24Q0025 - Questions and Answers.pdf
PDF 342 KB Posted
- Attached to
- CDC - NEW OFFICE RENOVATION 2024FAC001 Federal contract opportunity
- Solicitation number
- 19PM0724Q0025
- Issued by
- Department of State
About this file
This document is a set of Questions and Answers (Q&A) related to a federal contract opportunity for a renovation project at a Center for Disease Control (CDC) office space in Panama City.
The key details are:
- The project requires demolition, HVAC installation, electrical work, data/telecom infrastructure, ceiling and lighting upgrades, and new carpet installation for a reconfigured office suite.
- Clarifications were provided on the scope of work, including the ability to disassemble HVAC equipment for removal, the responsibility for furnishing and installing ductwork, and the government's provision of carpet and adhesive.
- Updated details were provided on the VAV system, electric panel specifications, and related mechanical drawings.
- The contract is being awarded on an initial proposal basis, without discussions, to the responsible company submitting the lowest acceptable offer.
- Proposals are due by March 22, 2024 at 12:00pm local time, and must be submitted electronically in the specified format.
- Offerors must be registered in the System for Award Management (SAM) database prior to submitting a proposal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 24Q0025 - SF30 Amendment 0001.pdf | ||
| 24Q0025 - SF1442 Cover Page.pdf | ||
| ATTACHMENT 1 - SF25 - PERFORMANCE AND GUARANTY BOND.pdf | ||
| ATTACHMENT 2 - SF 25A - PAYMENT BOND.pdf | ||
| 24Q0025 - Invitation letter.pdf | ||
| ATTACHMENT 5 - DRAWINGS.pdf | ||
| 24Q0025 - ATTACHMENT TO SF1442 - CDC - NEW OFFICE RENOVATION 2024FAC001.pdf | ||
| ATTACHMENT 6 - SPECIFICATIONS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers (Q&A)
1. What is the magnitude of the Project?
Answer: Please refer to Section J, paragraph D. MAGNITUDE OF CONSTRUCTION
2. Section 2.1. Demolition / 2.1.9. Remove existing Air Handling Unit.
Question: In the scope of works indicated we have to consider using a crane or other lifting equipment to safely remove the unit from the building and transport it to a disposal site. In the site visit we understood we can disarm in parts the HVAC existing equipment; can you clarify this?
Answer: The Equipment consist in modules assembled in one structure, to assure the mobilization inside the building, the government accept the contractor separate the system through the modules assembly joints. But the contractor is responsible to re-assembly the equipment modules once the equipment is outside the building.
3. Section 2.3. Installation of new HVAC Ducting:
Question: In the site visit we understood we only consider new ventilation ducts for the
VAV Box inside the Room 165 and the government shall furnish the duct ventilation for the main branch duct in the hallway to the 165 room, is that correct?
Answer: The Contractor is responsible to furnish and install the main metal duct branch and distribution branches, from the existing duct up to the diffusers.
4. Section 2.7 Ceiling installations
Question: in the site visit we understood we have to reuse the existing frame for the ceiling the Government shall furnish, or we have to consider a new frame?
Answer: the contractor is responsible to remove and rearrange the ceiling structure, if in the removal process and reinstallation the structure is affected, the contractor shall replace with equivalent beam structure. The Government will not provide the replacement. These structures are not common in the country so the contractor will have to get them with the correct specifications (SI units – mm) as the SOW specified.
5. Section 2.8 Carpet
Question: the adhesive for the carpet, there is any specifications and if must be VOC
Answer: the Government will provide carpet, glue and the glued process guidance.
6. Please confirm VAVs measures and capacity?
Answer:
• We have updated the VAV and diffuser chart with all the measurements. Please refer to the new attachment: PROPOSE CDC mar24-PAGE 4 - MECHANICAL
PLANS V3.1.
• Therefore, we provided new details for connections and hanging supports for flexible ducts to diffusers.
• Note that the 165 VAV system, has been changed from a round duct to a square duct with dampers on each flexible outlet. Please follow the new flexible duct connection and hanging support detail.
7. Please confirm electric panel model and capacity.
Answer:
• ELECTRIC PANEL NLR/11B:
o Catalog Number: P1C42FX225CTS o Panel Type 1 o System: 208Y/120 / 3Ph o 250 amps Max
• Breaker Specification o Type: BQD o Siemens o Surge Suppression Incorporated: 888-987-TVSS