This is an Invitation to Bid issued by the State of Utah Division of Facilities Construction and Management (DFCM) through its Construction Manager/General Contractor, Whitaker Construction Company, for the construction of two new buildings at the Bear Lake Marina in Garden City, Utah. The project encompasses a new single-story fee station building containing a staff office and accessible unisex restroom, and a new single-story public restroom building with men's and women's restrooms, multiple showers, janitor closet, and utility room. These buildings were deferred from the original marina expansion project but have since secured separate funding. Sealed bids are due June 9, 2026 at 5:00 PM MST, with a prebid meeting scheduled for June 2, 2026 at 10:00 AM. Award determination is anticipated on or about June 30, 2026, with a Notice to Proceed in Spring 2027 and substantial completion targeted for Fall 2027. Bids must be submitted via email to Cole Fronk at cole.fronk@whitcon.com and may be submitted as either a Turn-Key Lump Sum price for complete building construction or individual trade sub-quotes by line item, or both.
Bidders are required to submit pricing for both buildings and must comply with the 2021 Utah Building Code, applicable DFCM standards, and all federal, state, and local requirements. The General Contractor excludes earthwork and sitework, surveying, temporary sanitary facilities, materials testing, building permits, temporary fencing, dumpsters, and erosion control/SWPPP from trade sub-quote pricing. Complete bid documents, including the full Permit Set of Construction Documents and Bid Schedule, are available at whitcon.com under the Bid Opportunities tab. Questions regarding the solicitation should be directed in writing to Cole Fronk at cole.fronk@whitcon.com or 435-723-2921. The State of Utah DFCM and Whitaker Construction Company reserve the right to reject any or all bids, waive informalities, and accept the bid(s) deemed to be in the best interest of the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2-DA26049-Scope of Work-Bear Lake Marina Fee Station and Restroom.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
Bear Lake Marina Expansion — Fee Station & Restroom Building
BIDS DUE: June 9, 2026 at 5:00 PM MST
Owner: State of Utah Division of Facilities Construction and Management (DFCM)
CMGC: Whitaker Construction Company
Lead Engineer: Kimley-Horn
Design Architect: Cirque Studio Architects
Project Location: Garden City, UT 84028
Bid Due Date: June 11, 2026 at 5:00 PM MST — Email to Cole Fronk
Award: On or about June 30, 2026
Anticipated Start: Spring 2027
Contact: Cole Fronk, Whitaker Construction | cole.fronk@whitcon.com | 435-723-2921
Bid Documents: whitcon.com — navigate to the Bid Opportunities tab
PROJECT DESCRIPTION
The State of Utah Division of Facilities Construction and Management (DFCM), through its Construction Manager/General Contractor (CMGC), Whitaker Construction Company, is soliciting sealed bids for the complete construction of two (2) new buildings at the new Bear Lake Marina in Garden City, Utah.
These buildings were deferred from the original marina expansion project; separate funding has since been secured and this work is now being procured as a stand-alone bid package.
Fee Station Restroom Building
New single-story entry fee station building containing a staff office and accessible unisex restroom.
New single-story public restroom building with men’s and women’s restrooms, multiple showers, janitor closet, and utility room.
BIDDING REQUIREMENTS
• Bidders are required to submit pricing for both buildings.
• For each building, bidders shall provide either a Turn-Key Lump Sum price for the complete building, or individual trade sub-quotes by line item — or both.
• All bids shall be emailed to Cole Fronk cole.fronk@whitcon.com at the time and place stated in the bid advertisement. Late bids will not be accepted.
• Note: Earthwork & sitework, surveying, temporary sanitary facilities, materials testing, building permits, temporary fencing, dumpsters, and erosion control/SWPPP are provided by the General Contractor and are excluded from trade sub-quote pricing.
• All work shall be performed in accordance with the 2021 Utah Building Code (2021 IBC with Utah Amendments), applicable DFCM standards, and all federal, state, and local requirements.
PROJECT SCHEDULE
Bid Advertisement May 26th, 2026
Prebid Meeting June 2nd, 2026 at 10 AM
Sealed Bid Due Date June 9, 2026 at 5:00 PM MST
Award Determination On or about June 30, 2026
Notice to Proceed Spring 2027
Substantial Completion Fall 2027
PREBID MEETING LINK
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzdhN2E4M2UtZWNlYy00YTY0LWI1ODktMDFjOGRiNWNkMGNh%40thread.v2/0?context=
%7b%22Tid%22%3a%2289ed9f6b-31c6-4cfc-a21c-82cb5fd3b5bb%22%2c%22Oid%22%3a%2274008113-a3a2-
45ae-ac7a-98dab27b59c9%22%7d
BID DOCUMENTS & QUESTIONS
Complete bid documents, including the full Permit Set of Construction Documents and Bid Schedule, are available at whitcon.com — navigate to the Bid Opportunities tab.
Questions shall be directed in writing to:
Cole Fronk- Whitaker Construction Company cole.fronk@whitcon.com | 435-723-2921
The State of Utah DFCM and Whitaker Construction Company reserve the right to reject any or all bids, to waive informalities, and to accept the bid(s) deemed to be in the best interest of the Project.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzdhN2E4M2UtZWNlYy00YTY0LWI1ODktMDFjOGRiNWNkMGNh%40thread.v2/0?context=%7b%22Tid%22%3a%2289ed9f6b-31c6-4cfc-a21c-82cb5fd3b5bb%22%2c%22Oid%22%3a%2274008113-a3a2-45ae-ac7a-98dab27b59c9%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzdhN2E4M2UtZWNlYy00YTY0LWI1ODktMDFjOGRiNWNkMGNh%40thread.v2/0?context=%7b%22Tid%22%3a%2289ed9f6b-31c6-4cfc-a21c-82cb5fd3b5bb%22%2c%22Oid%22%3a%2274008113-a3a2-45ae-ac7a-98dab27b59c9%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzdhN2E4M2UtZWNlYy00YTY0LWI1ODktMDFjOGRiNWNkMGNh%40thread.v2/0?context=%7b%22Tid%22%3a%2289ed9f6b-31c6-4cfc-a21c-82cb5fd3b5bb%22%2c%22Oid%22%3a%2274008113-a3a2-45ae-ac7a-98dab27b59c9%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzdhN2E4M2UtZWNlYy00YTY0LWI1ODktMDFjOGRiNWNkMGNh%40thread.v2/0?context=%7b%22Tid%22%3a%2289ed9f6b-31c6-4cfc-a21c-82cb5fd3b5bb%22%2c%22Oid%22%3a%2274008113-a3a2-45ae-ac7a-98dab27b59c9%22%7d