19BY7025Q0019_Solicitation_DCMRRoof_Design.docx

DOCX document 157 KB Posted

Attached to
DCMR Roof Design
Solicitation number
19BY7025Q0019
Issued by

About this file

This document is a Request for Quotations (RFQ) for architectural and engineering services to redesign the roof of the Deputy Chief of Mission Residence (DCMR) at the U.S. Embassy in Bujumbura, Burundi. The project requires a comprehensive professional design for a 5,000 square foot roof, including architectural, structural, mechanical, electrical, and lightning protection services. The government seeks a contractor to investigate the existing roof's condition, develop construction documents, provide cost estimates, and ensure compliance with local building codes.

Key details include a quote-to-budget range of $10,000 to $40,000, with quotations due by the 21st day at 11:00 a.m. Bujumbura time. Contractors must be registered in the System for Award Management (SAM), provide a pre-proposal site visit on June 4, 2025, and submit electronic quotations to BujProcurement@state.gov. The design process will involve 35%, 60%, and 100% design completion stages, with the government reviewing and providing feedback at each stage. Submissions must include detailed architectural drawings, structural calculations, material specifications, and a comprehensive construction cost estimate.

View the file

Other files

File Type Posted
NDAA _Form.pdf PDF
19BY7025Q0019_SF1442_DCMRRoof_Design.pdf PDF
Certification re anti-discrimination law.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Embassy Bujumbura, Burundi

PoBox: 1720
50 Avenue des Etats-UnisBujumbura, Burundi

May 22, 2025 Dear Prospective Quoter:

Subject: Request for Quotations number 19BY7025Q0019

Enclosed is a Request for Quotes (RFQ) for DCMR Roof design. If you would like to submit a quotation, follow the instructions in Section J of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter.

The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

The Embassy intends to conduct a pre-quotation conference at the site, The pre-proposal conference will be held on June 4, 2025, at 10.00 Bujumbura time at the U.S. Embassy Burundi. Prospective offerors/quoters should contact NiyongaboS@state.gov or call +25722207006 two days before for additional information or to arrange entry to the building.

Quotations are due by the last day of posting this solicitation, that is the 21st day at 11.00 a.m Bujumbura time. No quotations will be accepted after this time. Proposals must be in English and incomplete quotations will not be accepted.

Your quotation must be submitted electronically to BujProcurement@state.gov . It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-1442

2. Section A, Pricing

3. Section L Representations and Certifications

4. Additional information as required in Section J

5. Proof of SAM Registration Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102. Failure to be registered at the time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given.

6. Statement or certification of contracting a DBA Insurance for the award of the contract.

Sincerely,

Jamie M. Fleischhacker
Contracting Officer

Enclosure:

TABLE OF CONTENTS

SF-1442 COVER SHEET

A. PRICING

B. STATEMENT OF WORK

C. PACKAGING AND MARKING

D. INSPECTION AND ACCEPTANCE

E. DELIVERIES AND PERFORMANCE

F. CONTRACT ADMINISTRATION DATA

G. SPECIAL TERMS AND CONDITIONS

H. CLAUSES

I. LIST OF ATTACHMENTS

J. INSTRUCTIONS ON HOW TO SUBMIT A QUOTATION

K. EVALUATION CRITERIA

L. REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS

SECTION A – PRICING

A.1. The Contractor shall perform all work necessary to produce a complete set of construction plans and technical specifications sufficient for the construction of the facility described in this contract. This shall include, but is not limited to, any architectural and engineering design and analyses, construction cost estimates, renderings, photographs and scale models described in the Statement of Work.

A.2. VALUE ADDED TAX

VALUE ADDED TAX (VAT). The bidder shall include VAT 18% as a separate charge (if applied).

A.3. This is a firm fixedprice purchase order for Items 1 to 5 below in the amount of _____________.

Reimbursement of certain expenses in addition to the fixedprice is allowed in Section G.4.

The Contractor shall deliver the following items:

Item No.

Quantity

Unit

Description

Prices

CLIN0001
1
LOT
Construction Documents
$
CLIN0002
1
LOT
Construction Cost Estimate
$
CLIN0003
1
LOT
Architectural fees
$
CLIN0004
1
LOT
Service Fees Tax (if applied)
$
CLIN0005
1
LOT
VAT 18% (if applied)
$
Total amount for all items
$

SECTION B - STATEMENT OF WORK

B.1.0. GENERAL INFORMATION

The drawings will not be posted, they are available upon request at BujProcurement@state.gov

Introduction. The U.S. Embassy Bujumbura has the requirement to redesign the roof of the Deputy Chief of Mission Residence roof and wants to contract a professional Architect & Engineer responsible contractor to design the roof.

B.2.0. PROJECT REQUIREMENTS

B.2.1. Description of Project This project is for a professional A&E Services to investigate the condition and design of the existing 5,000 square foot Deputy Chief of Mission Residence’s roof, building envelope & associated waterproofing systems on the existing structures. The contractor shall follow all the requirements as stated in the Statement of Work - A&E Deputy Chief of Mission Residence Roof Assessment & Design Services.

B.2.2. General Requirements

B.2.2.1. This design is a multidiscipline effort that requires complete architectural and engineering services to define the construction, operating, and maintenance requirements of the roof. The Architect & Engineer shall provide all professional building envelope and waterproofing services that include but are not limited to architectural, structural, mechanical, electrical, lightening protection, and any other services to meet the project’s requirements.

B.2.2.2. This design is a part of a major program undertaken by the Department of State using public funds. The Government will formally evaluate the A/E Contractor based on several factors:

1. Technical expertise and experience

2. Quality of previous work and references

3. Ability to meet project schedule and deadlines

4. Cost and pricing structure

5. Compliance with local building codes and regulations

6. Design quality and accuracy

7. Communication and project management skills

8. Relevant certifications and licenses

B.2.2.3. The Contractor shall carefully review and coordinate drawings and specifications, and other project documents before submittal. This includes identifying all interface points and controls between drawings and documents. The Contractor shall have a quality control program in effect, which will require his employees and consultants to thoroughly review and coordinate all project data prior to submittals. The Contractor shall correct deficiencies, ambiguities, conflicts, and inconsistencies before submitting documents or they will be rejected by the Contracting Officer. The letter of transmittal shall certify that all documents have been reviewed and coordinated prior to submittal. The certification shall be signed by a principal of the Contractor’s firm. The Contracting Officer's Representative (COR) will review and approve the Quality Assurance/Quality Control (QA/QC) program proposed by the Contractor. This program shall indicate the method of controlling the quality of all work produced by the Contractor and consultants. Refer to FAR Clause 52.236-23, "Responsibility of the Architect/Engineer Contractor".

B.2.2.4. The Contractor shall produce detailed architectural drawings (AutoCAD or Revit files), structural drawings and calculations, specifications for materials and construction cost estimate. The layout of individual drawings shall convey the required design and construction information. Symbols used shall be accepted international industry standards and shall be shown in the legend. Lettering shall be of sufficient size to be clearly read when drawings are reduced to half size.

B.2.2.5. Specifications shall not rely on sole-source designations to circumvent the requirement for full and open competition in the purchase of construction materials and equipment. When a sole-source manufacturer, product, or equipment is specified, the Contractor shall notify the U.S. Government in written monthly progress reports. These reports shall be accompanied by a justification explaining why sole-source acquisition is necessary and appropriate for the project. The justification shall provide the information that would be required by the Federal Acquisition Regulation (FAR Subpart 6.3). The justification must also explain why the salient characteristics of proposed sole source equipment cannot be described in the specifications. No classified work shall occur under this contract.

B.2.2.7. Schedule requirements for this Statement of Work are contained in Section E. The "designto" budget cost data is contained in G.2.

B.2.2.8. The Contractor shall prepare a detailed written record of all conferences and meetings with representatives of Post related to the project. The Contractor shall also document telephone conversations in which decisions affecting the project are made. The Contractor shall submit one copy of these records to the Contracting Officer’s Representative (COR) within five days of the event. The written format established by the Contractor for these records will be subject to the approval of the COR. Each record shall conclude with the following statement: "The matters reported in this document are considered by the Contractor to be within the scope of this contract as presently priced.

B.2.2.9. The Contractor shall provide designs that are costeffective as to usable space and that provide maximum flexibility for future uses. The Government will exercise particular care in consideration of these requirements in the design review and approval process.

B.3.0. SPECIAL REQUIREMENTS

B.3.1. The Contractor shall provide specific operations and maintenance data and information for the development of a Comprehensive Maintenance Program (CMP) by the Government.

B.3.2. The Government will provide comments to the Contractor in writing and in a standard format, numbered and grouped by discipline. Review conferences will be held if deemed necessary by the COR. The Contractor shall respond to these comments in writing within 21 days for 70% and 100% design submissions. The A/E contractor shall incorporate all review comments into the design and return all annotated material with the next submission. Comments not accepted by the Contractor shall be brought to the attention of the Contracting Officer's Representative in writing immediately for resolution. Decisions of the Contracting Officer to incorporate the comments considered within the scope of work of the contract will be final. Review comments outside the existing contract scope of work will require a contract modification.

No work shall be initiated until the Government has provided review comments under each submittal. The Contractor shall provide in booklet form all comments and the actions taken in response to the comments.

B.4.0. EXISTING CONDITIONS

B.4.1. Site The compound has a parking area which is made up of flagstones. The compound has 2,550 square meters with four perimeter walls around it. A swimming pool of 72 square meters is located at West side of the compound.

The house has the first-floor level, the mezzanine and the second floor. The roof has four high level: the master bedroom, the office, the computer room, and the guest bedroom are under the first-floor roof. The kitchen and the storages are under the other first floor roof. The living room is under the mezzanine. The second master bedroom, the patios and a small living room are under the other roof level of the second floor. The electrical cables are already installed in the attic and need to be taken care of during the work.

B.4.2. Surveys The compound is located at 12, Av.de Juillet at Kiriri quarter, the avenue is located at 1.50m from one perimeter wall of the compound. The gate is located at that avenue and the access area has a slope of almost 25% to a large parking lot of almost six vehicles. The main house is located at the middle of the compound, at ten meters from the perimeter wall on the front side, five meters from the South, eleven meters from the North and twenty-five meters from the West side.

B.5.0 DESIGN REQUIREMENTS

B.5.1. General Requirements

The requirements in this statement of work serve as direction to the Contractor in the development and delivery of a complete set of construction documents. These documents shall provide the necessary interfaces, coordination, and communication among the designer, constructor, and special disciplines (physical security, communications, fire and life safety, and computer systems). All submittals must be of a quality to achieve this result. The Contractor shall perform its services in accordance with professional standards of skill, care, and diligence adhered to by reputable, firstclass firms performing services of the same or similar nature for facilities of similar complexity. The Contractor’s design shall conform to generally accepted engineering practices and the approved design criteria.B.5.2. Design Process The design shall consist of the following parts

A. 35% design completion
B. 60% design completion
C. 100% design completion

The Contractor shall be required to make oral presentations to the Government at Post

The Contractor shall cease all design work during the Government review periods until receipt of written review comments from the Government on each of these submittals. Any design work on the project during these review periods is at the Contractor's risk. The Contractor shall consider this temporary cessation of work in its planning and scheduling.

B.6.0. SUBMITTAL REQUIREMENTS

Architectural Drawings:

Roof plan Site plan Ceiling plan Electrical plan Elevations Sections Details (example: flashing, drainage)

Structural Drawings:

Roof framing Structural details (e.g., beams, columns) Foundation plan (if applicable)

Calculations and Analysis:

Structural calculations Load calculations (example: wind, snow) Analysis if roof stability and integrity

Specifications :

Material specifications (example: roofing materials, fasteners) Installation specifications B.6.4. Submittal Copies

The contractor shall provide the following submittal copies:

1. Bound Copies:

- 2-3 sets of bound, hard-copy drawings and specifications

- Bound in a professional format (e.g., 3-ring binder, stapled)

2. Unbound Copies:

- 1-2 sets of unbound, hard-copy drawings and specifications

- For review and comment purposes

3. Digital Copies:

- 1 set of digital files (e.g., AutoCAD, Revit, PDF)

- Files shall be organized and named according to project requirements

- Digital files shall be submitted on a CD, DVD

B.7.0. FURNITURE AND FURNISHINGS PRICING, DOCUMENTATION, AND INSTALLATION PHASE

B.8.0. POST DESIGN AND CONSTRUCTION SERVICES

B.8.1. During the construction solicitation period, the Government may require the Contractor to provide consultation services, including providing clarifications and responses to questions about the construction documents prepared by the Contractor at no cost to Government. The Contractor shall be in attendance at the construction preproposal conference at no additional cost to the Government.

B.8.2. To Government reserves the right to modify the contract to add services that may be required of the Contractor during actual construction of the project. These services, known as construction phase services, may include, but are not limited to, review of shop drawings, approval of materials and equipment, and approval of proposed substitutions of materials and equipment.

B.8.3. Section A provides pricing for these services.

B.8.4. Whenever such services are required the Government will issue a modification to identify the scope of services required. Payment for these services will be negotiated in a supplemental agreement based on the scope of services, staffing needs, and duration of services.

SECTION C - PACKAGING AND MARKING

Packaging and marking shall follow commercial practice.

Deliverable items other than letter reports shall be threehole punched and bound with screwtype binders and rubber bands.

The Contractor shall ship drawing sets in rolls

The Contractor shall address letters, and all deliverables as listed below:

U.S. Embassy Bujumbura 50, Avenue des Etas Unis Kigobe Sud – Ntahangwa Bujumbura, Burundi

SECTION D - INSPECTION AND ACCEPTANCE

D.1.0. INSPECTION

The Contractor shall maintain a system of quality assurance and quality control to ensure that the design and documentation of the design meet the requirements of this contract. The Government reserves the right to inspect the Contractor's work as well as its system of Quality Assurances and Quality Control (QA/QC).

The Contractor's key individual responsible for quality of design is responsible for overseeing the design process, ensuring compliance with project requirements and standards, and verifying the quality and accuracy of design documents..

D.2.0. ACCEPTANCE

Acceptance of deliverable items shall be by the COR. Acceptance or use of documents developed under this contract shall not relieve the Contractor of responsibility for the design.

D.3.0. QUALITY PROGRAM REQUIREMENTS FOR DESIGN CONTRACTS

The Contractor shall prepare and implement (based on approval by the Government), a Quality Assurance and Control Plan. The Contractor shall address the following areas in the plan:

D.3.1. Organizational Structure. Proposed organizational structure for the project, including charts and a description of responsibilities of key persons who will perform the work. The Contractor shall identify persons responsible for interface with the Government.

D.3.2. Document Control. The program must ensure that documents, including changes, will be reviewed for adequacy, approved for release by authorized personnel, and properly conveyed to the Government. The persons responsible for reviewing, approving, and releasing documents and revisions must be identified.

D.3.3. Verification. The Contractor shall identify the senior person (s) who will be responsible for final review and verification before documents are transmitted to the Government. Cursory supervisory reviews will not be sufficient. Design verification may vary from spotchecking of calculations to fullscale review of design drawings and specifications, as the situation requires.

D.3.4.Corrective Action. The quality program must clearly define responsibility and procedures for corrective action if deficiencies in the services or resulting deliverables are found.
D.3.5.Quality Assurance Reporting. The Contractor shall prepare a Quality Assurance (QA) report to be submitted as part of the contract. This report shall identify the QA procedures used to review drawings and data for these submissions. This report shall also identify steps taken to coordinate all drawings and documents prepared by the Contractor and subcontractors. The report shall include:
1.QA status of the project.
2.Significant program problems and their solutions/corrective actions.
3.Organization and key personnel changes, as required.

D.3.6. Checking, Coordinating, and Integrating Drawings. Quality control procedures shall ensure that individual drawings and other documentation have been checked and that all documentation, including that of the supporting disciplines (such as civil, structural, mechanical, electrical) has been coordinated and integrated. The Contractor shall correct deficiencies, ambiguities, conflicts, and inconsistencies before document submittal.

SECTION E - DELIVERIES AND PERFORMANCE

E.1.0. PERIOD OF PERFORMANCE

The contractor shall complete all work required by this contract within the period indicated in Delivery Schedule. This period includes up to 1 month (30 calendar days) for Government review and approval for each deliverable item required by the contract.

E.2.0. CONTRACTOR DELAYS

The project schedule is a key parameter of this project. Completion of the design and documentation is key to the project as a whole. Liquidated damages are anticipated for construction associated with this project; they are not required for this A/E effort. The Government will require adequate consideration for any slippage in schedule without excusable delay. The Contractor is required to document any delays and submit justification to the Contracting Officer.

E.3.0. DELIVERY SCHEDULE

The Contractor shall deliver the items listed in Section A on the following delivery schedule:

Item No.
Description
Days after effective date of order*
1
100% Construction Documents
1 month

E.4.0. DELIVERABLES

E.4.1. The Contractor shall deliver design submittals to the COR at the following address:

U.S. Embassy Burundi, 50 Avenue des Etats -Unis, Kigobe Sud – Ntahangwa Bujumbure, Burundi

E.4.3. All delivery charges shall be prepaid by the Contractor.

SECTION F - CONTRACT ADMINISTRATION DATA

F.1.0. 652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR)

(AUG 1999)

(a) The Contracting Officer may designate in writing one or more Government employees, by name or position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer and this authority is delegated in the designation.
(b) The COR for this contract is Nyenimana Olympe, Architect.

F.1.1. Duties

The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract. The COR is designated as the authority to act for the Contracting Officer in matters concerning technical clarification, inspection, and acceptance of the Contractor's performance under this contract. The COR will coordinate all work with the Contractor during the term of this contract. In no instance is the COR authorized to alter the contract's terms or conditions, including the design to budget parameter. Such changes must be authorized by the Contracting Officer in a written modification to the contract. Reference to the project architect within documents incorporated into this contract shall be read to mean COR.

F.2.0. INVOICING AND PAYING INSTRUCTIONS

F.2.1. The Contractor shall submit invoices in the original and three copies to the designated billing address indicated in this contract. The COR will determine whether the invoice is complete and proper as submitted. The COR also will determine whether billed services have been satisfactorily performed and whether reimbursable expenses billed are correct. If the amount billed is incorrect, the COR will, within seven days, ask the Contractor to submit a revised invoice.

F.2.2. The Contractor shall specifically identify its last invoice as "Final Invoice." The final invoice shall include the remaining payments due under the basic contract and any and all modifications issued. The final invoice shall also attach a "Contractor's Release Certificate". The Contractor should keep one copy of the certificate for its files and include the others with each copy of the final invoice. If the Contractor has any questions regarding payment status, contact the COR.

F.2.3. Monthly progress payments pursuant to the contract clause FAR 52.232-10 titled "Payments Under Fixed Price Architect Engineer Contracts” are not authorized. Payments for deliverable items listed in Section A shall be made in accordance with FAR 52.2321, "Payments." For reimbursable expenses listed in Section G, payment shall be made after an acceptable invoice has been submitted by the Contractor. The Contractor shall mail invoices to:

U.S. Embassy Bujumbura 50, Avenue des Etats – Unis Attention to: BujumburaFMOVoucher@state.gov Bujumbura, Burundi

Invoices shall reflect the contract number and the name of the COR.

F.2.4. The Contractor shall not be eligible to receive payments for any subsequent deliverables until the Government has accepted the previous deliverables.

SECTION G - SPECIAL TERMS AND CONDITIONS

G.1.0. SECURITY

The following considerations must be followed by the Contractor and/or must be incorporated into the design documents.

G.1.1. All documents received or generated under the contract are the property of the U.S. Government.

G.1.2. All documents are to be controlled and disseminated on a needtoknow basis. Reproduction and distribution is prohibited without express approval of the U.S. Government. The Contractor shall mark all design and construction documents as follows:

WARNING

This document is the property of the United States Government. Further reproduction and/or distribution is prohibited without the express written approval of:

U.S. EMBASSY Bujumbura
50, Avenue des Etats – Unis
Attention to : BujProcurement@state.gov

G.1.3. Proposed and actual contract documents will only be disseminated on a strict needtoknow basis, and will not be further disseminated without prior authorization from the Department of State.

G.1.4. Contractor personnel receiving proposed or actual contract documents, to include blueprints, other technical drawings, sketches, photographs, exposed negatives, and/or descriptive narratives pertaining to the project, will be responsible for these materials while in their possession, or that of any of their subcontractors. The Contractor shall return all documents, including all copies, promptly upon demand by the Government.

G.1.5. Photographs of any public areas of any U.S. diplomatic or consular facility overseas must be approved and authorized in advance by the Site Security Manager (SSM) and/or the Senior Security Officer (SSO). The SSO or SSM will establish any controls, limits, and/or other restrictions as deemed necessary. The Contractor shall submit a written request for authorization for such photography citing the reason(s) and use(s) for the photographs and/or negatives.

G.1.6. The Department of State shall be afforded the opportunity to review all photographs and negatives in advance of any public use, and reserves the right to deny such use. No further dissemination, publication, duplication, or other use beyond that which was requested and approved under this contract is authorized without specific advance written approval from the Department of State.

G.1.7. The Department reserves the right to demand retention of all copies of photographs and negatives.

G.2.0. QUOTETOBUDGET

G.2.1. The Government has established a quoteto-budget amount of a range between $10,000 USD to $ 40,000 USD for quotation of this project. This amount includes the following:

G.2.2. Anything not listed as being included in the quoteto-budget amount shall be considered excluded. By way of example, but not by limitation, this amount does not include:

· Allowances for Government Furnished Equipment

· Operations and maintenance

· Government project supervision during construction

G.3.0. CONSTRUCTION COST ESTIMATING

G.3.1. The Contractor shall prepare estimates of the cost of construction and these shall be marked as "Source Selection Information". The Contractor shall safeguard the confidentiality and prevent unauthorized distribution of these estimates.

G.3.2. The Contractor shall prepare construction cost estimates with the same attention to detail as if the Contractor were bidding on the project as a construction contractor. The Contractor shall base estimates on the same construction contract conditions and specifications that will be used by the Government for procurement of the facilities being designed. Attached for reference are the model construction contract documents and procedures used by the Department of State.

G.3.3. The Contractor shall provide estimates of the cost of construction of the facilities described in the Scope of Work with 100% Construction Documents submittals. These estimates shall indicate the anticipated cost of construction of the facilities in the country and local where such facilities are to be built at the estimated midpoint of construction in USD.

G.3.5. The Contractor shall furnish quantities and pricing data for each section within each division showing labor, materials, overhead, and profit. The Contractor shall furnish a list of all foreign materials to be used in the facilities with their unit prices compared to prices for comparable U.S. materials. The costs for U.S. materials shall include, as a separate item, the estimated shipping costs to the site of construction. If the Contractor has specified a foreign material and there is no comparable U.S. material, the Contractor shall identify the material and the price of the foreign material used.

G.4.0. REIMBURSABLE EXPENSES

No reimbursable expenses under this contract shall be considered.

G.5.0. ORGANIZATIONAL CONFLICTS OF INTEREST

Neither the Contractor nor any of its employees, affiliates, or related entities may propose on the construction effort envisioned by this contract. The Contractor, its employees, affiliates, or related entities may not provide consulting or subcontract services related to the construction to any offeror or prospective offeror on the construction contract.

The Contractor shall include this clause in all subcontracts, purchase orders, and consulting agreements for service.

G.6.0. RELEASE OF INFORMATION

All data furnished to the Contractor and data developed in connection with the project shall be considered privileged. The Contractor shall not make public announcements, including news and press releases; these are the prerogative of the Contracting Officer.

G.7.0. NOTIFICATION OF CHANGES

G.7.1. This clause applies to changes other than changes directed by the Government pursuant to the contract clause titled "Changes Fixed Price (AUG 87) Alternate III (APR 1984)."

G.7.2. Definitions. "Contracting Officer," as used in this clause, does not include representatives of the Contracting Officer.

G.7.3. Notice. The primary purpose of this clause is to obtain prompt reporting of Government conduct that the Contractor considers to be a change to this contract. Except for changes identified in writing and signed by the Contracting Officer, the Contractor shall notify the Contracting Officer in writing within ten (10) days from the date the Contractor identified any Government conduct (including actions, inactions, and written or oral communications) that the Contractor regards as a change to the contract terms and conditions. Any notification received after 10 days will not be considered. On the basis of the most accurate information available to the Contractor, the notice shall state -

(i) The date, nature and circumstances of the conduct regarded as a change;

(ii) The name, function, and activity of each Government individual and Contractor official or employee involved in or knowledgeable about such conduct;

(iii) The identification of any documents and the substance of any oral communication involved in such conduct;

(iv) In the instance of alleged acceleration of scheduled performance or delivery, the basis upon which it arose;

(v) The particular elements of contract performance that the Contractor may seek an equitable adjustment under this clause, including –

· What contract line items have been or may be affected by the alleged change;

· What labor or materials or both have been or may be added, deleted,or wasted by the alleged change;
· To the extent practicable, what delay and disruption in the mannerand sequence of performance and effect on continued performance have been or may be caused by the alleged change;

· What adjustments to contract price, delivery schedule, and other provisions affected by the alleged change are estimated; and

(vi) The Contractor's estimate of the time by which the Government must respond to the Contractor's notice to minimize cost, delay, or disruption of performance.

G.7.4. Continued Performance. Following submission of the notice required above, the Contractor shall diligently continue performance of this contract to the maximum extent possible in accordance with its terms and conditions as construed by the Contractor. Unless the notice reports a direction of the Contracting Officer or a communication from a representative of the Contracting Officer, the Contractor shall continue performance. However, if the Contractor regards the direction or communication as a change as described above, notice shall be given in the manner provided.

G.7.5. Government Response. The Contracting Officer shall, within thirty (30) days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer shall -

(1)Confirm that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance;
(2)Countermand any communication regarded as a change;
(3)Deny that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance; or
(4)Advise the Contractor what additional information is required and when, and establish the date by which it should be furnished and the date the Government will respond.

G.7.6. Equitable Adjustments.

If the Contracting Officer confirms that the Government conduct effected a change as alleged by the Contractor, and the conduct causes an increase or decrease in the Contractor's cost of, or the time required for, performance of any part of the work under this contract, the Government will modify the contract to make an equitable adjustment -

(1)In the contract price or delivery schedule or both; and
(2)Any other term of the contract affected.

In the case of drawings, designs, or specifications that are defective and the Government is responsible, an equitable adjustment shall include the cost and time extension for the delay reasonably incurred by the Contractor in attempting to comply with the defective drawings, designs, or specifications before the Contractor identified, or reasonably should have identified, such defect. When the cost of property made obsolete or excess as a result of a change confirmed by the Contracting Officer under this clause is included in the equitable adjustment, the Contracting Officer shall have the right to prescribe the manner of disposition of the property. The equitable adjustment shall not include increased costs or time extensions for a delay resulting from the Contractor's failure to provide notice or to continue performance as provided above.

G.7.7. Failure to agree to any adjustment shall be a dispute under the Disputes clause. Nothing in this section shall relieve the Contractor from proceeding with the work.

G. The Contractor shall show Value Added Tax (VAT) as a separate item on invoices submitted for payment.

SECTION H- CLAUSES

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.

If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.

