About this file
This document is a federal solicitation (Request for Proposal) for window glazing repair and replacement at the U.S. Embassy in Copenhagen, Denmark. The U.S. Department of State seeks a contractor to replace window glazing and refurbish select aluminum window frames in the embassy's historic 1954 chancery building, with a focus on preserving the building's architectural integrity while improving thermal performance and security. The project will involve replacing existing glazing with double-pane insulated glass units, applying shatter-resistant window film, restoring window frames, and installing new window blinds.
Key details include a solicitation number of 19DA2025R0002, with proposals due by August 12, 2025 at 13:00 local time. The contract will be an Indefinite Delivery, Indefinite Quantity (IDIQ) type with a base period of 12 months and potential option years. The estimated total contract ceiling is 1,500,000.00 Danish Kroner (DKK). A pre-proposal conference and site visit is scheduled for July 10, 2025. Contractors must be registered in the System for Award Management (SAM), have necessary Danish business licenses, and submit both technical and pricing volumes electronically with material samples. The project requires security clearances for personnel working in controlled access areas and adherence to historic preservation standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19DA2025R0002_Cover Letter_Chancery Window Glazing Repair and Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENSITIVE BUT UNCLASSIFIED
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
19DA2025R0002
2. TYPE OF SOLICITATION
SEALED BID (IFB)
[X] NEGOTIATED (RFP)
3. DATE ISSUED
July 3, 2025
PAGE OF PAGES
1 87
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
PR15438204
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
U.S. Embassy Copenhagen, GSO Dag Hammarskjölds Allé 24 2100 Copenhagen O Denmark
U.S. Embassy Copenhagen, GSO Ref. 19DA2025R0002 Dag Hammarskjölds Allé 24 2100 Copenhagen O Denmark CopenhagenContracts@state.gov
9. FOR INFORMATION
CALL:
A. NAME
Ryan D. Young
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) +45 3341 7100
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
SF-1442 – Solicitation, Offer and Award Section A – Supplies/Services and Pricing Section B – Statement of Work Section C – Packaging and Marking Section D – Inspection and Acceptance Section E – Deliveries or Performance Section F – Contract Administration Data Section G – Special Terms and Conditions Section H – Clauses Section I – List of Attachments Section J – Instructions on How to Submit a Quotation Section K – Evaluation Criteria Section L - Representations, Certifications and Other Statements
11. The Contractor shall begin performance within 10 calendar days and complete it within 365 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _______________.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original to perform the work required are due at the place specified in Item 8 by August 12, 2025 at 13:00 (local time). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e) mailto:CopenhagenContracts@state.gov
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within _____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print) Ryan D. Young
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
TABLE OF CONTENTS
SF-1442 COVER SHEET
A. SUPPLIES/SERVICES AND PRICING
B. STATEMENT OF WORK
C. PACKAGING AND MARKING
D. INSPECTION AND ACCEPTANCE
E. DELIVERIES AND PERFORMANCE
F. CONTRACT ADMINISTRATION DATA
G. SPECIAL TERMS AND CONDITIONS
H. CLAUSES
I. LIST OF ATTACHMENTS
Attachment 1: RESERVED
Attachment 2: RESERVED Attachment 3: Sample Letter of Bank Guaranty Attachment 4: RESERVED Attachment 5: Drawings Attachment 6: Specifications Attachment 7: Sample Task Order Form
J. INSTRUCTIONS ON HOW TO SUBMIT A QUOTATION
K. EVALUATION CRITERIA
L. REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS
SECTION A – SUPPLIES/SERVICES AND PRICING
A.1 BACKGROUND
The United States Government (USG) requires a contractor to replace window glazing and refurbish select aluminum window frames and hardware at the U.S. Embassy chancery building in Copenhagen, Denmark. The building, completed in 1954, is inscribed on the Bureau of Overseas Building’s List of Significant Properties, as an example of postwar Modernism and the U.S. Department of State’s use of the architectural style as a symbol of American societal values of openness and democratic exchange. The glazing, over 70 years old, has reached the end of its service life and must be replaced while retaining the original frames. Due to the historic character of the building, this scope aims to take a restoration approach, and the original aluminum frames must remain in place during the glazing replacement.
A.2 TYPE OF CONTRACT
This contract is an indefinite-delivery indefinite-quantity contract with firm-fixed prices. Task orders will be priced and payable entirely in the currency indicated in the SF1442. The Government will not pay any additional sums due to any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract. Nor will the contract price be adjusted due to fluctuations in the currency exchange rates. The Government will make changes in the contract price or time to complete only due to changes made by the Government in the work to be performed, or by delays caused by the Government.
