This is a Statement of Work for a kitchen renovation project at the U.S. Embassy in Paris, organized into two separate lots with distinct scopes of work.

Lot 1 encompasses the complete fit-out of the kitchen breakroom in Room B15, Building B, including demolition of existing equipment, installation of new ceramic floor and wall tiling (Mosa Terra Maestricht porcelain tiles, 60×60cm), supply and installation of a full IKEA kitchen cabinet suite or equivalent with integrated appliances (two refrigerator/freezers, two microwave ovens), custom melamine countertop with sink and mixer tap, new plumbing and drainage systems, dedicated electrical circuits with backsplash-mounted outlets and switches, and concealed under-cabinet LED lighting with occupancy sensors. All work must comply with French standards (NF DTU 60.1, NF C 15-100, NF DTU 52.2) and conclude with a CONSUEL electrical compliance certificate. Lot 2 covers partial demolition of a non-load-bearing partition to 2,000mm above finished floor level and installation of a proprietary atelier-style glazed screen with steel frame, providing visual separation while preserving natural light transmission. This lot includes a 200mm coffee bar shelf at the junction, structural steel support columns spaced at 1.2m maximum centers, and transparent laminated safety glass panels. Structural calculations for both the columns and glazed screen must be certified by an engineer and submitted to the Contracting Officer's Representative for approval prior to fabrication.

The project requires strict compliance with French health and safety regulations, coordination with the Embassy regarding working hours (9:00–12:00 and 13:00–17:00 Monday–Friday), site segregation with proper barriers and signage in English and French, dust and debris control measures including HEPA filtration, and provisions for fire safety, electrical safety, plumbing safety, and working at height per Décret n° 2004-924. All contractor personnel must obtain Embassy access authorizations and be accompanied by an Embassy-provided escort. The contractor shall commence work within fifteen working days after award and complete all work within thirty working days after start. Materials storage is limited to scaffolding and roof areas only, with no ground-level storage permitted. Site mobilization, protection, cleaning, and waste removal to licensed facilities are included in both lots.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1- Scope of works — Kitchen Renovation

RFQ 19FR6326Q0097

1 | P a g e 1 4

STATEMENT OF WORK FOR

Consular Affairs, B-building

Location:

2 Avenue Gabriel, Paris 75008, France

Client:

Embassy of the United States of America in Paris

Date:

July 17 , 2026

2 | P a g e 1 4

I. PROJECT OVERVIEW:

This project comprises the full renovation of the kitchen breakroom in Room B15, Building B, at the U.S. Embassy Paris. Works shall be organized into two lots:

Lot 1 covers the complete fit-out of the kitchen space, including demolition of all existing equipment and finishes; installation of new ceramic floor and wall tiling throughout the room;

supply and installation of a full kitchen cabinet suite (type IKEA or equivalent) with integrated appliances (refrigerators, compact oven, and microwave); a custom quartz countertop; a new stainless steel sink and mixer tap; reinstallation of the existing water fountain; new dedicated plumbing, drainage, and electrical circuits; and concealed under-cabinet LED lighting with occupancy sensor control. All works shall comply with applicable French standards (NF DTU

60.1, NF C 15-100, NF DTU 52.2) and a CONSUEL electrical compliance certificate shall be issued upon completion.

Lot 2 covers the partial demolition of an existing non-load-bearing partition and installation of a custom steel-framed workshop-style glazed screen (verrière atelier) above 2,000mm finished floor level. The glazed screen is designed to preserve natural light transmission between the kitchen and the adjacent open-plan office while providing a defined visual separation. A 200mm coffee bar shelf shall be installed at the junction between the retained partition and the base of the glazed screen. All structural calculations shall be certified by an engineer and submitted to the Contracting

Officer's Representative (COR) for approval prior to fabrication.

Both lots shall include site mobilization, protection, cleaning, and waste removal to a licensed disposal facility upon completion.

All brand-name items are specified for design reference purposes only. The contractor may supply equivalent products meeting the same dimensional, functional, and aesthetic criteria, subject to prior written approval.

