Attachment 1 - Statement of Work (A0002).docx

DOCX document 67 KB Posted

Attached to
IT Solution for UIN
Solicitation number
19AQMM27Q0008
Issued by

About this file

This is a Statement of Work (SOW) for an IT solution supporting the U.S. Department of State's initiative to provide geospatial imaging and analysis capabilities to Mexico's Secretariat of the Navy, Naval Intelligence Unit (MARINA-UIN). The SOW outlines procurement of 24 workstations featuring Intel Xeon W5-2565X processors with NVIDIA RTX A6000 graphics cards and 128 GB DDR5 RAM; 20 Dell Pro 24" monitors and 14 Dell UltraSharp 40" curved monitors; perpetual licenses for ArcGIS Pro Advanced with nine required extensions (12 seats), ArcGIS Enterprise Standard with high availability architecture, ArcGIS Image Server for four cores, and four floating SOCET GXP eXtreme Analysis Bundle licenses; and comprehensive on-site installation and configuration services. All hardware must be new and arrive without damage, with refurbished or used items explicitly prohibited. Delivery of hardware is required no later than 60 business days after contract award, with installation completion within 30 business days thereafter at the MARINA-UIN facility in Mexico City.

The contractor bears full responsibility for customs clearance, importation taxes, and all required Mexican import permits and documentation, including obtaining proper invoices (Facturas) compliant with Mexican fiscal regulations to enable U.S. Government VAT reclamation. Installation services must be performed entirely on-site and include configuration of SSL/TLS certificates, users, groups, roles, permissions, map and image services, security mechanisms, backup and recovery procedures, and high-availability failover testing. All software must be provided as perpetual licenses with 12 months of maintenance and support beginning at license activation, including patches, updates, and Spanish-language technical support Monday through Friday, 8:00 to 17:00 Mexico City time, with four-hour maximum response time. Hardware and software carry a 12-month in-country warranty beginning at INL inspection and acceptance for hardware and license activation for software. Payment is made following satisfactory inspection and acceptance, with partial invoicing permitted for delivered hardware and subsequent invoicing for installation services upon end-user confirmation of functionality.

View the file

Other files

File Type Posted
Attachment 2 - Pricing Table (A0002).xlsx XLSX spreadsheet
19AQMM27Q0008 - Questions and Answers.xlsx XLSX spreadsheet
19AQMM27Q0008-A0002 (SF-1449).pdf PDF
19AQMM27Q0008 NMR Individual Waiver (Redacted).pdf PDF
19AQMM27Q0008-A0001 (SF-1449).pdf PDF
Attachment 1 - Statement of Work.docx DOCX document
19AQMM27Q0008 (SF-1449).pdf PDF
Attachment 2 - Pricing Table.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

INL- CounterFTOs and Counternarcotics

IT Solution for the Mexican Navy - Naval Intelligence Unit

1. GENERAL

The U.S. Department of State is supporting an on-going, long-term effort between the U.S. and Mexican Governments to detect, deter, prevent, and mitigate criminal activity in Mexico and its effects in both Mexico and the United States.

The overall objective of this contract is to provide the Secretariat of the Navy - Naval Intelligence Unit (MARINA-UIN) with an IT solution, including hardware and software, needed to conduct geospatial imaging and analysis to support ongoing operations.

2. SCOPE

The scope of work consists of procuring all the equipment, software and services listed in APPENDIX A: Technical Specifications of this Statement of Work (SOW). All goods shall be new, arrive without damage and meet or exceed the salient characteristics as detailed. Refurbished, recycled or used items are not acceptable. Items outlined under APPENDIX A shall be brand name or equal.

3. DELIVERY DATE

Delivery of the hardware requested in this SOW is expected no later than 60 business days after the contract award. Installation services are also required. Installation shall be completed within 30 business days after hardware is delivered and accepted at MARINA-UIN facilities.

4. DELIVERY ADDRESS

The Contractor is responsible for delivering all requested items in accordance with contract specifications to the following address:

MARINA-UIN

Eje 2 Oriente Heroica Escuela Naval Militar Núm. 861 Colonia Los Cipreses Alcaldía Coyoacán C.P. 04830 Mexico City

5. GENERAL PERFORMANCE REQUIREMENTS

5.1. The Contractor shall describe the technical specifications of the proposed goods and include color photographs and technical specification sheets of the items.

5.2. Importation permits and licenses: The Contractor shall be aware that if any item is purchased outside Mexico, INL Mexico will not be involved in the importation process at any time or under any circumstance. The Contractor shall also note that INL Mexico will not provide anyone nor sign documents related to the importation process since INL Mexico is not authorized by the Secretariat of Foreign Affairs (Secretaria de Relaciones Exteriores) to act as an importer of goods to be transferred to the Government of Mexico.

The Contractor is solely responsible for clearing customs in Mexico, paying importation taxes, and providing all required importation permits and paperwork in compliance with Mexican regulations. All shipping/export documentation and relevant permits/licenses, or any other documentation necessary for the importation of the goods to Mexico, shall be submitted to INL Mexico as requested.

5.3. Delivery and logistics: The items acquired will be donated to MARINA-UIN. The Contractor shall wait to receive written authorization from INL Mexico Logistics to deliver the items described in this SOW. No item can be delivered without previous authorization and coordination with INL Mexico Logistics. Once the Contractor gets written approval, a specific delivery date will be established.

The Contractor shall ensure all items are prepared for safe transportation once confirmation from INL Mexico Logistics is received and shall consolidate the entire shipment to prevent loss and misdirection. The contractor is responsible for the unloading of the goods.

The Contractor´s personnel shall be physically on site at the time of delivery to perform the inventory, unless other instructions are provided by INL Mexico. Contractor´s personnel shall unpack and check each of the items described in APPENDIX A in presence of the end user and INL Mexico to make sure that all the items are delivered in good condition.

The Contractor, upon notification, shall replace lost or damaged items during shipment. Any costs or arrangements associated with getting the employees and equipment to the site location shall be included in the cost proposal.

5.4. Bill of materials: The Contractor shall provide a detailed bill of materials to the following address: mexicocityinllogistics@groups.state.gov to be verified and ratified by INL Mexico Logistics. The list shall include item description, name of manufacturer, serial number, delivered quantity, volume and dimensions, unit price and extended price. All paperwork shall be provided at least 5 business days before the goods are transported and delivered to destination. One copy of the packing list and commercial invoice shall accompany the shipment, attached to the outside of each box/carton/package.

5.5. Inspection and acceptance: The final inspection and acceptance of all items will be performed by the U.S. Government upon arrival at MARINA-UIN facilities. The payment(s) to the Contractor shall be made following satisfactory inspection and acceptance of products by the Office of INL in Mexico.

Partial invoicing is accepted. If the Contractor is ready to deliver the hardware and receives written authorization from INL Mexico Logistics to proceed, it can be delivered at MARINA-UIN facilities, and the Contractor will be able to submit a partial invoice for those goods. MARINA-UIN will store all the equipment until installation is completed. After installation finishes and the end user confirms all the equipment and software licenses work properly, the Contractor will be able to submit a new invoice for those services.

5.6. Quality Assurance: If the end user or INL Mexico officials find that a material is incomplete or defective, they should immediately refuse to receive it and notify the Contractor. If the contractor fails to meet the performance standard, the U.S. Government reserves the right to take action, including deducting from any invoice.

6. INSTALLATION SERVICE

6.1. The Contractor shall install, configure, and integrate all hardware and software at the MARINA-UIN facility in Mexico City identified in Section 4. All installation and configuration shall be performed on-site. Remote installation is not permitted. . After all the equipment is delivered and accepted at MARINA-UIN’s facilities, the Contractor shall coordinate the installation service with the Contracting Officer’s Representative (COR) at least 10 business days before starting on-site work. No labor shall begin until the COR confirms in writing that the location is ready.

6.2. Installation services shall include the installation, configuration, integration, and commissioning of ArcGIS Enterprise Standard and ArcGIS Image Server, encompassing Portal for ArcGIS, ArcGIS GIS Server, ArcGIS Data Store, and ArcGIS Web Adaptor. The service shall include the configuration of SSL/TLS certificates, users, groups, roles, permissions, map and image services, raster data stores, security mechanisms, backup and recovery procedures, as well as Raster Analytics capabilities, a Hosting Server, and high-availability testing.

The migration of existing data, geospatial databases, or satellite imagery is not required, nor is the integration of the solution with other institutional systems at MARINA-UIN.

6.3. MARINA-UIN will provide the server infrastructure, virtual machines, server operating systems, storage, network connectivity, power and cabling needed for the solution. The Contractor shall state the minimum specifications for each virtual machine (vCPU, RAM, storage and operating system) in its technical proposal.

6.4. After installation and integration, the Contractor shall perform operational capability testing to confirm that all hardware and software meet the contract requirements and operate properly. The testing shall include a high-availability failover test of ArcGIS Enterprise and ArcGIS Image Server, and a check that all four SOCET GXP concurrent seats can be checked out. The Contractor shall provide written test results to the COR.

7. REQUIREMENTS FOR SOFTWARE LICENSES

7.1. All software in CLINs 1, 4, 5, 6 and 7 shall be provided as perpetual licenses. Subscription and term licenses are not acceptable. All software shall be the most recent version available at the time of delivery and officially supported by the manufacturer.

7.2. The Contractor shall provide 12 months of software maintenance and technical support, beginning on license activation. Maintenance and support shall include: all patches, updates, firmware and new software versions the manufacturer releases during the maintenance period, delivered in a format that can be installed offline; and technical support in Spanish by email or phone, Monday through Friday, 8:00 to 17:00 (Mexico City time), with a response time of four hours or less after an incident is reported.

8. WARRANTY

8.1. The equipment offered shall be covered by a 12-month, in-country, supported warranty on all hardware and software components. The Contractor shall deliver the warranty policy, installation manuals, and tech support contact information the same day as the equipment.

8.2. The hardware warranty term shall begin at INL inspection and acceptance and software maintenance shall start at license activation.

8.3. The warranty service shall include phone support, onsite component replacement, and problem resolution. To guarantee long term warranty support in Mexico, the Contractor shall verify that equipment manufacturer(s) has (have) local presence in Mexico and be able to provide technical and warranty support for equipment and software in Spanish.

8.4. If the Contractor receives a warranty claim for defects in materials, functioning, or workmanship, the equipment will be sent to the nearest Contractor’s location to perform an evaluation, verify the status of the claim and respond officially to the warranty claim. If the Contractor determines that the product has a defect covered under warranty, the Contractor shall replace the product or the part at no additional cost. Neither MARINA-UIN nor INL will be responsible for transportation or any additional charge incurred when a product or a part needs to be replaced under warranty policy.

8.5. All expenses related to warranty application after donation to MARINA-UIN are the Contractor´s responsibility. Neither MARINA nor INL will be involved in the warranty application.

9. DELIVERABLES

Deliverables are summarized in Table 1. All days listed below refer to business days.

TABLE 1

Deliverable
Due Date
Frequency
Distribution
D01– Export/Import plan
As part of the proposal
Once
Contracting Officer (CO)
D02 – Bill of materials
5 days before the agreed delivery date
Once
COR, INL Logistics
D03 – Equipment and software
NLT 60 days after contract award
Once
COR, INL Logistics, MARINA-UIN
D04 – Installation services
Within 30 days after delivery and acceptance of the equipment
Once
COR, MARINA-UIN
D05 – Results of the operational capability testing
After installation and integration of all hardware and software.
Once
COR, MARINA-UIN
D06 – Warranty and technical support
Hardware: shall begin at INL acceptance.

Software maintenance: shall start at license activation.

Both shall be valid for 12 months

Once
MARINA-UIN

10. VAT RECLAMATION

Value Added Tax (VAT) is 16% or the one stated in the Value Added Mexican Law Tax (VAT: https://www.diputados.gob.mx/LeyesBiblio/pdf/LIVA.pdf), for payments associated with the in-country purchases of goods, materials or services required to perform this contract.

