKE MARINA EXPANSION PROJECT
FEE STATION & RESTROOM BUILDING
SCOPE OF WORK
Garden City, Utah
Owner State of Utah Division of Facilities Construction and Management (DFCM)
CMGC Whitaker Construction Company
Lead Engineer Kimley-Horn
Location Garden City, UT 84028
Bid Date June 11, 2026
Anticipated Construction Start
Spring 2027
Contact for Questions
Cole Fronk, 435-723-2921
1. GENERAL PROJECT DESCRIPTION
The Bear Lake Marina Expansion Project involves construction of a new marina facility in Garden City, Utah. The overall project includes a new marina, site improvements, utilities, and associated infrastructure. The Fee Station and Restroom Building were deferred from the original project due to budget constraints; separate funding has since been secured and this work package is now being procured as a stand-alone bid.
This Bid Package is a stand-alone scope for the complete construction of two (2) new buildings:
• Bid Package BP-1 – Fee Station (small entry fee station building with office and unisex restroom)
• Bid Package BP-2 – Restroom Building (multi-user restroom building with men’s and women’s restrooms, showers, and support spaces)
Bidders must review the full Permit Set of Construction Documents (Cirque Studio Architects / Kimley-Horn, September 9, 2024, including Addendum 01) in their entirety. All work shall be performed in accordance with the 2021 Utah Building Code (2021 IBC with State of Utah Amendments), applicable DFCM standards, and all federal, state, and local regulations.
2. BID PACKAGE STRUCTURE
This work consists of TWO (2) separate bid packages covering the two buildings. Bids are being accepted either on a turn-key basis for complete construction of both packages or as individual building-trade bids. Bidders are required to submit pricing for both buildings. For each building, bidders shall provide either of the following:
1) Turn-Key (Complete) Bid:
a) A single lump sum price for all labor, materials, equipment, and incidentals to deliver the complete building ready for occupancy, including all trades.
2) Individual Trade Sub-Quotes:
a) Separate lump sum prices broken out by trade (see Bid Schedule) for both buildings.
3. GENERAL BID NOTES
Items provided by General Contractor
• All earthwork and sitework will be completed by the general contractor.
• All surveying by general contractor
• Temporary sanitary facilities by general contractor
• Materials testing by general contractor
• Building permits by general contractor
• Temporary fencing, barricades, and site safety controls
• Dumpster(s) / common trash removal for sitewide use
• Erosion control / SWPPP
Items provided by Subcontractor
• Temporary power and temporary water as required
• Labor, materials, tools, equipment, fasteners, and incidentals required for their trade
• Field verify dimensions and existing conditions before fabrication or installation
• Provide unloading, hoisting, and distribution of their own materials
• Provide trade-specific temporary protection of installed work
• Daily cleanup and removal of debris generated by their work
• Patch/repair damage caused by their work
• Coordination with other trades
• Sealants, closures, trims, and accessories required for a complete installation
• Submittals, shop drawings, product data, and samples for their scope
• Applicable testing, start-up, balancing, labeling, and commissioning support for their scope
• Warranties, O&M data, and closeout documents for their scope
• Compliance with permits, codes, and manufacturer installation requirements applicable to their trade
• Protection from weather for their own materials and work in progress
• Provision of lifts/scaffolding/small equipment needed for their own work
4. PROJECT SCHEDULE
Bid Advertisement
May 26th 2026
Prebid Date/Time
June 2nd at 10 AM
Bid Due Date June 11th at 5PM
Award Determination
June 30th 2026
Notice to Proceed / Mobilization Target
Spring 2027
Anticipated Substantial Completion
Fall 2027
5. GENERAL CONDITIONS & REQUIREMENTS
5.1 Sealed Bids
All bids shall be submitted at the time and place described in the bid advertisement. Bids submitted after the deadline will not be accepted. Bidders shall submit pricing for both buildings per the Bid Schedule provided.
5.2 Right to Reject Bids
The Owner State of Utah (DFCM) and Whitaker Construction CMAR reserve the right to reject any or all bids, to waive informalities, and to accept the bid(s) deemed to be in the best interest of the Project.
6. BID FORM
Bidders shall submit bids on the forms provided. A separate Bid Schedule (Excel format) is provided for each bid package. Bidders shall complete the following for both buildings on the Bid Schedule:
• Either a turn-key lump sum bid for complete construction of both packages or individual trade pricing per the Bid Schedule provided for both buildings
See the attached Excel Bid Schedule (Bear Lake Marina Fee Station & Restroom – Bid Schedule.xlsx) for the required bid form. All lump sum prices shall include all labor, materials, equipment, permits, and incidentals required to complete the described scope of work.
7. QUESTIONS & DOCUMENT AVAILABILITY
Questions regarding the project shall be directed in writing to:
Cole Fronk – Whitaker Construction Company
Email: cole.fronk@whitcon.com | Phone: 435-723-2921
Complete bid documents, including the full Permit Set of Construction Documents, are available at whitcon.com;
navigate to the Bid Opportunities tab.
| 1. GENERAL PROJECT DESCRIPTION |
| 2. BID PACKAGE STRUCTURE |
| 3. GENERAL BID NOTES |
| Items provided by General Contractor |
| Items provided by Subcontractor |
| 4. PROJECT SCHEDULE |
| 5. GENERAL CONDITIONS & REQUIREMENTS |
| 5.1 Sealed Bids |
| 5.2 Right to Reject Bids |
| 6. BID FORM |
| 7. QUESTIONS & DOCUMENT AVAILABILITY |