This is Addendum No. 001 issued by Thompson & Litton, Inc. on behalf of Tazewell County Public Schools for the TCPS High School Restroom Renovations project, which involves the renovation of 12 restrooms (4 at each of three high schools: Tazewell, Graham, and Richlands). The addendum, issued April 10, 2026, modifies the original bidding documents dated March 18, 2026, and includes a pre-bid conference held April 8, 2026. The revised bid due date is May 6, 2026, at 2:00 p.m., with electronic submission through the T&L plan room. Key modifications include replacement of the bid form to add unit prices for asbestos-containing materials, revised work hour restrictions (7:00 a.m. to 7:00 p.m. during summer or when school is out of session; 3:30 p.m. onward and weekends during school sessions, with potential coordination for quiet, dust-free work during school hours), and comprehensive additions of asbestos abatement specification sections addressing worker protection, respiratory protection, decontamination units, and regulated areas. The project includes unit pricing for removal of plaster ceilings containing hazardous materials at an estimated quantity of 1,400 square feet. Substantial completion is required within 270 consecutive calendar days after Notice to Proceed, with final completion within 290 calendar days, and liquidated damages are set at $1,500 per day for delays.

The addendum emphasizes contractor responsibility for obtaining necessary permits at each school, background checks for all personnel working on school property, and compliance with extensive OSHA and EPA asbestos abatement standards. All 12 restrooms are being renovated with the constraint that no more than two restrooms may be closed at any given time per school to maintain operational restroom facilities during construction. The addendum includes detailed specifications for asbestos abatement work, including mini-enclosures, glovebag systems, worker decontamination procedures, equipment decontamination units, and project decontamination requirements with HEPA filtration. Bidders must acknowledge receipt of all addenda on the bid form or face disqualification. Pre-bid questions had a deadline of April 27, 2026, at 4:00 p.m., with responses provided through addenda. The Owner will coordinate staging locations and utility interruptions, and the project interfaces with a concurrent Tazewell High School Gym Wall Structural Improvements project scheduled for summer 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERS ARCHITECTS SURVEYORS

T&L 726 Auburn Avenue Radford, Virginia 24141 tel: 540.633.1897 fax: 540.633.1896 www.T-L.com

ADDENDUM NO. 001

TO: All Plan Holders

RE: TCPS High School Restroom Renovations

Tazewell, Graham, and Richlands High Schools

Tazewell County Public Schools

T&L Project No. 19321

DATE: April 10, 2026

BIDS RECEIVED DATE: May 6, 2026

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated March

18, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.

This Addendum consists of 80 pages.

CLARIFICATIONS AND ANSWERS TO PRE-BID QUESTIONS:

1. The Pre-Bid Conference Meeting Minutes are enclosed.

2. The Pre-Bid Conference Attendance Record is enclosed.

CHANGES TO BIDDING REQUIREMENTS:

1. ADVERTISEMENT FOR BIDS

a. The Bid Due date has been REVISED.

BIDS DUE; Wednesday, May 6, 2026 at 2:00 p.m.

CHANGES TO SPECIFICATIONS:

1. Section 00 4100 Bid Form:

a. REPLACE Bid Form in its entirety. Added unit prices for asbestos-containing materials.

2. Section 01 1000 – Summary of Work:

a. REVISE Paragraph 1.5. E to read, Time Restrictions:

1. Limit conduct of the hours of 7:00 a.m. to 7:00 p.m. only in the Summer or when school is out of session.

Addendum No. 001

TCPS High School Restroom Renovations

April 10, 2026

T&L www.T-L.com

2. With Owner approval and being that the work to be done is quiet and dust free, some work may be done during school hours while school is in session. 3. Normal work hours while school is in session will be from 3:30 p.m. – onward, and weekends.

3. Section 01 2200 – Unit Prices:

a. ADD Section in its entirety.

4. Section 02 8210 – Asbestos Abatement – Summary of Work:

5. Section 02 8212 – Asbestos Abatement – Reference Standards and Definitions:

6. Section 02 8214 – Asbestos Abatement – Codes, Regulations and Standards:

7. Section 02 8216 – Regulated Areas:

8. Section 02 8218 – Mini Enclosures and Glove Bags:

9. Section 02 8220 – Asbestos Abatement – Worker Protection:

10. Section 02 8222 – Respiratory Protection:

11. Section 02 8224 – Decontamination Units:

12. Section 02 8226 – Project Decontamination:

13. Section 02 8228 – Removal of Asbestos-Containing Materials:

14. Section 02 8240 – Disposal of Regulated Asbestos-Containing Material:

15. Appendix A:

a. ADD Appendix A: Existing Asbestos Information.

Enclosures: Pre-Bid Conference Meeting Minutes, 4 pages

Pre-Bid Conference Attendance Record, 1 page

Addendum No. 001

TCPS High School Restroom Renovations

April 10, 2026

T&L www.T-L.com

00 4100 Bid Form

01 2200 Unit Prices

Section 02 8210 – Asbestos Abatement – Summary of Work

Section 02 8212 – Asbestos Abatement – Reference Standards and Definitions

Section 02 8214 – Asbestos Abatement – Codes, Regulations and Standards

Section 02 8218 – Mini Enclosures and Glove Bags

Section 02 8220 – Asbestos Abatement – Worker Protection

Section 02 8222 – Respiratory Protection

Section 02 8224 – Decontamination Units

Section 02 8226 – Project Decontamination

Section 02 8240 – Disposal of Regulated Asbestos-Containing Material

Existing Asbestos Information

END OF ADDENDUM NO. 001

ENGINEERS ARCHITECTS SURVEYORS

T&L 726 Auburn Avenue Radford, Virginia 24141 tel: 540.633.1897 fax: 540.633.1896 www.T-L.com

PRE-BID CONFERENCE MEETING MINUTES

PROJECT: TCPS High School Restroom Renovations

Tazewell County Public Schools

T&L Project No. 19321

DATE: April 8, 2026

1. PROJECT PERSONNEL:

Architectural/Engineering Firm: Thompson & Litton, Inc.

Architectural/Engineering Representative: Erica Sunshine, Director of Architecture

Telephone: 540-633-1897

Project Manager: Pamela Young

Telephone: 304-425-9555

2. SCOPE OF PROJECT:

The project generally consists of the renovation of (4) restrooms in each of the three high schools in Tazewell County (Graham, Tazewell, Richlands) Total of (12) restrooms.

3. PROJECT REVIEW:

Contractor will need to obtain all necessary permits for each school.

Pre-Bid Conference Agenda

Richlands High School-Tazewell High School-Graham High School Bathroom Renovations

April 8, 2026

T&L www.T-L.com

4. SPECIAL SITE/PROJECT CONDITIONS:

a) Phases of construction will occur during the school year.

a. Work hours: 3:30 p.m. – onward; weekends.

b. Some work may be done during school hours (8:00 a.m. – 3:30 p.m.) if the work to be done is quiet and dust free (i.e. Tiling). Coordinate with Owner.

b) Maximum of (2) restrooms closed within each school at (1) time.

a. School operations should not be disrupted during construction.

b. Allow for (2) restrooms to remain operable in each school during construction.

c) All personnel must complete a background check to work on school property.

d) Tunnel under bathrooms at Tazewell and Richlands will need to be mitigated.

5. STAGING AREA:

Utilities, Site Limitations, Access, Parking, Storage:

On-site area may be used. Owner will coordinate with Awarded contractor.

6. PROTECTION OF ADJACENT AREAS AND FACILITIES:

All adjacent areas must be kept free of dust (provide dust barriers)

Any exterior staging areas that are damaged such as pavement, concrete sidewalks, and grass areas are to be replaced.

7. COORDINATION:

Coordinate with the Owner on staging locations and utility interruptions.

Eugene Parkhurst – Maintenance Director – will be point of contact, information on Attendance

Record

8. CONTRACT(S) DETAILS:

Substantial Completion shall be achieved within 270 consecutive calendar days after Notice to

Proceed. Final Completion shall be achieved within 290 consecutive calendar days after

Substantial Completion.

Liquidated Damages: $1,500.00 per day

9. BID DOCUMENTS:

Bid Documents (electronic and/or hard copy) are available for purchase through TRASCO at http://www.trascoplanroom.com.

10. SEPARATE OWNER’S CONTRACTS INTERFACING:

a) Tazewell High School Gym Wall Structural Improvements for the Summer of 2026.

11. CONFIRMATION OF BID DATE AND TIME:

Sealed bids will be received electronically online at https://www.tlplanroom.com until 2:00 P.M., local prevailing time, on May 6, 2026, and then publicly opened and read aloud virtually.

CONTRACTOR QUESTIONS:

All questions must be submitted in writing using the Pre-Bid Question Form provided in the Bid

Documents. Instructions for submission (via email or fax) are included on the form. Responses to questions, if deemed necessary, will be made via addendum(a).

Deadline (Date/Time) for Submitting Questions: April 27, 2026 by 4:00 p.m.

12. ADDENDA/ITEMS TO BE CLARIFIED:

A. Bid Opening – May 6, 2026 at 2:00 p.m.

B. Existing Asbestos Information – to be included in an Addendum

C. Replacement of janitor closet door(s) within restroom(s). Modified per Addendum

D. Work hours – to be clarified by Addendum.

13. SITE VISIT

The attendees visited each restroom at each of the three schools – Richlands, Tazewell, and

Graham. Reviewed staging areas at each school

00 4100/1

BID FORM

PROJECT IDENTIFICATION: TCPS High School Restroom Renovations

Graham, Tazewell, and Richlands High School

CONTRACT IDENTIFICATION NO: T&L Project No. 19321

THIS BID IS SUBMITTED TO: Tazewell County Public Schools

506 Jeffersonville Street

Tazewell, Virginia 24651

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract

Time indicated in this Bid and in accordance with the other terms and conditions of the Contract

Documents.

2. Bidder accepts all of the terms and conditions of the Advertisement and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for sixty (60) days after the day of Bid Opening. Bidder will sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within the timeframe presented in the Instructions to Bidders.

3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:

(A) Bidder has examined copies of all Bidding Documents and of the following Addenda

(receipt of all which is hereby acknowledged):

Number Date

(B) Bidder has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work.

(C) Bidder has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, and studies which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance, or furnishing of the Work as Bidder considers necessary for the performance or furnishing of the Work at the Contract time and in accordance

00 4100/2 with the other terms and conditions of the Contract Documents, including specifically the provisions of Paragraph 3.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, or similar information or data are or will be required by Bidder for such purposes.

(D) Bidder has reviewed and checked all information and data shown or indicated on the

Contract Documents with respect to existing utilities at or contiguous to the site and assumes responsibility for the accurate location of said utilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect of said utilities are or will be required by Bidder in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of

Paragraph 3.2 of the General Conditions.

(E) Bidder has correlated the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract

Documents.

(F) Bidder has given Architect written notice of all conflicts, errors, or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by Architect is acceptable to Bidder.

(G) This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any person, firm, or corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.

4. Bidder will complete the Work for the following price:

PART A

BASE BID – THE ALTERATIONS OF (12) HIGH SCHOOL RESTROOMS. (4) MULTI-USER RESTROOMS

AT EACH OF TAZEWELL COUNTY PUBLIC SCHOOL'S HIGH SCHOOLS: TAZEWELL HS, GRAHAM HS

AND RICHLANDS HS, INCLUDING ALLOWANCES AS INDICATED IN SPECIFICATION SECTION 01

2100 - ALLOWANCES, AND IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS.

Dollars ($ )

PART B - UNIT PRICE

Unit Price No. 01: Removal of Plaster Ceiling (Hazardous Materials) as defined by Section 02

8210 Asbestos Abatement – Summary of Work and Appendix A.

Estimated Quantity of 1400 SF @ $ per SF =

00 4100/3

TOTAL BASE BID (PART A + PART B)

5. Bidder agrees that the Work will be substantially completed within two hundred seventy (270) consecutive calendar days after Notice to Proceed, and Final Completion shall be achieved within thirty (30) consecutive calendar days after Substantial Completion.

6. In the event that the project does not reach Substantial Completion within the time specified in

Paragraph 5 above, Owner and Contractor recognize that time is of the essence with regard to this Agreement and that the Owner will suffer financial loss and inconvenience if Work is not completed within the designated time. They also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), the Contractor shall pay the Owner fifteen hundred dollars ($1500.00) for each calendar day that expires after the time specified for project completion.

7. The following documents are attached to and made a condition of this Bid:

(A) Required Bid Security in the form of .

(B) Required Contractor's Qualification Statement with supporting data.

(C) Certification of Bidder Regarding Debarment.

(D) Workers’ Compensation Certificate of Coverage.

(E) If Bid amount exceeds $10,000, signed Compliance Statement (RD 400-6). Refer to specific equal opportunity requirements set forth in the Supplementary Conditions.

(F) If Bid amount exceeds $25,000, signed Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transactions (AD-1048).

8. Communications concerning this Bid shall be addressed to the address of Bidder indicated below.

The following address:

00 4100/4

9. The terms used in this Bid which are defined in the General Conditions of the Construction

Contract included as part of the Contract Documents have the meanings assigned to them in the

General Conditions.

SUBMITTED on __________________, 20___.

BIDDER hereby submits this Bid as set forth above:

Bidder:

(typed or printed name of organization)

By:

(authorized signature)

Name:

(typed or printed)

Title:

Date:

Attest:

(individual’s signature)

Date:

Address for giving notices:

Bidder’s Contact:

(typed or printed)

00 4100/5

Phone:

Email:

Address:

Bidder’s Contractor License No.: (if applicable)

Unit Prices 19321 01 2200/1 of 2

SECTION 01 2200 - UNIT PRICES

PART 1 GENERAL

1.1 SECTION INCLUDES

A. List of unit prices, for use in preparing Bids.

B. Measurement and payment criteria applicable to Work performed under a unit price payment method.

C. Defect assessment and non-payment for rejected work.

1.2 RELATED REQUIREMENTS

A. Document 00 2113 - Instructions to Bidders: Instructions for preparation of pricing for Unit Prices.

B. Section 01 2000 - Price and Payment Procedures: Additional payment and modification procedures.

1.3 COSTS INCLUDED

A. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit.

1.4 UNIT QUANTITIES SPECIFIED

A. Quantities indicated in the Bid Form are for bidding and contract purposes only. Quantities and measurements of actual Work will determine the payment amount.

1.5 MEASUREMENT OF QUANTITIES

A. Measurement methods delineated in the individual specification sections complement the criteria of this section. In the event of conflict, the requirements of the individual specification section govern.

B. Take all measurements and compute quantities. Measurements and quantities will be verified by Architect/Engineer.

C. Assist by providing necessary equipment, workers, and survey personnel as required.

D. Measurement by Area: Measured by square dimension using mean length and width or radius.

1.6 PAYMENT

A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities of Work that is incorporated in or made necessary by the Work and accepted by the Architect/Engineer, multiplied by the unit price.

Unit Prices 19321 01 2200/2 of 2

1.7 DEFECT ASSESSMENT

A. Replace Work, or portions of the Work, not complying with specified requirements.

B. If, in the opinion of Architect/Engineer, it is not practical to remove and replace the Work, Architect/Engineer will direct one of the following remedies:

1. The defective Work may remain, but the unit price will be adjusted to a new unit price at the discretion of Architect/Engineer.

2. The defective Work will be partially repaired to the instructions of the Architect/Engineer, and the unit price will be adjusted to a new unit price at the discretion of Architect/Engineer.

1.8 SCHEDULE OF UNIT PRICES

A. Item: Existing Plaster Ceilings - Hazardous Materials; Section 02 8210.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION

Asbestos Abatement - Summary of the Work 19321 02 8210/1 of 2

SECTION 02 8210 - ASBESTOS ABATEMENT - SUMMARY OF THE WORK

PART 1 - GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

A. The Project consists of removal of asbestos-containing textured plaster ceiling .

1.2 ASBESTOS-CONTAINING MATERIALS

A. The Work of this contract involves activities that will disturb asbestos-containing materials

(ACM) or presumed asbestos-containing materials (PACM). The location and type of ACM known to be present at the worksite is set forth in the specifications. If any other ACM or

PACM is found, notify the Designer about the location and quantity of the ACM or PACM within 24 hours of the discovery.

1.3 ASBESTOS HEALTH RISK

A. The disturbance or dislocation of ACM may cause asbestos fibers to be released into the building’s atmosphere, thereby creating a potential health risk to workers. Apprise all workers, supervisory personnel, subcontractors and consultants who will be at the job site of the seriousness of the risk and of proper work procedures which must be followed.

B. Where in the performance of the work, workers, supervisory personnel, subcontractors, or consultants may encounter, disturb, or otherwise function in the immediate vicinity of any identified ACM, take appropriate continuous measures as necessary to protect all building occupants from the risk of exposure to airborne asbestos. Such measures shall include the procedures and methods described herein, and compliance with regulations of applicable federal, state and local agencies.

1.4 CONTRACTOR USE OF PREMISES

A. Use of the Site: Limit use of the premises to work in areas indicated. Confine operations to areas within contract limits indicated. Do not disturb portions of the site beyond the areas in which the Work is indicated.

1. Driveways and Entrances: Keep driveways and entrances serving the premises clear and available to the Owner and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

B. Use of the Existing Building(s): The Building(s) will remain occupied during asbestos abatement.

1.5 OCCUPANCY REQUIREMENTS

A. The Contractor shall have full occupancy of the designated portions of the building but must not encroach upon adjacent areas.

1.6 TESTING

Asbestos Abatement - Summary of the Work 19321 02 8210/2 of 2

A. The Contractor may conduct air monitoring and laboratory testing. If he elects to do this, the cost of such air monitoring and laboratory testing shall be at no additional cost to the Owner.

1.7 PERSONAL MONITORING

A. Owner will not perform air monitoring for the Contractor to meet Contractor's OSHA requirements for personal sampling or any other purpose.

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION - NOT USED

Asbestos Abatement - Reference

Standards and Definitions 19321 02 8212/1 of 6

SECTION 02 8212 - ASBESTOS ABATEMENT - REFERENCE STANDARDS AND DEFINITIONS

PART 1 - GENERAL

1.1 DEFINITIONS

A. Definitions Relative to Asbestos Abatement:

1. “Adequately Wet” means to sufficiently mix or penetrate with liquid to prevent the release of particulates. If visible emissions are observed coming from the asbestos-containing material (ACM), then that material has not been adequately wetted.

However, the absence of visible emissions is not sufficient evidence of being adequately wetted.

2. "Asbestos": The asbestiform varieties of chrysotile (serpentine), amosite

(cummingtonite-grunerite), crocidolite (riebeckite), tremolite, anthophyllite, actinolite, and any of these minerals that has been chemically treated and/or altered. For purposes of the contract documents materials described in the contract documents as asbestos are to be considered as asbestos.

3. "Asbestos-Containing Material (ACM)": Any material containing more than 1% asbestos as determined using the methods specified in appendix A, subpart F, 40 CFR part 763, section 1, Polarized Light Microscopy.

4. "Asbestos-Containing Waste Material": Any waste that contains asbestos. This term includes filters or other materials contaminated with asbestos. This term also includes regulated asbestos-containing material waste and materials contaminated with asbestos including disposable equipment and clothing.

5. "Asbestos debris": Pieces of ACM that can be identified by color, texture, or composition, or dust, if the dust is determined by an accredited inspector to be ACM.

6. "Certified Industrial Hygienist (C.I.H.)": One certified in the practice of industrial hygiene by the American Board of Industrial Hygiene.

7. "Competent person": An individual who meets the requirements of OSHA as a

“competent person” for the specific activity involved in the work. The “competent person” must meet the requirements of 29 CFR 1926.32(f), and 29 CFR 1926.1101.

8. "Filter": A media component used to remove solid or liquid particles from air and water.

9. "Friable Asbestos": Any asbestos-containing material that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

10. "Grinding": To reduce to powder or small fragments and includes manual or mechanical chipping or drilling.

11. "HEPA Filter": A High Efficiency Particulate Air (HEPA) filter capable of trapping and retaining 99.97% of all mono-dispersed particles of 0.3 microns in diameter.

19321 02 8212/2 of 6

12. "HEPA Filter Vacuum Collection Equipment (or vacuum cleaner)": High efficiency particulate air filtered vacuum collection equipment with a HEPA filter.

13. "Intact": That the ACM has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.

14. "Leak-tight": That solids or liquids cannot escape or spill out. It also means dust-tight.

15. "Negative Pressure Enclosure (NPE)": A pressure differential and ventilation system where the work area is maintained at a negative pressure relative to air pressure outside the work area.

16. "Nonfriable Material": any material that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure and has not been rendered friable.

17. "Personal Monitoring": Sampling of the asbestos fiber concentrations within the breathing zone of an employee.

18. "Surfacing material": Material that is sprayed, troweled-on or otherwise applied to surfaces (such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, and other purposes).

19. "Thermal system insulation (TSI)": Insulation applied to pipes, fittings, boilers, breeching, tanks, ducts or other components to prevent heat loss or gain.

20. "Time Weighted Average (TWA)": The average concentration of a contaminant in air during a specific time period as determined by the method prescribed in Appendix A of

29 CFR part 1926.1101.

21. "Visible Emissions": Any emissions containing particulate material that are visually detectable without the aid of instruments. This does not include condensed uncombined water vapor.

22. "Working Day": Monday through Friday and includes holidays that fall on any of the days

Monday through Friday as indicated in the notification requirements.

1.2 INDUSTRY STANDARDS

A. Applicability of Standards: Except where the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publication Dates: Comply with the standards in effect as of the date of the Contract

Documents.

C. Conflicting Requirements: Where compliance with 2 or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement.

19321 02 8212/3 of 6

1. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum acceptable. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of the requirements.

D. Copies of Standards: Each entity engaged in construction on the Project is required to be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, the

Contractor shall obtain copies directly from the publication source.

E. Standards: which apply to asbestos abatement work or hauling and disposal of asbestos waste materials include but are not limited to the following:

1. American National Standards Institute (ANSI), 1430 Broadway, New York, New York

10018, (212) 354-3300

a. Fundamentals Governing the Design and Operation of Local Exhaust Systems

Publication Z9.2

b. Practices for Respiratory Protection Publication Z88.2

2. ASTM International (ASTM), 100 Bar Harbor Drive, West Conshocken, PA 19428-2959,

(610) 832-9585

a. Standard Practice for Encapsulation Testing of Friable Asbestos-Containing Surfacing

Materials, ASTM E1494

b. Standard Practice for Visual Inspection of Asbestos Abatement Projects, ASTM E1368

F. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. Where such acronyms or abbreviations are used in the Specifications or other Contract Documents, they mean the recognized name of the trade association, standards-generating organization, authorities having jurisdiction, or other entity applicable to the context of the text provision. Refer to Gale Research Co.'s "Encyclopedia of Associations," available in most libraries.

1. ACI: American Concrete Institute, P.O. Box 19150, Detroit, MI 48219, (313) 532-2600

2. ACIL: American Council of Independent Laboratories, 1629 K St., NW, Washington, DC

20006, (202) 887-5872

3. ACPA: American Concrete Pipe Association, 8300 Boone Blvd., Suite 400, Vienna, VA

22182, (703) 821-1990

4. ACGIH: American Conference of Governmental Industrial Hygienists, 1330 Kemper

Meadow Dr., Cincinnati, OH 45240, (513) 742-2020

19321 02 8212/4 of 6

5. AIA: The American Institute of Architects, 1735 New York Ave., NW, Washington, DC

20006, (202) 626-7300

6. AIHA: American Industrial Hygiene Association, 2700 Prosperity Ave., Suite 250, Fairfax, VA 22031, (703) 849-8888

7. ANSI: American National Standards Institute, 11 West 42nd St., 13th Floor, New York, NY

10036, (212) 642-4900

8. ASHRAE: American Society of Heating, Refrigerating and Air-Conditioning Engineers, 1791 Tullie Circle, NE, Atlanta, GA 30329, (404) 636-8400

9. ASME: American Society of Mechanical Engineers, 345 East 47th St., New York, NY

10017, (212) 705-7722

10. ASPE: American Society of Plumbing Engineers, 3617 Thousand Oaks Blvd., Suite 210, Westlake, CA 91362, (805) 495-7120

11. ASTM: ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959,

(610) 832-9585

12. CGA: Compressed Gas Association, 1725 Jefferson Davis Highway, Suite 1004, Arlington, VA 22202-4100, (703) 412-0900

13. FM: Factory Mutual Systems, 1151 Boston-Providence Turnpike, P.O. Box 9102, Norwood, MA 02062, (617) 762-4300

14. GA: Gypsum Association, 810 First St., NE, Suite 510, Washington, DC 20002, (202) 289-

15. IEEE: Institute of Electrical and Electronic Engineers, 345 E. 47th St., New York, NY

10017, (212) 705-7900

16. IETA: International Electrical Testing Association, P.O. Box 687, Morrison, CO 80465,

(303) 697-8441

17. IRI: Industrial Risk Insurers, P.O. Box 5010, 85 Woodland St., Hartford, CT 06102-5010,

(203) 520-7300

18. ISA: Instrument Society of America, P.O. Box 12277, 67 Alexander Dr., Research Triangle

Park, NC 27709, (919) 549-8411

19. ISO: International Standards Organization

20. NEC: National Electrical Code (from NFPA)

21. NECA: National Electrical Contractors Association, 3 Bethesda Metro Center, Suite 1100, Bethesda, MD 20814, (301) 657-3110

22. NEMA: National Electrical Manufacturers Association, 2101 L St., NW, Suite 300, Washington, DC 20037, (202) 457-8400

19321 02 8212/5 of 6

23. NFPA: National Fire Protection Association, One Batterymarch Park, P.O. Box 9101, Quincy, MA 02269-9101, (617) 770-3000, (800) 344-3555

24. NRCA: National Roofing Contractors Association, 10255 W. Higgins Rd., Suite 600, Rosemont, IL 60018-5607, (708) 299-9070

25. RFCI: Resilient Floor Covering Institute, 966 Hungerford Dr., Suite 12-B, Rockville, MD

20805, (301) 340-8580

26. UL: Underwriters Laboratories, 333 Pfingsten Rd., Northbrook, IL 60062, (708) 272-8800

27. White Lung Association, P.O. Box 1483, Baltimore, MD 21203

G. Federal Government Agencies: Names and titles of federal government standard- or

Specification-producing agencies are often abbreviated. The following acronyms or abbreviations referenced in the Contract Documents indicate names of standard- or

Specification-producing agencies of the federal government. Names and addresses are subject to change and are believed, but are not assured, to be accurate and up-to-date as of the date of the Contract Documents.

1. CE: Corps of Engineers (U.S. Department of the Army), Chief of Engineers - Referral, Washington, DC 20314, (202) 272-0660

2. CFR: Code of Federal Regulations (Available from the Government Printing Office), N.

Capitol St. between G and H St., NW, Washington, DC 20402, (202) 783-3238; (Material is usually first published in the "Federal Register")

3. Consumer Product Safety Commission, 5401 Westbard Ave., Bethesda, MD 20207, (800)

638-2772

4. CS: Commercial Standard (U.S. Department of Commerce), Government Printing Office, Washington, DC 20402, (202) 783-3238

5. DOC: Department of Commerce, 14th St. and Constitution Ave., NW, Washington, DC

20230, (202) 482-2000

6. DOT: Department of Transportation, 400 Seventh St., SW, Washington, DC 20590, (202)

366-4000

7. EPA: Environmental Protection Agency, 401 M St., SW, Washington, DC 20460, (202)

260-2090

8. FS: Federal Specification (from GSA), Specifications Unit (WFSIS), 7th and D St., SW, Washington, DC 20407, (202) 708-9205

9. GSA: General Services Administration, F St. and 18th St., NW, Washington, DC 20405,

(202) 708-5082

10. MIL: Military Standardization Documents (U.S. Department of Defense), Naval

Publications and Forms Center, 5801 Tabor Ave., Philadelphia, PA 19120

19321 02 8212/6 of 6

11. NIST: National Institute of Standards and Technology (U.S. Department of Commerce), Gaithersburg, MD 20899, (301) 975-2000

12. OSHA: Occupational Safety and Health Administration (U.S. Department of Labor), 200

Constitution Ave., NW, Washington, DC 20210, (202) 219-6091

13. PS: Product Standard of NBS (U.S. Department of Commerce), Government Printing

Office, Washington, DC 20402, (202) 783-3238

14. USPS: U.S. Postal Service, 475 L'Enfant Plaza, SW, Washington, DC 20260-0010, (202)

268-2000

PART 2 - PRODUCTS - NOT USED

Asbestos Abatement - Codes, Regulations and Standards 19321 02 8214/1 of 5

SECTION 02 8214 - ASBESTOS ABATEMENT - CODES, REGULATIONS AND STANDARDS

PART 1 - GENERAL

1.1 SUMMARY

A. This section sets forth governmental regulations which are included and incorporated herein by reference and made a part of the specification. This section also sets forth those notices and permits which are known to the Owner and which either must be applied for and received, or which must be given to governmental agencies before start of work.

1. Requirements include adherence to work practices and procedures set forth in applicable codes, regulations and standards.

2. Requirements include obtaining permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with codes, regulations, and standards.

1.2 CODES, REGULATIONS AND STANDARDS

A. General Applicability of Codes, Regulations and Standards: Except to the extent that more explicit or more stringent requirements are written directly into the Contract Documents, all applicable codes and regulations have the same force and effect (and are made a part of the contract documents by reference) as if copied directly into the Contract Documents, or as if published copies are bound herewith.

B. Contractor Responsibility: The Contractor shall assume full responsibility and liability for the compliance with all applicable Federal, State, and local regulations pertaining to work practices, hauling, disposal, and protection of workers, visitors to the site, and persons occupying areas adjacent to the site. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable

Federal, State, and local regulations. The Contractor shall hold the Owner and Designer harmless for failure to comply with any applicable work, hauling, disposal, safety, health or other regulation on the part of the contractor, the contractor’s employees, or subcontractors.

C. Federal Requirements: which govern asbestos abatement work or hauling and disposal of asbestos waste materials include but are not limited to the following:

1. OSHA: U.S. Department of Labor, Occupational Safety and Health Administration, (OSHA), including but not limited to:

a. Occupational Exposure to Asbestos, Tremolite, Anthophyllite, and Actinolite

1) Final Rules Title 29, Part 1910, Section 1001 of the Code of Federal Regulations

2) Final Rules Title 29, Part 1926, Section 1101 of the Code of Federal

Regulations

b. Respiratory Protection

1) Title 29, Part 1910, Section 134 of the Code of Federal Regulations

19321 02 8214/2 of 5

2) Title 29, Part 1926, Section 103 of the Code of Federal Regulations

c. Personal Protective Equipment for General Industry

1) Title 29, Part 1910, Section 132 of the Code of Federal Regulations

2) Title 29, Part 1926, Sections 95 - 107 of the Code of Federal Regulations

d. Access to Employee Exposure and Medical Records

1) Title 29, Part 1926, Section 33 of the Code of Federal Regulations

e. Hazard Communication

1) Title 29, Part 1926, Section 59 of the Code of Federal Regulations

f. Specifications for Accident Prevention Signs and Tags

1) Title 29, Part 1910, Section 145 of the Code of Federal Regulations

g. Permit Required Confined Space

1) Title 29, Part 1910, Section 146 of the Code of Federal Regulations

h. Construction Industry

1) Title 29, Part 1910, Section 1001 of the Code of Federal Regulations

2) Title 29, Part 1926, Section 1101 of the Code of Federal Regulations

i. Construction Industry - General Duty Standards

1) Title 29, Part 1926, Sections 20 through 35 of the Code of Federal Regulations

j. DOT: U.S. Department of Transportation, including but not limited to:

1) Hazardous Substances

(a) Title 49, Part 171 and 172 of the Code of Federal Regulations

2) Hazardous Material Regulations

(a) General Awareness and Training Requirements for Handlers, Loaders and

Drivers

(b) Title 49, Parts 171-180 of the Code of Federal Regulations

3) Hazardous Material Regulations

(a) Editorial and Technical Revisions

(b) Title 49, Parts 171-180 of the Code of Federal Regulations

k. EPA: U. S. Environmental Protection Agency (EPA), including but not limited to:

19321 02 8214/3 of 5

1) Asbestos Abatement Projects; Worker Protection Rule

(a) Title 40 Part 763, Sub-part G of the Code of Federal Regulations

2) Asbestos Hazard Emergency Response Act (AHERA) Regulation

(a) Title 40, Part 763, Sub-part E of the Code of Federal Regulations

3) EPA Model Accreditation Plan - Asbestos Containing Materials Final Rule &

Notice

(a) Title 40, Part 763, Sub-part E, Appendix C of the Code of Federal

Regulations

4) National Emission Standard for Hazardous Air Pollutants (NESHAP), National

Emission Standard for Asbestos

(a) Title 40, Part 61, Sub-part A, and Sub-part M (Revised Sub-part B) of the

Code of Federal Regulations

D. State Requirements which govern asbestos abatement work or hauling and disposal of asbestos waste materials include but are not limited to the following:

1. Virginia Department of Waste Management:

a. Solid Waste Management Regulations, VR 672-20-10.

2. Virginia Department of Labor and Industry:

a. Occupational Safety and Health Standard For General Industry (VOSHA).

1.3 NOTICES

A. U.S. Environmental Protection Agency

1. Postmark or Deliver Written Notification as required by USEPA National Emission

Standards for Hazardous Air Pollutants (NESHAP) Asbestos Regulations (40 CFR 61, Subpart M) to the regional Asbestos NESHAP Contact at least 10 working days prior to beginning any work on asbestos-containing materials (ACM).

2. A copy of the NESHAP form is provided at the end of this Section.

3. Notification: Include the following information in the notification sent to the NESHAP contact:

a. Indication whether the notification is the original or revised notification

b. Name, address, and telephone number of owner or operator.

c. Name, address, and telephone number of contractor.

d. Type of Operation (demolition or renovation).