LOT 1 LOT 2

3 | P a g e 1 4

II. HEALTH & SAFETY REQUIREMENTS

i) General Obligations

✓ The contractor shall comply with all applicable French health and safety legislation, including but not limited to:

o Code du Travail (French Labor Code), in particular provisions relating to construction site safety.

o Décret n° 2004-924 relating to working at height.

o Décret n° 94-1159 and associated regulations on coordination of health and safety on construction sites (SPS — Sécurité et Protection de la Santé).

o NF C 15-100 for all electrical works.

o NF DTU 60.1 for all plumbing works.

✓ The contractor shall always appoint a competent site supervisor responsible for health and safety on site during works.

✓ Prior to commencement, the contractor shall submit a site-specific Health & Safety Plan

(Plan Particulier de Sécurité et de Protection de la Santé — PPSPS) to the Contracting

Officer's Representative (COR) for review and approval.

✓ All subcontractors engaged by the contractor are subject to the same health and safety obligations and must be briefed accordingly before commencing work.

ii) Works in an Occupied and Functioning Embassy Environment

✓ Works are being carried out within an active, occupied U.S. Embassy facility. Embassy staff, Consular Affairs personnel, and members of the public may always be present in adjacent areas during normal working hours.

✓ The contractor shall coordinate all works with the COR and the Embassy Facilities Manager to:

o Agree on permitted working hours prior to commencement. Works generating significant noise, dust, or disruption (demolition, drilling, grinding, tiling) shall be scheduled to minimize impact on Embassy operations, and may be restricted to outside normal Embassy working hours as directed by the COR.

o Provide a minimum of 48 hours' advance notice to the COR before commencing any phase of work that may cause disruption, noise, or temporary loss of access.

o Obtain all necessary Embassy access authorizations for contractor personnel and vehicles before work begins. All contractor personnel must carry valid identification and always comply with Embassy security protocols.

4 | P a g e 1 4

iii) Site Segregation and Pedestrian Protection

✓ The contractor shall fully segregate the works area from all occupied and circulation spaces using rigid hoarding, temporary partitions, or equivalent barriers of sufficient height and stability to prevent unauthorized access and contain dust, debris, and noise.

✓ All barriers shall be clearly marked with warning signage in both English and French indicating an active construction zone and prohibiting unauthorized entry.

✓ Pedestrian routes adjacent to the works area shall remain clear, safe, and unobstructed at all times. Where temporary narrowing of a corridor or passage is unavoidable, the contractor shall provide adequate signage and, where required, a banksman or site marshal to manage pedestrian flow safely.

✓ Floor protection shall be installed on all circulation routes used by contractor personnel for access to and from the works area, to prevent damage to existing finishes and to reduce slip hazards from dust and debris.

✓ No materials, tools, or equipment shall be stored in corridors, stairwells, emergency exits, or any other shared circulation area.

iv) Dust and Debris Control

✓ The contractor shall implement effective dust suppression and containment measures throughout all phases of works, including:

o Sealing of all openings, gaps, and ventilation grilles in the works area with temporary covers or tape prior to any dusty operations (demolition, cutting, grinding, sanding).

o Use of dust extraction equipment fitted with HEPA filters on all power tools generating dust.

o Dampening of debris prior to removal where practicable.

o Regular cleaning of the works area and all adjacent circulation routes throughout the working day.

✓ All waste and debris shall be bagged, contained, and removed from the building promptly.

No accumulation of waste shall be permitted within the Embassy building overnight.

✓ Waste removal routes through the building shall be agreed with the COR in advance and shall avoid occupied office areas wherever possible.

v) Noise and Vibration

✓ The contractor shall take all reasonable measures to minimize noise and vibration transmitted to adjacent occupied spaces.

✓ Where noise-generating works cannot be avoided during Embassy working hours, the contractor shall provide the COR with a noise management plan identifying the activities, expected noise levels, duration, and proposed mitigation measures (e.g., acoustic screens, scheduling of breaks).

✓ Pneumatic or percussive tools (breakers, hammer drills) shall only be used during agreed restricted hours unless otherwise authorized in writing by the COR.

5 | P a g e 1 4

vi) Working at Height

✓ All works at height (including installation of the glazed screen, upper cabinet installation, and

LED lighting) shall comply with Décret n° 2004-924 on working at height.

✓ The contractor shall use appropriate access equipment (rolling scaffold, podium steps, or mobile elevated work platform) rated for the task and inspected before use.