The contractor shall follow the invoicing procedures established by INL to allow the U.S. Embassy Mexico to reclaim the IVA/VAT taxes charged. VAT, or “IVA” as it is known in Mexico, shall be itemized in all invoices. In order for the contractor to claim VAT on its invoices, the Contractor is required to obtain an invoice, “Factura”, from a Mexican Company that complies with all the requirements of Article 29 A of the Mexican Fiscal Code or obtain a VAT Registration Identification Number from the Secretaria de Hacienda y Crédito Público to emit its own facturas.

The Contractor shall provide the necessary invoicing requirements to enable the USG to obtain reimbursement for VAT. This reimbursement benefit is extended only to the U.S. Government – not the Contractor – as a diplomatic privilege. The following/current Factura´s requirements are outlined in the paragraphs below.

All Facturas, the Contractor delivers to the U.S. Government shall be in accordance with VAT Mexican Tax regulations:

(VAT: http://www.diputados.gob.mx/LeyesBiblio/ref/liva.htm) and Mexican Fiscal Code (MFC: http://www.diputados.gob.mx/LeyesBiblio/ref/cff.htm).

The Contractor’s failure to follow these procedures shall result in the U.S. Government’s inability to secure tax reimbursement on this contract, resulting in VAT payment in the Invoice being denied to the contractor. Facturas for the in-country purchases described above shall include only charges authorized in this contract. Such Facturas shall list separately or collectively the pre-tax price of any supplies or services provided in country.

As it is required by local authorities, the Contractor shall impose the appropriate tax rate against the pre-tax total of the purchases represented on the Factura. The Contractor shall submit the invoices associated with such purchases as supporting documentation for its in-country payment request. The USG shall only compensate the Contractor for the tax amount provided on such Facturas and in any case VAT reimburse won’t exceed the amount authorized in the contract for this purpose.

VAT on items such as contractor personnel housing, personal vehicles, utilities, phone charges, per diem, etc. are excluded from reimbursement.

All Facturas shall be addressed to “Embajada de Estados Unidos de Norteamerica” as stated in the below requirements.

The contractor´s Factura shall provide at least the following in accordance with Article 29 A of the Fiscal Mexican Code:

· Issuer’s name and address

· Issuer’s Federal Tax Registry Number (RFC) (aka Certificate of Fiscal Identification)

· Photo image of Federal Tax Registry card (aka Certificate of Fiscal Identification) on the invoice

· Invoice number and complete transaction date (month, day, and year). Also needed is the date and place of issue (Lugar y fecha de expedición). The two dates shall be the same.

· Required legal wording that addresses the illegal reproduction of the document. The printing company information shall annex the date of printing and official authorization number

· Customer ´s Name: “Embajada de Estados Unidos de Norteamérica”

· U.S. Embassy R.F.C. Number: EEU930201289

· Quantity and description of acquired services or merchandise

· If applicable, the number and date of customs import documents associated with all sales of imported merchandise

· Invoice(s) received in Mexican pesos shall also include, in the legend, the date and exchange rate used when the invoice was emitted by the Mexican company. The exchange rate noted on the Mexican company’s invoice will be used to reimburse VAT to contractors.

· Invoice shall say “FACTURA.” All digital invoices (“FACTURAS”) shall be presented to the Embassy/ Contracting Officer Representative (COR).

· The tax-relief invoice shall be written in English and Spanish versions.

· Invoice shall have a valid digital seal.

The requirements above apply to all supplies and services purchased in Mexico that are provided to the USG as part of this contract. All IVA/VAT documentation shall be submitted to the COR for approval and submission to Hacienda at the time of the invoice request for payment. Once a Contract is awarded, the CO will provide instructions for invoice submission.

The Contractor shall also obtain and submit the “Complemento de Pago” in each factura as the primary proof of payment. According to the Fiscal Mexican Regulation, all vendors shall issue this Complement of Invoice Payment after receiving their pay from their facturas labeled as “Pago en parcialidades”.

Attached is the link with additional information Complemento de pagos - Factura electrónica - Portal de trámites y servicios - SAT

11. NON-PAYMENT FOR UNAUTHORIZED WORK

No payments will be made for any unauthorized services or supplies, or for any unauthorized changes to the work specified herein. This includes any services performed by the Contractor of its own volition or at the request of an individual other than a duly appointed Contracting Officer. Only a duly appointed Contracting Officer is authorized to change the specifications, terms, and/or conditions of this contract. Any such changes will be made in writing by the Contracting Officer.

APPENDIX A. Technical Specifications

CLIN
Item
Qty.
Unit
Technical Specifications
1
Workstations
24
Ea.
Processor: Intel Xeon W5-2565X (37.5 MB CACHE, 18 CORES, 36 THREADS, 4.8 GHz TURBO, 240W)

Operating System: Windows 11 Pro (64-bit) Graphics card: NVIDIA RTX A6000 (48 GB GDDR6) or an equivalent or superior professional GPU with at least 48 GB of memory Memory and Storage: 128 GB DDR5 ECC RAM; 1 TB NVMe SSD; 4 TB SATA HDD Peripherals & Software: Spanish-language wired keyboard, wired mouse, required DisplayPort cables compatible with the GPU and monitor inputs, and Microsoft Office LTSC 2024 Perpetual License (Word, Excel, PowerPoint, OneNote, Outlook)

DELL PRECISION 5860 Tower or equal

2
Monitors 24”
20
Ea.
24" Flat screen monitor

15W via USB-C downstream port Resolution 1920 x 1080 In-Plane Switching (IPS) technology

Dell Pro 24 Plus Monitor - P2425H or equal

3
Curved monitors 40”
14
Ea.
40" Curved screen monitor

WUHD (5120 x 2160) Resolution IPS Black Panel Type Height-adjustable stand Integrated USB Hub Integrated speakers

Dell UltraSharp 40 Curved Thunderbolt Hub Monitor - U4025QW or equal

4
ArcGIS Pro Perpetual Licenses
12
Ea.
Perpetual license

Core Software: ArcGIS Pro Advanced (Perpetual) Required Perpetual Extensions:

• ArcGIS 3D Analyst

• ArcGIS Data Reviewer

• ArcGIS Geostatistical Analyst

• ArcGIS Image Analyst

• ArcGIS LocateXT

• ArcGIS Network Analyst

• ArcGIS Publisher

• ArcGIS Spatial Analyst

• ArcGIS Workflow Manager

5
ArcGIS Enterprise Standard
1
Ea.
License Type: Perpetual Server License including perpetual Creator/Viewer user entitlements

5 creator user types in addition to the 12 Pro Perpetual licenses in CLIN 4.

250 viewer user types Managed centrally via the ArcGIS Enterprise portal.

Contractor shall install and configure ArcGIS Enterprise Standard on agency-provided VMs using an Active-Passive High Availability (HA) architecture with automated failover and redundancy to ensure continuous operation without requiring duplicate active core licenses.

The Contractor shall state the minimum VM specifications in its proposal.

6
ArcGIS Image Server
1
Ea.
License Type: Perpetual Server License (Licensed for four cores).

The Contractor shall install, configure, and enable Raster Analytics and Image Hosting capabilities on agency-provided VMs, integrated into the Active-Passive High Availability architecture in CLIN 5.

The Contractor shall state the minimum VM specifications in its proposal.

7
SOCET GXP
4
Ea.
License Type: Perpetual Floating License

SOCET GXP eXtreme Analysis Bundle.

Included Modules: GeoAnalysis, Multi-Sensor Triangulation, Ortho-Mosaic Manager, Automatic Terrain Generation (AutoSOCET), Interactive Terrain Editing, Automatic Feature Collection, Spatially Enabled Exploitation, and SOCET for ArcGIS.

8
Installation service
1
Svc.
Per section 6

SBU - CONTRACTING AND ACQUISITIONS

SBU - CONTRACTING AND ACQUISITIONS

File details come from the government source that posted it. Updated .