About this file
This specification document outlines channel erosion repairs for Rolling Fork submitted by Harris County for the Harris County Flood Control District (HCFCD), Project ID E125-00-00-X011. The scope of work includes furnishing all labor, supervision, equipment, materials, and incidentals necessary to perform comprehensive drainage system repairs with emphasis on earthwork, including erosion repair, channel alignment rectification, slope failure repair, sediment removal and disposal, riprap installation, pipe removal and replacement, backslope swale repair, and outfall structure removal and replacement. A pre-bid conference is scheduled for March 3, 2026, at 10:30 a.m. CST via teleconference (conference number 281-985-1862, code 954 065 877#), with attendance encouraged but not mandatory. Vendors must submit written questions through the Bonfire platform at https://harriscountytx.bonfirehub.com by the deadline specified in the Events Schedule, and all questions and answers will be released publicly. Project manuals, drawings, and additional specifications are available for download through Bonfire. Vendors must examine the entire bid package, seek written clarification, and review bids for accuracy before submission.
Bid pricing must be all-inclusive of labor, material, equipment, and all other costs on the BidTable within Bonfire, with no separate line item rates accepted; unit pricing governs in case of discrepancies between unit and total pricing. Payment terms are Net 30 from invoice approval by HCFCD. Prevailing wage compliance is mandatory under Texas Government Code Section 2258, with contractors required to pay the higher of Harris County's Contractor Minimum Wage (currently $21.65/hour) or applicable prevailing wage rates, and submit certified weekly payrolls. Performance bonds are required for projects exceeding $100,000, and payment bonds are required for projects exceeding $25,000. All contractors must complete the Certificate of Interested Parties (Form 1295) prior to bid submission and comply with all Harris County General Requirements and the Project Manual specifications. Toll and parking fees are the vendor's responsibility, and all bids become public record upon opening with no confidentiality exceptions.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Channel Erosion Repairs for Rolling Fork for the Harris County Flood Control District – Project
ID E125-00-00-X011
SCOPE
Harris County is soliciting bids for channel erosion repairs for Rolling Fork for the Harris County Flood Control District (HCFCD).
PRE-BID CONFERENCE
A pre-bid conference is scheduled for this project. Attendance is not mandatory, but vendors are encouraged to attend to gain a better understanding of the requirements listed within this bid. A teleconference for this pre-bid will be held March 3, 2026, 10:30 a.m. CST, local time Houston, TX using the following dial-in information. Conference number (281) 985-1862 conference code 954 065 877#. Space is limited, if you desire to participate in the audio pre-bid conference, please contact Maria Heinzmann, Office of the Purchasing Agent, via email to maria.heinzmann@pur.hctx.net three (3) days prior to the audio conference.
It is the responsibility of each vendor to examine the entire bid package, seek clarification in writing, and review their bid for accuracy before submitting. Questions relating to this bid must be submitted in writing online within Bonfire at https://harriscountytx.bonfirehub.com. The deadline for submission of questions relating to this bid is listed on the Events Schedule within Bonfire. All questions submitted in writing prior to the deadline will be compiled and answered in writing. A copy of all questions and answers will be released as a Public Notice to all firms through Bonfire. The County will not be bound by any information conveyed verbally.
CERTIFICATE OF INTERESTED PARTIES (FORM 1295)
Texas law requires all parties who enter into any contract with the County which must be approved by Commissioners Court to disclose all interested parties. Form 1295 must be completed in its entirety at the following website: https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm prior to submitting your response. Failure to do so may result in disqualification of your response.
SPECIAL REQUIREMENTS
Where these special requirements and information as detailed in the attachment titled Project Manual, under Supporting Documents inside Bonfire, differ from the preceding Harris County General Requirements for bids within the specific requirements and attachment titled Project Manual, under Supporting Documents inside Bonfire, supersede where applicable.
Coordination of the project will be through HCFCD and all invoices must be routed through their department.
All invoices shall include submission requirements stated herein including completed certified payroll records and lien waivers (if applicable). Payment terms are “Net 30” from date the invoice is approved by HCFCD;
therefore, payment to the vendor may be up to one (1) month from the date the invoice is approved by the
HCFCD.
In addition, the vendor must comply with Texas Government Code (GC) 2258, Prevailing Wage Rates, and GC 2253.021, Performance and Payment Bonds. Accordingly, GC 2258 requires the vendor to submit a certified payroll record as detailed in the attachment titled Prevailing Wage Rates, Worker Classification Definitions and Payroll Submittal Instructions (http://www.eng.hctx.net/Consultants/Construction/Prevailing-Wage-Rates), and compensate any worker employed on a public works not less than as applicable. As well, GC 2253.021, Performance and Payment mailto:maria.heinzmann@pur.hctx.net https://harriscountytx.bonfirehub.com/ https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm http://www.eng.hctx.net/Consultants/Construction/Prevailing-Wage-Rates
Bonds, requires the vendor to provide a payment bond on all public works jobs that exceed $25,000, and a performance bond on all public works jobs that exceed $100,000.
The rates quoted on the BidTable (bid pricing sheets) within Bonfire must be all-inclusive. “All-inclusive" shall be construed as costs incorporating all charges for labor, material, equipment and any other cost incurred. No separate line item rates or charges will be accepted. Quantities are estimated. Harris County may require more or less. In case of a discrepancy between unit and total pricing, unit pricing governs.
No compensation will be received for any part of these items unless they are actually used on the job under the direction of the field engineer. Any additional items required over and above those listed on the BidTable will have to be secured on a change-in-contract and are not to be used until they have been approved by the Harris County Auditor’s Office, HCFCD and Commissioners Court.
It may be required that the vendor submit a sample of specified items on the BidTable for inspection and approval by the Office of the County Engineer prior to order placement.
This bid or Commissioners Court approved award to the vendor(s) for the requirements stated in this solicitation does not obligate Harris County or HCFCD to the eventual purchase of any product/service described, implied or which may be proposed. Progress toward this end is solely at the discretion of Harris County and HCFCD and may be terminated at any time.
NO CONFIDENTIALITY OF BIDS
Once opened, bids are public record. There are no exceptions. When submitting a bid, the vendor must be sure to redact confidential information if the information is needed to address requirements of the bid. If there are any questions concerning confidentiality of information to be submitted, contact Maria Heinzmann immediately at maria.heinzmann@pur.hctx.net.
ALTERATION OF DOCUMENT
No alterations may be made to this document. Any alterations made may result in the bid being rejected.
The terms and conditions contained within this bid supersede all conflicting terms within any cooperative purchasing contracts associated with this purchase.
TOLL/PARKING FEES
Any and all toll/parking FEES incurred by the vendor during the term of this contract will be the responsibility of the vendor.
DRAWINGS/ADDITIONAL SPECIFICATIONS
Vendors may download the project manual (additional specifications), plans and drawings for this project through Bonfire at https://harriscountytx.bonfirehub.com as referenced in the attachments titled Project Manual, and Drawings, under Supporting Documents inside Bonfire. Do NOT include the drawings from this bid package with the bid submittal.
SPECIFICATION
The project will consist of furnishing all labor, supervision, equipment, materials, and incidentals necessary to perform channel erosion repairs for Rolling Fork for the Flood Control District. The scope of this project includes drainage system repairs with major emphasis on earthwork, including but not limited to erosion repair, channel alignment rectification, slope failure repair, removal and disposal of sediment accumulations, riprap installation, pipe removal and replacement, backslope swale repair, outfall structure removal and replacement.
For bidding purposes and to get a better understanding of the requirements of this bid, please refer to the attachment titled Project Manual, Report File, and Drawings, under Supporting Documents inside Bonfire.
mailto:maria.heinzmann@pur.hctx.net https://harriscountytx.bonfirehub.com/ https://harriscountytx.bonfirehub.com/
PREVAILING WAGES
In accordance with Section 2258 of the Texas Government Code, contractor and any subcontractor hired by contractor for the construction of any project, shall not pay less than the rates set forth in the Schedule of Prevailing Wages attached and incorporated by reference in each Project Manual. Contractor warrants that it and its subcontractors shall comply with all requirements and worker ratios per the applicable Schedule of Prevailing Wages and Texas state law.
In addition to these wage rates, Contractors must separately comply with Harris County’s Minimum Wage Policy [see link] and pay all workers on county projects at least Harris County’s Contractor Minimum Wage (currently $21.65/hour). Every worker on a Harris County construction project will make at least the higher of the Harris County Minimum Wage or their applicable Prevailing Wage.
Contractor shall submit certified payroll of contractor and all subcontractors on a weekly basis. At County’s request, contractor shall make available and shall require its subcontractors to make available, copies of cancelled checks and check stubs for comparisons by the County or its agents.
County reserves the right for its agents to visit the project site and to interview contractor, its subcontractors and employees of each on any date or time, as often as desired during the construction period, without prior notification.
County will ascertain if proper wage rates are being paid to the employees as required by the Project Manual. In the event of a discrepancy between the work performed and the wages paid, County will document same and notify contractor. All initial determinations of the classification of workers or the appropriate prevailing wage shall be made by the Harris County Contract Compliance Officer. Her determinations shall be binding.
If, for any length of time and as determined by the Harris County Contract Compliance Officer, discrepancies appear between the certified payrolls and the actual wage paid, County shall require check stubs to be attached to each weekly certified payroll.
Pursuant to TEX. GOV’T CODE ANN. §2258.051, the County reserves the right to withhold any monies due contractor until such discrepancy is resolved and the necessary adjustment made. Contractor shall also pay a penalty in accordance with TEX. GOV’T CODE ANN. § 2258.023(b), of Sixty and No/Dollars ($60.00) per day per person per incident that such person is underpaid. Contractor shall impose these same obligations upon its Subcontractors. Contractor understands that with monthly certified payrolls, contractor is responsible for any and all penalties that shall accrue during the month, regardless of the fact that any error could not be discovered by the Contract Compliance Officer until the following certified payroll.