This is a cost breakdown template for a federal construction project involving ceiling replacement and office renovation work at the US Embassy Madrid Chancery Building. The document outlines three separate Contract Line Items (CLINs) with detailed scope items and quantities for measuring and estimating costs.

CLIN 1 encompasses 63 square meters of work including demolition of false ceilings with plaster and existing luminaires, removal and reinstallation of installations, furniture relocation, removal of Armstrong Sahara 60x60 cm false ceiling panels, installation of LED screens (20 units), painting of vertical walls with two coats of RAL 9010 washable plastic paint covering 112 square meters, and ancillary services such as waste management and safety/security measures. CLIN 2 represents the largest scope at 684 square meters of false ceiling demolition, includes supply and installation of 684 square meters of Armstrong Sahara false ceiling, adaptation of electrical installations to double lighting points (138 units), formation of 300 linear meters of partition walls, installation of 138 LED screens, creation of 100 linear meters of masonry ruts, smoothing and painting of 321 square meters of vertical walls, supply and installation of 9 new doors, and 125 linear meters of baseboard installation. CLIN 3 covers 30 square meters of false ceiling work with similar scope elements including demolition, supply and installation of Armstrong Sahara ceiling, electrical adaptation for 15 light points, 30 linear meters of partitions, 15 LED screen installations, 30 linear meters of masonry ruts, and painting/finishing of 70 square meters of wall space and 70 linear meters of baseboard. All measurements are noted as estimates with offerors responsible for independent verification.

View the file

Other files

File Type Posted
Amendment 1.docx DOCX document
Attachment 8 Drawings V1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 All measurements included here are estimates. Each Offeror is responsible for taking its own measurements.

Presupuesto
CódigoUdItemMesCanPresPres
CLIN 1 : TSS RELOCATION
1.01udCover of all area1
1.02m2Demolition of false ceiling with plaster including disconnection and removal of existing screen-type luminaires, PCI , exhaust grills.63
1.03paRemoval of installations in the affected area and reinstallation once works are finished.1
1.04paRemoval of furniture.1
1.05m2Removal of false ceiling type Armstrong Sahara 60x60 cm or similar Auxiliary anchors included. Fully assembled.63
1.06m2Installation of retired false ceiling type Armstrong Sahara 60x60 cm Auxiliary anchors included. Fully assembled.63
1.07udInstallation of LED screens 60x60 series according to the technical specifications provided by the Embassy in false ceiling type Armstrong 60x60.20
1.08m2Supply of paint and application of 2 coats of plastic paint washable on vertical walls inside the offices. RAL 9010.112
1.09paRemoval and relocation of heavy furniture inside the office itself, in order to smooth and paint. Includes protection.1
1.1PAReinstallation of disconnected installation.1
1.11paWaste mangement.1
1.12paSafety and security.1
1.13paMiscellaneous.1
CLIN2
1.01udProtection of all working area1
1.02m2Demolition of false ceiling with plaster including disconnection and removal of existing screen-type luminaires, PCI , exhaust grills.684
1.03paRemoval of installations in the affected area and reinstallation once works are finished.1
1.04paRemoval furniture1
1.05paRemoval baseboard and doors1
1.06m2Supply and installation of false ceiling type Armstrong Sahara 60x60 cm or similar Auxiliary anchors included. Fully assembled.684
1.07udAdapt the current electrical installation to double the current points of light.138
1.08mlFormation of partition of h=40 cm in false ceiling type Armstrong 60x60 Sahara or similar.300
1.09udSupply and installation of LED screens 60x60 series according to the technical specifications provided by the Embassy in false ceiling type Armstrong 60x60.138
1.1mlCreation of masonry ruts to hide current installations. Includes demolition, removal of debris, and plastering prior to painting work100
1.11m2Smoothing of the vertical walls inside the offices.321
1.12m2Supply and application of 2 coats of plastic paint washable on the vertical walls inside the offices. RAL 9010.321
1.13m2Supply and installation of new doors9
1.14mlSupply and installation baseboard125
1.15PAReinstallation of installation disconnected1
1.16paRemoval and relocation of heavy furniture inside the office itself, in order to smooth and paint. Includes protection.1
1.17paWaste mangement.1
1.18paSafety and security.1
1.19paMiscellaneous.1
CLIN3
1.01udCover of all area1
1.02m2Demolition of false ceiling with plaster including disconnection and removal of existing screen-type luminaires, PCI , exhaust grills.30
1.03paRemoval of installations in the affected area and reinstallation once works are finished.1
1.04paRemoval furniture inside the office itself, in order to smooth and paint. Includes protection.1
1.05paRemoval baseboard.1
1.06m2Supply and installation of false ceiling type Armstrong Sahara 60x60 cm or similar Auxiliary anchors included. Fully assembled.30
1.07udAdapt the current electrical installation to double the existing points of light.15
1.08mlFormation of partition of h=40 cm in false ceiling type Armstrong 60x60 Sahara or similar.30
1.09udSupply and installation of LED screens 60x60 series according to the technical specifications provided by the Embassy in false ceiling type Armstrong 60x60.15
1.1mlCreation of masonry ruts to hide the current installations. Includes demolition, removal of debris, and plastering prior to painting work30
1.11m2Smoothing of vertical walls inside the offices.70
1.12m2Supply of paint and application of 2 coats of plastic paint washable on vertical walls inside the offices. RAL 9010.70
1.13mlSupply and installation baseboard.70
1.14PAReinstallation of disconnected installation.1
1.15paRemoval and relocation of heavy furniture inside the office itself, in order to smooth and paint. Includes protection.1
1.16paWaste mangement.1
1.17paSafety and security.1
1.18paMiscellaneous.1