The Government will make payments based on quantities and unit prices only to the extent specifically provided in the contract. The estimated quantities listed in A.3 below are estimates only and the Government does not guarantee that such quantities will be ordered.
A.3 CONTRACT PRICE
A.3.1 General. The Contractor shall complete all work, including furnishing all labor, material, equipment, and services required under this purchase order for the following firm fixed price and within the time specified. This price shall include all labor, materials, all insurance, overhead and profit.
A.3.2 Payment. All prices are in Danish Kroner (DKK), and the Government will make payment in Danish Kroner (DKK).
A.3.2 (a) VALUE ADDED TAX (VAT). The Contractor shall include VAT as a separate charge on the Invoice and as a separate line item in Section A.
A.3.2 (b) DEFENSE BASE ACT INSURANCE. Defense Base Act Insurance (DBA) requirement will only apply to employees working on this contract. The U.S. Department of Labor has issued a geographic waiver of the DBA Insurance requirement for employees covered under compulsory workers’ compensation laws of Denmark. The waiver does not apply to any employees working under this contract who are: (a) citizens of the United States of America; or
(b) lawful resident(s) of the United States of America; or (c) were hired in the United States of America. If the above waiver does not apply, the Contractor shall include Defense Base Act (DBA) insurance premium costs covering employees. The offeror may obtain DBA insurance directly from any Department of Labor approved providers at the DOL website at http://www.dol.gov/owcp/dlhwc/lscarrier.htm.
http://www.dol.gov/owcp/dlhwc/lscarrier.htm
A.3.3 PRICING – BASE PERIOD. The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are:
CHANCERY
CLIN Description of service Unit Unit Price in DKK Estimated Quantity*
Estimated Total in
DKK
001 Window Replacement – Type A Window
Each 2
002 Window Replacement – Type B Window
Each 2
003 Window Replacement – Type C Window
Each 2
004 Window Replacement – Type D Window
Each 1
005 Window Frame Restoration and Refurbishment – Type 1 Window Frame
Each 2
006 Window Frame Restoration and Refurbishment – Type 2 Window Frame
Each 1
007 Window Replacement – Type Ax Window
Each 2
008 Window Replacement – Type Bx Window
Each 2
009 Window Replacement – Type Cx Window
Each 2
010 Window Frame Refurbishment
– Type 1x Window Frame
Each 2
011 Window Stool Refurbishment
012 Window Blind Installation
DEFENSE BASE ACT INSURANCE (DBA)
CLIN Description Price (DKK) 013 Defense Base Act Insurance (if applicable)
Total Estimated Amount _______________
25% VAT _______________
BASE YEAR TOTAL ESTIMATED AMOUNT _______________
* This estimated amount reflects the Government’s total anticipated requirements for the period of performance. As this is a single-award contract, the full estimated amount may be obligated to the selected Contractor through one or more task orders.
A.3.4 PRICING – FIRST OPTION YEAR. The Contractor shall provide the services shown below for the First Option Year of the contract, starting one year after the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are:
CHANCERY
CLIN Description of service Unit Unit Price in DKK Estimated Quantity*
Estimated Total in
DKK
101 Window Replacement – Type A Window
Each 2
102 Window Replacement – Type B Window
Each 2
103 Window Replacement – Type C Window
Each 2
104 Window Replacement – Type D Window
Each 1
105 Window Frame Restoration and Refurbishment – Type 1 Window Frame
Each 2
106 Window Frame Restoration and Refurbishment – Type 2 Window Frame
Each 1
107 Window Replacement – Type Ax Window
Each 2
108 Window Replacement – Type Bx Window
Each 2
109 Window Replacement – Type Cx Window
Each 2
110 Window Frame Refurbishment
– Type 1x Window Frame
111 Window Stool Refurbishment
112 Window Blind Installation
DEFENSE BASE ACT INSURANCE (DBA)
CLIN Description Price (DKK) 113 Defense Base Act Insurance (if applicable)
Total Estimated Amount _______________
25% VAT _______________
OPTION YEAR ONE TOTAL ESTIMATED AMOUNT _______________
* This estimated amount reflects the Government’s total anticipated requirements for the period of performance. As this is a single-award contract, the full estimated amount may be obligated to the selected Contractor through one or more task orders.
