This submittal register outlines the required submissions for a refurbishment and enlargement project of existing barracks. It lists over 150 submittal items across various construction disciplines that the contractor must provide for review and approval. Key submittals include project schedules, personnel qualifications, quality plans, shop drawings, product data sheets, samples, test reports, certificates, operation and maintenance manuals, and closeout documents. The register specifies for each submittal item the relevant specification section and paragraph, required submission timing, review and approval process, and other notes. It provides a comprehensive list to guide the contractor's compliance with submission requirements for this military construction project.

Attachment #5 - Submittal Register

View the file

Other files

File Type Posted
ALOJAMIENTO1a.zip ZIP file
2._BANOS.zip ZIP file
ALOJAMIENTO1b.zip ZIP file
6._PLANO_INDICE.zip ZIP file
Vendor_Q&A__2.xlsx XLSX spreadsheet
3._ADMIN.zip ZIP file
SF30_-_A002.pdf PDF
A002_Attachments.zip ZIP file
Vendor_Questions.xlsx XLSX spreadsheet
A0001_Final.pdf PDF
Attachment__3_Bidding_Chart.pdf PDF
Attachment__4_Insurance.pdf PDF
Attachment__7_PPQ.pdf PDF
Attachment__6_Firm_Project_Info.pdf PDF
Attachment__1_SOW_&_Specifications.pdf PDF
19AQMM19R0123.pdf PDF
Attachment__2_Drawings.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 15 PAGES

NOV 30, 2018

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance Bond:

Payment Bond:

Liability Bond Stability Bond Elements Quality Bond Correct Equipment Functioning Bond

Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors List of Proposed Products

01 32 16.00 20 SD-01 Preconstruction Submittals 1.3Construction schedule

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

01 78 00 SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

01 78 00 3.3Operation and Maintenance Manuals

SD-11 Closeout Submittals 3.1As-Built Drawings

02 41 00 SD-01 Preconstruction Submittals 1.2.1Demolition Plan 1.2.1Deconstruction Plan 1.9Existing Conditions

03 30 00 SD-01 Preconstruction Submittals

1.6.3 GLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data 2.4.1Cementitious Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 2.4.5Admixtures 2.2.1Waterstops 2.4.6Biodegradable Form Release

Agent SD-05 Design Data

2.3.1 GMix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

3.12.2.3 GCompressive Strength Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

03 30 00 2.5.1Reinforcing Bars SD-08 Manufacturer’s Instructions

2.3.3Curing Compound 04 20 00 SD-03 Product Data

2.1.2 GClay or Shale Brick

05 12 00 SD-02 Shop Drawings

1.3.2 GFabrication Drawings

SD-03 Product Data

2.5.2Shop Primer 2.4.1Welding Electrodes and Rods 2.4.2Non-Shrink Grout

SD-06 Test Reports 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 1.3.3.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods

05 51 33 SD-02 Shop Drawings 2.3Stairs and Ladders

SD-03 Product Data 2.3Stairs and Ladders

05 52 00 SD-02 Shop Drawings 1.2.1Fabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

05 52 00 SD-03 Product Data 2.2.1Structural-Steel Plates, Shapes, and Bars 2.2.2Structural-Steel Tubing 2.2.4Cold-Finished Steel Bars 2.2.3Hot-Rolled Carbon Steel Bars 2.2.5Cold-Drawn Steel Tubing 2.1.2Protective Coating 2.2.8Steel Railings and Handrails 1.2.1Anchorage and Fastening