✓ Ladders shall only be used for access and egress, not as a working platform for sustained tasks.

✓ A minimum of two operatives shall be present during all glazing handling and installation at height, using appropriate lifting suction cups and personal protective equipment (PPE).

vii) Electrical Safety

✓ All electrical works shall be carried out by a qualified electrician holding appropriate French certification.

✓ Prior to any electrical disconnection or new circuit installation, the contractor shall confirm with the Embassy Facilities Manager that the relevant circuits have been isolated and locked out (consignation électrique) in accordance with French regulations.

✓ No live working shall be permitted without explicit written authorization from the COR and the Embassy Facilities Manager.

✓ Upon completion, a CONSUEL compliance certificate shall be obtained and submitted to the

COR before the electrical installation is energized.

viii) Plumbing and Water Safety

✓ All plumbing works shall be carried out by a qualified plumber in compliance with NF DTU

60.1.

✓ Prior to any disconnection of water supply lines, the contractor shall coordinate with the

Embassy Facilities Manager to confirm isolation of the relevant water supplies.

✓ Pressure testing of all new pipework shall be completed and witnessed by the COR or their representative before partitions are closed.

✓ The contractor shall take all necessary precautions to prevent water ingress or flooding to adjacent occupied areas during works.

ix) Fire Safety

✓ The contractor shall ensure that fire escape routes and emergency exits remain clear and unobstructed at all times throughout the works.

✓ Hot works (welding, cutting, grinding) shall only be carried out under a hot works permit issued by the Embassy Facilities Manager. A fire watch shall be maintained during and for a minimum of 60 minutes after completion of any hot works.

✓ Appropriate fire extinguishers (CO₂ and dry powder) shall be maintained on site at all times.

6 | P a g e 1 4

✓ All perimeter joints of the glazed screen frame shall be sealed with fire-rated sealant as specified in the scope.

✓ The contractor shall familiarize all site personnel with the Embassy's fire evacuation procedures and assembly points before work commences.

x) Personal Protective Equipment (PPE)

All contractor personnel on site shall always wear appropriate PPE, including as a minimum:

Activity Required PPE

All site activities Safety footwear (EN ISO 20345), high-visibility vest

Demolition and breaking

Hard hat, safety goggles, dust mask (minimum FFP2), hearing protection

Tiling and cutting Safety goggles, dust mask (minimum FFP2), cut-resistant gloves

Electrical works Insulated gloves, safety footwear (ESD rated)

Working at height Hard hat, fall arrest harness where required

Glazing handling Cut-resistant gloves (EN 388), safety footwear, hard hat

xi) Incident Reporting

✓ Any accident, near-miss, or dangerous occurrence on site shall be reported immediately to the COR and the Embassy Facilities Manager.

✓ The contractor shall maintain an on-site accident book and provide a written incident report to the COR within 24 hours of any reportable event.

✓ In the event of a serious injury or emergency, the contractor shall immediately call the French emergency services (15 / 18 / 112) and notify the Embassy security desk.

xii) End-of-Day and Weekend Site Security

✓ At the end of each working day, the contractor shall ensure the works area is left in a safe and secure condition: all tools stored securely, all hazardous materials locked away, all barriers and hoarding in place, and all temporary electrical supplies isolated.

✓ No contractor personnel shall remain in the Embassy building outside of agreed working hours without prior written authorization from the COR.

III. WORKING HOURS & ACCESS

7 | P a g e 1 4

See “Due diligence” also: Access for all trades (masonry, carpentry, plumbing, electrical) is strictly limited to approved working hours. The property will be occupied during the works, and the contractor shall take all necessary measures to avoid disturbances and nuisances to occupants. No additional space will be allocated on the ground floor exterior spaces. Materials shall be stored on scaffolding platforms and roof area only. No ground level storage will be permitted.

Use of the storage space on the roof and scaffolding will be restricted to loading and fire safety by the contractor.

The working hours should be from 9:00 to 12:00 and from 13:00 to 17:00 Monday to Friday. The persons carrying out the work shall be always accompanied by an “escort”, who will be provided by the Embassy.

