Bujumbura PV System Drawings.pdf
PDF 4 MB Posted
- Attached to
- SOLAR PV PREVENTIVE MAINTENANCE SERVICES
- Solicitation number
- 19BY7026Q0009
- Issued by
-
Department of State
About this file
This document is a set of photovoltaic (PV) system design drawings and technical specifications for Project 92937, a multi-location solar installation project. The drawings detail the design and layout of PV arrays, inverters, transition boxes, conduit requirements, and electrical interconnections across five distinct locations: NOB (National Office Building), MSGQ, WHE (Warehouse Equipment), UTL (Utility), and a Parking Structure.
The PV system comprises multiple "Sunny Towers" with varying configurations across locations. NOB features Sunny Tower A (144 Sunpower SPR 320E modules with six SMC 7000HV-11 inverters) and Sunny Tower B (72 modules with three SMC 7000HV-11 inverters). MSGQ includes Sunny Tower A with three SMC 5000A inverters serving 48 modules. WHE contains Sunny Towers A, B, and C (each with 144 modules and six SMC 7000HV-11 inverters) plus wall-mounted inverters D1, D2, and D3 serving the Parking Structure. The Parking Structure includes two arrays of 48 modules each, powered by two SMC 7000HV-11 inverters. All systems use Sunpower SPR 320E-WHT-D modules with specifications of Voc=518V and Isc=6.24A, employing positive ground configuration. The design includes transition boxes (Wiley Electronics ACE Box units) converting PV wire to THWN-2 conductors with 20A fuses, exterior AC disconnects (Square D HU363RB rated 100A, 600VAC), and integration with existing building electrical distribution systems. Conduit and conductor specifications vary by location and circuit, ranging from ¾" RGS with #10 THWN-2 conductors for array circuits to larger 2" RGS with #1/0 THWN-2 for main AC circuits. A Data Acquisition System monitors performance through sensors installed on roofs and equipment rooms, communicating via CAT5 network cables and RS485 shielded twisted pair cables with specified maximum run lengths.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19BY7026Q0009_QuestionsResponse.pdf | ||
| 19BY7026Q0009_Solicitation_Document.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Switchboard NOBSB-E
1000A, 400/230VAC
42kA Interrupt (Existing) Sheet E5-606
80A, 3P
40A, 3P
C
Tower A – Breaker 22
Tower B – Breaker 23
INV
A1
Sunny Tower A Located on rooftop
Inverters are connected Phase to Neutral
Exterior AC Disconnect
Square D HU363RB
100A, 600VAC,
isolated neutral, NEMA 3R
(provided by others)
A1
Sunny Tower “A” 6 x SMC 7000HV -11
Inverters (all used)
Sunny Tower “B” 6 x SMC 7000HV -11
Inverters (3 used / 3 spare)
Exterior AC Disconnect
Square D HU363RB
100A, 600VAC,
isolated neutral, NEMA 3R
(provided by others)
INV
A2
A2
INV
A3
A3
INV
A4
A4
INV
A5
A5
INV
A6
A6
INV
B1
Sunny Tower B Located on rooftop
B1
INV
B2
B2
INV
B3
B3
Array
DC
AC
6-PV wire 4 mm2, #8G bare
¾” RGS, 6#10 THWN-2, #8 EGC
2" RGS, 4#1/0 THWN-2, 1#6 G
Conduit & Conductor requirements Conduit & WireDescriptionLabel
B A
C
A
B
ESS
Transition Boxes @ PV Arrays
General notes:
-See sheet BE1.07 for PV array layouts & location -See sheet BE1.08 for Sunny towers, inverters, disconnects & DAS equipment layout -See sheet BE6.01 for Data Acquisition Plan
Sunny tower A configuration:
144 Sunpower SPR 320E-WHT-D PV Modules One array per inverter; Six arrays total Each array comprised of three strings of eight modules or 24 modules per inverter Voc =518V, Isc = 6.24A Location: rooftop Positive Ground
Sunny tower B configuration:
72 Sunpower SPR 320E-WHT-D PV Modules One array per inverter; Three arrays total Each array comprised of three strings of eight modules or 24 modules per inverter Voc = 518V, Isc = 6.24A Location: rooftop Positive Ground
To building electrical distribution system
NOBSG-E
2000A bus, CB#3, 1000A
NOBSG-E-U
‘CBA’
2000A
UTLSG-E
‘CBA’
3000A bus, CB#7, 2000A
UTLSG-E-U
‘CB1’
3000A
G Transformer
15kVΔ :400/230Y
2MVA
ESSESS ESS ESS ESS ESS ESS ESS
Transition Boxes @ PV Arrays
A
B
1000A
Wiley Electronics ACE Box
Transition box from module PV WIRE conductors to THWN-2 insulated conductors One transition box per inverter
Use 20A fuses
TO PV
MODULES
TO
INVERTER
TRANSITION BOX DETAIL
To building electrical distribution system
- - - + + + EG
C C
SMC 7000HV -11 Inverters
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
NOB
MPS
1 2 3
TRANSITION BOX A1
SUNNY TOWER ASUNNY TOWER B
TRANSITION BOX B3 TRANSITION BOX A2 TRANSITION BOX A3
TRANSITION BOX A4
TRANSITION BOX A5 TRANSITION BOX A6
TRANSITION BOX B2
TRANSITION BOX B1
SEE VIEW 1 BE1.08
EG
TRANSITION BOX
@ PV ARRAY
MC-4
CONNECTOR
SCHEMATIC OF PV STRING WIRING
N.T.S.
