2-2-2026 WCSD EHS Field House Response Form.docx

DOCX document 19 KB Posted

Attached to
EHS Athletic Field House CMGC RFP
Solicitation number
WCSD-MH-008
Issued by
Washington County, Utah

About this file

This is a response form for the EHS Athletic Field House Construction Manager/General Contractor (CM/GC) Request for Proposal issued by the Washington County School District in Utah. The form is designed for qualified firms to submit competitive proposals for the construction management and general contracting services related to the athletic field house project. The response form establishes the framework through which interested contractors must formally respond to the RFP requirements, including documentation of qualifications, project approach, team composition, and other proposal components as specified by the district. The document appears to serve as the official submission template that bidders must complete and return to the Washington County School District by the established deadline to be considered for contract award.

The response form functions as an administrative tool to ensure all proposals are submitted in a standardized format, facilitating consistent evaluation across all bidders. The form likely includes sections for contractor information, proposed team members, relevant experience documentation, insurance and bonding information, and other standard proposal requirements. As a CM/GC selection process, the award will be made to the responsive and responsible vendor with the highest evaluation score in accordance with Utah procurement regulations. The contract is anticipated to result in a single award, and the form serves to structure the submission process and ensure compliance with all RFP specifications and state procurement requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Response Form #1 Athletic Field House at Enterprise High School

PROPOSAL BREAKDOWN

THE PROPOSAL BREAKDOWN MUST BE PROVIDED IN A SEPARATE SEALED ENVELOPE.

CM/GC Name:

Each line item must be filled out either numerically or indicate if item is to be bid with a not to exceed amount.

If a line item is included in the overall bid, then indicate on the line item “$0.00” or “Included in Bid.” No line items shall be left blank.

PRECONSTRUCTION WORK:

Design and Preconstruction Phase Services (Per Proposed Timeline Stated in RFP Paragraph K)

Monthly Rate: $__ ________ Total Months: Nine (9) Total:
$__________________________
Other Preconstruction Costs:_________
$
Grand TOTAL PRECONSTRUCTION WORK:
$

MONTHLY SUPERVISION FEES:

Project Manager (1 Person, Part-Time Administrative)
$
Project Superintendent(s)
$
Office Staff
$
Trailer and Supplies
$

Utilities:

Communication (Phones and Fax)

Electricity (Temporary Power Installation)
$
Electrical Panels (Temporary)
$
Water (Temporary Water Installation)
$
Portable Toilets
$
Mobilization / Demobilization
$
Construction Fencing & Barricades (Temporary)
$
Project Sign (8' x 8')
$

Insurance:

General Liability

Owners Protective Liability
$
Automotive
$
Workers’ Compensation
$
Clean-up (Including Dumpster)
$

Soils Testing & Special Inspections

By Owner

Fees and Permits
By Owner
Vehicle Costs
$
Building Layout, Survey, and Engineering
$
Construction Equipment
$
Small Tools / Consumables
$
Other Costs:
$
TOTAL MONTHLY SUPERVISION FEES:
$

BOND PREMIUMS:

Labor & Material Payment Bond (100% of Construction Costs -- $4,125,000.00)

Performance Bond (100% of Construction Costs -- $4,125,000.00)

CONSTRUCTION MANAGER FEE:

(4.0% of Construction Costs -- $4,125,000.00)

$165,000.00

TOTAL MONTHLY SUPERVISION FEES , BOND PREMIUMS, AND

CONSTRUCTION MANAGER FEE

Acknowledgement of Addenda, if any:

Addendum No. (Signature) Addendum No. (Signature) Addendum No. (Signature) Addendum No. (Signature) Addendum