THE FOLLOWING FEDERAL ACQUISITION REGULATION (48 CFR CH. 1) CLAUSES ARE INCORPORATED BY REFERENCE:

CLAUSE TITLE AND DATE

52.202-1 DEFINTIONS (JUN 2020)

52.203-3 GRATUITIES (APR 1984)

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

X 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2020)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE

(OCT 2018)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

X 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATION AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT OR VOLUNTARILY EXCLUDED (JAN 2025)

52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES (JAN 2025)

52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)

52.225-5 TRADE AGREEMENTS (NOV 2023)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT (FEB 2000)

52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)

52.227-17 RIGHTS IN DATA – SPECIAL WORKS (DEC 2007)

X 52.228-3 WORKERS’ COMPENSATION INSURANCE (DEFENSE BASE ACT)

(JUL 2014)

52.228-4 WORKERS’ COMPENSATION AND WAR HAZARD INSURANCE OVERSEAS (APR 1984)

52.229-6 TAXES – FOREIGN FIXED PRICE CONTRACTS (FEB 2013)

52.232-1 PAYMENTS (AUG 1984)

52.232-7 PAYMENTS UNDER TIME-AND-MATERIALS AND MATERIALS LABOR-HOUR CONTRACTS (NOV 2021)

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

52.232-10 PAYMENTS UNDER FIXED-PRICE ARCHITECT-ENGINEER CONTRACTS (APR 2010)

52.232-11 EXTRAS (APR 1984)

52.232-18 AVAILABILTY OF FUNDS (APR 1984)

52.232-26PROMPT PAYMENT FOR FIXED-PRICE ARCHITECT-ENGINEERCONTRACTS (JAN 2017)
52.232-33PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FORAWARD MANAGEMENT (OCT 2018)

52.233-1 DISPUTES (MAY 2014) Alternate I (DEC 1991)

52.233-3 PROTEST AFTER AWARD (AUG 1996)

52.236-22 DESIGN WITHIN FUNDING LIMITATIONS (APR 1984)

52.236-23 RESPONSIBILITY OF THE ARCHITECTENGINEER CONTRACTOR (APR 1984)

52.236-24 WORK OVERSIGHT IN ARCHITECTENGINEER CONTRACTS (APR 1984)

52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT AND VEGETATION (APR 1984)

52.242-14 SUSPENSION OF WORK (APR 1984)

52.243-1 CHANGES – FIXED PRICE (AUG 1987) Alternate III (APR 1984)

52.243-3 CHANGES – TIME-AND-MATERIAL OR LABOR-HOUR

(SEPT 2000)

52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996)

52.246-26 REPORTING NON-CONFORMING ITEMS (AUG 2024)

52.249-7 TERMINATION (FIXED-PRICE ARCHITECT-ENGINEER)

(APR 1984)

52.249-14 EXCUSABLE DELAYS (APR 1984)

I. THE FOLLOWING FAR CLAUSE(S) IS/ARE INCORPORATED IN FULL TEXT:

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(a) Definitions. As used in this clause— Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).

Covered foreign country means The People’s Republic of China.

Covered telecommunications equipment or services means–

(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);

(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);

(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or

(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

Critical technology means–

(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;

(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-

(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

(ii) For reasons relating to regional stability or surreptitious listening;

(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);

(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or

(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 ( 50 U.S.C. 4817).

Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.

Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.

Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.

Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.

(c) Exceptions. This clause does not prohibit contractors from providing—

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(d) Reporting requirement.

(1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause

(i) Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.

(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.

(End of clause)

52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES) (JAN 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(iv) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.

(v) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) (Pub. L. 115–390, title II).

(vi) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

(vii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(viii) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

(ix) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(xi) 52.233-3, Protest After Award (Aug 1996) ( 31 U.S.C. 3553).

(xii) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) ( Pub. L. 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (Apr 1984).

(ii) 52.232-8, Discounts for Prompt Payment (Feb 2002).

(iii) 52.232-11, Extras (Apr 1984).

(iv) 52.232-25, Prompt Payment (Jan 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (Jun 2013).

(vi) 52.233-1, Disputes (May 2014).

(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (Jan 2025).

(viii) 52.253-1, Computer Generated Forms (Jan 1991).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020)(Pub. L. 109-282) ( 31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(iii) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025) ( E.O. 13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and…

This is the start of the file's text. The full file is on GovTribe.