SF-30 19C02026Q0019_CO Seismic design.pdf
PDF 359 KB Posted
- Attached to
- Seismic design annex building at CMR
- Solicitation number
- 19C02026Q0019
- Issued by
-
Department of State US Embassy Bogota
About this file
This is an Amendment of Solicitation/Modification of Contract issued by the American Embassy Bogota on August 28, 2026. The amendment corrects the Quantity Chart for Proposals related to requisition PR16146161 -VI, with an effective date of August 28, 2026. The contracting officer is Jack L. Parker, and the document references solicitation amendment 19C02026Q0019 dated August 6, 2026.
The quantity chart addresses a seismic assessment project for the CMR Annex Building at the U.S. Embassy Bogota, Colombia. The scope consists of six phases of engineering services, each measured in Lump Sum (Ls) units with a quantity of one: Phase 1 (Field Investigation and Technical Mapping), Phase 2 (Vulnerability Diagnostics), Phase 3 (Concept Engineering and Design Solutions), Phase 4 (Detailed Engineering Design With Specialities), Phase 5 (Documentation Specification and Scheduling), and Phase 6 (Agency Review and Support). Each phase requires Senior-level staff including architects, structural engineers, and principals, with CADD/BIM operators included in later phases. The pricing structure includes a 19% Value Added Tax (VAT) applied to the total cost, with the final amount expressed as a Grand Total Cost of Performance (COP).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_19C02026Q0019.pdf | ||
| Solicitation 19C02026Q0019.pdf | ||
| Cover Letter.pdf | ||
| SF330-21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .