This document is a solicitation for the Senegal Multifunctional Classroom Building and Warehouse Construction Project, Solicitation Number 19AQMM24R0105, issued by the Department of State Office of Acquisition Management.
The solicitation requires the construction of a multifunctional classroom building and a multipurpose warehouse in Senegal. Key details include:
- The classroom building shall have a single-story structure with removable partitions to allow for different room configurations. The warehouse shall be a pre-engineered or steel truss building.
- Proposals are due by the proposal deadline, and soft copy submission is acceptable. Contractors must provide a current copy of their Senegalese business authorization with their proposal.
- The contract has an 11-month construction period after issuance of the Notice to Proceed. Contractors shall propose technical solutions to meet the stated requirements.
- Relevant project experience, past performance, and other evaluation factors will be used to assess proposals. There is no requirement for a bid guarantee, but performance and payment bonds will be required.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19AQMM24R0105
| Nmbr | Question | Answer |
| 1 | Section: Attachment 3 - Appendix 1 to Senegal Classroom SOW (CAD Drawings), Task A |
| Question: We observe some discrepancies between floor plan and sections & elevations which lead to different building areas. (Dimensions are not provided in plan view, different axis designations for plan and elevation views). Please Clarify. | See revised SOW, including revised Appendix 1. While the revised drawings reflect the intent of the design, they are not fully finished. The finished A&E will be based on the illustrated design intent and the responsibility of the contractor. | |
| 2 | Section: Attachment 3 - Appendix 1 to Senegal Classroom SOW (CAD Drawings), Task A |
| Question: “Attachment 1 - 19AQMM24R0105 SOW ” item 3.1.2. states that “…with removable partitions that allow larger space to be broken into classrooms 1-4, offices 1-7 and latrines 1-2.” Related drawing shows only one piece of removable partition dividing the main hall. Please indicate exact locations of removable partitions on the drawing. | See revised SOW, including revised Appendix 1. There are three partitions: One to partitition the center hall classroom into two smaller classrooms and on in each smaller classroom to partition those each into smaller breakout rooms. | ||
| 3 | Please provide material/system specifications for removable partitions. | Offerors shall propose a technical solution IAW with SOW requirements as part of their technical proposal. | |
| 4 | Section: Attachment 1 - 19AQMM24R0105 SOW – figure 2 Space Schedule |
| Question: Task A main hall floor and wall requirements are not clear. Please clarify. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 5 | Section: Attachment 1 - 19AQMM24R0105 SOW – figure 2 Space Schedule |
| Question: Please clarify painting requirement for outer surface of exterior walls | Exterior walls are to be CMUs "3.1.5.Walls shall be constructed with solid CMU concrete blocks (reinforced with rebar, as necessary) with a minimum strength of 13.7 20 MPa (2,0900 PSI) and the exterior shall be plastered, primed, and painted with water-based acrylic paint." | |
| 6 | Section: Attachment 1 - 19AQMM24R0105 SOW – figure 3 Door and Window Schedule |
| Question: We observe some other door and window whose dimensions are not listed in the schedule. Please Clarify. Please provide material specifications for doors and windows. | Window and door schedules are representative, not exhaustive. Window and door sizes can be scaled from the concept drawing as needed. Plan to use windows and door sizes compatable with local size customs. | |
| 7 | Section: Attachment 1 - 19AQMM24R0105 SOW – APPENDIX 2, 2.1 Task A - Furniture |
| Question: We do not observe office sofas, guest chair and coffee tables listed. These are designated in the drawing. | See Answer 1 and 2. Certain graphics and blocks are are provided for illustrative purposes only. See Answer #1 and #2. Offeror's should also review the updated equipment list in the SOW. | ||
| 8 | Please provide a general construction material specification. | See revised SOW. | |
| 9 | We do not observe any requirement for exterior patios and entry ways and storm water drainage (area to be worked on?). Please provide any narrative and/or drawings. | See Answer #1 | |
| 10 | Please provide a few more details for “flat interior ceiling”. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 11 | Please provide details on CMU Wall reinforcement (both horizontal and vertical) and CMU wall thickness. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 12 | Please provide epoxy terazzo thickness, material specifications. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 13 | Please provide typical foundation drawings. | See revised Appendix 1. Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 14 | Section: Attachment 1 - 19AQMM24R0105 SOW – figure 4 Septic System Design |
| Question: We understand that the contractor is going to design the septic tank. Please state the # of people, the designated septic tank in this figure is designed for. | Please review 3.1.11. of the SOW. "The system shall have a capacity to accommodate the level of use based on 850 personnel." | ||
| 15 | We understand that the construction area is in a currently operational military zone. Please state allowed working hours/days for the contractor. Also please share any information regarding entry/exit rules/regulations. | Please review section 2.3.7. of the SOW. "The Contractor shall observe all rules and follow all directions given by the End User (Senegalese Armed Forces) pertaining to security...and shall provide all required documentation and identification for all personnel, materials, tools, equipment, and vehicles entering or exiting the area to complete all work delineated herein." If properly coordinated at the start the project, Offerers should expect strong support from the Senegelese throughout this project for any planned worked hours, included extended hours and days. It is otherwise up to the contractor to work with the Senegalese to stay abreast of any security issues which impact the progress of work, and is required to report those issues immediately to the COR as required. | |
| 16 | Please state the electrical tie-in point distance from the buildings. | See revised SOW. Offerors should anticipate less then 300 meters. | |
| 17 | Please provide material specification for water container supplying the latrines. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 18 | Please confirm that load bearing system for both buildings is reinforced CMU walls. (we observe some details in the drawings that imply otherwise) | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 19 | Please clarify what exactly is required for ‘quality’ under factor 1. Does this need to be included for each project submitted or is another subsection within factor 1 for answering the quality questions? | "Quality |
Page limit for each explanation in Section For the past five years on any project the Offeror was involved with, identify whether the Offeror has had any of the following problems, and if so, explain the reasons for and the remedy/resolution of the problem:
(Note: if the Offeror did not have any of the following problems, please include a statement to identify that fact in the proposal for this section)..." Please see page #94 (Factor 1) for more details.