A.4 GRAND TOTAL ESTIMATED CONTRACT AMOUNT
The quoter shall complete this blank as part of the quote.
The Grand Total Estimated Contract Amount for the base and all optional periods of performance is__________________________________
A.5 MINIMUM AND MAXIMUM AMOUNTS
The minimum guarantee is 1,000.00 DKK. During the entire contract period, the Government is required to order, and the contractor is required to furnish this minimum amount of services.
This shall not be considered the minimum amount for each year should any option years be exercised. It is the minimum amount services that must be ordered during the entire contract performance period (base year plus any option years). Funding will be at the task order level.
This is a single award indefinite delivery, indefinite quantity (IDIQ) contract awarded to a contractor with an overall ceiling of 1,500,00.00 DKK.
The Government does not guarantee amount of work during each period, should any option periods be exercised.
A.6 PERIOD OF OFFER VALIDITY
The offer must be valid for 90 calendar days.
SECTION B - STATEMENT OF WORK
The character and scope of the work are set forth in the contract. The Contractor shall furnish and install all materials required by this contract.
In case of differences between small and large-scale drawings, the latter will govern. Where a portion of the work is drawn in detail and the remainder of the work is indicated in outline, the parts drawn in detail shall apply also to all other portions of the work.
SECTION C - PACKAGING AND MARKING
Mark materials delivered to the site as follows:
U.S. Embassy Copenhagen Attn.: FAC (Contract Number) * Dag Hammarskjölds Allé 24 2100 Copenhagen O Denmark
* The contract number will be issued at the time of award.
SECTION D - INSPECTION AND ACCEPTANCE
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.
If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.
THE FOLLOWING FEDERAL ACQUISITION REGULATION CLAUSE(S) IS/ARE
INCORPORATED BY REFERENCE (48 CFR CHAPTER 1):
CLAUSE TITLE AND DATE
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
https://acquisition.gov/browse/index/far https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl
SECTION E - DELIVERIES AND PERFORMANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.
If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.
The following Federal Acquisition Regulation clause(s) is/are incorporated by reference (48 CFR Chapter 1):
CLAUSE TITLE AND DATE
52.242-14 SUSPENSION OF WORK (APR 1984)
E.2 EFFECTIVE ORDERING PERIOD
The Government may extend this contract under FAR 52.217-9, “Option to Extend the Term of the Contract” and 52.217-8, “Option to Extend Services”.
E.3 COMPLETION DATES UNDER TASK ORDERS
The Contractor shall have a minimum of 10 days in order to commence work under each task order issued.
The following are the minimum completion times that will be included in individual task orders, dependent upon the number of windows to be replaced:
• Window Replacement, 1 to 10 windows – up to ten (10) calendar days
• Window Replacement, 11 to 20 windows – up to twenty (20) calendar days
• Window Replacement, more than 20 windows – one (1) calendar day per window, unless otherwise specified in the task order due to site conditions or complexity.
E.4 ACCEPTANCE OF SCHEDULE
When the Government has accepted any time schedule, this acceptance shall be binding on the Contractor. The completion date is fixed and may be extended only by a written contract https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl modification signed by the Contracting Officer. Acceptance or approval of any schedule or revision by the Government shall not:
(1) extend the completion date or obligate the Government to do so;
(2) constitute acceptance or approval of any delay, or;
(3) excuse or relieve the Contractor of its obligation to maintain the progress of the work and achieve final completion by the established completion date.
E.5 NOTICE OF DELAY
If the Contractor receives a notice of any change in the work, or if any other conditions arise which are likely to cause or are actually causing delays which the Contractor believes may result in late completion of the project, the Contractor shall notify the Contracting Officer. The Contractor’s notice shall state the effect, if any, of such change or other conditions upon the approved schedule, and shall state in what respects, if any, the relevant schedule, or the completion date should be revised. The Contractor shall give such notice promptly, not more than ten (10) days after the first event giving rise to the delay or prospective delay. Only the Contracting Officer may revise the approved time schedule.
E.6 NOTICE TO PROCEED
(a) After receiving and accepting evidence of insurance, the Contracting Officer will provide the Contractor a Notice to Proceed. The Contractor must then prosecute the work, commencing and completing performance not later than the time period established in the contract.
(b) It is possible that the Contracting Officer may elect to issue the Notice to Proceed before receipt and acceptance of any insurance. Issuance of a Notice to Proceed by the Government before receipt of insurance certificates or policies shall not be a waiver of the requirement to furnish these documents.
