PAST_PERFORMANCE_evaluationpdf.pdf

PDF 35 KB Posted

Attached to
Real Estate Appraisal and Advisory Services
Solicitation number
19AQMM18R0158
Issued by

About this file

Attachment J2-Past Performance Evaluation Form

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.1.2

Past Performance Survey

CONTRACT INFORMATION

Please provide the following information to assist us in tracking responses received and resolving any conflicts in the evaluation process if necessary.

1. Contractor: _____________________________________________________

2. Contract Number: _____________________________________________________

3. Contract Type: _____________________________________________________

4. Name of Evaluator: __________________________________

5. Telephone Number: __________________________________

6. E-mail Address: ______________________________________________________

8. Mailing Address: _____________________________________________________

10. Length of involvement with contract: ________________________________________

11. Degree or extent of involvement with contract: _________________________________

Period of Performance: ____________________ to ___________________________

Initial Contract Value: $__________________________

Current or Completed Contract Value: $_________________________

Brief Description of Requirement:

Complexity of effort ( ) Difficult ( ) Routine

Thank you in advance for completing this survey. THIS INFORMATION WILL BE PROTECTED

IN ACCORDANCE WITH FAR 15.1004 (e).

SCORING CRITERIA

EXCEPTIONAL - Indicates the Contractor's performance within the area of evaluation clearly and consistently exceeds contractual requirements.

ACCEPTABLE - Indicates no problem in area of evaluation or has only minor problems for which solutions were satisfactory.

UNACCEPTABLE - Indicates serious problems in the evaluation area. The Contractor is/was in danger of being unable to satisfy contractual requirements and timely recovery is not likely or did not occur.

I. CONFORMANCE TO SPECIFICATIONS AND STANDARDS OF GOOD WORKMANSHIP

1a. Overall ability to pro-actively and aggressively perform contract requirements.

Please circle the appropriate rating below or check if N/A.

0 1 2 3 4 5 6 7 8 9 10

Unacceptable Acceptable Exceptional

1b. Effectiveness and reliability of contractor's Key Personnel.

Unacceptable Acceptable Exceptional

II. ADHERANCE TO CONTRACT SCHEDULE

2a. Overall performance in planning, scheduling, and monitoring.

Unacceptable Acceptable Exceptional

2b. Completion of major milestones on schedule.

Unacceptable Acceptable Exceptional

2c. Timely completion within period of performance.

Unacceptable Acceptable Exceptional

III. GENERAL BUSINESS CONDUCT AND BUSINESS LIKE CONCERN FOR THE

CUSTOMER

3a Responsiveness and flexibility in responding to changes.

Unacceptable Acceptable Exceptional

3b. Responsiveness/capability to respond to surge/short term requirements.

Unacceptable Acceptable Exceptional

3c. Accuracy and completeness of vouchers/invoices.

Unacceptable Acceptable Exceptional

IV. COMPLIANCE WITH THE TERMS AND CONDITIONS OF THE CONTRACT

4a. Quality, completeness, and accuracy of price proposals.

Unacceptable Acceptable Exceptional

4b. Accuracy and timeliness of required reports.

Unacceptable Acceptable Exceptional

4c. Ability to perform within negotiated prices.

Unacceptable Acceptable Exceptional

File details come from the government source that posted it.