QUESTIONS AND ANSWERS NO 1.docx
DOCX document 16 KB Posted
- Attached to
- Boiler upgrade U. S. Embassy Madrid, Spain
- Solicitation number
- 19SP5026Q0012Questionsandanswers
- Issued by
-
Department of State US Embassy Madrid
About this file
This is a Questions and Answers document (No. 1) for Solicitation 19SP5026Q0012, a boiler upgrade project at the U.S. Embassy Madrid, Spain, issued by the Department of State.
The document addresses clarification regarding the existing heating system at the embassy facility. The current system consists of two boiler types in a closed-loop configuration serving heating and domestic hot water loads: three natural gas boilers, each approximately 575 kW (totaling 1,725 kW capacity), and one diesel backup boiler of approximately 1,200 kW capacity. This Q&A document provides prospective contractors with technical details about the existing system infrastructure necessary for developing upgrade proposals in response to the solicitation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS NO. 1 – SOLICITATION 19SP5026Q0012
Question no. 1 Could please share some more information about your system?
1. Load demand:
1. boiler use (hydronic, domestic, steam, etc)
1. closed loop or open loop
1. fuel type
Answer no. 1 The system consists of two boilers: one diesel and one natural gas. The system provides heating and domestic hot water in a closed-loop configuration.
· Three natural gas boilers of approximately 575 kW each provide a total of 1,725 kW
· One diesel boiler (backup) of approximately 1,200 kW
File details come from the government source that posted it. Updated .