This document is a Request for Information (RFI) for RFQ 19MX5325Q0028, detailing questions and answers from a site visit and pre-proposal conference for a tents and flooring rental project at the U.S. Embassy in Mexico City. The RFI covers critical project details including work dates (June 16-24, 2025), personnel requirements (minimum 3 workers onsite), equipment specifications, and logistical arrangements. Key clarifications include confirmation of exterior tent removal on the event day, approval of raised access flooring instead of plywood modules, and specification of water tank requirements (4 x 2,500-liter empty tanks).
Significant technical details address safety procedures, electrical connections, staging areas, and tent configuration. The embassy confirmed that permits for sidewalk and driveway closure will be handled by embassy personnel, and provided guidance on flooring color options (blue-grey, black, or natural wood). Some work statement items (Items #16 and #17) were eliminated from the solicitation. The document emphasizes flexibility, with many confirmations noted as "not limited" to the specific details discussed, indicating potential for adjustments during the project implementation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Safety Plan - FAC.docx | DOCX document | |
| Amendment 0001 19MX5325Q0028.pdf | ||
| 19MX5325Q0028 F.pdf | ||
| OL RFQ 19MX5325Q0028 MEX-4 July Tents FY-25.pdf | ||
| 19MX5325Q0028 F.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Embassy Mexico City General Services Office / Procurement Paseo de la Reforma No. 305 Cuauhtemoc 06500 Ciudad de Mexico
RFQ 19MX5325Q0028
MexicoCityGSOSolicitations@groups.state.gov
Questions / Request For Information (RFI)
Per the Site Visit and Pre-Proposal Conference on Tuesday, April 29, 2025, at 12:00 pm (Local Time - Mexico City) at Avenida Paseo de la Reforma No. 2414, Colonia Lomas Altas, there were many questions asked by the attendees, and responses were provided by the Foreign Service General Services Officer. However, confirmation in writing is best to prevent any misunderstanding. Please see below list of request for information:
1. It was mentioned that a plan of action is required in case any safe issues arise.
Please advise on any specific details or requirements are needed in the plan of action to ensure compliance with the embassy.
R: Is implied in the safety plan EMERGENCY PROCEDURES / ACCIDENT RESPONSE
2. It was mentioned that a 100-meter extension cord can be used for any power tool usage and will be plugged into the security guard building. Please advise if the extension cord will need to be a GFCI (Ground Fault Circuit Interrupter).
R: No. We will make the appropriate connection to our electrical protected panel.
3. There was an SBU - Infrastructure drawing sheet provided by the embassy personnel, depicting the areas where the work will be performed. Is it possible to number each statement or scope of work on the drawing sheet to limit confusion?
R: No. as this information is SBU we cannot provide additional information, but you can find and base your quote on the SOW/CLIN (line items).
4. Please provide any photos that may be useful to limit any misinterpretation, if possible.
R: Sorry but pictures are SBU classified too.
5. Please confirm there will need to be a maximum of 3 workers of the contracting company onsite during the day(s) of the event.
R: Minimum 3 but not limited to having additional personal covering for the event.
mailto:MexicoCityGSOSolicitations@groups.state.gov
6. Please confirm the start date of work will be June 16, 2025.
R: Confirmed but not limited for any change.
7. Please confirm the end date of work will be June 24, 2025.
R: Confirmed but not limited for any change.
8. In the RFQ, page 7, under section #1-General, in the 2nd bullet point paragraph, it mentions the “disassembly, removal and pickup day” will be after June 26, 2025, which is the date of the event. Please confirm “disassembly, removal and pickup day” will be on June 27, 2025.
R: Exterior (street) tents should be removed on the same day as the event (afterwards) and start the full removal one day after the event.
9. Please provide the preferred color of the flooring finish.
R: As mentioned in the site visit is to be defined but there are some optional options: Blue grey, black or natural wood floor, but not limited to be defined to the awarded.
10. Please confirm there will be a construction staging area for materials that will be used within a 24-to-48-hour period. (For example, if an order of 50 plywood takes 2 days to install, is it possible to leave it onsite in a designated area)
R: Confirmed. 24 hours before.
11. Work Statement (Item #1 and Item #2) - Please confirm any permits required to close the sidewalk and the driveway approach on the day of the event will be handled by the embassy personnel.
R: Confirmed.
12. Work Statement (Item #4) - Please confirm the Waiters Service tent will require a curtain between the Patio area tent mentioned in Item #3.
R: Yes, should be considered. Also, all perimetral tented areas should have lifted-rolled curtains, this is if the day of the event it rains.
13. Work Statement (Item #10 and Item #11) - Water tanks will have holes drilled for pipe connections. This work will be performed by embassy personnel or by others.
R: Yes, it is not part of your activities.
14. Work Statement (Item #10 and Item #11) - Please confirm water tanks are not to be removed from the property after the event.
R: Should remain until the full equipment and tents are removed.
15. Work Statement (Item #11) - Please confirm a total of (4) - 2,500 liters capacity, empty water tanks will be required.
16. Work Statement (Item #12) - Please confirm raised access flooring can be utilized in lieu of a structural module consisting of plywood.
17. Work Statement (Item #14) - Please confirm raised access flooring can be utilized in lieu of a structural module consisting of plywood.
18. Work Statement (Item #16) - Please confirm this statement/scope of work is eliminated from the solicitation.
19. Work Statement (Item #17) - Please confirm this statement/scope of work is eliminated from the solicitation.