About this file

This quality assurance surveillance plan outlines monitoring requirements for a concrete work contract. The contractor will be observed daily to ensure all work is performed safely and in accordance with the timeline and scope of work. Materials will undergo random inspections to verify specifications are met. Upon completion, a final inspection will validate all work conforms to the contract's scope of work. The related federal solicitation seeks two concrete mounting pads for Rock Island Arsenal from offers due by May 11, 2022. The Department of the Army Materiel Command Contracting Command at Rock Island Arsenal will award the contract.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rock Island Arsenal Quality Assurance Surveillance Plan

Concrete Work (Concrete Mounting Pad)

TARA-IFF-19-1-06

DATE: 21-Mar-2022

Task Contract

Reference Freq Performance Standard

Acceptable Quality Level

Surveil Method

Surveil Date(s)

Perform Level Notes

Site Conference

Sheet 1 - Security Notes

Once

Each individual working at the site must receive this information for safety and accountability purposes.

May be updated if additional personnel come to the work site.

May be performed as part of the badging process.

100% Visual/ Roster

Work Roster Sheet 1 - Security Notes

Daily

Must be maintained for safety and security purposes. Must show who is at the work-site at any given time.

90% Written Roster

Project Timeline

Dictated by contract Once

To be provided within 1-week of award of the contract. Must show plan for completion prior to the date stated in the contract. May be adjusted during performance provided within project completion date.

100% Visual/ Written

Site Inspection

Sheet 1 - Security Notes

Daily

Observe work is being performed safely and in accordance with the contractor provided timeline and IAW the contracted Scope of Work

90% Visual

Materials Inspections

Sheet 1 - Notes 1-17 Random

Materials provided by the contractor may be inspected to ensure that they meet the contracted Scope of Work and minimum industry and design standards. (e.g. slump or temperature tests of incoming concrete)

100% Visual/ Measure

Rock Island Arsenal Quality Assurance Surveillance Plan

Concrete Work (Concrete Mounting Pad)

TARA-IFF-19-1-06

DATE: 21-Mar-2022

Task Contract

Reference Freq Performance Standard

Acceptable Quality Level

Surveil Method

Surveil Date(s)

Perform Level Notes

Final Inspection

Sheet 1 - Notes 1-17 Once

Verify that all work is completed IAW the contracted Scope of Work 100% Visual