Statement of Work

View the file

Other files

File Type Posted
19AQMM19Q0112_M00002.pdf PDF
question_(III).docx DOCX document
SOW_for_Ballistic_Testing_of_Mild_Steel_Stainless_Steel_and_Aluminum_Plate_Final.docx DOCX document
19AQMM19Q0112,_Amendment_0001.pdf PDF
questions_(II).docx DOCX document
questions.docx DOCX document
19AQMM19Q0112.pdf PDF
Appendix_A_monthly_report.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Ballistic Testing of Mild Steel, Stainless Steel and Aluminum Plate

Background The Department’s Bureau of Diplomatic Security (DS), Research and Development Branch (DS/PSD/RD) is interested in conducting ballistic resistance testing on common Stainless Steel and Aluminum alloys found in products used in the structural and façade components of Department of State embassies and facilities.

Testing The materials to be tested in this effort are: Mild Steel A36 and A572 Gr. 50; Stainless Steel 304L and 316L; Aluminum 6063 T6, 6063 T5, 6005 T61, and 6061 T6. Testing will be conducted on one square foot plates in various thicknesses and configurations seen in Tables 1, 2, and 3. Each thickness and configuration will be tested with all three calibers listed in Table 4. The total configuration and shot matrix is shown in Table 5. Ensuring the proper materials have been procured as test samples is of the utmost importance for this effort. In addition to having the Certified Mill Test Reports for each lot of material purchased a sample from each lot must be tested to determine the materials actual Yield Strength, Ultimate Tensile Strength, % Elongation, and Hardness.

The first materials tested will be carbon steel with various air gap between the ¼” plates. Whichever air-gap configuration performs most favorably during those tests will be the air-gap used for all of the multiple plate configurations during the Stainless Steel and Aluminum tests.

Steel Type

ASTM:

Samples Thickness and Configuration

A36
1/4" x 1/4"
1/4" x 1/4" - 1" Air gap
1/4" x 1/4" - 2" Air gap
1/4" x 1/4" - 3" Air gap
1/2"
5/8"
A572 Gr. 50
1/4" x 1/4"
1/4" x 1/4" - 1" Air gap
1/4" x 1/4" - 2" Air gap
1/4" x 1/4" - 3" Air gap
1/2"
5/8"

Table 1: Carbon Steel Thickness and Configurations to Test

Steel Type

ASTM:

Samples Thickness and Configuration

304L
1/4" x 1/4" – Gap as Directed
1/2"
5/8"
316L
1/4" x 1/4" – Gap as Directed
1/2"
5/8"

Table 2: Steel Thickness and Configurations to Test

Alum Type ASTM B209-10:
Samples Thickness and Configuration, Air-Gap as Directed
6063 T6
1/4"x1/4"x1/4"
1/2"x1/2"
3/4"x1/2"
1/2"x3/4"
3/8"x3/8"x3/8"
3/4"x3/4"
1"x1/2"
6063 T5
1/4"x1/4"x1/4"
1/2"x1/2"
3/4"x1/2"
1/2"x3/4"
3/8"x3/8"x3/8"
3/4"x3/4"
1"x1/2"
6005 T61
1/4"x1/4"x1/4"
1/2"x1/2"
3/4"x1/2"
1/2"x3/4"
3/8"x3/8"x3/8"
3/4"x3/4"
1"x1/2"
6061-T6
1/4"x1/4"x1/4"
1/2"x1/2"
3/4"x1/2"
1/2"x3/4"
3/8"x3/8"x3/8"
3/4"x3/4"
1"x1/2"
Alum Type
Continued
6063 T6
1/2"x1"
3/4"x1"
1"x3/4"
2"
1"x1"
2"x1/4"
1/4"x2"
2-1/2"
2"x1/2"
1/2"x2"
3"
6063 T5
1/2"x1"
3/4"x1"
1"x3/4"
2"
1"x1"
2"x1/4"
1/4"x2"
2-1/2"
2"x1/2"
1/2"x2"
3"
6005 T61
1/2"x1"
3/4"x1"
1"x3/4"
2"
1"x1"
2"x1/4"
1/4"x2"
2-1/2"
2"x1/2"
1/2"x2"
3"
6061-T6
1/2"x1"
3/4"x1"
1"x3/4"
2"
1"x1"
2"x1/4"
1/4"x2"
2-1/2"
2"x1/2"
1/2"x2"
3"

Table 3: Aluminum Thickness and Configurations to Test

The testing of the materials will be done using the calibers and allowable velocity parameters per Table 3 and Revision G.

In SD-STD-01.01 Rev. G (Amended) the minimum shot spacing for opaque armor 1.5,” but in the proposed new SD-STD-01.01 Rev. H the minimum shot spacing for opaque armor is 2”. For this testing, both the 1.5”, 2” and a 3” shot spacing will be used for testing. Each caliber shown in Table 3 will be tested 9 times per each spacing. In order to accommodate these three shot spacing’s on a single one square foot sample, the shots will be done in accordance with Figure 1.

Cartridge
Velocity Range
Minimum
Maximum
7.62mm, M80, Steel Jacketed Ball, 147gr.
411.5 mps

(1350 FPS)

442.0 mps (1450 fps)

5.56 mm, M193, ball, 55gr.
823.0 mps

(2700 fps)

853.5 mps (2800 fps)

5.56 mm, M855, ball, 63gr.
899.2 mps

(2950 fps)

929.6 mps (3050 fps)

Table 4. Ballistic Resistance Test Ammunition

Figure 1: Unified Shot Pattern to Accommodate all Three Shot Spacing’s on a Single Square Foot Sample Face.

Material Type
# of Calibers
# of Test Configurations
Total Tests
Shots Per Test
Total Shots
Mild Steel A36
3
6
18
27
486
A572 Gr. 50
3
6
18
27
486
Stainless Steel 304L
3
3
9
27
243
Stainless Steel 316L
3
3
9
27
243
Alum 6063 T6
3
18
54
27
1458
Alum 6063 T5
3
18
54
27
1458
Alum 6005 T61
3
18
54
27
1458
Alum 6061-T6
3
18
54
27
1458
Totals
3
93
279
27
7290

Table 5: Test Matrix

Deliverables A quick look report will be provided within 7 days of test completion, with full written reports within 45 days. Reports will include test descriptions, high resolution photos and videos, and documented descriptions test panel condition posttest. All final reports, photos, and full testing videos shall be delivered at the completion of all samples testing on a DVD mailed via FedEx or UPS to:

Attention: Alec Williamson

1400 Wilson Blvd
9th Floor
Arlington, VA 22209

A monthly status update on progress, scheduling, delays or other information shall be provided the first of the month. Status updates shall be in the format of an email with subject “Forced Entry Testing of a Variety of Five Minute Walls– Month”. An example monthly status update template is provided in Appendix A.

Appendix A:

Example Monthly Status Report DS/C/PSP/PSD/RD – Project Name Task Manager: TBD Developer PI: (Fill in name, phone number once contract is awarded) Contract Number: (fill in)

MONTHLY STATUS REPORT

1) TASK TITLE: ((fill in)

2) DESCRIPTION/REQUIREMENT: (fill in)

3) DEVELOPER(S): (add any significant subcontractors)

4) TECHNICAL APPROACH: (In five or six sentences, summarize the project’s technical approach.)

5) MILESTONES: (fill in relevant milestones)

Milestone
Planned
Rescheduled
Actual

Project Plan

Kickoff Meeting

Preliminary Design Review

Operations and Maintenance Manual

Critical Design Review

Test Plan

Test Report

Etc.

6) FUNDING & COSTS:

Project Funding History

Funding Action
Date
Amount
Comment
Contract Award
7/15/2016
$68,000.00
Contract award, funds through Nov 2016
Mod 1
10/15/2016
$58,000.00
Incremental funding, funds through Dec 2016.
Mod 2
1/15/2017
$65,000.00
Fully funds effort

Funding Provided to Date Expenditures (Current Month)

Accrued Expenditures (Cumulative)
Remaining

Obligated Funds

Funding
$100,000.00
$25,000.00
$100,000.00
$0.00
Total Funding Provided
$200,000.00
Contract Value
$300,000.00

Insert graph showing planned expenditures, current funding level, and actual expenditures here. The graph must cover from contract start date to end date. If a revised spend plan becomes necessary, be sure to include the original plan as well. (See sample below):

7)TASK STATUS / MONTHLY ACTIVITIES:
a.Report month –
b.Upcoming Month –

8) ISSUES: (Identify any issue that affects the progress of the project, funds requirements, payment of invoices, potential schedule problems. Include requirements for resolution of the issue.)

9) PHOTOS/VIDEO: (Include at least two current digital images of 300 pixel/inch quality or better, in “.jpg”, “.tif”, or “.bmp” format that show a conceptual application, design, physical prototype, or other meaningful representation of the project progress If applicable, provide video compatible with Windows Media Player.)

image1.png image2.jpg