E.7 WORKING HOURS
All work shall be performed during Monday through Friday between 07:30 – 17:00 (local time).
Other hours, if requested by the Contractor, may be approved by the Contracting Officer's Representative (COR). The Contractor shall give 24 hours in advance to COR who will consider any deviation from the hours identified above. Changes in work hours, initiated by the Contractor, will not be a cause for a price increase.
The Embassy observes the following days as holidays:
New Year’s Day Martin Luther King’s Birthday Washington’s Birthday Maundy Thursday Good Friday Easter Monday
Great Prayer Day Ascension Day Memorial Day Whit Monday Juneteenth Constitution Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Eve Christmas Day Boxing Day New Year’s Eve
E.8 EXCUSABLE DELAYS
The Contractor shall be allowed time, not money, for excusable delays as defined in FAR 52.249-10, “Default”. Examples of such cases include:
(l) acts of God or of the public enemy;
(2) acts of the United States Government in either its sovereign or contractual capacity;
(1) acts of the government of the host country in its sovereign capacity;
(2) acts of another contractor in the performance of a contract with the Government;
(3) fires;
(4) floods;
(5) epidemics;
(6) quarantine restrictions;
(7) strikes;
(10) freight embargoes;
(11) delays in delivery of Government furnished equipment, and;
(12) unusually severe weather.
In each instance, the failure to perform shall be beyond the control and without the fault or negligence of the Contractor, and the failure to perform furthermore:
(1) shall be one that the Contractor could not have reasonably anticipated and taken adequate measures to protect against;
(2) cannot be overcome by reasonable efforts to reschedule the work, and;
(3) directly and materially affects the date of final completion of the project.
E.9 PRECONSTRUCTION CONFERENCE
A preconstruction conference will be held 10 days after contract award at the American Embassy, Dag Hammarskjölds Allé 24, 2100 Copenhagen O, Denmark to discuss the schedule, submittals, notice to proceed, mobilization and other important issues that effect construction progress. See FAR 52.236-26, Preconstruction Conference.
E.10 DELIVERABLES
The Contractor shall delivery the following items under this contract:
Description Quantity Deliver Date Deliver To
Section G. Insurance 1 10 days after award CO
Section G. Securities 1 For each task order over $35,000 USD CO
Section E. Construction Schedule 1 Identified in each task order COR
Section E. Preconstruction Conference 1 10 days after award COR Section G. Personnel Biographies 1 10 days after award COR
Section F. Payment Request 1 Completion of each task order COR
SECTION F – CONTRACT ADMINISTRATION DATA
F.1 652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)
(a) The Contracting Officer may designate in writing one or more Government employees, by name or position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR).
Such designation(s) shall specify the scope and limitations of the authority so delegated;
provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer, and this authority is delegated in the designation.
(b) The COR for this contract is the Building Engineer Supervisor.
F.1.1 Duties
The COR is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation required by the contract.
The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract.
F.2 PAYMENT
F.2.1 General The Contractor's attention is directed to Section H, 52.232-5, "Payments Under Fixed- Price Construction Contracts". The following elaborates on the information contained in that clause.
F.2.2 Detail of Payment Requests/Invoices Requests for payment, may be made no more frequently than monthly. Payment requests shall cover the value of labor and materials completed and in place, including a prorated portion of overhead and profit.
F.2.3 Payments to Subcontractors The Contractor shall make timely payment to his subcontractors and suppliers from the proceeds of the progress or final payment for which request is being made, following the Contractor's contractual arrangements with them.
F.2.4 Evaluation by the Contracting Officer After receipt of the Contractor's request for payment, and on the basis of an inspection of the work, the Contracting Officer shall make a determination as to the amount, which is then due. If the Contracting Officer does not approve payment of the full amount applied for, less the retainage allowed by in 52.232-5, the Contracting Officer shall advise the Contractor as to the reasons for the reductions.
F.2.5 Additional Withholding Independently of monies under FAR 52.232-5, the Government may withhold from payments due the Contractor any amounts as may be considered necessary to cover –
(1) Wages or other amounts due the Contractor's employees on this project;
(2) Wages or other amounts due employees of subcontractors on this project;
(3) Amounts due suppliers of materials or equipment for this project; and
(4) Any other amounts for which the Contractor may be held liable under this contract, including but not limited to the actual or prospective costs of correction of defective work and prospective liquidated damage when the Contractor has failed to make adequate progress.
F.2.6 Payment Under the authority of 52.232-27(a), the 14 day period identified in FAR 52.232- 27(a)(1)(i)(A) is hereby changed to 30 days.
Invoices are to be submitted electronically in PDF format to the e-mail:
CopenhagenUSFaktura@state.gov with attention to Financial Management Office (FMO).
Attention FMO U.S. Embassy Copenhagen Dag Hammarskjölds Allé 24 2100 Copenhagen Ø
Danish invoice requirements apply to all companies performing construction or services in Denmark, regardless of where the company is based, because the services are being rendered locally in Denmark.
The contractor shall submit an invoice that complies with Danish law. According to Danish legislation, an invoice must include the following elements:
• Invoice date
• Unique invoice number
• Contractor’s full name and address
• Contractor’s CVR number (Danish VAT registration number)
• Embassy name and address (as specified above)
• Description of goods or services supplied
• Quantity and unit price of goods/services
• Date of delivery or service provision (if different from the invoice date)
• Total amount payable (excluding VAT)
• VAT rate applied and amount of VAT
• Total amount payable (including VAT)
• Payment terms (as stated in the contract)
The invoice must clearly reference the task order number and the applicable Contract Line Item Number (CLIN).
Please include the following banking information on each invoice: bank name and address, account number, IBAN code and SWIFT code.
Note: The Financial Management Office will receive invoices, log them in, and forward them to the COR for review and approval.
F.3 TASK ORDERS
F.3.1 General The Government will order all services under this contract on a Deliver/Task Order Form (Attachment 7), issued by the Contracting Officer, as the need arises.
F.3.2 Content Task Orders shall include:
Date of order Contract number Task Order number Location and amount of work
Required completion date
SECTION G - SPECIAL TERMS AND CONDITIONS
G.1 PERFORMANCE/PAYMENT PROTECTION – For task orders over $35,000 USD, the Contractor shall furnish some form of payment protection as described in 52.228-13 in the amount of 50% of the task order price.
G.1.1 The Contractor shall provide the information required by the paragraph above within ten (10) calendar days after award. Failure to timely submit the required security may result in rescinding or termination of the contract by the Government. If the contract is terminated, the Contractor will be liable for those costs as described in FAR 52.249-10, Default (Fixed-Price Construction), which is included in this purchase order.
G.1.2 The bonds or alternate performance security shall guarantee the Contractor's execution and completion of the work within the contract time. This security shall also guarantee the correction of any defects after completion, the payment of all wages and other amounts payable by the Contractor under its subcontracts or for labor and materials, and the satisfaction or removal of any liens or encumbrances placed on the work.
G.1.3 The required securities shall remain in effect in the full amount required until final acceptance of the project by the Government. Upon final acceptance, the penal sum of the performance security shall be reduced to 10% of the contract price. The security shall remain in effect for one year after the date of final completion and acceptance, and the Contractor shall pay any premium required for the entire period of coverage.
G.2 INSURANCE - The Contractor is required by FAR 52.228-5, "Insurance - Work on a Government Installation" to provide whatever insurance is legally necessary. The Contractor shall at its own expense provide and maintain during the entire performance period the following insurance amounts:
G.2.1 GENERAL LIABILITY (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury):
(1) BODILY INJURY, ON OR OFF THE SITE, IN DANISH KRONER (DKK)
Per Occurrence 1,000,000 DKK
Cumulative 10,000,000 DKK
(2) PROPERTY DAMAGE, ON OR OFF THE SITE, IN U.S. DOLLARS
Per Occurrence 1,000,000 DKK
Cumulative 10,000,000 DKK
G.2.2 The foregoing types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.
G.2.3 The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its officers, agents, servants, and employees, or any other person, arising from an incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising therefrom, except in the instance of gross negligence on the part of the Government.
G.2.4 The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.
G.2.5 The general liability policy required of the Contractor shall name "the United States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.
G.2.6 Subcontractors The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits.
G.3 DOCUMENT DESCRIPTIONS
G.3.1 SUPPLEMENTAL DOCUMENTS: The Contracting Officer shall furnish from time to time such detailed drawings and other information as is considered necessary, in the opinion of the Contracting Officer, to interpret, clarify, supplement, or correct inconsistencies, errors or omissions in the Contract documents, or to describe minor changes in the work not involving an increase in the contract price or extension of the contract time. The Contractor shall comply with the requirements of the supplemental documents, and unless prompt objection is made by the Contractor within 20 days, their issuance shall not provide for any claim for an increase in the Contract price or an extension of contract time.