BACKSIDE OF
SUNPOWER 320W MODULE
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
N.T.S.
NOB1
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
Panelboard MDP
400A, 400/230VAC
25kA Interrupt (Existing) Sheet E6-602
30A, 3P
C
Inverter breakers 38, 40, 42
UTLSB-U
1600A bus, CB#1, 400A CB, 65kAIC
UTLSG-U
‘CB#11’
3000A bus, 1000A CB, 65kAIC
UTLSG-E-U
‘CB#3’
3000A bus, 3000A
G Transformer
15kVΔ :400/230Y
2MVA
Room MQ110
Sunny Tower A Located on rooftop
Exterior AC Disconnect
Square D HU363RB
100A, 600VAC,
isolated neutral, NEMA 3R
(provided by others)
Sunny Tower “A” 6 x SMC 5000A Inverters
(3 used/3 spare)
INV
A1
A1
INV
A2
A2
INV
A3
A3
ESS ESS ESS
Transition Boxes @ PV Arrays
A
B
Array
DC
AC
6-PV wire 4 mm2, #8G bare
¾” RGS, 6#10 THWN-2, #8 EGC
1 1/4" RGS, 4#4 THWN-2, 1#6 G
Conduit & Conductor requirements Conduit & WireDescriptionLabel
B A
C
General notes:
-See sheet BE2.07 for PV array layouts & location -See sheet BE2.08 for Sunny towers, inverters, disconnects & DAS equipment layout -See sheet BE6.01 for Data Acquisition Plan
Sunny tower A configuration:
48 Sunpower SPR 320E-WHT-D PV Modules One array per inverter; Three arrays total Each array comprised of 2 strings of eight modules or 16 modules per inverter Voc =518 , Isc = 6.24A Location: rooftop Positive Ground
400A
TRANSITION BOX DETAIL
To building electrical distribution system
Wiley Electronics ACE Box
Transition box from module PV WIRE conductors to THWN-2 insulated conductors One transition box per inverter
Use 20A fuses
TO PV
MODULES
TO
INVERTER
- - - + + + EG
C
SMC 5000A Inverters
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
MSGQ
12 111
222222211111111
2222222
THRU ROOF INTO STAIRWELL
1111 1111
22222222
EXTERIOR AC DISCONNECT
(TOWER "A")
A
A SEE BE2.08
SUNNY TOWER "A"
10'-111 4" [3333mm]
9'-41 8" [2849mm]
TRANSITION BOX A2
TRANSITION BOX A3
TRANSITION BOX A3
MAINTAIN 4' MIN. WORKING SPACE
PER NEC 2008 ARTICLE 110.26
EG
TRANSITION BOX
@ PV ARRAY
MC-4
CONNECTOR
SCHEMATIC OF PV STRING WIRING
N.T.S.
BACKSIDE OF
SUNPOWER 320W MODULE
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
Scale: N.T.S.
MSGQ1
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
MSGQ
INV
B1
Sunny Tower B in elect.
room
B1
INV
B2
B2
INV
B3
B3
INV
B4
B4
INV
B5
B5
INV
B6
B6
A
B
INV
C1
Sunny Tower C in elect.
room
C1
INV
C2
C2
INV
C3
C3
INV
C4
C4
INV
C5
C5
INV
C6
C6
A
B
INV
A1
Sunny Tower A in elect.
room
A1
INV
A2
A2
INV
A3
A3
INV
A4
A4
INV
A5
A5
INV
A6
A6
A
B
INV
D1
D1
INV
D2
INV
D3
A
B
ESS
Transition Boxes @ PV Arrays
Transition Boxes @ PV Arrays
Transition Boxes @ PV Arrays
Transition Boxes @ PV Arrays
Switchboard WHU SEC2
800A, 400/230VAC
42kA Interrupt (Existing) Sheet E7-602
80A, 3P
800A
80A, 3P
Tower A – breaker 67, 69, 71
Tower B – breaker 73, 75, UTLSB-U
1600A bus, CB#5, 800A
UTLSG-U
‘CB3’
3000A bus, CB#3, 3000A
40A, 3P
80A, 3PTower C – breaker 79, 81, 83
Wall mounted inverters-breaker 74, 76, 78
D
40A, SP
40A, SP
AC Panel Board Square D NF418L1C 125A,3 ph, 400/230VAC MLO, NEMA 1
(provided by others)
40A, SP
F
G Transformer
15kVΔ :400/230Y
2MVA
Array
DC
AC
AC
AC
6-PV wire 4 mm2, #8G bare
¾” RGS, 6#10 THWN-2, #8 EGC
2" RGS, 4#1/0 THWN-2, #6 G
1 ¼” RGS, 4#4 THWN-2, #6 G
1" RGS, 6#8 THWN-2, #6 G
Conduit & Conductor requirements Conduit & WireDescriptionLabel
B A
C D E
C C
C
NOTE:
Inverters D2 & D3 are powered by PV arrays on the Parking Structure
General notes:
-See sheet BE3.07 for PV array layouts & location -See sheet BE3.08 for Sunny towers, inverters & disconnects.
-See sheet BE6.01 for Data Acquisition Plan
Sunny tower A,B,C configuration:
144 Sunpower SPR 320E-WHT-D PV Modules One array per inverter; Six arrays total Each array comprised of three strings of eight modules, or 24 modules per inverter Voc =518V, Isc = 6.24A Location: rooftop Positive Ground
Inverter D1 configuration:
24 Sunpower SPR 320E-WHT-D PV Modules One array per inverter; One array total Each array comprised of three strings of eight modules, or 24 modules per inverte Voc = 518, Isc = 6.24A Location: rooftop Positive Ground
ESS ESS ESS ESS ESS ESS ESS ESS ESS ESS ESS
ESS ESS ESS ESS ESS ESS ESS
Inverters D1, D2, D3 mounted on wall in elect. room of WHE
TRANSITION BOX DETAIL
ESS ESS
AC COMBINER PANEL DETAIL
N R S T G
To building electrical distribution system
SMC 7000HV -11 Inverters
SMC 7000HV -11 Inverters SMC 7000HV -11 Inverters
SMC 7000HV -11 Inverters
Wiley Electronics ACE Box
Transition box from module PV WIRE conductors to THWN-2 insulated conductors One transition box per inverter
Use 20A fuses
TO PV
MODULES
TO
INVERTER
- - - + + + EG
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
WHE
2 22
2 22
2 22
3 3
2 3
INVERTERS IN MEZZ. LEVEL ROOM
THRU ROOF INTO MEZZTHRU WALL INTO MEZZ
TRANSITION BOX C4 TRANSITION BOX C3 TRANSITION BOX C2
TRANSITION BOX C5TRANSITION BOX C6
TRANSITION BOX D1
TRANSITION BOX C1 TRANSITION BOX B6 TRANSITION BOX B5
TRANSITION BOX B3 TRANSITION BOX B4
TRANSITION
BOX B1
TRANSITION BOX A6 TRANSITION BOX A5 TRANSITION BOX A4 TRANSITION BOX A3 TRANSITION BOX A2
TRANSITION BOX A1
TRANSITION BOX B2
UNDERGROUND CONDUIT WITH
DC CONDUCTERS FROM PARKING CANOPY
EXTERIOR JUNCTION BOX FOR
TRANSITION FROM UNDERGROUND
TO ABOVE GROUND CONDUIT
TO BE FIELD LOCATED
EG
TRANSITION BOX
@ PV ARRAY
MC-4
CONNECTOR
SCHEMATIC OF PV STRING WIRING
N.T.S.
BACKSIDE OF
SUNPOWER 320W MODULE
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
Scale: N.T.S.
WAREHOUSE1 PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
WHE
C breakers 74, 76, 78E
Use RGS conduit above ground. Convert to PVC conduit underground from Parking Canopy to WHE Building if allowed by electrical specifications
Under ground
Above ground
Above ground
D2 D3
A
B
Transition Boxes @ PV Arrays
INV
D1
INV
D2
INV
D3
40A, SP
40A, SP
AC Panel Board Square D NF418L1C 125A,3 ph, 400/230VAC MLO, NEMA 1
(provided by others)
40A, SP
ESS
Inverters D1, D2, D3 mounted on wall in elect. room of WHE
NOTE:
Inverter D1 powered by the modules on
Warehouse
ESS ESS
Array
DC
DC
DC
AC
AC
6- PV Wire, 4mm2, #8G bare 3/4” RGS, 6#10 THWN-2, #8 EGC (above ground) 2” PVC, 6#8 THWN-2, #8 G (underground) -SINGLE CONDUIT 1” RGS, 6#10 THWN-2, #8 EGC (above ground) -TWO SEPERATE CONDUITS
1 1/2” RGS, 4#2 THWN-2, #6 G
1" RGS, 6#8 THWN-2, #6 G
Conduit & Conductor requirements Conduit & WireDescriptionLabel
B A
C
E F
Switchboard WHU SEC2
800A, 400/230VAC
42kA Interrupt (Existing) Sheet E7-602
80A, 3P
800A
80A, 3P
UTLSB-U
1600A bus, CB#5, 800A
UTLSG-U
‘CB3’
3000A bus, CB#3, 3000A
40A, 3P
80A, 3P
G Transformer
15kVΔ :400/230Y
2MVA
General notes:
-See sheet BE5.07 for PV array layouts & location -See sheet BE4.08 for Sunny towers, inverters & disconnects -See sheet BE6.01 for Data Acquisition Plan
Sunny tower D configuration:
48 Sunpower SPR 320E-WHT-D PV Modules One array per inverter; two arrays total Each array comprised of three strings of eight modules or 24 modules per inverter Voc = 518A , Isc = 6.24A Location: rooftop Positive Ground
TRANSITION BOX DETAIL
Transition from above ground RGS conduit to underground PVC conduit at Parking Canopy
Transition from above ground RGS conduit to underground PVC conduit at Parking Canopy Junction box to be field located
D
D
F
To building electrical distribution system
Wiley Electronics ACE Box
Transition box from module PV WIRE conductors to THWN-2 insulated conductors One transition box per inverter
Use 20A fuses
TO PV
MODULES
TO
INVERTER
- - - + + + EG
D
SMC 7000HV -11 Inverters
SEPERATE CONDUITS
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
PARKING STRUCTURE
2 x 34" RGS CONDUIT
THRU ROOF TO COLUMN BELOW
1 1 1 1 1 1 1 2 2
3 3 3 3 3 3 3
2 2 22 22
1 1 1 1 1 1 1 1
2 22 2 22 223 3 3 3 3 3 3 3
TRANSITION BOX D2
TRANSITION BOX D3
EG
TRANSITION BOX
@ PV ARRAY
MC-4
CONNECTOR
SCHEMATIC OF PV STRING WIRING
N.T.S.
BACKSIDE OF
SUNPOWER 320W MODULE
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
MC-4
CONNECTOR
Scale: N.T.S.
PARKING STRUCTURE1
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
PARKING STRUCTURE
INV
A1
Sunny Tower A in elect.
room
A1
INV
A2
A2
INV
A3
A3
INV
A4
A4
INV
A5
A5
INV
A6
A6
A
B
ESS
Transition Boxes @ PV Arrays
ESSESS ESS ESS ESS
INV
B1
B1
INV
B2
B2
INV
B3
B3
ESS ESS ESS
Transition Boxes @ PV Arrays
A
B
Panelboard UBPU
400A, 400/230VAC
65kA Interrupt (Existing) Sheet E8-605
80A, 3P
30A, 3P
Tower A – breaker 19, 21, 23
Tower B – breaker 25, 27, 29
C
UTLSB-U
‘CB#2’
1600A bus, 400A
UTLSG-U
‘CB#11’
3000A bus, 1000A
UTLSG-E-U
‘CB2’
3000A
G Transformer
15kVΔ :400/230Y
2MVA
Electrical Room – UTL-101 tie in point
UTL-
AC Disconnect Square D HU363
100A, 600VAC, isolated neutral, NEMA 1
(provided by others) AC Disconnect Square D HU363
100A, 600VAC,
isolated neutral, NEMA 1 (provided by others)
30A, SP
30A, SP
AC Combiner Panel Square D NF418L1C
125 A, 230/400 VAC,
isolated neutral, NEMA 1 (provided by others)
30A, SP
C
D
Stand alone Inverters mounted on wall in elect.