Systems SD-07 Certificates

1.4.1Welding Procedures 1.4.2Welder Qualification

06 20 00 SD-02 Shop Drawings 1.2Detail Drawings Indicating All

Wood Assemblies SD-03 Product Data

2.1Wood Products 2.3Hardware and Accessories

SD-04 Samples 1.4Samples

06 61 16 SD-02 Shop Drawings 1.3.1Detail Drawings 3.1Installation

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

06 61 16 2.1Countertop Material SD-04 Samples

2.3.4Counter and Vanity Tops 07 11 13 SD-07 Certificates

1.2Materials 07 41 13 SD-02 Shop Drawings

1.3.5Roofing Panels SD-03 Product Data

2.1Roof Panels 1.3.5Factory-Applied Color Finish 2.3Accessories 1.3.5Fasteners

SD-04 Samples 1.3.5Factory-applied Color Finish

SD-07 Certificates 2.1Roof Panels 1.3.2Qualification of Applicator

SD-08 Manufacturer’s Instructions 1.3.5Installation Manual

SD-11 Closeout Submittals 1.7Warranties

07 60 00 SD-02 Shop Drawings 3.1.3Gutters

07 61 15.00 20 SD-02 Shop Drawings 2.1Roofing Panels

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

07 61 15.00 20 2.1Roofing Panels 2.2Attachment Clips 2.3.1Closures 2.3Accessories

SD-08 Manufacturer’s Instructions 3.3Installation

SD-11 Closeout Submittals 1.7Warranty

07 92 00 SD-03 Product Data 2.1Sealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.3 GFrames

2.2Accessories 2.4Weatherstripping

SD-03 Product Data

2.1 GDoors

2.3 GFrames

08 51 13 SD-02 Shop Drawings 2.1Windows

SD-03 Product Data 2.1Windows 2.2.6.1Hardware 2.2.2Fasteners

SD-04 Samples 1.2.2.1Finish Sample

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

08 71 00 SD-03 Product Data 2.2Hardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

08 81 00 SD-03 Product Data 2.1.3Tempered Glass 2.1.1Laminated Glass

SD-07 Certificates 2.1.1Laminated Glass

08 91 00 SD-03 Product Data 1.4Metal Wall Louvers 2.2Metal Wall Louvers

09 23 00 SD-04 Samples 1.3.1Plaster

09 29 00 SD-03 Product Data 2.1.2Fiber cement Units 2.1.6Accessories 2.1.1Gypsum Board

09 30 10 SD-02 Shop Drawings 3.2Detail Drawings

SD-03 Product Data 2.1.1Porcelain Tile 2.1.2Wall Tile 2.4Mortar, Grout, and Adhesive

SD-04 Samples 2.1Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

09 30 10 SD-08 Manufacturer’s Instructions 3.6Maintenance Instructions

09 90 00 SD-02 Shop Drawings 3.8Piping identification 3.8stencil

SD-03 Product Data 2.1Coating 2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.6Color SD-08 Manufacturer’s Instructions

3.5.2Mixing 1.4.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1Coatings:

10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings 3.3Installation Drawings

SD-03 Product Data 2.1Cleaning and Maintenance

Instructions 2.2.1Anchoring Devices and

Fasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

10 21 13 2.2.3Hardware and Fittings 2.2.2Brackets 2.2.4Door Hardware 2.3.1Toilet Enclosures 2.3.2Urinal Screens

SD-07 Certificates 1.4Warranty

10 28 13 SD-03 Product Data 2.2Accessory Items

SD-10 Operation and Maintenance Data

2.2.8Electric Hand Dryer 10 44 16 SD-03 Product Data

2.1.1Fire Extinguishers 10 71 13.13 SD-02 Shop Drawings

2.2.1Folding & Sliding shutters 2.2shutters

SD-03 Product Data 2.2.1Folding & Sliding shutters

SD-10 Operation and Maintenance Data

2.2Shutters 22 00 00 SD-03 Product Data

2.4Fixtures 2.4.1Flush Valve Urinals 2.4.2Flush Tank Water Closets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

22 00 00 2.4.3Countertop Lavatories 2.6Pumps 2.5.2Shower Faucets

SD-06 Test Reports 3.5Tests, Flushing and Disinfection

23 00 00 SD-02 Shop Drawings 1.4.5Detail Drawings

SD-03 Product Data 2.6.2Louvers 2.7.1.2Exhaust Fans

SD-06 Test Reports 3.8Performance Tests

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions SD-10 Operation and Maintenance Data