G.3.1.1 RECORD DOCUMENTS. The Contractor shall maintain at the project site:
(1) a current marked set of Contract drawings and specifications indicating all interpretations and clarification, contract modifications, change orders, or any other departure from the contract requirements approved by the Contracting Officer; and,
(2) a complete set of record shop drawings, product data, samples and other submittals as approved by the Contracting Officer.
G.3.1.2 . "As-Built" Documents: After final completion of the work, but before final acceptance thereof, the Contractor shall provide:
(1) clearly annotated markups of USG provided drawings reflecting all modifications made during installation; and,
(2) record shop drawings and other submittals, in the number and form as required by the specifications.
G.4 LAWS AND REGULATIONS
The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the Kingdom of Denmark, and with the lawful orders of any governmental authority having jurisdiction. Danish authorities may not enter the construction site without the permission of the Contracting Officer. Unless otherwise directed by the Contracting Officer, the Contractor shall comply with the more stringent of the requirements of such laws, regulations, and orders and of the contract. In the event of a conflict between the contract and such laws, regulations and orders, the Contractor shall promptly advise the Contracting Officer of the conflict and of the Contractor's proposed course of action for resolution by the Contracting Officer.
G.4.1 The Contractor shall comply with all Danish labor laws, regulations, customs, and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.
G.4.2 The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits.
G.4.3 The Contractor shall submit proper documentation and evidence satisfactory to the Contracting Officer of compliance with this clause.
G.5 SUBCONTRACTORS AND SUPPLIERS
G.5.1 Claims and Encumbrances
The Contractor shall satisfy as due all lawful claims of any persons or entities employed by the Contractor, including subcontractors, material men and laborers, for all labor performed and materials furnished under this contract, including the applicable warranty or correction period, unless the Government shall be directly liable therefore by contract. The Contractor shall not at any time permit any lien, attachment, or other encumbrance to be entered against or to remain on the building(s), or the premises, whether public or private, or any portion thereof, as a result of nonperformance of any part of this contract.
G.5.2 Approval of Subcontractors
(a) Review and approval. The Government reserves the right to review proposed subcontractors for a period of five (5) calendar days before providing notice of consent or rejection of any or all subcontractors.
(b) Rejection of subcontractors. The Government reserves the right to reject any or all subcontractors proposed if their participation in the project, as determined by the Contracting Officer, may cause damage to the national security interests of the United States. The Contractor agrees to promptly replace any subcontractor rejected by the Government under this clause.
G.6 CONSTRUCTION PERSONNEL
The Contractor shall maintain discipline at the site and at all times take all reasonable precautions to prevent any unlawful, riotous, or disorderly conduct by or among those employed at the site. The Contractor shall ensure the preservation of peace and protection of persons and property in the neighborhood of the project against such action. The Contracting Officer may require, in writing that the Contractor remove from the work any employee that the Contracting Officer deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the project is deemed by the Contracting Officer to be contrary to the Government's interests.
G.6.1 If the Contractor has knowledge that any actual or potential labor dispute is delaying or threatens to delay the timely performance of this contract, the Contractor shall immediately give notice, including all relevant information, to the Contracting Officer.
G.6.2 After award, the Contractor has 10 calendar days to submit to the Contracting Officer a list of workers and supervisors assigned to this project for the Government to conduct all necessary security checks. It is anticipated that security checks will take 30 days to perform.
For each individual, the list shall include:
Full Name Place and Date of Birth Current Address CPR Number
Failure to provide any of the above information may be considered grounds for rejection and/or resubmittal of the application. Once the Government has completed the security screening and approved the applicants a badge will be provided to the individual for access to the site. This badge may be revoked at any time due to the falsification of data, or misconduct on site.
G.6.3 The Contractor shall provide an English-speaking supervisor on site at all times.
This position is considered as key personnel under this purchase order.
G.7 MATERIALS AND EQUIPMENT
G.7.1 Selection and Approval of Materials
(a) Standard of quality. All materials and equipment incorporated into the work shall be new and for the purpose intended, unless otherwise specified. All workmanship shall be of good quality and performed in a skillful manner that will withstand inspection by the Contracting Officer.
