SF_30_19AQMM19R0166_A0001_Continuation_Page.docx
DOCX document 15 KB Posted
- Attached to
- Multi-Mission Aviation Support Services
- Solicitation number
- 19AQMM19R0166
About this file
19AQMM19R0166 SF30 Continuation Page
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_G_Q&A_Amendment_A0001.xlsx | XLSX spreadsheet | |
| 19AQMM19R0166_SF30_A0001.pdf | ||
| 19AQMM19R0166_SOLITUDE_RFP_SECTIONS_B_-_M_A0001_Clean.docx | DOCX document | |
| 19AQMM19R0166_SOLITUDE_RFP_SECTIONS_B_-_M_A0001_Track_Changes.docx | DOCX document | |
| Attachment_A_Pricing_Table_A0001.xlsx | XLSX spreadsheet | |
| Attachment_F_Bidder's_DDForm254_19AQMM19R0166.pdf | ||
| Attachment_B_-_Q&A_Template.xlsx | XLSX spreadsheet | |
| Attachment_D_-_PP_Customer_Satisfaction_Survey.xlsx | XLSX spreadsheet | |
| 19AQMM19R0166_SOLITUDE_RFP_SECTIONS_B_-_M.docx | DOCX document | |
| Attachment_A_Pricing_Table.xlsx | XLSX spreadsheet | |
| 19AQMM19R0166_SF33.pdf | ||
| Attachment_C_-_PP_Contract_Profile.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This Amendment:
1. Attach 19AQMM19R0166 SOLITUDE SECTIONS B-M A0001 (CLEAN)
2. Attach 19AQMM19R0166 SOLITUDE SECTIONS B-M A0001 (TRACK CHANGES). Refer to track changed version for specific changes to RFP 19AQMM19R0166 B through M.
3. Attach Attachment G (Questions and Answers – A0001).
4. Attach Attachment F (Bidder’s DD254)
5. Update Table of Contents and Page Numbers.
6. Amend Section C (Description/Specifications/Statement of Work) as follows:
a. Amend C.2.2.1 Dedicated Multi-Mission Aircraft Capability, Configuration, and Air Crew - CONUS to add “Contractor shall be fully mobilized within 24 hours of Task Order Award.”
b. Amend C.2.2.2 Dedicated Multi-Mission Aircraft Capability, Configuration, and Air Crew – OCONUS to add “Contractor shall be fully mobilized within 14 days of Task Order Award.”
c. Amend C 3.3 Security Requirements to remove the first paragraph in its entirety.
7. Amend and Renumber Section H (Special Contract Requirements) as follows:
a. Amend H.15.2 Assignment of Contractor Personnel to remove second paragraph in its entirety.
8. Amend Section J Attachments to Include: Attachment G Questions and Answers – A0001
9. Amend Section L (Instructions, Conditions and Notices to Offerors) as follows:
a. Amend L.8 (Solicitation Response) Facility Clearance is corrected to SECRET
b. Amend L.19.3.1 c) to include “While CPARS submissions are not EACH required to cover all aspects of the PHIMS requirements, performance of all PHIMS requirements must be clearly addressed in one or more CPARS evaluations.”
10. Amend Attachment A Pricing Sheet as follows:
a. Amend DBA to a unit of 1.
File details come from the government source that posted it.