room
Array
DC
AC
AC
AC
EGC
6-PV wire 6 mm2
¾” RGS, 6#10 THWN-2, #8 EGC
2" RGS, 4#1/0 THWN-2, #6 G
4" FMC, 2#8 THWN-2, #6 G FOR EACH INVERTER
4" RGS, 6#8 THWN-2, #6 G
#6 BARE COPPER, SEE DRAWING BE4.04
Conduit & Conductor requirements Conduit & WireDescriptionLabel
B A
C D
General notes:
-See sheet BE4.07 for PV array layouts & location -See sheet BE4.08 for Sunny towers, inverters & disconnects -See sheet BE.CD06 for Data Acquisition Plan
Sunny Tower A configuration:
144 SunpowerSPR 320E-WHT-D PV Modules One array per inverter; Six arrays total;
Each array comprised of three strings of eight modules or 24 modules per inverter Voc =518V, Isc = 6.24A Location: rooftop Positive Ground
Stand alone inverter (B1, B2 & B3) configuration:
48 Sunpower SPR 320E-WHT-D PV Modules One array per inverter; Two arrays total Each array comprised of 2 strings of eight modules or 16 modules per inverter Voc =518 , Isc = 6.24A Location: rooftop Positive Ground
400A
TRANSITION BOX DETAIL
AC COMBINER PANEL DETAIL
N R S T G
To building electrical distribution system
Wiley Electronics ACE Box
Transition box from module PV WIRE conductors to THWN-2 insulated conductors One transition box per inverter
TO PV
MODULES
TO
INVERTER
- - - + + + EG
SMC 5000A InvertersSMC 7000HV -11 Inverters
C
F
Dots indicate insulated terminals to convert from THWN-2 to PV wire inside Sunny Towers.
Add Sunclix connectors to PV wire for ESS connection.
Dots indicate insulated terminals to convert from THWN-2 to PV wire inside Sunny Towers.
Add Sunclix connectors to PV wire for ESS connection. Wireway "B"
50A, SP BREAKERS ON "L"
L1 , L
2, L
3, N
, P E
L, N, PE
Wireway "B"
Individual conduits
FSingle Conduit
G
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
UTIL
MPS
REVISED: 12/30/11 -ISSUE FOR CONSTRUCTION
ALL SCALES BASED ON FULL SIZED DRAWING 24"x36"
SUNNY TOWER "A"
WITH WEB BOX
INVERTER D1
SUNNY TOWER "B"
MSGQ
SUNNY TOWER "A"
WHE
SUNNY TOWER "A" SUNNY TOWER "B" SUNNY TOWER "C"
INVERTER D2 INVERTER D3
MEZZANINEROOFROOF
INVERTER B1
UTL
SUNNY TOWER "A"
INVERTER B2 INVERTER B3
ROOM 102
WIND
SENSOR
IRRADIANCE
SENSOR
AMBIENT
TEMP
MODULE
TEMP
SUNNY
SENSOR
POWER
INJECTOR
230V
AC OUTLET
NOB
LOBBY
ROUTER
SUNNY
MATRIX
DISPLAY
FTP FILE
SERVER
UPS
230V
230V
AC OUTLET
DATA- CAT5 NETWORK CABLE, SHIELDED, TWISTED PAIR,
INSULATED, MINIMUM AWG #24,
MAX LENGTH BETWEEN WEB BOX AND ROUTER IS 100M
A
DATA- RS 485 CABLE, FOUR CONDUCTOR,
SHIELDED, TWISTED PAIR, UV RESISTANT,
MAX LENGTH BETWEEN DEVICES IS 1,200M
B
DATA- SAME AS B
MAX LENGTH BETWEEN POWER INJECTOR AND SENSOR BOX IS 150M
C
CABLES SUPPLIED WITH SENSOR KITSD
AC POWER CORD SUPPLIED WITH EQUIPMENTE
A
E A
A
B B
B
E
C
D
UTL ROOF
M
AX
L
EN
GT
H
0M
MAX LENGTH 1,200M
M
AX
L
EN
GT
H
0M
MAX LENGTH 1,200MMAX LENGTH 1,200M
NOTE:
ALL DATA COMMUNICATION CABLES TO BE INSTALLED
IN CONDUIT PER REQUIREMENTS OF ELECTRICAL SPECIFICATIONS
PROJECT:
DESCRIPTION:
DWG BY: TSI CHK BY:
DATE: 07/18/11
SCALE: AS NOTED
SHEET No.
DATA ACQUISITION SYSTEM
File details come from the government source that posted it. Updated .