20 Are all 4 project experiences required to have been completed in past 5 years or just one? If only 1, what is the limit on recency for the other 3? "JV Project Examples - Four relevant project examples are required. Of the four examples, Offerors organized as a JV shall submit at least one example of a relevant project for each JV partner to demonstrate technical project experience for the JV partner’s proposed role in the Project. Projects may be substantially complete or completed within the past five years. If the Offeror submits more than the required number of project examples, DOS will evaluate only the stated number of projects, in the order presented in the Offeror’s submittal. If a JV partner’s role does not include construction, the Offeror shall submit project examples based on the number of partners whose role includes construction.
The following additional requirements apply to the project examples:
At least one project shall be substantially complete or completed within the past five years.
At least two projects shall be Design-Bid-Build Construction projects." Please see page #93 for more details.
| 21 | SOW lists CMU walls for both buildings however elevations appear to show metal cladding. Are building structures metal or CMU? | Per the SOW. Buildings are CMU. The illustration reflects general intent. |
| 22 | Should there be a line item in price schedule for design works? | No |
| 23 | What is the required phased design schedule? | Refer to Section 5 of SOW. |
| 24 | Are hard copies required? For international companies this complicates submission and reduces the time we have for proposal preparation. | No |
| 25 | Attachment-1 Point 2.2.3: “Doors shall be made of metal” |
| Question: Just to confirm, can aluminum serve as a substitute, or is it strictly limited to steel? Please clarify if this applies to both internal and external doors, or only external doors, for both Tasks A and B. | Steel doors are required due to having greater strength than aluminum. See the door and window schedule | |
| 26 | Attachment-1 Point 2.2.4: “Contractor is responsible of any damages made by these activities (previously mentioned; clearing, excavation, carrying out…)” |
| Question: Could you please specify the types of damages we should consider? For instance, damages to surrounding buildings or roads? Additionally, after visiting the site, we observed that the road leading to the construction site is muddy. Should any actions be taken (as a road finish after delivery) regarding the road, such as laying down a compacted layer of gravel or asphalt? Please advise accordingly. | There are no road improvement requirements in this SOW, Nor will the government provide a more specific list of what it considers "damages made by these activiites." Contractors are responsible for any damages incurred by their contractors and subcontractors during the course of performing the construction activities on this contract. | |
| 27 | Attachment-1 Point 2.3: “In the event the Contractor discovers discrepancies contained in the various design/ technical documents, the Contractor must immediately notify the Contracting Officer Representative (COR)” |
| Question: While all data and technical supporting documents will be submitted to prevent discrepancies, it is important to note that certain elements such as materials and technical designs may need to be reviewed and resubmitted during the project's progress. This flexibility ensures adaptation to situations like market shortages or improvements in validity as they arise | Noted. Contractor shall follow all requirements of the SOW and contract; Issues on contract performance, including suggested material and design improvements that come at additional cost to the government and meet all SOW requirements and including market shortages that may be resolved at no additional cost to government and meet SOW requirements, should be communicated directly to the COR and CO. The governement otherwise welcomes and encourages flexiblity from Contractors provided that flexiblty comes at no addtional cost, maintains efficient and effective contract peformance, and continues to meet all contract requirments. | |
| 28 | Attachment-1 Point 2.3.3.1: "Activities shall be sequentially planned by the Contractor, and that plan shall be approved by the COR prior to commencement of the project. No work shall be initiated that contradicts the project plan” |
| Question: Is it possible for the contractor to review the plan during the project's progress and give advance notice of one or two weeks for any anticipated plan modifications? | Contractor shall follow all requirements of the SOW and contract, including early and often communications with the COR and CO on project progress. Contractors shall otherwise perform IAW with the technical proposal accepted by the Government, and shall not deviate from that accepted proposal unless formally directed by the COR or CO, including through a contract modification. | |
| 29 | TASK A Point 3.1.2: “with removable partitions that allow larger space to be broken into classrooms 1-4, offices 1-7 and latrines 1-2” |
| Question: Q: Please review attached “Removable Partition Plan Verification.pdf” and approve that the highlighted walls are to be removable and please rectify highlights if any… | See revised Appendix on removable walls and other answers in this Q&A. | |
| 30 | TASK A Point 3.1.5: “Walls shall be constructed with solid CMU concrete blocks (reinforced with rebar, as necessary) with a minimum strength of 13.7 20 MPa (2,0900 PSI) and the exterior shall be plastered, primed, and painted with water-based acrylic paint. Interior surfaces shall also be plastered, primed, and painted with water-based acrylic paint unless other specified.” |
| Question: Q: As instructed at the site visit (please confirm the following), Contractor has to advise for construction intervention material; if the choice has been made to go for a PEB building the above-mentioned point is not applicable. In addition to that if any CMU walls have occurred in construction the above-mentioned instructions will be respected. | See previous answers. | |