(b) Selection by Contractor. Where the contract permits the Contractor to select products, materials, or equipment to be incorporated into the work, or where specific approval is otherwise required by the contract, the Contractor shall give the Contracting Officer, for approval:
(1) the names of the manufacturer;
(2) model number;
(3) source of procurement of each such product, material or equipment; and
(4) other pertinent information concerning the:
(i) nature,
(ii) appearance,
(iii) dimensions,
(iv) performance,
(v) capacity, and
(vi) rating;
unless otherwise required by the Contracting Officer.
The Contractor shall provide this information in a timely manner to permit the Government to evaluate the information against the requirements of the contract. The Contractor shall provide a submittal register ten (10) days after contract award showing when shop drawings, samples, or submittals shall be made. The Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid, when directed to do so by the Contracting Officer or COR. Installation or use of any products, materials or equipment without the required approval shall be at the risk of rejection.
G.7.2 Custody of Materials
The Contractor shall be responsible for the custody of all materials received for incorporation into the project, including Government furnished materials, upon delivery to the Contractor or to any person for whom it is responsible, including subcontractors. The Contractor shall deliver all such items to the site as soon as practicable. If required by the Contracting Officer, the Contractor shall clearly mark in a manner directed by the Contracting Officer all items of which the Contractor has custody but which have not been delivered or secured at the site, clearly indicating the use of such items for this U.S. Government project.
G.7.3 Basis of Contract Price
The contract price is based on the use of the materials, products and equipment specified in the contract, except for substitutions or "Or-Equal" items proposed by the Contractor which have been specifically approved by the Government at the time of execution of the contract.
Any substitution approved by the Government after execution of the contract shall be subject to an appropriate adjustment of the contract price.
G.7.4 Substitutions
(a) Prior approval required. Before substitutions
(1) proposed by the Contractor but not yet approved at the contract award, or
(2) proposed by the Contractor after execution of the contract may be used in the project, the Contractor must obtain approval in writing from the Contracting Officer. Any substitution request shall be timely and accompanied by sufficient information to permit the Government to evaluate its acceptability. The date shall provide reasons for the proposed substitution and data concerning the design, appearance, performance, composition, and relative cost of the proposed substitute. If the Contracting Officer determines the substitute items is not in the best interests of the Government, the Contractor shall obtain the items originally specified with no adjustment in the contract price or completion date.
(b) Approval Through Shop Drawings. The Contractor may propose substitutions of materials in the submittal of shop drawings, provided such substitution is specifically requested in writing in the transmittal of the shop drawings to the Contracting Officer. Such substitution requests must be made in a timely manner and supported by the required information.
(c) Final Approval on Delivery. Acceptance or approval of proposed substitutions under the contract is conditioned upon approval of items delivered at the site or approval by sample.
Approval by sample shall not limit the Government's right to reject material after delivery to the site if the material does not conform to the approved sample in all material respects.
G.7.5 "Or-Equal Clause"
References in the Specifications/Statement of Work to materials, products or equipment by trade name, make, or catalog number, or to specific processes, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may propose for approval or rejection by the Contracting Officer the substitution of any material, product, equipment or process that the Contractor believes to be equal to or better than that named in the Specifications/Statement of Work, unless otherwise specifically provided in this contract.
G.8 SPECIAL WARRANTIES
G.8.1 Any special warranties that may be required under the contract shall be subject to the stipulations set forth in 52.246-21, "Warranty of Construction", as long as they are not in conflict.
G.8.2 The Contractor shall obtain and furnish to the Government all information required to make any subcontractor's, manufacturer's, or supplier's guarantee or warranty legally binding and effective. The Contractor shall submit both the information and the guarantee or warranty to the Government in sufficient time to permit the Government to meet any time limit specified in the guarantee or warranty, but not later than completion and acceptance of all work under this contract.
G.9 EQUITABLE ADJUSTMENTS
G.9.1 Any circumstance for which the contract provides an equitable adjustment that causes a change within the meaning of paragraph (a) of the "Changes" clause shall be treated as a change under that clause; provided, that the Contractor gives the Contracting Officer prompt written notice (within 20 days) stating:
(a) the date, circumstances, and applicable contract clause authorizing an equitable adjustment and
(b) that the Contractor regards the event as a changed condition for which an equitable adjustment is allowed under the contract
G.9.2 Differing Site Condition Notice The Contractor shall provide written notice of a differing site condition within 10 calendar days of occurrence following FAR 52.236-2, Differing Site Conditions.
G.9.3 Documentation of Proposals for Equitable Adjustments
(a) Itemization of proposals and requests. Any request for equitable adjustment in the contract price, including any change proposal submitted in accordance with the "Changes" clause, shall be submitted in the form of a lump sum proposal supported with an itemized breakdown of all increases and decreases in the contract price in at least the detail required by the Contracting Officer, and shall include all costs and delays related to or arising out of the change or event giving rise to the proposed adjustment, including any delay damages and additional overhead costs.
(b) Proposed time adjustments. The Contractor shall submit with any request for an equitable adjustment or change proposal a proposed time extension (if applicable), and shall include sufficient information to demonstrate whether and to what extent the change will delay the contract in its entirety.
(c) Release by Contractor. The price and time adjustment made in any contract modification issued as a result of a change proposal or request for an equitable adjustment shall be considered to account for all items affected by the change or other circumstances giving rise to an equitable adjustment. Upon the issuance of such contract modification, the Government shall be released from any and all liability under this contract for further equitable adjustments attributable to the facts and circumstances giving rise to the change proposal or request for equitable adjustment.
G.10 NON-COMPLIANCE WITH CONTRACT REQUIREMENTS
In the event the Contractor, after receiving written notice from the Contracting Officer of noncompliance with any requirement of this contract, fails to initiate promptly such action as may be appropriate to comply with the specified requirement within a reasonable period of time, the Contracting Officer shall have the right to order the Contractor to stop any or all work under the contract until the Contractor has complied or has initiated such action as may be appropriate to comply within a reasonable period of time. The Contractor will not be entitled to any extension of contract time or payment for any costs incurred as a result of being ordered to stop work for such a cause.
G.11 ZONING APPROVALS AND PERMITS
The Government shall be responsible for:
- obtaining proper zoning or other land use control approval for the project
- obtaining the approval of the Contracting Drawings and Specifications
- paying fees due for the foregoing; and,
- for obtaining and paying for the initial building permits.
SECTION H -CLAUSES
H.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.
If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.
THE FOLLOWING FEDERAL ACQUISITION REGULATION CLAUSE(S) IS/ARE
INCORPORATED BY REFERENCE (48 CFR CH. 1):
CLAUSE TITLE AND DATE
52.202-1 DEFINITIONS (JUN 2020)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL
(JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (JUN 2020)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
(AUG 2020)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED
OR PROPOSED FOR DEBARMENT OR VOLUNTARILY EXCLUDED (JAN
2025)
52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018)
https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES
(JAN 2025)
52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
52.225-5 TRADE AGREEMENTS (NOV 2023)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION
OF CONTRACT (FEB 2000)
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING (MAY 2024)
52.228-4 WORKERS’ COMPENSATION AND WAR-HAZARD INSURANCE
OVERSEAS (APR 1984)
52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.228-11 INDIVIDUAL SURETY - PLEDGES OF ASSETS (FEB 2021)
52.228-13 ALTERNATIVE PAYMENT PROTECTION (JULY 2000)
52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (JUN 2020)
52.229-6 TAXES - FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)
52.229-7 TAXES- FIXED PRICE CONTRACTS WITH FOREIGN GOVERNMENTS
(FEB 2013)
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS
(MAY 2014)
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
52.232-11 EXTRAS (APR 1984)
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
52.232-22 LIMITATION OF FUNDS (APR 1984)
52.232-25 PROMPT PAYMENT (JAN 2017)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
52.232-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER – OTHER THAN
SYSTEM FOR AWARD MANAGEMENT (JULY 2013)
52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
(APR 1984)
52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236-8 OTHER CONTRACTS (APR 1984)
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (APR 1984)
52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236-12 CLEANING UP (APR 1984)
52.236-13 ACCIDENT PREVENTION (NOV 1991)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.242-14 SUSPENSION OF WORK (APR 1984)
52.243-4 CHANGES (JUN 2007)
52.243-5 CHANGES AND CHANGED CONDITIONS (APR 1984)
52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES
(APR 2012)
52.245-9 USE AND CHARGES (APR 2012)
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)
52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
52.246-26 REPORTING NONCONFORMING ITEMS (AUG 2024)
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-
PRICE) (APR 2012)
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
52.249-14 EXCUSABLE DELAYS (APR 1984)
H.2 FAR CLAUSES INCORPORATED IN FULL TEXT
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT (NOV 2021)
(a) Definitions. As used in this clause— Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network).
This is the start of the file's text. The full file is on GovTribe.