2-03 Drawing Material Handlers.pdf

PDF 284 KB Posted

Attached to
Blackbridge Road Transfer Station Construction Project Procurement and Installation of Stationary Electric Material Handlers
Solicitation number
Not on record
Issued by
York County, Pennsylvania

About this file

This is a technical drawing document for the York County Solid Waste and Refuse Authority (YCSWA) Blackbridge Road Transfer Station Construction Project, prepared by Providence Engineering Corp. The project involves the procurement and installation of two (2) Stationary Electric Material Handlers (SEMH). Bids for this work will be received online via PennBid until 10:00 a.m. local time on Tuesday, March 10, 2026, with public opening and reading of bids at the YCSWA Management Center located at 2700 Blackbridge Road, York, PA 17406. Bidding documents became available at no cost through the PennBid Program beginning Monday, February 16, 2026. A non-mandatory pre-bid conference is scheduled for Tuesday, February 24, 2026, at 10:00 a.m. at the Management Center, with virtual attendance available upon request to Terry Simpson at tsimpson@armgroup.net. The technical drawings provide detailed specifications for the two SEMH units, including their placement on the tipping floor, electrical and hydraulic utility requirements, access platforms, railings, ladders, and anchor bolt installation details based on the assumed BuiltRite Model 2150-SE specification.

Bid security must be furnished in the form of a certified check or bid bond in an amount not less than 10% of the bid. The SEMH vendor/installer is responsible for supplying all procurement, installation, coordination, and utility requirements to the owner and contractors under the main project package. Final shop drawings and cut sheets for the purchased units must be provided to the engineer prior to construction commencement for review and approval. The vendor must coordinate trench pathways, utility locations, and anchor bolt specifications with the general contractor and engineer, with all clear space and installation requirements to be verified prior to the start of construction. Questions regarding the bidding documents must be submitted through the PennBid Program, with no telephone inquiries accepted and an established RFI deadline provided on the platform.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J KF G H

10'-8"

ELECTRIC / IT

SPRINKLER

ROOM

20'-0" 20'-0" 20'-0"

STAIR

ST-1

OPEN

STATIONARY ELECTRIC

MATERIAL HANDLER, SEE

NOTE 1

36" HIGH CONCRETE BACK

WALL BY GC. SEE MAIN

PROJECT PACKAGE, TYP.

OPEN

OPEN

OPEN

PIT DEFLECTOR

EL. = (+0'-0")

FINISH FLOOR

'-0

'-0

'-0

DN

DN

EQUIPMENT

ROOM

STATIONARY ELECTRIC

MATERIAL HANDLER,

SEE NOTE 1

'-0

'-0

'-0

'-0

TIPPING FLOOR

APPROXIMATE PATH OF TRENCH

FOR STATIONARY ELECTRIC

MATERIAL HANDLER UTILITIES -

SEE DETAIL A/SMH01, TYP.

SEMH01

SEMH01

REMOTE POWER UNITS FOR

STATIONARY MATERIAL

HANDLER UNITS TO BE

LOCATED IN THIS ROOM

PLAN NOTES

1. PROCURE AND INSTALL STATIONARY ELECTRIC MATERIAL HANDLERS (SEMH). SEMH VENDOR/INSTALLER TO SUPPLY ALL REQUIREMENTS AND COORDINATION ITEMS TO THE OWNER AND CONTRACTORS UNDER THE MAIN

PROJECT PACKAGE. SEE SEMH SPECIFICATION SECTION FOR ADDITIONAL INFORMATION.

2. REFERENCE THE MAIN PROJECT BID PACKAGE FOR ADDITIONAL INFORMATION: BUILDING, STRUCTURAL, ELECTRICAL, ETC.

HYDRAULIC AND ELECTRIC

UTILITIES, BY STATIONARY

ELECTRIC MATERIAL

HANDLER VENDOR

6" MAX. CLEAR - VERIFY

WITH STATIONARY ELECTRIC

MATERIAL HANDLER PRIOR TO

THE START OF CONSTRUCTION

1'-5" MAX. - VERIFY WITH

STATIONARY ELECTRIC

MATERIAL HANDLER

PRIOR TO THE START OF

CONSTRUCTION

SEE MAIN PROJECT DOCUMENTS

FOR INFORMATION NOT CALLED OUT

2" 10" 10" 10" 10" 2"

3'-8"

2"

2"

3' -8

(16) 1 1/4" DIA. A193 GRADE B7

ANCHOR BOLTS WITH DOUBLE

A194 GRADE 2H HEAVY HEX

NUTS TOP AND BOTTOM,

ASSUMED, COORDINATE WITH

FINAL STATIONARY ELECTRIC

MATERIAL HANDLER SHOP

DRAWINGS

PLATE PER STATIONARY ELECTRIC

HANDLER MANUFACTURER

PLATE CENTERLINE

PLATE CENTERLINE

FINISH FLOOR

EL. = (SEE PLAN)

B O

LT

P

R O

JE

C

T

IO

N 7"

A N

C H

O R

E M

B E

D M

E N

T

2' -4

A

N C

H O

R B

O

LT

1' -6

1 1/2" HIGH STRENGTH NON-SHRINK

GROUT PER STATIONARY ELECTRIC

MATERIAL HANDLER MANUFACTURER'S

RECOMMENDATIONS

ANCHOR BOLT - SEE DETAIL F/S401

FOR ADDITIONAL INFORMATION

PLATE PER STATIONARY ELECTRIC

MATERIAL HANDLER MANUFACTURER

STATIONARY ELECTRIC MATERIAL

HANDLER

CENTERLINE OF CONCRETE BEAM AND

STATIONARY ELECTRIC MATERIAL HANDLER

SEE MAIN PROJECT DOCUMENTS

FOR INFORMATION NOT CALLED OUT

FINISH FLOOR EL.

EL. = (0'-0")

2 3 4 5 6 7

PIT FLOOR

EL. = (-18'-6")

PIT

EL. = (-22'-0")

TIPPING FLOOR

PIT

STATIONARY ELECTRIC

MATERIALHANDLER (SEMH) -

SEE PLAN, TYP. (2)

SEMH TO INCLUDE ACCESS

PLATFORM, RAILING AND

LADDER FROM FLOOR

BEHIND WALL

SEMH ELEMENTS MUST

CLEAR ADJACENT

CONCRETE WALLS, TYP.

FINISH FLOOR EL.

EL. = (0'-0")

PIT FLOOR

EL. = (-18'-6")

PIT

EL. = (-22'-0")

JF G H

EAVE

EL. = (36'-0")

PIT

STATIONARY ELECTRIC

MATERIAL HANDLER

(SEMH) - SEE PLAN, TYP. (2)

TIPPING FLOOR

SEMH TO INCLUDE ACCESS

PLATFORM, RAILING AND

LADDER FROM FLOOR

BEHIND WALL

Phone: 717-509-7000 Lancaster, PA 17603

10 Eisenhower Boulevard

DRAWN BY:

CHECKED BY:

DATE

SCALE:

JOB NO.:

SHEET:

REVISION -

C op yr ig ht

N ot ic e, P ro vi de nc e

En gi ne er in g

Al l R ig ht s

Re se rv ed

. T he se p la ns a re th e pr op er ty o f P ro vi de nc e En gi ne er in g Co rp . A ny u se o r r ep ro du ct io n of th es e pl an s, in w ho le o r i n pa rt

, w ith ou t p er m is si on o f P ro vi de nc e

En gi ne er in g

Co rp

. i s ill eg al , f or bi dd en

. F ur th er a ny pa rt y th at w ou ld d o su ch is d oi ng a t s ol e ris k.

AS NOTED

Certificate Number: 3869

02/16/26

SEMH01

231718

JAH/BIF

KDL

S T

A T

IO

N

A R

Y E

L E

C T

R

IC

M A

T E

R

IA

L H

A N

D L E

R S

S

E M

H

B L A

C K

B R

ID

G

E R

O A

D Y

O R

K T

R A

N S

F E

R S

T A

T

IO

N

B L A

C K

B R

ID

G

E R

O A

D

W E

S T

G O

V E

N O

R R

O A

D P

.O

B O

X

A R

M G

R O

U P

H E

R S

H E

Y P

A

Y O

R K

C O

U N

T Y

S O

L

ID

W A

S T

E A

N D

R E

F U

S E

A U

T H

O R

IT

Y

Y O

R K

P

A

P R

E L

IM

IN

A R

Y

IS

S

U E

D F

O R

B

ID

D

IN

G O

N L

Y

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E V

IS

IO

N D

A T

E B

Y

IS

S U

E D

F O

R S

M H

B

ID

D

IN

G

/1

/2

JA

H /B

IF

N O R

THSCALE: 1/8" = 1'-0"

PARTIAL TIPPING FLOOR PLAN

STATIONARY ELECTRIC MATERIAL HANDLER NOTES FOR DETAILS F/S401

AND G/S401

1. INFORMATION SHOWN IS ASSUMED BASED ON BUILTRITE STATIONARY

ELECTRIC MATERIAL HANDLER MODEL 2150-SE.

2. FINAL CUT SHEETS FOR THE PURCHASED UNIT TO BE PROVIDED TO

THE ENGINEER PRIOR TO THE START OF CONSTRUCTION FOR

REVIEW. FOLLOWING REVIEW, DETAILS SHOWN MAY REQUIRE

REVISION.

3. STATIONARY ELECTRIC MATERIAL HANDLER MANUFACTURER TO

PROVIDE ANCHOR BOLT SIZE, GRADE, AND PROJECTION

REQUIREMENTS TO THE G.C.

4. STATIONARY ELECTRIC MATERIAL HANDLER MANUFACTURER TO

SUPPLY ANCHOR BOLT TEMPLATE TO G.C. FOR THEIR USE.

5. STATIONARY ELECTRIC MATERIAL HANDLER TO BE SOURCED AND

INSTALLED UNDER THIS BID PACKAGE.

NO SCALESEMH01

A

STATIONARY ELECTRIC MATERIAL

HANDLER TRENCH

NO SCALESEMH01

B

STATIONARY ELECTRIC MATERIAL

HANDLER PLATE

NO SCALESEMH01

C

STATIONARY ELECTRIC MATERIAL

HANDLER

SECTION

SEMH01 SCALE: 1/8" = 1'-0"

SECTION

SEMH01 SCALE: 1/8" = 1'-0"

Sheets
SEMH01 - STATIONARY ELECTRIC MATERIAL HANDLERS (SEMH)

File details come from the government source that posted it. Updated .