SOW Production Services 2024.pdf
PDF 192 KB Posted
- Attached to
- Production for event in June 27, 2024
- Solicitation number
- 19MX5324Q0028
- Issued by
-
Department of State US Embassy Mexico
About this file
This document is a Statement of Work (SOW) for production services required by the U.S. Embassy in Mexico City for a 4th of July event on June 27, 2024. The Contractor shall provide production logistics services including audio, lighting, staging, pipe and drape, and video equipment and technicians. The firm-fixed-price contract requires the Contractor to have all necessary equipment and personnel to perform the services at the specified location. Key requirements include: 1 audio console, 8 line-array speaker systems, 4 subwoofers, 6 floor monitors, 2 wired and 6 wireless microphones, and 1 audio technician; 1 lighting console, 40 LED lights, 40 Par cans, 2 power centers, 1 dimmer rack, and 1 lighting technician; a 6m x 10m main stage, a 1.22m x 2.44m Marine stage, four 1.22m x 2.44m press stages, and a 3.66m x 3.66m music band stage; pipe and drape elements for various areas; and a 10m x 2.5m LED screen, three 80-inch LCD screens, 2 cameras, 1 video technician, and 2 camera operators. The Contractor must designate a point of contact to manage the project. A site visit is scheduled for April 9, 2024, and proposals are due by April 18, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Production 4OJ 2024 -Site Visit (002).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PRODUCTION SERVICES FOR 4OJ 2024
I. Scope of Services
A. The Contractor shall provide to the US Embassy Mexico City: Production Logistics Services for the 4th of July Event, which will be celebrated on June 27, 2024 in Lomas de Chapultepec CDMX, in accordance with the specifications, terms and conditions set forth herein.
B. This is a firm-fixed price type of purchase order.
C. The prices listed below shall include all labor, materials, overhead, profit, and transportation necessary to produce, develop, organize, and manage the logistics for audio setup, lighting, pipe and drape setup and video camera, on the date and to the location stated in paragraph IV, Delivery Instructions.
D. The selected Contractor shall have the complete elements to produce, develop, organize, and take care of the logistics for Audio, Lighting, Pipe & Drape, Video Camera, and Banner Printing setup, details below:
a) Audio
• 1 – Audio Console
• 8 – Linear active stack systems TTL33 to RCF
• 4 – Active Subwoofers TTS-56 RCF
• 6 – Floor Monitors
• 2 – Wired microphones (for podium)
• 6 – Wireless Microphones
• 8 – Active cabinets NMX 15 RCF (placed around the reception area)
• Wiring and plugs as needed
• 1 – Operator/Technician
b) Lighting
• 1 – Pearl console Titan mobile
• 40 – Leekos 26 grade
• 40 – PAR Cans
• 2 – Power center (Generators) – main and back-up
• 1 – Rack Dimmers
• Wiring and plugs as needed
• 15 – 12in x 12in x 10ft in standing position with floor plates. One on each corner and two in the middle in line with hanging truss.
• 2 – 20ft hanging truss; for hanging from tent.
• 1 – Operator/Technician
• Temporary structures as needed (rigging), for all the lighting – including technicians.
Notes: Standard or LED Parcans are acceptable. A range of Leko lenses can be used, not just 16s.
c) Stages
• 1 – Main Stage – 6 meters (width), 10 meters (length), 1.00 meter (height) with 2 handrails (side and front)
• 1 – Marines stage – 1.22 meters (width), 2.44 meters (length), 0.30 meters (height)
• 4 – Press stages - 1.22 meters (width), 2.44 meters (length), 0.30 meters (height)
• 1 – Music band stage – 3.66 meters (width), 3.66 meters (length), 0.30 meters
(height)
d) Pipe & Drape
• 1 – Pipe & drape in event entrance (9x10m x 4 m tall)
• 2 – Pipe & drape in receiving line (3x6x 3m tall)
• 1 – Press tent (8.7 m x 3 m tall)
• 1 – VIP line (6m x 3m tall)
• 1 – Balcony – 35 meters x 1.00 meters tall
• 1 – Railing above bathroom’s swimming pool 9.50 meters x 5.50 meters x 4 m tall
• 2 – Pool area (12 m long x 3 m tall) leave a space for the door
• Provide extra navy cloth for masking temporary structures:
o 1 – Main Stage o 1 – Marines stage o 4 – Press stages o 1 – Music band stage o Cover trusses as needed
Notes:
Blue exact color for the pipe and drape (not the structures) is Royal Blue pantone PMS 287 Proof – please provide a sample before buying the fabric.
e) Video
• 1 – LED Screen for the main stage (10 m long by 2.5 m tall)
• 3 – 80’’ LCD Screens (with close circuit to replicate)
• Closed circuit television to two Sony HD cameras, Digital switcher, tripods and wiring required.
• 1 – Technician
• 2 – Camera Operators
• Wiring and plugs as needed Note: Winning bidder is NOT permitted to video tape event.
Set up for singers (talent):
5 music stands 1 Pioneer DJM-900NXS2 4-channel professional mixer 2 pioneer CDJ-3000 / Monitor speaker for DJ
1 Ampeg BA 115 Combo amplifier and instrument microphone set for the music group
4 sennheiser G4 iem in-ear monitors + 1 sennheiser antenna combiner ac41 + 1 set of Sennheiser a 2003 uhf antennas for the music group
E. The site visit will be on April 9, 2024, at 10:30am. Prospectors should send their proposals individually for each competition.
F. The Contractor shall provide qualified technicians and equipment. All production equipment shall be in perfect conditions and adequate to perform the services needed and shall furnish management, administrative, and direct operational personnel to accomplish all work as required in this Contract.
G. The Contractor shall provide hours of availability from 08:00 hours until at least 18:00 hours, with flexibility for earlier or later services and logistics and have weekend availability for delivery, assembly, and installation, as needed by the Government performing all services within appropriate periods.
H. Due to the sensitivity of the event timing, the Contractor will not be allowed to be delayed even in the assembly activities or the disassembly activities and Any exceptions shall be made only in extenuating circumstances, at the discretion of the Government.
I. The Contractor shall designate an individual who shall be the Contractor’s point of contact and delegated authority to lead the project. S/He shall be responsible for managing the Contractor’s workforce under this contract and shall be the Contractor's liaison with the U.S. Embassy. The POC shall be available at all times during the performance period of these services to receive and implement orders or special instructions from the Embassy requester section and ensure a smooth and effective operation.
File details come from the government source that posted it. Updated .