3.9.1Operation and Maintenance Manuals

23 07 00 SD-03 Product Data 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

23 23 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

23 23 00 2.3Refrigerant Piping System SD-03 Product Data

2.3Refrigerant Piping System SD-06 Test Reports

3.4Refrigerant Piping Tests 23 82 02.00 10 SD-03 Product Data

2.1Materials and Equipment SD-06 Test Reports

3.5Refrigerant Tests, Charging, and Start-Up

3.6System Performance Tests 26 20 00 SD-02 Shop Drawings

2.12Panelboards 2.4Cable trays

SD-03 Product Data 2.11Receptacles 2.12.3Circuit breakers 2.10Switches

SD-06 Test Reports 3.5.2600-volt wiring test 3.5.4Grounding system test 3.5.3Ground-fault receptacle test

26 41 00 SD-06 Test Reports 3.5.1Lightning Protection and

Grounding System Test 26 51 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

26 51 00 2.2Luminaires 2.4Light Sources 2.3Drivers 1.6.1LED Luminaire Warranty 2.6.1Exit Signs 2.5.2.1Occupancy Sensors

SD-07 Certificates 1.6.1.1Luminaire Useful Life Certificate

27 10 00 SD-02 Shop Drawings 1.5.1.1Telecommunications drawings

SD-03 Product Data 2.3Telecommunications cabling 2.4.3Patch panels 2.5Telecommunications outlet/connector assemblies 2.4.1Equipment support frame

SD-06 Test Reports 3.4.1Telecommunications cabling testing SD-07 Certificates

1.5.2.1Telecommunications Contractor 1.5.3Test plan

SD-10 Operation and Maintenance Data

1.9.1Telecommunications cabling and pathway system

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

28 31 00.00 10 SD-02 Shop Drawings 1.4.2Detail Drawings

SD-03 Product Data 2.1.2Low Battery Voltage 3.6Testing

SD-06 Test Reports 3.6Testing

SD-07 Certificates 2.1Equipment

SD-10 Operation and Maintenance Data

1.3Operating and Maintenance Instructions

31 00 00 SD-01 Preconstruction Submittals

3.5 GShoring

1.3.2 GDewatering Work Plan

SD-03 Product Data

3.9 GUtilization of Excavated Materials

1.3.1.2Rock Excavation 3.4Opening of any Excavation or

Borrow Pit SD-06 Test Reports

3.17Testing SD-07 Certificates

3.17Testing 31 11 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

31 11 00 3.5.1 GNonsaleable Materials 32 16 13 SD-03 Product Data

2.1Concrete 2.6.2Biodegradable Form Release

Agent 3.2Biodegradable Form Release

Agent SD-06 Test Reports

3.6Field Quality Control 33 11 00 SD-03 Product Data

2.1.1Pipe, Fittings, Joints and Couplings

SD-06 Test Reports 3.3.1.2Leakage Test 3.3.1.1Hydrostatic Test

33 30 00 SD-01 Preconstruction Submittals 1.6Existing Conditions

SD-02 Shop Drawings 1.4.2Drawings 2.3.2Metal Items 2.3.2.1Frames, Covers, and Gratings

SD-03 Product Data 2.1Pipeline Materials

SD-06 Test Reports 2.4Reports

33 71 02 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 15 PAGES

A&E FOR REFURBISHING AND ENLARGEMENT OF EXISTING BARRACKS

33 71 02 2.2.1 GAluminum conductors SD-03 Product Data

3.4.2Pulling-In Irons

2.9.2 GManhole frames and covers

2.9.3 GHandhole frames and covers

2.10 GCable supports

SD-06 Test Reports

3.14.1 GField Acceptance Checks and

Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .