This is a technical architectural drawing for a wastewater treatment system, specifically detailing biodigester design and installation for the PNC Barracks located at 23 Calle A, Lote 303 Zona 16, Kanajuyu 2, Ciudad Guatemala. The drawing was prepared in November 2023 by Ovalle Nájera Arquitectos and includes multiple views and specifications for construction implementation.

The design comprises a 1.30 cubic meter high-density polyethylene anaerobic biodigester as the primary treatment component, supplemented by auxiliary structures including a screening box, trap box, chlorine contact box, sampling box, control box, and sludge extraction box. The system incorporates PVC piping (ranging from 3-inch to 8-inch diameter) configured with flex connectors to manage both sewage and rainwater inputs and outputs. The technical specifications include reinforced concrete construction details with numbered rebar reinforcement patterns (No. 3, 4, and 5 bars at specified intervals), lateral load applications, inlet/outlet configurations, and drainage specifications. The drawing provides location plans for both house and apartment basement installations, sectional views at 1:20 scale, typical box slab cover details, and reinforcement specifications referencing ACI 318-14 code requirements for concrete construction. Existing infrastructure to be demolished includes a 1.50-meter deep by 1.10-meter diameter septic tank and provisions for discharge into a new 0.90-meter diameter infiltration pit at 20.00 meters depth.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PVC

0.570.57

0.25 1.15

1.

PVC

0.

0.20

1.60

1.

0.

OUTLET

1.30 M3 High Density

Polythilene anaerobic biodigester

INLET

Sludge extraction box

0.

1.

LATERAL LOADS

APPLIED SIDE

0.

0.

0.

0.

0.

0.

GRAVEL 3/8"

TO OUTLET PIPE

No. 3 @ 0.15

D

IM

EN

SI

O N

DIMENSION

OPENING

O

PE

N

IN

G min L = 0.60 m

DIAGONAL REINFORCEMENT

No . 3

.1

No. 3 @ 0.13 t=0.35

4" DIAMETER HOLES

TO DRAIN

INFILTRATION WATER

1.

1.60

CU

PVC Ø 4"

PVC Ø

4"

FROM

UPPER

LEVEL

DRAINS MUNICIPAL

COLECTOR

23 STREET

D= 12"

H= 5.30 MTS.

CR3

PVC Ø 4"

2.00

2.36

WASTEWATER

TREATMENT

IPLE=98.19OPLE=98.17

IPLE=98.34

OPLE=98.24

IPLE=98.12

OPLE=98.10

CR

IPLE=97.41

OPLE=97.39

RAINWATER

SEWAGE PVC Ø 4"

S=2%

CU

OPLE=97.46

IPLE=97.20

DISCHARGE

PIPE

S

IPLE=97.34

OPLE=97.32

DISCHARGE

PIPE

IPLE=97.48

Screening box

1.30 M3.

high density polythilene anaerobic biodigester

Trap box

Clorine contact box

Sampling box

Control box

Chlorinator

Sludge extraction box

OUTLET PVC 4"

INLET PVC 4"AFTER INSTALLING THE

DISCHARGE PIPES, COMPACT

TO 90 PERCENT IN 0.30 MTS

LAYERS OF SELECTED FILL

MATERIAL FROM BOTTON

TO TOP OF THE EXCAVATION.

PVC 4" +

PVC 4" + PVC 4" +

PVC 4" +

>> PVC 4" +

+Flex connector 4" +Flex connector 4"

Flex connector 4"

Flex connector 4"

Flex connector 4"Flex connector 4"

Flex connector 4"IPLE=97.48

PVC Ø 8"

PVC Ø 4"

S=2%

S=2%

S

PILA

CU

CR2

TG

PVC Ø

4"

PV

C Ø

3"

PVC Ø 4"

CIE=92.88

CIS=92.86

IPLE=92.80

DISCHARGE IN NEW

INFILTRATION PIT

ONLY FOR SEWAGE

DIAM= 0.90 MTS.

DEPTH= 20.00 MTS.

Trap box

2.73

TRATAMIENTO DE

AGUAS NEGRAS

Existing septic tank, to demolish Depth: 1.50 m Diameter: 1.10 m

Existing infiltration pit for rainwater Depth: 35.00 m Diameter: 1.20 m

1.88

IPLE=92.66

OPLE=92.56

IPLE=92.51

OPLE=92.19

IPLE=92.18

Clorine contact box

Sampling box

Control box

Chlorinator

2.00Sludgeextractionbox

PVC 4" +

Flex connector 4"

PVC 4" +

Flex connector 4"

PVC 4" +

Flex connector 4"

OUTLET PVC 4"

INLET PVC 4"

+Flex connector 4"

+Flex connector 4"

1.30 M3 High Density

Polythilene anaerobic biodigester

1.60

0.25

2.

2.

0.12

1.15 0.20

SLUDGE

OUTLET

2.

2.

0.10

1.

0.85

0.125 0.60 0.125

1.05

0.20 0.60 0.25

REINFORCED CONCRETE

No. 3 @ 0.15

REINFORCED CONCRETE

No. 3 @ 0.15

REINFORCED

OPENING

CONCRETE BASE FLOOR

VERTICAL No. 5 @ 0.15 HORIZONTAL No. 3 @ 0.20

CONCRETE

OPENING

REINFORCED CONCRETE

VERTICAL No. 4 @ 0.10 HORIZONTAL No. 3 @ 0.20

REINFORCED BED

No. 3 @ 0.20

DOUBLE STEEL

REINFORCED CONCRETE

VERTICAL No. 4 @ 0.20 HORIZONTAL No. 3 @ 0.20

0.60 OPENINGNo. 3 @ 0.15

REINFORCED CONCRETE

CONCRETE MAINTENANCE

DETAIL ON SHEET A-22

COVER, SEE ARCHITECTURAL

INLET

LATERAL LOADS APPLIED SIDE

0.05 0.05

0.10

0.10

0.05

0.05

No. 3 @ 0.15

REINFORCED CONCRETE

GRAVEL 3/8"

1.

TO OUTLET PIPE

0.10

0.10

0.075

0.075

0.

No. 3 @ 0.15

0.

0.075

0.075

No. 3 @ 0.15

REINFORCED CONCRETE

REINFORCED BED

DOUBLE STEEL

0.

0.

0.05 0.10

0.200.25

LATERAL LOADS APPLIED SIDE

O V A L L E N Á J E R A

DATE:

DESIGNER:DRAWER:

PROJECT :

ADDRESS:

CONTENT:

(f)

A R Q U I T E C T O S

SCALE:

SHEET #:

LANDLORD(f) CONSTRUCTOR(f)

NOVEMBER 2023

AS INDICATED

GENERAL PLAN BIODIGESTER

SCALE: 1:20

BIODIGESTERS' DETAILS

AND TYPICAL BOX SLAB

COVER

WASTEWATER TREATMENT

23 CALLE A, LOTE 303 ZONA 16

KANAJUYU 2, CIUDAD GUATEMALA

PNC BARRACKS

SAN-16

DESIGNER

BIODIGESTER

SCALE: 1:20

LOCATION OF UNITS

SCALE: 1:50HOUSE

LOCATION OF UNITS

SCALE: 1:50APARTMENT BASEMENT

WASTEWATER TREATMENT

WASTEWATER TREATMENT

WASTEWATER TREATMENT

BIODIGESTER SECTION

SCALE: 1:20

WASTEWATER TREATMENT

LOWER SLAB

TYPICAL BOX SLAB COVER

SCALE: 1:20OPENING REINFORCEMENT

FA FA

APPLIES TO ALL COVERS

TIPICAL REINFORCEMENT DETAIL

SCALE: 1:20

The required lengths per the code ACI 318-14 section 25.4.3 are as follows:

0.20 m. for # 3 bar

0.25 m, for # 4 bar

0.31 m. for # 5 bar

Sheets and Views
SAN-16