| 31 | TASK A Point 3.1.7: “Door and Window schedule is described in Figure-3” |
| Question: Some of the described Doors & Window do not reflect the dimension mentioned on Drawings; in the Contractor proposal, a schedule of Doors & Windows will be attached according to the drawing’s measurements, and the schedule submitted by the contractor shall be respected in construction. | Window and door schedules are representative, not exhaustive. Window and door sizes can be scaled from the concept drawing as needed. Plan to use windows and door sizes compatable with local size customs. | |
| 32 | TASK A Point 3.1.12: “Ductless wall mounted heat pump air conditioner with a minimum of 20,000 BTUs each shall be installed throughout the facility” |
| Question: Concerning the Air conditioning capacity of 20000 BTU, this capacity is a given and shall be respected? Or the Contractor shall review machines capacity following room volumes & conditions? | 20,000 BTUs is a minimum. Larger units can be used as room size requires. | |
| 33 | TASK-B Point 3.2.6. “Walls. Walls shall be constructed with solid CMU concrete blocks (reinforced with rebar, as necessary) with a minimum strength of 13.7 20 MPa (2,0900 PSI) and the exterior shall be plastered, primed, and painted with water-based acrylic paint. Interior surfaces shall also be plastered, primed, and painted with water-based acrylic paint unless other specified.” |
| Question: Q: (Same Question as Point 3.1.5): As instructed at the site visit (please confirm the following), Contractor has to advise for construction intervention material; if the choice has been made to go for a PEB building the above-mentioned point is not applicable. In addition to that if any CMU walls have occurred in construction the above-mentioned instructions will be respected. | Assume CMUs throughout. | |
| 34 | TASK-B Point 3.2.14: “The Contractor shall provide fifteen (10) ductless wall mounted heat pump air conditioner with a minimum of 20,000 BTUs each shall be installed throughout the facility” |
| Question: Q: (Same Question for point 3.1.12): Concerning the Air conditioning capacity of 20000 BTU, this capacity is a given and shall be respected? Or the Contractor shall review machines capacity following room volumes & conditions? | 20,000 BTUs is a minimum. Larger units can be used as room size requires. | |
| 35 | In Attachment-3 Concerning the submitted drawings; we are finding inconveniences matching the Floor Plan to the sections In Task-A: |
| Question: In the Sections: East & West Length of the building is approx. 45m; North & South Length of the Building is approx. 48m. However, in the Floor Plan the Building seams more rectangular in proportions compared to the dimensions mentioned previously. In addition to that the Openings layout (Doors & Windows) are not matching. Please advise concerning this matter (Building dimensions) and confirm if the Floor plan shall be fully respected (Partitioning & Opening Layout (Doors & Windows) so we can proceed in our proposal by adjusting the sections (& Elevations) according to the Floor Plan layout. | See Revised Appendix 1 and other answers. | |
| 36 | Miscellaneous |
| Question: Concerning the calculation notes for structural design; is there any specific criteria that has to be respected from our side, or if there is any “special” or added weights in certain areas that also can affect in this process? | See soliciation and contract for requirements. Plans must be certified by a structural engineer. | |
| 37 | Topic: Under Section L.18 PROPOSAL PREPARATION INSTRUCTIONS both hardcopy and electronic proposal submission requirements have been described. |
| Question: Please inform whether only electronic proposal submission can be accepted by the Government or the offerors shall submit their proposals as both hardcopy and electronic. | Soft copy only is acceptable. | |
| 38 | Topic: IAW Section L.18.2 FACTOR 2: CONSTRUCTOR PAST PERFORMANCE the Offeror is required to submit at least three (3) past performance questionnaires (PPQs). |
| Question: Please clarify whether or not CPARS ratings can be submitted instead of PPQs. | both PPQs and CPARS ratings can be submitted as a part of proposal to support the offeror's past performance expereince. | |
| 39 | Topic: IAW Section L.18.4.4 SUBFACTOR 4: BUSINESS AUTHORIZATION the Offeror shall provide current copy of license/certificate/accreditation which demonstrates that the Offeror is licensed/certified/accredited or otherwise authorized by the government of Senegal. |
| Question: Please clarify whether or not it is acceptable for the Government | if the offeror provide in its proposal a thorough description as to what steps have been taken to investigate all requirements to obtain authorization to perform in the country of performance and specific information concerning the period of time the offeror anticipates it will take to obtain appropriate authorization | and if the offeror can initiate the company registration procedures after receiving the contract award. | not acceptable; per solicitation, the offerors shall provide current copy of license/certificate/accreditation which demonstrates that the Offeror is licensed/certified/accredited or otherwise authorized by the government of Senegal upon submission of their proposals. | |
| 40 | Topic: Section H.4 BOND REQUIREMENTS states that the contractor shall furnish performance and payment bonds and the example ILC can be found at Section J. |
| Question: Please note the example ILC is not included in the solicitation documents. Therefore we kindly request you to provide sample ILCs. | See FAR 52.228-14 for sample document. | |
| 41 | Topic: Section H.4 BOND REQUIREMENTS. |
| Question: Please confirm whether or not the ILCs can be provided as BANK LETTER OF PERFORMANCE AND GUARANTY and BANK LETTER OF PAYMENT GUARANTY formats. Please provide sample bank letters. | See solicitation section H.4. for sample, see FAR 52.228-14. | |
| 42 | Topic: Section H.36 IMPORTED MATERIALS, EQUIPMENT, AND PERSONNEL. |
| Question: Please clarify whether or not the Government will provide custom exoneration for the imported materials. | All Offerors are reminded per Section 4.2 fo the SOW, "The Contractor shall obtain all required licenses to acquire, ship and deliver the supplies and equipment as specified in each task." After contract award, the government will provide, as a courtesy, the contact information for the Embassy Dakar Shipping office and Offerors can expect the U.S. Embassy in Dakar to assist with shipping and customs exonerations. The Government otherwise accepts no responsiblity for shipping and delivering equipment, nor does the government accept any responsiblity for fullfilling any requirements directed by the Government of Senegal or Senegalese Armed Forces with respect to equipment delivery-- including those requirements for exoneration of customs imports (including VATs). Offerors are also reminded that only the COR and CO can provide contract performance direction, and that any performance direction from any individual who is no the COR and CO (including the Government of Senegal and the Senegalese Armed Forces) that is not IAW the SOW and contract shall be communicated immediately to the COR and COR. | |
| 43 | Topic: General Solicitation |
| Question: Could you please specify the design stages to be submitted (35%, 65% etc.) | The Contractor may choose to submit earlier design phases to the COR and CO for feedback, but submission and approval a 100%, Issued for Construction (IFC) set is the only requirement for a Notice to Proceed. | |
| 44 | Topic: General Solicitation |
| Question: Please clarify how many days will the contractor have for design submittals. Please also provide Government's review time for each design submission. | See Question 43. The contractor shall submit all required NTP documents prior to receiving and NTP. The Contractor should expect a timely review of any NTP documents submitted. The contract authorizes 30 days for a pre-construction design survey and other pre-mobilization activiites, including collection and submission of all required NTP documents (including the IFC). Historically, we have seen contracts of this size and scope receive an NTP in as little as 30-60 days after contract award as well as contracts of this size and scope take significantly longer for an NTP due pre-mobilization delays not caused by the Government. | |
| 45 | Topic: SOW section 5.2. states, Actual Construction: 11 months from the issuance of the Notice to Proceed (NTP). |
| Question: Please confirm that the NTP will be issued after design approval. Please also clarify whether or not material technical submission, Government's submittal approval, and material, procurement, transportation & delivery periods are included within this 11 month construction period. | See question 43 and 44. | |
| 46 | Topic: Task A. Construct Multifunctional Classroom Building, SOW 3.1.2 states, The building shall be a single-story structure with removable partitions that allow larger space to be broken into classrooms 1-4, offices 1-7 and latrines 1-2. |
| Question: Could you please provide more information for requested removable partitions. (material, system, etc.) | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 47 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.8. Roof Design and Task B. Multipurpose Warehouse, SOW Section 3.2.9. Roof Design |
| Question: Please clarify whether or not thermal insulation is required on the roofs of these buildings? If so, please provide information regarding the insulation material, R value and thickness. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. Should thermal insulation be proposed, contractors shall refer to local Senegalese building codes for prescribed R-values and appropriate ventilation. | |
| 48 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.9. Interior Ceiling |
| Question: Please clarify whether or not suspended ceiling is required in the entire Classroom Building. | Yes. Offerors shall propose a ceiling solution in their technical proposal. | |
| 49 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.13.1. states that high-speed wireless internet capability throughout the facility shall be provided. |
| Question: Please confirm that there is an available utility infrastructure near the place of performance. Please provide the type of the available cabling and the distance of the internet connection manhole near the project site. | See previous answers on utility locations. | |
| 50 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.13.4. states that high quality overhead projectors and screens system shall be provided in the smaller classrooms and main hall. |
| Question: Please provide requested projector type and screen dimensions. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 51 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.15. |
| Question: Please specify the surface material of the trainees tables. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 52 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.16. and Task B. Multipurpose Warehouse, SOW Section 3.2.16. state that contractor shall connect water for the latrines to the camp water source approximately fifty (50) meters away, however SOW Section 2.2.7. states that there is not a reliable water source nearby. |
| Question: Please clarify. | Sources of water depend on the purpose. Sections 2 and Sections 3 are distinguishing between purposes, including those sources of water that will be used for the latrines and a water source that will be used to support construction. Offerors should have a plan to provide their own water to support construction, even if the availablity and use of different source is made available after contract award. | |
| 53 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.18. and Task B. Multipurpose Warehouse, SOW Section 3.2.20. state that two (2) standby 150 kw three (3) phases, stationary, encased generators and one (1) external fuel tank shall be provided for each of the facility. |
| Question: Please clarify whether two (2) generators shall be provided separately for each of the facilities (total 4 generators) or two buildings shall be connected to the same two (2) generators. | See Revised SOW. Two (2) generators total. | |
| 54 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.18. and Task B. Multipurpose Warehouse, SOW Section 3.2.20. state that two (2) standby 150 kw three (3) phases, stationary, encased generators and one (1) external fuel tank shall be provided for each of the facility. |
| Question: Please clarify whether a Manuel Transfer Switch (MTS) or an Automatic Transfer Switch (ATS) shall be provided within the generator packages. Please also clarify for how many hours of continuous run shall the fuel tanks be sized. | See revised SOW. MTS. Offerors should assume fuel capacity to maintain up to 24 hours. | |
| 55 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.19. and Task B. Multipurpose Warehouse, SOW Section 3.2.21. state that the Contractor shall install a power transformer in the vicinity of the site to connect to the main CET-3 power source and main distribution box. |
| Question: Please clarify whether separate transformers are required for the Classroom Building and Warehouse or both facilities can be connected to a new transformer. Please also inform type of the transformer, pole mounted or transformer kiosk, and dry type or oil type. | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal and which aligns information on local conditions collected during the site survey. | |
| 56 | Topic: Task A. Construct Multifunctional Classroom Building, SOW Section 3.1.19. and Task B. Multipurpose Warehouse, SOW Section 3.2.21. state that the Contractor shall install a power transformer in the vicinity of the site to connect to the main CET-3 power source and main distribution box. |
| Question: Please provide additional information regarding the existing power source such as capacity, distance to the construction site, type (underground or overhead) etc. | Offerors should use the information on electrical capacity at CET3 collected during the site survey. | |
| 57 | Topic: Task B. Multipurpose Warehouse, SOW Section 3.2.12. Roll-up Doors states that the contractor shall install galvanized steel (20-gauge) roll up doors throughout the warehouse facility. |
| Question: Please inform whether or not the roll-up doors shall be manual. Since the building will be climatized please also clarify whether or not insulated overhead doors shall be used instead of roll-up doors. | Manual | |
| 58 | Topic: Task A. Construct Multifunctional Classroom Building and Task B. Multipurpose Warehouse |
| Question: Please inform whether or not the building structural system (columns and beams) can be proposed as steel structure and the walls of the buildings as insulated sandwich panels. | Assume CMUs throughout. Assume metal trusses per SOW. | |
| 59 | Topic: APPENDIX 2.2 Task B. Item 25 Workbench Stool for storage rooms. |
| Question: Could you please provide more information for the workbenches (dimensions, material, etc.). | Where specific technical requirements and details are not described in the SOW, Offerors shall propose a technical solution IAW with broader SOW requirements and project intent as part of their technical proposal. | |
| 60 | Topic: General |
| Question: Please clarify whether or not the contractor should acquire any building permits and zoning approval to start the construction activities. | The contractor shall ensure compliance with all Senegalese building codes, including those permits and zoning approvals which may or may not be required. | |
| 61 | Reference: Attachment 3 Page 1-3 |
| Question: Multifunctional classroom building plan do not match with elevations and sections (number of Axis do not match, the location of doors do not match, all external doors in plan are double door but the drawings west elevation shows single doors). Please advise which one to follow? | See revised Appendix 1. | |
| 62 | Reference: Classroom Building and Warehouse |
| Question: The proposed Buildings structure is Pre-Engineered Building (PEB) or truss arrangement steel building? | Assume CMUs throughout. Assume metal trusses per SOW. | |
| 63 | Reference: Attachment 3 Page 4-3 |
| Question: Multipurpose warehouse plan do not match with elevations (span: distance between Axis do not match, the location of doors in side elevation do not match). Please advise which one to follow? | See revised Appendix 1 and Question #1. | |
| 64 | Reference: Statement of Work (SOW) June 5, 2024 |
| Question: SOW -Para 3.1.19. & 3.2.21 states The Contractor shall install a power transformer in the vicinity of the site to connect to the main CET-3 power source and main distribution box. We understand the Low voltage system is 400/ 230 , 50 Hz. Please confirm and also provide the MV distribution Voltage. The proposed Power Transformer is a Pad mounted type and or a Unit substation? | Offerors should use the information on electrical capacity at CET3 collected during the site survey. | |
| 65 | Reference: General |
| Question: Is there any preference for Country of origin for Generators, Transformer , furniture or any other Building construction materials? | Offerors should refer to solicitation documents covering applicable procurements under the Foreign Assistance Act, which includes the USG funding that will be used to fund contract. Offerors should also review SOW requirements and reccommendations for local procurement of materials that meet contract requirements. | |
| 66 | Reference: General |
| Question: Provide the reference standards and specification for the project. | This request is noted. | |
| 67 | Reference: Attachment 3 Page 4, SOW Page 14 Figure 2 |
| Question: Do we have to provide paved sidewalk around the proposed building? If yes please define the width of the sidewalk. | See revised Appendix 1. | |
| 68 | Reference: SOW Page 15 Figure 3 |
| Question: In Figure 3, the Door and Window schedule designates the doors as steel casement double swing doors and specifies a total of six doors. However, the drawings depict both single and double swing doors, with quantities differing from those in the schedule. Could you please clarify whether all the doors should be double swing steel doors? Additionally, are the doors intended to be glazed or solid? | Window and door schedules are representative, not exhaustive. Window and door sizes can be scaled from the concept drawing as needed. Plan to use windows and door sizes compatable with local size customs. | |
| 69 | Reference: SOW Page 15 Figure 3, Attachment 3 Page 4 |
| Question: In Attachment 3, page 4, the proposed building drawing shows only two windows, each with a width of 3 meters. However, on SOW page 15, Figure 3 designates different sizes for the windows. To clarify, could you please specify which window sizes are intended for the Task A and which size for Task B. | Window and door schedules are representative, not exhaustive. Window and door sizes can be scaled from the concept drawing as needed. Plan to use windows and door sizes compatable with local size customs. | |
| 70 | Reference: Solicitation 19AQMM24R0105 |
| Question: Referred to solicitation letter standard form 1442; An offer guarantee is required but value of bid guarantee is not indicated. Please confirm if bid guarantee is required and what will be the value. | Bid gurantee is not required. | |
| 71 | Reference: General |
| Question: Referring to the solicitation letter, the submission of questions is due on June 28, 2024. Gathering all the clarifications from other vendors/suppliers takes time. Therefore, the Contractor requests that the deadline for clarification submission be extended to July 10, 2024. | No. the Government will not entertain to extend the questions to solicitation due date. | |
| 72 | Reference: Solicitation 19AQMM24R0105 |
| Question: Will performance and payment bonds be acceptable if issued from a local bank? Please confirm. | See Solicitation Section H.4 for detail bond information. | |
| 73 | Reference: General |
| Question: Is complete design development part of contractor’s scope of work? Please confirm. | Please review the SOW and solicitation packet as well as other questions already answered on design. | |
| 74 | Reference: General |
| Question: Is project exempted from all custom duties, excise duties and all other local taxes including VAT? | See answer #42 | |
| 75 | Reference: General |
| Question: Should we consider temporary site office facilities for COR? If yes, please confirm the number of staff from COR and detail of facilities which are to be provided? | No | |
| 76 | Section: L.18 PROPOSAL PREPARATION INSTRUCTIONS / Page: 90 / Reference: Hardcopy and Electronic Submissions |
| Question: Please confirm electronic submission is acceptable in leiu of hardcopy submission. | Yes | |
| 77 | Section: L.18.1 / Page: 93, 94 / Reference: FACTOR 1: CONSTRUCTOR TECHNICAL PROJECT EXPERIENCE / FACTOR 2: CONSTRUCTOR PAST PERFORMANCE |
| Question: Should the word Constructor actually be Contractor? | Yes | |
| 78 | Section: L.18.1 / Page: 91 / Reference: Ensure that all required fill-ins are completed in the solicitation; the "Price Proposal" shall be submitted with sufficient data to support the proposal and to justify the reasonableness of the price. |
| Question: Please provide clarification on the additional fill-ins mentioned in this instruction. | the offeror shall complete all fill-ins in all solicitation documents including the SF-1442, B-M, bid chart and other documents as applicable. | |
| 79 | Section: Site Visit / Page: / Reference: During the site visit we were not able to see a water distribution map of the base. |
| Question: Will the HN provide a water distribution scehmatic? | See question 52. | |
| 80 | Section: Site Visit / Page: / Reference: During the site visit we confirmed a power coonection point on the edge of the base compund. |
| Question: Will the HN provide a clarification on the power connection location? | Offerors should use the information on electrical capacity at CET3 collected during the site survey. | |
| 81 | Section: Site Visit / Page: / Reference: During the site visit the HN indicated a change to the site |
| Question: Does the gov the site is as stated in the SOW? | Yes. However, the government may choose to modify the contract at any time after contract award, including the location of the building. Offerors should otherwise submit their technical propoals for the site visited during the site survey. | |
| 82 | Section: SOW 3.1.18. / Page: / Reference: 3.1.18. The Contractor shall propose a power solution to supply the building and each room within it and its support functions. The power solution shall connect to the main camp electrical supply, but contractor shall also provide two (2) standby 150 kw three (3) phases, stationary, encased generators suitable for the size of the building. |
| Question: | No question | |
| 83 | Section: 3.2.6 / Page: / Reference: 3.2.6. Walls. Walls shall be constructed with solid CMU concrete blocks (reinforced with rebar, as necessary) with a minimum strength of 13.7 20 MPa (2,0900 PSI) and the exterior shall be plastered, primed, and painted with water‐based acrylic paint. Interior surfaces shall also be plastered, primed, and painted with water‐based acrylic paint unless other specified. |
| Question: Will the gov allow filled hollow core block as elevation walls? | Filled hollow core blocks are acceptable. | ||
| 84 | Building axis differs in drawings. For example, in Task A - Classroom sections and elevations indicate 6m x 6m axis from A to J. However, the floor plan indicates 4 axes from A to D with different dimensions that are more than 6m. If section & elevation axis are correct, then there will be columns in the middle of the classrooms and main hall. Please clarify if contractor to proceed with axis indicated in floor plan or in sections & elevations. | See Revised Appendix 1 and other answers. | |
| 85 | The building axis of Task B-Warehouse plans and sections & elevations are different. Please confirm contractor will proceed with axis indicated in floor plan. | See Question 1 and revised Appendix 1 | |
| 86 | Please clarify Task A-Classroom plan dimensions. The axis indicated in plan and sections & elevations are different. Please confirm exterior dimensions will be approximately 42m x 45.5m + 1.5m eave in both dimensions. | See Question 1 and revised Appendix 1 | |
| 87 | Sections in Attachment 3 (drawings) for classroom do not indicate flat ceiling. However, SOW 3.1.9 requires a flat ceiling. Please clarify if acoustical panel ceilings are required or not? | See SOW and other answers. A flat ceiling is required in for Task A and in designated spaces of the building in Task B. | |
| 88 | Please confirm there will be approximately 1.5 m wide sidewalk below eaves of classroom building. | See Question 1 and revised Appendix 1 | |
| 89 | Scope of Work paragraphs 3.1.3 and 3.2.3 states foundation depths to be determined during site survey. Construction area is close to river, and we do not know ground water level, soil type, bearing capacity or other information that affects foundation design. Please provide a geotechnical report prior to bid. Or at least a report that is close to the construction area that may help for bid purposes if possible., | The contractor is required to complete a geotechnical survey prior to issuance of the NTP, and foundation recommendations should be included in the IFC design submission. The contractor shall complete all of this during the design survey after contract award. | |
| 90 | Please confirm geotechnical report for foundation design is not in contractor's scope. | See SOW and documents required for the issuance of an NTP. Contractor is to arrange for and pay for geotechnical report. | |
| 91 | Please confirm tree removal (not relocation) is allowed. | See SOW, including the requirement for site preparation. All anticipated site preparation requiring tree removal has already been coordinated and approved the the SAF. | |
| 92 | Please clarify Scope of Work paragraph 2.2.8 "provide recommended solutions…". Does USG request construction method or something else. | The Government seeks solutions in the built environment based requirements in the SOW. | |
| 93 | There is no road or parking area etc. indicated in the plans. However, SOW 3.1.1 mentions these activities. Please provide a draft sketch or elaborate these requirements for bid purpose. For example, will there be any parking lot? If yes, what will be the capacity? Will it be connected directly to existing roads, or will there be a new road that directs to the adjacency of buildings...etc. | See SOW. There is no requirement for road construction in this contract. | |
| 94 | Please confirm there will not be any requirement for new road surrounding buildings for patrol or fire brigade purposes. | See question 93. | |
| 95 | Please specify the R value for roof and R value for walls for both buildings. | See Senegal building codes for answer. If no codes exist then use comperable IBC requirements. | |
| 96 | CMUs specified in SOW 3.1.5 and 3.2.6 are load bearing CMU's and hard to find in local market that will lead to huge transport cost to purchase from abroad. CMU's do not carry any loads in these buildings. Please delete the load bearing CMU requirement to non-load bearing CMU for a decrease in bid cost. Also please delete rebar and grout fill requirement for these non-load bearing CMU's. | See revised SOW and other answers. | |
| 97 | Please advise if abuse resistant gypsum wall board or similar local materials may be used instead of specified load bearing CMUs? | See revised SOW and other answers on CMU requirement answers provided elsewhere in this Q&A. | |
| 98 | Please clarify if room signage is required or not. | See SOW | |
| 99 | Please clarify if building signage installed on building facades are required or not. | See SOW | |
| 100 | Please confirm 3D drawings, or any BIM related reports or drawings are not required. If required please specify in detail. | There is no requirement for 3-D or BIM deliverables in this contract. | |
| 101 | Please confirm there are no environmentally hazardous materials such as asbestos available in excavation areas during foundation activities. | The Government cannot confirm all materials that may or may not present at the construction site. The Contractor shall manage any hazardous or other unforeseen materials encountered during construction IAW contract requirements, including communication with both the Senegalese and the COR. | |
| 102 | Please confirm furniture, appliances, woodwork or similar items in breakroom of warehouse building are not in contractor's scope | Offerors should refer to the SOW and its equipment lists for all requirements pertaining to furniture, appliances, and other end items. | |
| 103 | Section B-M page 43/103: "Definition - "Allowance items" means items designated as such by the Government in the Contract Documents which the Government has the option either to delete from the contract and procure directly, or to allow them to remain in the contract as a responsibility of the Contractor to provide.". Please confirm allowance items are the only ones in APPENDIX 2: Furnishings and End Items for Task A and Task B 25-line items mentioned in Scope of Work. If else, please provide a list or clarify further. For example, can CMU, concrete, steel, cabling, HVAC ... etc activities be considered as an "allowance item"? | confirmed. | |