During American and French holidays, the property will be closed. All access and deliveries shall be coordinated around these periods, and any special access request must be requested via the COR representative. This request will not necessarily obtain authorization.

IV. WORK DETAILS

1. LOT 1 — KITCHEN SUPPLY, INSTALLATION, AND ASSOCIATED WORKS

The Contractor shall

1.1. Demolition and Removal

➢ Remove and dispose of all existing kitchen equipment, sink, faucets, and accessories.

➢ Disconnect and cap existing hot and cold water supply lines and drains (qualified plumber required).

➢ Disconnect and de-energize all existing electrical installations (qualified electrician required).

➢ Carefully remove the existing water fountain and store for reinstallation.

➢ Remove all carpet and adhesive residue; prepare substrate to receive new tile (maximum tolerance ±3mm under a 2m straightedge; self-leveling compound if required).

➢ Supply and install brushed stainless steel or aluminum flush transition profiles at all junctions between new tile and adjacent existing carpet.

➢ Remove and dispose of all existing furniture and debris from site.

➢ Protect all circulation floor areas adjacent to the works throughout the duration of the project.

1.2. Kitchen Back Wall Preparation

➢ Supply and install a new moisture-resistant plasterboard partition as a lining on the kitchen back wall, per layout plan, in order to:

o Align and regularize the existing wall surface.

o Conceal new hot and cold-water supply lines and drains.

➢ Apply jointing tape and finishing coat to all plasterboard joints.

➢ Smooth finish coat, ready to receive tiling.

8 | P a g e 1 4

1.3. Floor and Wall Tiling

Floor:

➢ Apply self-leveling compound to the full floor area prior to tiling.

➢ Supply and install Mosa Terra Maestricht porcelain tile, light cool grey (225), 60×60cm, smooth finish (V) — Item No. 225V6060 — OR EQUAL throughout Room B15, including under all kitchen cabinets.

➢ Anti-slip classification: minimum R10 (DIN 51130), smooth finish (V).

➢ Adhesive: flexible water-resistant C2TE (EN 12004).

➢ Grout: epoxy or cement, 3mm width, color matched to tile (to be confirmed by CA Section).

➢ Waterproofing membrane/upstand at floor level and 150mm up the wall in all wet areas.

➢ Stainless steel expansion profiles at doorways and every 5m maximum (NF DTU 52.2).

➢ Supply and install stainless steel threshold bar at the room entrance.

Backsplash (Wall):

➢ Supply and install the same Mosa Terra Maestricht tile (225V6060) OR EQUAL as a backsplash above the countertop, from countertop level to the underside of the upper cabinets

(500mm height).

➢ All exposed edges finished with stainless steel or aluminum profiles.

➢ Electrical outlet and switch locations to be reserved prior to grouting (see Section 1.10).

1.4. Painting

➢ All non-tiled wall surfaces in Room B15 shall receive two coats of washable matte paint; color to be agreed with the CA Section.

➢ All plaster and render repairs shall be prepared and painted to match existing — off-white color.

1.5. Kitchen Cabinets — Supply and Installation (IKEA or Equivalent)

Ref. Description Qty

ME 720

Tall cabinet for integrated refrigerator/freezer (60×60×220cm), oak

SINARP veneer doors (60×80cm + 60×140cm), stainless steel ventilation grille, 95° hinges

×2

ME/MA 436

Base cabinet with drawer and shelves (60×60×80cm), MAXIMERA medium drawer, oak SINARP drawer front (60×20cm), oak SINARP door (60×60cm), shelf, soft-close 110° hinge

×1

ME 203

Base cabinet for sink with doors (60×60×80cm), oak SINARP doors

(30×80cm ×2), 22L bin with lid and pull-out frame, shelf protector, soft-close 110° hinges ×2

×1

9 | P a g e 1 4

Ref. Description Qty

ME 107

Base cabinet with shelves (60×60×80cm), oak SINARP doors (30×80cm

×2), shelf, soft-close 110° hinges ×2 ×2

ME/MA 7010

Tall cabinet for microwave and compact oven with drawers

(60×60×220cm), MAXIMERA high drawers ×2, oak SINARP drawer fronts (60×40cm ×2), oak SINARP door (60×60cm), ventilated fixed shelves ×2, soft-close 110° hinge