19321 02 8214/4 of 5

e. Description of the facility or affected part of the facility being demolished or renovated, including the size (square feet [square meters], number of floors), age, present and prior use of the facility.

f. Estimate of the approximate amount of RACM to be removed from the facility in terms of linear meters (linear feet) of pipe, and surface area in square meters

(square feet) of other facility components. Also estimate the approximate amount of Category I and Category II nonfriable ACM in the affected part of the facility that will not be removed before demolition.

g. For facilities in which the amount of friable asbestos materials less than 80 linear meters (260 linear feet) on pipes and less than 15 square meters (160 square feet) or 1 cubic meter (35 cubic feet) if the length and width could not be measured. On other facility components, explain techniques of estimation.

h. Location and street address (including building number or name and floor or room number, if appropriate), city county, and state, of the facility being demolished or renovated.

i. Scheduled starting and completion dates of asbestos removal work (or any other activity, such as site preparation that would break up, dislodge, or similarly disturb asbestos material) in a demolition or renovation; planned renovation operations involving individual nonscheduled operations shall only include the beginning and ending dates of the report period as described in paragraph (a)(4)(iii) of 40 CFR

61.145.

j. Scheduled starting and completion dates of demolition or renovation.

k. Nature of planned demolition or renovation and method(s) to be used, including demolition or renovation techniques to be used and description of affected facility components.

l. Procedures to be used to comply with the requirements of USEPA National Emission

Standards for Hazardous Air Pollutants (NESHAP) Asbestos Regulations (40 CFR 61

Subpart M).

m. Name and location of the waste disposal site where the asbestos containing waste material will be deposited.

n. A certification that at least one person trained as required by paragraph (c)(8) of 40

CFR 61.145 will supervise the stripping and removal described by this notification.

B. State and Local Agencies

1. Send written notification as required by state and local regulations prior to beginning any work on ACM.

1.4 PERMITS

19321 02 8214/5 of 5

A. Permit: All asbestos containing waste is to be transported by an entity maintaining a current

"Industrial waste hauler permit" specifically for ACM, as required for transporting of waste

ACM to a disposal site.

B. Contractor is responsible for obtaining any demolition, building, renovation or other permits, and for paying application fees, if any, where required by State or Local jurisdictions.

1.5 LICENSES

A. Licenses: Maintain current licenses as required by the State of Virginia for the removal, transporting, disposal or other regulated activity relative to the work of this contract.

1.6 POSTING AND FILING OF REGULATIONS

A. Posting and Filing of Regulations: Post all notices required by applicable federal, state and local regulations. Maintain two (2) copies of applicable federal, state and local regulations and standard. Maintain one copy of each at job site. Keep on file in Contractor's office one copy of each.

1.7 SUBMITTALS

A. Before Start of Work: Submit the following to the Designer for review. No work shall begin until these submittals are returned with Designer's action stamp indicating that the submittal is returned for unrestricted use or final-but-restricted use.

1. Permits, Licenses, and Certificates: For the Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, and similar documents, correspondence and records established in conjunction with compliance with standards and regulations bearing upon performance of the Work including:

a. State and Local Regulations: Submit copies of codes and regulations applicable to the work.

b. Notices: Submit notices required by federal, state and local regulations together with proof of timely transmittal to agency requiring the notice.

c. Permits: Submit copies of current valid permits required by state and local regulations.

d. Licenses: Submit copies of all State and local licenses and permits necessary to carry out the work of this contract.

PART 2 - PRODUCTS - NOT USED

This page intentionally left blank

Regulated Areas 19321 02 8216/1 of 4

SECTION 02 8216 - REGULATED AREAS

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

A. Work of this section consists of preparing a Regulated Area for work of the following specification sections only. Do not use procedures set forth in this section in connection with any other work.

1. Section 02 8228 - Removal of Asbestos-Containing Materials.

2. Section 02 8230 - Resilient Flooring Removal.

3. Section 02 8232 - Removal of Asbestos Roofing Materials.

1.2 RELATED WORK SPECIFIED ELSEWHERE

A. Section 02 8220 - Asbestos Abatement - Worker Protection.

B. Section 02 8222 - Respiratory Protection.

1.3 SUBMITTALS

A. Before the Start of Work: Submit the following to the Designer for review. Begin no work until these submittals are returned with Designer's action stamp indicating that the submittal is returned for unrestricted use or final-but-restricted use.

1. HEPA Filtered Vacuum Cleaners: Submit product data.

2. Signs: Submit samples of each type of sign to be used.

3. Warning Tape: Submit samples.

PART 2 - PRODUCTS

2.1 HEPA FILTER VACUUM CLEANERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products which may be incorporated in the Work include, but are not limited to, the following:

1. Nilfisk of America, Inc., 225 Great Valley Parkway, Malvern, PA 19355, (800) 645-3475

2. Pullman-Holt (White) Corporation, P.O. Box 16647, Tampa, FL 33617, (813) 645-3475

3. Minuteman International, 111 South Route 53, Addison, IL 60101, (708) 627-6900

2.2 PLASTIC SHEET

A. Plastic Sheet: A single polyethylene film in the largest sheet size possible to minimize seams,

6.0 mil (0.15 mm) thick, clear, frosted, or black as indicated.

PART - EXECUTION

Regulated Areas 19321 02 8216/2 of 4

3.1 SECURING WORK AREA

A. Secure work area from access by everyone except abatement workload. Accomplish this where possible, by locking doors, windows, or other means of access to the area, and by constructing barriers with signs and warning tape around exterior perimeter of work area.

3.2 DEMARCATION OF REGULATED AREA

A. Demarcation: Demarcate the Regulated Area with a sheet plastic drop cloth, signs and barrier tape. Configure the regulated area in a manner that minimizes the number of persons within the area and protects persons outside the area from exposure to airborne concentrations of asbestos.

1. Drop Cloth: Cover floor in vicinity of Work Area and six (6) feet (1.82 meters) beyond, with 6 mil (0.15 mm) polyethylene drop sheet. Where work is adjacent to wall, extend drop sheet up wall and secure at ceiling with duct tape. This drop sheet demarcates the boundary of the Regulated Area.

2. Signs: Post warning signs that carry the following legends in both English and Spanish:

a. First Sign: Provide warning signs at each locked door leading to the controlled area reading as follows:

Legend Notation

KEEP OUT 3-inch (76.2 mm) Block

b. Second Sign: Immediately inside the locked door and outside the controlled area post an approximately 20-inch by 14-inch (508 mm x 356 mm) manufactured caution sign displaying the following legend with letter sizes and styles of a visibility required by 29 CFR 1926:

1) Legend:

(a) DANGER

(b) ASBESTOS

(c) CANCER AND LUNG DISEASE HAZARD

(d) AUTHORIZED PERSONNEL ONLY

(e) RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA

3. Barrier Tape: Delineate area with 3 inch (76.2 mm) wide polyethylene ribbon with the printed warning, "CAUTION ASBESTOS REMOVAL". Install this ribbon at between 3 and 4 feet (0.91 and 1.22 meters) above the floor.

3.3 SCHEDULING

A. Work may be carried out during normal working hours in those areas as scheduled with

Owner.

3.4 GENERAL PROCEDURES

Regulated Areas 19321 02 8216/3 of 4

A. The following precautions and procedures have application to work of this section. Workers must exercise caution to avoid release of asbestos fibers into the air:

1. Setup and management of the controlled area is to be under the supervision of an OSHA

Competent Person.

2. Before start of work comply with requirement for worker protection in Section 02 8220 and respiratory protection in Section 02 8222.

3. Do not allow eating, drinking, smoking, chewing tobacco or gum, or applying cosmetics in the Regulated Area.

4. Cover ground in vicinity of Work Area and six (6) feet (1.82 meters) beyond, with 6 mil

(0.15 mm) polyethylene drop sheet. Where work is adjacent to wall, extend drop sheet up wall and secure at ceiling with duct tape. This drop sheet demarcates the boundary of the Regulated Area.

5. Perform the work per the appropriate specification section while on plastic drop sheet.

6. Immediately remove any asbestos-containing debris which collects on the drop sheet either by using a HEPA vacuum or by spraying with amended water or removal encapsulant, collecting with wet paper towels, placing in a disposal bag while still wet, and cleaning surface of plastic sheet with wet paper towels.

7. Complete the following at completion of work in an area before stepping off drop sheet:

a. While standing on plastic sheet thoroughly HEPA vacuum ladder and any tools used and pass to worker standing off sheet.

b. Worker standing off the sheet HEPA vacuum thoroughly the worker standing on the sheet.

c. Worker on the sheet thoroughly HEPA vacuum all surfaces of the plastic sheet, bags, and any other items on the sheet including the worker’s feet.

8. If moving to the next Work Area in the same secured area: Worker on the drop sheet is to don clean foot covers, placing each foot, in turn, off the sheet as the foot cover is put

on. Remove clean foot covers at the next Work Area while standing on the sheet.

Dispose of the used foot covers along with the plastic sheet at completion of work in that area. Do not reuse foot covers to move off the sheet.

9. If work day is complete or if next Work Area is in another secured area: all workers remove paper suits turning them inside out while doing so. The person on the sheet steps with each foot off the sheet as the foot covers are removed.

10. Fold sheet and all its contents toward the center.

11. Place the sheet in a properly labeled disposal bag.

12. Neck down the bag and collapse it with the HEPA vacuum.

Regulated Areas 19321 02 8216/4 of 4

13. Twist the bag shut, bend over and seal with duct tape by wrapping around bag neck at least 3 times.

14. Clean all surfaces of the Work Area by use of a HEPA filter vacuum until no visible residue remains.

B. Remove respirators using the procedure in Section 02 8222 - Respiratory Protection.

C. At completion of work require all workers to complete wet decontamination procedures in accordance with Section 02 8220 Worker Protection – Asbestos Abatement.

Mini Enclosures and Glovebags 19321 02 8218/1 of 6

SECTION 02 8218 - MINI ENCLOSURES AND GLOVEBAGS

PART 1 – GENERAL

1.1 DESCRIPTION OF THE WORK

A. Work of this section consists of preparing a Regulated Area for work for which there is no negative exposure assessment or that involves drilling, cutting, abrading, sanding, chipping, breaking, or sawing of thermal system insulation or surfacing material. This is Class III OSHA work, and is limited in size to operations that generate small amounts of ACM, i.e., no more than can be contained in one standard (60 inch x 60 inch) glove or waste bag filled no more than 1/3 to 1/2 full.

1.2 SUBMITTALS

A. Before Start of Work, submit the following to the Designer for review. Do not begin work until these submittals are returned with the Designer's action stamp indicating that the submittal is returned for unrestricted use.

1. Glovebags: Submit product data.

2. HEPA Vacuums: Submit product data.

3. Signs: Submit samples of signs to be used.

4. Mini-enclosure: Provide shop drawing of mini-enclosure arrangement to be used.

PART 2 - PRODUCTS

2.1 GLOVE BAGS

A. Glovebags: Provide minimum 6 mil (0.15 mm) thick polyethylene, polyvinyl chloride or equivalent plastic sack, with a seamless bottom, and two sealed inward projecting long sleeved gloves or mittens, preprinted with same warning notice as a disposal bag, equipped with a pouch for storage of tools, with designated location for wand or HEPA vacuum wand.

Glove bag is to be not more than 60 inches by 60 inches in size.

B. Negative Pressure Glove Bag Systems: Provide glovebags as…