| 104 | Please confirm material submittal review will be only done by Government and Prime contractor as mentioned in H.26. There is no review requirement for designer. | H.26 is correct as written. | |
| 105 | Please confirm if a construction permit is needed from any local authority in Senegal, such as the Municipality, Department of Defense, or Military, before starting construction work on site? | See Question 60. Offerors should not anticipate cumbersome permitting processes on the ground in Senegal, if any at all. Offerors should instead ensure that all requirmed NTP documents are are submited to the CO prior to its issuance. | |
| 106 | As per the Senegalese laws, all construction activities in public and private projects have to be supervised and controlled by a nominated 3rd party quality control company, please confirm if this applies to this project and please provide us with the nominated company's name to communicate with. | See question 60. Further, the Government will not make any legal determination on Senegalese laws based on this question. However, the Government does not anticipate the requirement for third party quality control company to work on this project. | |
| 107 | It was mentioned in solicitation documents that key personnel i.e. Project Manager and Site Superintendent shall have a valid Senegalese engineering license, and after having checked with the related entities, a Senegalese who is holding a certificate degree in Engineering from a university is already certified and no further registration is required in any engineering institute. Please confirm if a university degree in Engineering is enough as proof of a valid engineering license. | Confirmed; the offerors shall submit any evidenced documents to prove each nominating key personnel's engineering capability such as university degree or other equivalent certificates. | |
| 108 | Please specify the Government’s material submittal review duration. | The Government is committed to a timely review of all materials submitted by the contractor. Review times will depend on the scope and complexity of the request. | |
| 109 | Please specify the Government’s RFI (Request For Information) response duration. | The Government is committed to a timely review of all materials submitted by the contractor. Review times will depend on the scope and complexity of the request. | |
| 110 | Please specify the design review duration of Government. | The Government is committed to a timely review of all materials submitted by the contractor. Review times will depend on the scope and complexity of the request. | |
| 111 | Please confirm materials can be European or any other standard that meet or exceeds Senegalese standard as minimum. | Offerors should refer to solicitation documents covering applicable procurements under the Foreign Assistance Act, which includes the USG funding that will be used to fund contract. Offerors should also review SOW requirements and reccommendations for local procurement of materials that meet contract requirements. | |
| 112 | For the design and technical specifications, please confirm ASTM or any other OBO SED standards are not an obligation. | confirm ASTM or other OBO SED standards are not an obligation for this requirement. | |
| 113 | SOW refers to technical specifications. However technical specifications are not provided with the solicitation documents. Please advise If the Government will provide technical specification before the bidding, or the contractor will prepare and submit together with the design. | Technical specifications are part of the contractors design responsibility, which comes after contract award. | |
| 114 | Please confirm US registered PE's or architects are not required. Designers can have Senegalese or any other country's university degree that can design and coordinate as per SOW. | confirm; PE or architects are not considered as a part of key personnel. | |
| 115 | Please confirm project language is English. Please confirm French is only required for "3.1.23-Building Maintenance Handbook" for Task A. And confirm French language is not required for Task B's Handbook mentioned in 3.2.26. | See revised SOW. Handbooks shall be in French and English. The intent of these handbooks is to enable Senegalese sustainment and maintenance of the site over the long term. Contractors shall ensure that all the information required for this is included in that handbook. | |
| 116 | Confirm French translated handbook(s) just include warranties, sources of supply, spare parts, equipment operation/maintenance, and tips for partner-nation sustainment of the site over the long term. Handbooks will not include product data or other not specified in 3.1.23 and 3.2.26. | See previous. | |
| 117 | Please clarify what is meant by "tips for partner-nation sustainment of the site over the long term" mentioned in 3.1.23 and 3.2.26. | The Government assumes that Offerors with strong techncial proposals and strong in-country staffs will not require further explanation of this requirement and understand its intent. | |
| 118 | Please confirm the Government does not request any extra materials for maintenance. If requested please specify the required percentage for finish items such as tiling, paint, stucco, lighting etc. | Correct. Sustainment of the project, including repairs and materal maintenance, is the responsibility of the end user. | |
| 119 | Please specify Government' requirements for H.30 TEMPORARY FACILITIES & SERVICES. How many rooms, how much area per room is required etc. for Government employees? Will the Government supply its own telecom and data requirements in this temporary building? Confirm no security hardware or room protection required. | The COR will be located in the USA during the project. | |
| 120 | Will Contractor supply Government's furniture for H.30 TEMPORARY FACILITIES & SERVICES? If so, please clarify what and how many are required. | The COR will be located in the USA during the project. |