×1

ME 561

Tall cabinet with cleaning product storage (60×60×220cm), oak SINARP doors (60×80cm + 60×140cm), shelf, UTRUSTA cleaning product storage unit 140cm, soft-close 110° hinges ×3

×1

ME 336

Wall cabinet with shelves (60×37×80cm), oak SINARP doors (30×80cm

×2), SKYDRAG or equivalent LED worktop strip light with integrated sensor (60cm, dimmable), shelf, soft-close 110° hinges ×2

×4

Accessories and Hardware:

➢ METOD or equivalent suspension rail, galvanized steel, 200cm × 2

➢ FÖRBÄTTRA or equivalent plinth, gloss white, 220×8cm × 3

➢ METOD or equivalent legs, 8cm × 13

➢ BODBYN or equivalent side finishing panel, black, 62×220cm × 1

➢ LERHYTTAN or equivalent side finishing panel, black stained, 62×220cm × 1

➢ SINARP or equivalent side finishing panel, oak veneer, 39×240cm × 1

➢ SINARP or equivalent decorative rail, oak veneer, 221cm × 3

➢ BAGGANÄS or equivalent handles, stainless steel, 143mm × 13

➢ UTRUSTA or equivalent push-openers × 1

Installation and Delivery:

The contractor shall:

➢ Fully install of all kitchen cabinets and accessories

➢ Deliver all kitchen units and materials to site as included within the contractor's scope.

1.6. Countertop

➢ Supply and install a standard melamine/laminate finish worksurface: JÄRSTORP or equivalent, white/laminate finish, 246×2.8cm (IKEA Article No. 505.896.53).

➢ Include: sink cutout for VRESJÖN or equivalent undermount sink; faucet cutout for

MAJSJÖN or equivalent mixer tap. Cutout and installation shall be made by the contractor.

➢ All exposed edges shall be finished with matching edge strip or profile.

10 | P a g e 1 4

1.7. Sink and Faucet

➢ Supply and install a VRESJÖN or equivalent undermount sink, stainless steel, 1 bowl, 54×44cm (IKEA Article No. 404.946.98).

➢ Supply and install a MAJSJÖN or equivalent kitchen mixer tap with pull-out spray, stainless steel finish (IKEA Article No. 706.019.13).

➢ Supply and install LILLVIKEN or equivalent trap/waste fitting, 1 bowl (IKEA Article No.

103.115.39) and LILLVIKEN plug (Article No. 203.178.52).

1.8. Integrated Appliances

➢ 2 × integrated refrigerator/freezer — TINAD or equivalent, IKEA 500, 210/79L

(IKEA Article No. 005.728.72), one per ME 720 tall cabinet.

➢ 2 × built-in microwave ovens — FRILLESBO or equivalent, IKEA 300, stainless steel (IKEA

Article No. 906.002.48). One integrated in ME/MA 7010 tall cabinet; location of the second unit to be confirmed by the CA Section prior to fabrication and award.

➢ Reinstallation of the existing water fountain in the designated base cabinet (include cutout and access hatch to pipework).

1.9. Plumbing and Mechanical Works

➢ New hot and cold-water supply lines from capped connections to the sink, concealed within the new plasterboard partition. Copper or CPVC pipework, insulated, pressure-tested before partition is closed.

➢ New drain from sink to existing drainage connection, including trap and LILLVIKEN or equivalent waste fitting.

➢ Dedicated cold water supply for the reinstalled water fountain.

➢ Modification of all existing supply and drainage connections as required to accommodate the new layout.

➢ All works to comply with NF DTU 60.1.

1.10. Electrical Works

➢ Dedicated electrical circuit from the nearest distribution board, with RCD/RCBO differential protection (NF C 15-100).

➢ Dedicated connections for the following circuits:

Circuit Rating

Refrigerator 1 20A

Refrigerator 2 / Freezer 20A

Microwave oven 1 20A

Microwave oven 2 20A

11 | P a g e 1 4

Circuit Rating

Water fountain Dedicated circuit

Backsplash Electrical Installations — Flush-Mounted in Tile:

All items below shall be flush mounted within the tile backsplash behind the countertop, with minimum IP44 protection and differential protection. All items shall be positioned in strict compliance with the minimum safe distances from the kitchen sink required under French standard

NF C 15-100:

✓ No electrical outlet or switch shall be installed within Zone 1 (directly above the sink bowl) or Zone 2 (within 300mm horizontally of the sink edge at countertop level).

✓ All outlets and switches shall be positioned at a minimum 300mm horizontally from the nearest edge of the sink.

✓ The contractor's electrician shall confirm exact positions on site prior to tiling; outlet and switch locations shall be reserved in the tile layout before grouting.

Item Specification Qty

Double EU outlet 2P+T, 16A, IP44, flush-mounted in backsplash tile, with differential protection ×2

Light switch

Flush-mounted in backsplash tile, IP44, controlling the under-cabinet

LED lighting circuit; positioned adjacent to the double outlets and at minimum safe distance from the sink per NF C 15-100

×1

✓ All cables concealed within the partition or in surface conduit where necessary.

✓ CONSUEL compliance certificate to be issued upon completion of works.

1.11. Under-Cabinet LED Lighting

➢ Concealed LED lighting installed under all wall-mounted upper cabinets (ME 336 ×4) above the countertop, using the following components or equivalents:

Description IKEA Article No. Qty

SKYDRAG LED worktop/cabinet strip light with integrated sensor, dimmable, white, 60cm

— ×4

TRÅDFRI connected electric transformer, grey, 30W 603.426.56 ×1

FÖRNIMMA power cable, 3.5m 504.468.81 ×1

VÅGDAL connecting cable, white, 3.5m 704.636.00 ×1

Lighting specification:

✓ Warm white (2700–3000K), minimum 400 lm/m, minimum IP20.

✓ The SKYDRAG units incorporate an integrated sensor; the lighting circuit shall additionally be controlled by the flush-mounted light switch installed in the backsplash tile

(see Section 1.10).

✓ Sensor sensitivity and time delay shall be adjustable (recommended switch-off delay: 5 minutes).

12 | P a g e 1 4

✓ The TRÅDFRI 30W connected transformer shall serve the full bank of four SKYDRAG strip lights or equivalent.

✓ All cabling shall be concealed within cabinet structure; no exposed surface cabling above the countertop.

1.12. Miscellaneous

The Contractor shall

➢ Remove waste to licensed recycling/disposal facility.

➢ Mobilize and demobilize equipment and personnel.

➢ Protect site and standard clean throughout works.

2. LOT 2 — GLAZED PARTITION, COFFEE BAR, AND SUPPORTING STRUCTURE

The Contractor shall:

2.1 Partial Partition Demolition

➢ Partially demolish the existing non-load-bearing plasterboard partition to 2,000mm above finished floor level (AFL), across the full width of the opening in accordance with the layout plan.

➢ Dress, square, and prepare the top surface of the retained section to receive the base plate of the new steel frame.

➢ Remove all rubble from site properly to a licensed recycling/disposal facility.

2.2 Coffee Bar — 200mm Shelf with Structural Steel Column Support

Shelf:

➢ Supply and install a 200mm-wide shelf at the top of the retained partition, at the junction with the base of the glazed screen.

➢ Material: moisture-resistant MDF, finished with durable laminate or solid surface

(color/finish to be agreed with the CA Section).

➢ Minimum load capacity: 50 kg/m².

Structural Support — Steel Stabilizing Columns:

➢ To provide primary structural support for the coffee bar shelf and to act as perpendicular bracing to the existing retained partition wall, the contractor shall supply and install a series of vertical steel square-section columns positioned along the front face of the retained partition, as follows:

o Section: 80×80mm hollow square steel section (8–10cm as specified), to be confirmed by the contractor based on load and span calculations.

o Spacing: Maximum 1,200mm (1.2m) centres along the full length of the retained partition, from floor to underside of the coffee bar shelf.

13 | P a g e 1 4 o Base fixing: Each column to be fixed to the finished floor via a steel base plate with anchor bolts, positioned to avoid conflict with the tile waterproofing membrane. Base plates to be recessed or finished flush.

o Head fixing: Each column to be fixed to the underside of the coffee bar shelf and/or to the top of the retained partition via a steel head plate, providing both vertical support to the shelf and lateral/perpendicular bracing to the partition wall.

o Lateral bracing function: The columns shall act as perpendicular bracing elements to the retained partition, stabilizing it against out-of-plane forces and providing a rigid structural connection between the floor, the partition, and the glazed screen frame above.

o Finish: All columns, base plates, and head plates to be painted white (RAL 9010 or equivalent), finish to match the glazed screen frame color if white is selected, or as directed by the CA Section.

o Structural verification: The contractor shall verify column section sizes, base fixing capacity, and connection details via a structural engineer. Endorsed structural calculations and a dimensioned shop drawing shall be submitted to the Contracting

Officer's Representative (COR) for approval prior to fabrication and installation.

Note: The exact number of columns shall be determined by the on-site measured length of the retained partition divided by the 1.2m maximum spacing. The contractor shall confirm the final column count and layout in the dimensioned shop drawing submitted for COR approval.

2.3 Proprietary Atelier-Style Glazed Screen

The glazed separation above 2,000mm AFL shall be a proprietary atelier-style steel-framed glazing system, fabricated and supplied by a specialist manufacturer. This system is selected to preserve natural light transmission between the kitchen and the adjacent open-plan office space, while providing a defined visual separation in an industrial and elegant aesthetic.

Structural Strategy — Self-Supporting Frame:

➢ The structural ceiling height is 3,500mm AFL. The existing suspended ceiling at 2,700mm

AFL shall remain intact.

➢ Vertical steel uprights shall act as vertical cantilevers from the base plate fixed to the top of the retained partition, laterally stabilized by corner posts bolted into the side walls on each side of the opening. Where required, a stiffener/raidisseur shall be incorporated into the frame design.

➢ The structural steel columns specified in Section 2.2 shall be coordinated with the glazed screen frame design to ensure a unified structural system. The contractor shall confirm the interface between the column heads, the coffee bar shelf, and the glazed screen base plate in the shop drawings submitted for COR approval.

➢ If the geometry of the opening does not allow sufficient lateral bracing from the side walls, the contractor shall propose a horizontal steel distribution beam at the top of the frame, spanning from side wall to side wall, subject to approval prior to fabrication.

➢ The contractor shall verify the upright sections and base fixing capacity. Structural calculations shall be submitted to the COR for approval prior to fabrication.

14 | P a g e 1 4

Dimensions and Number of Glazing Panels:

➢ The exact width of the opening shall be measured on site by the contractor prior to fabrication.

The number of glazing panels shall be determined accordingly per the manufacturer's standard sizing matrix (1 panel per 20–35cm of width, up to 8 panels for widths up to 300cm).

➢ A dimensioned workshop drawing shall be submitted for COR approval prior to fabrication.

Frame Finish:

➢ Powder coat (thermolacquered) finish.

➢ Color to be confirmed by the CA Section from the following options:

o Black — RAL 7005 o Anthracite grey — RAL 7016 o White — RAL 9010

➢ Primer-only (pre-painted) finish shall not be acceptable.

Glazing Specification:

➢ Transparent laminated safety glass 33/2 — 6mm, providing transparency and light transmission while meeting workplace safety requirements.

➢ Option: opal glass may be substituted on one or more panels where localized privacy is required, subject to agreement with the CA Section prior to fabrication.

Accessories:

➢ Decorative flat transoms or head/sill finishing flats.

➢ Fixed or adjustable corner posts at all returns and ends.

➢ Glazing beads supplied by the manufacturer.

Installation:

➢ Frame shall be fixed to the retained partition via base plate with pre-drilled holes.

➢ All perimeter joints (frame/partition, frame/side walls) shall be sealed with appropriate fire-rated and acoustic sealant.

➢ Installation shall be carried out using a rolling scaffold or platform suitable for the working height, in compliance with French Decree No. 2004-924 (working at height).

➢ Glazing handling at height shall be performed by a minimum of two operators using appropriate lifting suction cups.

➢ A method statement for installation of the glazed screen shall be submitted 48 hours prior to commencement of works.

➢ Delivery of the glazed screen to site is included within the contractor's scope.

V. PERIOD OF PERFORMANCE

The Contractor shall commence work within fifteen (15) working days after award.

The Contractor shall complete work within thirty (30) working days after the work has started.