This is a Questions and Answers (Q&A) document for federal contract solicitation 19GE5026A0155, addressing inquiries from potential contractors regarding the procurement of two armored vehicles for delivery to Quito, Ecuador.

The procurement requires two completed armored vehicles based on commercially produced mid-size SUVs (Toyota Fortuner, Ford Explorer, or Chevrolet Trailblazer, or equal), with a maximum overall length of 202 inches, equipped with NIJ Level III ballistic protection per NIJ Standard 0108.01 or equivalent standards such as VPAM PM7 or VPAM BRV VR7 (with supporting independent ballistic test certifications). The vehicles must accommodate a mission crew of at least four occupants (one driver and three operators) with direct access to a rear protected cargo area designed to hold a vehicle-rated 19-inch equipment rack (26" × 32" × 27" minimum installation envelope) and two auxiliary batteries (15" × 15" × 12" minimum envelope), with a total 250-pound payload allowance for rear technical equipment. The contractor bears full responsibility for obtaining all U.S. export licenses and authorizations from the Department of State/DDTC prior to shipment, determining applicable export-control classifications, and ensuring compliance with all export regulations. Delivery is F.O.B. destination (Incoterm DDP—Delivered Duty Paid) to Quito, Ecuador, with the contractor responsible for all logistics, customs brokerage, and inland transportation costs; delivery must be completed no later than 270 calendar days after contract award, though shorter lead times will be favorably evaluated. The contractor must issue all vehicle warranties in the name of the end user (Ecuadorian National Police), provide OEM manufacturer documentation confirming continued warranty validity after armoring, and furnish a separate two-year warranty covering armored modifications and conversion-induced failures. The Government, through INL in coordination with the Ecuadorian National Police and relevant Government of Ecuador agencies, will obtain duty-free tax exemption documentation and end-user certification prior to vehicle arrival; the contractor must provide the Contracting Officer's Representative with all required supporting documentation. Evaluation will employ comparative best-value procedures per FAR Part 12, considering stated evaluation factors in conjunction with price, without fixed numerical weighting, and permitting selection of higher-priced quotations if comparative advantages justify additional cost.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19GE5026A0155 – Attachment 4 - Questions and Answers (Q&A)

Q1: Since the requirement includes completed armored vehicles, ballistic materials/glazing, technical documentation, and delivery to Quito, Ecuador, can you confirm whether the contractor is expected to obtain any U.S.

Department of State/DDTC export authorization or export license prior to shipment?

A1: Yes. The Contractor shall be responsible for complying with all applicable

U.S. export-control laws and regulations and for obtaining any required export licenses, permits, or authorizations prior to shipment of the completed armored vehicles and associated equipment to Quito, Ecuador.

The Contractor shall determine the applicable export-control classification for the completed vehicles, ballistic components, technical documentation, and associated equipment, and shall obtain any required authorization from the appropriate U.S.

Government agency.

Any applicable licensing exemption or license exception must be properly documented and supported by the relevant regulatory requirements. The Contractor shall anticipate and coordinate regarding any proposed reliance on an export authorization involving U.S. Government participation or written direction.

All applicable export compliance requirements shall be satisfied prior to shipment and shall be included in the Contractor's proposed price and delivery schedule.

Q2: Related to Q1, if an export authorization is required, could you also confirm whether the Government will provide any supporting documentation for the end user, duty-free customs clearance, importation, or any related INL coordination?

A2: INL, in coordination with the Ecuadorian National Police (ENP), will provide the required information for this process. Also, INL will work with the relevant

Government of Ecuador agencies to obtain a tax exemption (duty-free clearance process) before the vehicles arrive in Ecuador. The contractor shall provide the contracting officer's representative (COR) with all documentation required for this process.

Regarding delivery, Section (iv) of the combined synopsis/solicitation for this contract states that delivery and acceptance are F.O.B. destination, equivalent to the Incoterm DDP (Delivered Duty Paid). The contractor is therefore responsible for all logistics and customs brokerage costs associated with delivering the vehicles to the final delivery location in Quito, Ecuador.

Q3: Could you please advise us if the required ‘End User Certificate’ for the supply of the vehicles to the customer, will be signed by a representative of the

United States State Department, or if it will be signed by a representative of the Ecuadorian government?

A3: The end-user certificate will be signed by an authorized representative of the

Government of Ecuador – Ecuadorian National Police.

Q4: Question - Could you please confirm if the warranties for the two vehicles supplied under this solicitation, will be held by the United States – State

Department, or the branch of the Ecuadorian government?

A4: The contractor shall issue all vehicle warranties in the name of the end user, the Ecuadorian National Police (ENP).

Q5: Could you please confirm if the warranties for the two vehicles supplied under this solicitation, will be held by the United States – State Department, or the branch of the Ecuadorian government?

A5: The contractor shall issue all vehicle warranties in the name of the end user, the Ecuadorian National Police (ENP).

Q6: Ref. 5.1 - Protection standard

Do you also accept VPAM PM7 or VPAM BRV VR7 (latter applies for fully certified vehicles), which includes M80/DM111 and SS109, as an equivalent for

NIJ level III? In this context we also would like to highlight that we usually only produce fully certified vehicles according to VPAM BRV in level VR7 and VR9 with proper protection against blast. A certified armored vehicle design, live tested by an independent authority, is a much more secure solution than uncertified vehicles.

A6: The SOW requires NIJ Level III ballistic protection in accordance with NIJ

Standard 0108.01, or an equivalent ballistic standard providing protection against the same or greater rifle threat. VPAM PM7 or VPAM BRV VR7 may be proposed as an equivalent standard, provided the Quoter submits independent ballistic test reports or certifications demonstrating that the proposed opaque and transparent armor systems meet or exceed the required protection level. Compliance with all other applicable SOW requirements remains mandatory.

Reference: SOW, Sections 5 and 8, pages 4 and 9.

Q7: Ref. 4.1 – Vehicle Classification

As we are specialized in certified armored Toyota Land Cruisers 300, could you please confirm if this model will be acceptable? If so, could you please confirm if there is a minimum required emission class or if any emission class will be acceptable? A lower emission class increases the mission readiness of the armored vehicle.

A7: The SOW identifies the Toyota Fortuner, Ford Explorer, Chevrolet Trailblazer, or equal as representative of the required vehicle class. An alternative vehicle, including the Toyota Land Cruiser 300, may be offered only if it meets or exceeds all salient characteristics specified in Section 4 and all other applicable SOW requirements. The SOW does not establish a specific minimum emissions classification. However, the offered vehicle must comply with applicable

Ecuadorian importation, homologation, and registration requirements.

Reference: SOW, Sections 3 and 4, pages 2–3.

Q8: Evaluation grid. Could you please confirm, in which way the bid will be evaluated by the contracting authority, e.g. “lowest price when technically compliant” or “60 percent technics/40 per cent price” etc.?

A8: The Government will evaluate quotations using the comparative evaluation procedures established in FAR Part 12 and the evaluation criteria set forth in the solicitation. The Government will compare the relative merits of the quotations, consider the stated evaluation factors, and make an award decision based on the quotation determined to represent the best value to the Government.

The evaluation is not based solely on selecting the lowest-priced quotation that meets the requirements, nor does it use a fixed numerical weighting between technical factors and price. Price will be considered in conjunction with the other stated evaluation factors in determining the best value. Accordingly, a higher-priced quotation may be selected if its comparative advantages under the stated evaluation factors justify the additional cost. As stated in the solicitation, the evaluation method does not rule out or prohibit award on a low-priced quotation if that quotation represents the overall best value to the Government.

Q9: To assess the supply and delivery route, could you please clarify the allocation of Ecuador import clearance, importer-of-record duties and any applicable duties/taxes between the contractor and the Government, including whether Government-provided exemption documentation will be available.

A9: INL will work with the relevant Government of Ecuador agencies to obtain a tax exemption (duty-free clearance process) before the vehicles arrive in Ecuador.

The contractor shall provide the contracting officer's representative (COR) with all documentation required for this process.

Regarding delivery, Section (iv) of the combined synopsis/solicitation for this contract states that delivery and acceptance are F.O.B. destination, equivalent to the Incoterm DDP (Delivered Duty Paid). The contractor is therefore responsible for all logistics and customs brokerage costs associated with delivering the vehicles to the final delivery location in Quito, Ecuador.

Q10: To assess the supply and delivery route, please clarify whether any

Government-provided end-user documentation is available to support the supplier's assessment of required export authorizations.

A10: INL, in coordination with the Ecuadorian National Police (ENP), will provide the required information for this process.

Q11: Vehicle Length and Classification: Section 4 specifies a maximum overall vehicle length of 202 inches and identifies midsize SUVs as the required vehicle class. Just to confirm, would the Toyota Land Cruiser 300 be considered an acceptable vehicle platform notwithstanding its classification as a full-size SUV? Additionally, would the Government consider larger the

Chevrolet Tahoe (approximately 211 inches) provided the proposed vehicle meets or exceeds all other technical, ballistic protection, payload, and mission requirements?

A11: Section 4 requires a commercially produced mid-size SUV with a maximum overall length of 202 inches (5,131 mm). These requirements are mandatory under the current SOW. An alternative vehicle platform is acceptable only if it satisfies all applicable salient characteristics and technical requirements. Vehicles exceeding the specified maximum length or not meeting the required vehicle classification would not comply with the current SOW.

Reference: SOW, Section 4, pages 2–3.

Q12: Vehicle Weight Certification: Where the completed armored vehicle exceeds the OEM GVWR or GAWR, will the Government accept a documented engineering assessment and certification issued by the armoring manufacturer establishing revised maximum operating weight and axle capacities, or is independent third-party certification required?

A12: Yes. Section 5 provides that, where the proposed operating weight or axle loads exceed the original OEM GVWR or GAWR, the armoring manufacturer or vehicle integrator shall provide an engineering basis and certify that the completed vehicle is suitable for operation at the proposed weights. The SOW does not expressly require independent third-party certification for this purpose. All applicable weight, axle-load, payload, performance, and documentation requirements remain in effect.

Reference: SOW, Sections 5 and 8, pages 4–6 and 9–10.

Q13: OEM Warranty: Will the Government accept the remaining OEM warranty coverage applicable under the manufacturer's published terms, supplemented by the armoring contractor's separate two-year warranty covering armored modifications and conversion-induced failures?

A13: Yes, the Government will accept the proposed warranty arrangement, provided that the offeror submits written documentation from the Original

Equipment Manufacturer (OEM) confirming that the remaining manufacturer's warranty coverage will remain valid and applicable after the armoring modifications.

The armoring contractor shall also provide a separate two-year warranty covering all armored modifications and any failures resulting from the armoring conversion.

All warranty coverage and support must comply with the requirements established in Section 7, "Warranty and In-Country Support," of Attachment 1, "The Schedule and Contract Clauses."

Q14: Mission Equipment: Please confirm that the Government will supply and install the equipment rack, auxiliary batteries, wiring, and mission equipment after vehicle acceptance, with the contractor responsible for providing the required protected cargo space, access, and dimensional accommodations.

A14: The SOW establishes that the principal technical equipment will be installed in the rear protected cargo area by the Government after vehicle acceptance. The

Contractor is responsible for providing the required protected cargo space, seating configuration, payload and axle capacity, equipment installation envelopes, access, and serviceability accommodations specified in Section 6. The SOW does not require the Contractor to furnish or install the equipment rack, auxiliary batteries, or Government mission equipment.

Reference: SOW, Section 6, pages 6–8.

Q15: Importation and Registration: Will INL or the designated consignee be responsible for obtaining and/or assist with any required Ecuadorian import authorizations, homologation approvals, and vehicle registration, with the contractor responsible for supplying supporting documentation and coordinating delivery?

A15: Yes. INL, in coordination with the Ecuadorian National Police (ENP), will provide the required information for this process. The contractor shall provide the contracting officer's representative (COR) with all documentation required for this process.

Q16: Ballistic Certification: Will independent ballistic test reports for the proposed opaque and transparent armor systems, supported by documentation of their integration into the completed vehicle, satisfy the ballistic certification requirements without destructive ballistic testing of the completed production vehicles?

A16: Section 8 requires independent ballistic test reports or certifications demonstrating that the opaque and transparent armor systems meet the specified ballistic protection level. The SOW does not expressly require destructive ballistic testing of each completed production vehicle. The Contractor remains responsible for demonstrating compliance of the completed armored vehicles with all applicable requirements, including the continuous protected ballistic envelope, ballistic seams and overlaps, and required inspection and acceptance provisions.

Reference: SOW, Sections 5 and 8, pages 4 and 9–11.

Q17: Are you able to provide a picture/drawing or model of the vehicle-rated

19-inch equipment rack that the government intends to install in the vehicles?

We want to make sure we adequately accommodate for this item.

A17: Section 6 establishes a minimum usable installation envelope of 26 inches wide × 32 inches longitudinally × 27 inches high for a vehicle-rated 19-inch equipment rack. The Contractor shall provide sufficient protected cargo space and access for installation, operation, inspection, maintenance, cabling, and ventilation.

The Quoter shall submit a dimensioned drawing of the finished armored cargo area showing the proposed rack location and applicable dimensional constraints.

Q18: Vehicle Classification and Dimensional Requirements – Please clarify whether the specified "midsize SUV" classification is mandatory or whether an alternative SUV platform, such as the Toyota Land Cruiser 300 GXR 3.5L gasoline model, would be acceptable, provided it meets all required dimensions, ballistic protection, payload, and performance specifications.

A18: The mid-size SUV classification specified in Section 4 is a mandatory salient characteristic. An alternative vehicle platform, including the Toyota Land Cruiser

300 GXR 3.5L gasoline model, may be offered only if it meets all salient characteristics specified in Section 4, including vehicle classification and maximum length of 202 inches (5,131 mm), as well as all applicable technical, ballistic protection, payload, performance, and Ecuadorian supportability requirements.

Reference: SOW, Sections 3 and 4, pages 2–3.

Q19: Ballistic Protection Standard – The SOW requires NIJ Level III protection in accordance with NIJ Standard 0108.01 or an equivalent standard. Would CEN B6-certified armor be acceptable as an equivalent, provided the offeror submits supporting ballistic test reports and certifications demonstrating compliance with the required protection level?

A19: Section 5 permits NIJ Level III protection in accordance with NIJ Standard

0108.01 or an equivalent ballistic standard providing protection against the same or greater rifle threat. CEN B6-certified armor may be proposed for consideration, provided the Quoter submits independent ballistic test reports or certifications demonstrating that the proposed opaque and transparent armor systems meet or exceed the required protection level. A CEN B6 designation alone does not establish compliance without the required supporting documentation.

Reference: SOW, Sections 5 and 8, pages 4 and 9.

Q20: Seating Capacity and Configuration – Please clarify the required seating capacity after armoring and whether the three-operator mission crew includes the driver and co-driver. If available, could the Government provide reference photos or drawings showing the intended second-row seating arrangement and access to the rear equipment area?

A20: The OEM base vehicle shall provide seating for at least five adult occupants prior to conversion. Following armoring and conversion, the completed vehicle shall accommodate a normal mission crew of three operators, including the co-driver but excluding the driver. Therefore, the completed armored vehicle must provide seating for at least four occupants: one driver and three mission operators.

The seating configuration shall accommodate one mission operator in the front passenger (co-driver) seat and two mission operators in the second row. The second-row configuration must permit direct access to the rear technical-equipment area from within the protected passenger compartment. Compliance may be achieved through aftermarket captain's chairs, partial bench-seat removal, or another configuration that maintains the required seating capacity and internal access. Third-row seating, where installed, shall be removed. The Government does not prescribe a specific second-row seating layout. The Quoter is responsible for proposing a configuration that meets the seating, access, and operational requirements and shall provide the dimensioned cargo-compartment drawing required under Section 6.

Reference: SOW, Sections 4 and 6, pages 3 and 6–8.

Q21: Rear Equipment Rack and Auxiliary Batteries – Please confirm whether the contractor must furnish and install the rear equipment rack and two auxiliary batteries or provide mounting provisions for Government-furnished equipment to be installed after delivery. Please also provide available rack drawings or specifications, including dimensions, fully loaded weight, mounting locations, electrical or communications interfaces, and requirements for cargo space, seating configuration, access, and serviceability.

A21: The Government intends to install the principal technical equipment in the rear protected cargo area after vehicle acceptance. The Contractor shall provide the required accommodation for a vehicle-rated 19-inch equipment rack and two auxiliary automotive batteries, including sufficient protected space, payload and axle capacity, operator access, ventilation, cable routing, and serviceability.

The minimum installation envelopes are 26 inches wide × 32 inches longitudinally

× 27 inches high for the equipment rack and 15 inches wide × 15 inches longitudinally × 12 inches high for the two auxiliary batteries. These envelopes are not required to form a single rectangular cargo-space volume. For payload and axle-loading calculations, the SOW establishes a total rear technical-equipment allowance of 250 lb. (113 kg), including the equipment rack, two auxiliary batteries, mounting hardware, cabling, and associated installation components.

The Quoter shall provide a dimensioned drawing of the finished armored cargo area showing the proposed equipment rack and battery locations, seating configuration, operator access path, rear ballistic protection, and principal dimensional constraints.

Q22: Required Delivery Period – Please confirm the required delivery period and whether it is measured from contract award or another milestone. Would a production lead time of approximately 270 calendar days be acceptable, or must offerors propose vehicles currently in stock?

A22: Please refer to Section 9, "Delivery and Import," in Attachment 1, "The

Schedule and Contract Clauses," of the solicitation. As a minimum requirement, this section states that delivery shall be completed no later than 270 calendar days after contract award.

If an offeror proposes vehicles it has in stock that fully comply with all solicitation requirements, the offer will be acceptable for evaluation. [A shorter delivery lead time will be considered during the evaluation.]

Q23: Delivery Location, Transportation, and Acceptance – Please identify the designated Ecuadorian port of entry and final delivery location in Quito.

Please clarify where contractual delivery, inspection, and acceptance will occur and whether the contractor is responsible for inland transportation from the port to the final destination.

A23: The Government does not designate a specific port of entry into Ecuador. The contractor may select the most appropriate port of entry, provided that all applicable importation, customs clearance, and transportation requirements are met.

Regarding delivery, Section (iv) of the combined synopsis/solicitation for this contract states that delivery and acceptance are F.O.B. destination, equivalent to the Incoterm DDP (Delivered Duty Paid). The contractor is therefore responsible for all logistics and customs brokerage costs associated with delivering the vehicles to the final delivery location in Quito, Ecuador.

Regarding inspection, please refer to Section 8, "Testing, Inspection, Certification, and Acceptance," in Attachment 1, "The Schedule and Contract Clauses," of the solicitation.

Q24: Customs Clearance and Import Costs – Please identify the importer of record and clarify the contractor's responsibilities for customs clearance, duties, taxes, port handling, and related charges. If diplomatic or other exemptions apply, will the Government provide the documentation required to obtain them?

A24:

Regarding delivery, Section (iv) of the combined synopsis/solicitation for this contract states that delivery and acceptance are F.O.B. destination, equivalent to the Incoterm DDP (Delivered Duty Paid). The contractor is therefore responsible for all logistics and customs brokerage costs associated with delivering the vehicles to the final delivery location in Quito, Ecuador.

The Ministry of the Interior (MOI) of Ecuador will be the end user of the vehicles.

INL will work with the relevant Government of Ecuador agencies to obtain a tax exemption (duty-free clearance process) before the vehicles arrive in Ecuador. The contractor shall provide the contracting officer's representative (COR) with all documentation required for this process.

{END OF Q&A}