19-1-06 B222 Mounting Pad Drawings for Forging Hammer.pdf

PDF 697 KB Posted

Attached to
Concrete Mounting Pads Federal contract opportunity
Solicitation number
W9098S22R0010
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document contains drawings and notes related to a federal solicitation for concrete mounting pads. The Army Contracting Command - Rock Island (ACC-RI) is seeking bids for the procurement of two concrete mounting pads in support of the Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC). Solicitation number W9098S22R0010 has a closing date of May 11, 2022 at 11:00 AM Central Time. The drawings provide specifications for demolishing existing concrete slabs, laying rebar, and pouring new concrete pads measuring 12 inches and 48 inches thick. Notes cover requirements for saw cutting, jackhammering, concrete mixes, expansion joints, cleanup, and other construction details.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWN BY

SCALE DATE

APPROVED

ROCK ISLAND ARSENAL

NA

PLANT ENGINEERING DIRECTORATE

NO.

DRAWING

ROCK ISLAND ARSENAL JMTC

PLANT ENGINEERING

B. NILES

TARA-IFF

JMTC CONCRETE PROJECTS

SHEET- 1 OF 5

SECURITY NOTES

J. Carpentier

03-14-22

21 29

30-G

70-G

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X X

X

PC

2-G 3-G

4-G

6-G

50 52

62 64

102 104

157120144

301-G

314 312

220210

332333

204203

R O

C K

IS

L

A N

D

U .S . G

O V

E R

N M

E N

T

B R I D

G E

PARKING

RODMAN

D A V E N P

O R T

G

IL

L E

S P

IE

KINGSBURY

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

TERRACE

PARKING PARKING PARKING

HEDGE

LANE

SOUTH AVENUE

NORTHAVENUE

PARKING

PARKING

PARKING

PARKING

E A

S T

RODMAN

DRIVE

BECK

SYLVAN

AV

EN

U E

KING

DRIVE

SHED

B L U

N T

R O

A D

PROSPECT

DRIV

E

D R

IV

E

C E

M E T E R

Y

D R

IV

E

DYKE

ROAD

R O

D M

AN

BLUNT

PARKING

PARKING

PARKING

PARKING

PARKING

79 83

S Y

V N

R

IV

E

AVE

BAUMBECK AVENUE

216212

LO

C

K

AND

DAM

NO

. 1

BETTENDORF

DAVENPORT

MOLINE

ROCK ISLAND

C A N A L

M

O

L

I N

E

S L O U G H

E. RIVER DR. GRANT ST.

2ND ST.

4TH ST.

3RD ST.

STATE ST.M I

S S

I P P

I R

I V E R

LOCATION ON ROCK ISLAND ARSENAL

The RAMP program is discussed in the RIA-JMTC AT training.

Department.

Contractors will comply with any instructions given by the Rock Island Arsenal Police installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc.).

Contractor personnel working on Rock Island Arsenal are subject to participation in change.

The COR will keep the contractors informed on the current FPCON or any possible FPCON

The FPCON descriptions will be provided in the RIA-JMTC AT training.

threat. Services will resume when FPCON level is reduced to level Bravo or lower.

During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher iWATCH program. The iWATCH training will be provided in the RIA-JMTC AT training.

The Contractor and all associated subcontractors shall brief all employees on the local support of any future contract.

Contractors who routinely fail to return these items will not be issued them in placed in a drop box at a RIA-JMTC access point.

within 24 hours of no longer being needed. Items will returned to the COR or

RIA-JMTC electronic keys and access passes are accountable items and will be returned contractor5#32s employment.

IF00015 IF00015 at the end of the contract or the last day of an individual

Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause

Contractor will acquire and need to return all issued U.S. Government Common Access thru the RIA Directorate of Emergency Services.

will provide guidance to complete the Access Control Records Check request Form security policies and procedures (provided by government representative). The COR

(Army Directive 2014-05/AR 190-13), applicable installation, facility access and local identification Index (NCIC-III) and Terrorist Screening Database (TSDB) standards and procedures using the National Crime Information Center interstate

Contractor and all associated subcontractor employees shall comply with adjudication training will be provided in the RIA-JMTC AT training.

all employees on the local iWATCH program. The iWATCH

The Contractor and all associated subcontractors shall brief be issued them in support of any future contract.

Contractors who routinely fail to return these items will not box at a RIA-JMTC access point.

needed. Items will returned to the COR or placed in a drop items and will be returned within 24 hours of no longer being

RIA-JMTC electronic keys and access passes are accountable contractor�s employment.

at the end of the contract or the last day of an individual access passes. Use FAR 52.204-9 or PADDS Clause IF00015 IF00015 Government Common Access Cards, installation badges, and/or Contractor will acquire and need to return all issued U.S.

Form thru the RIA Directorate of Emergency Services.

guidance to complete the Access Control Records Check request (provided by government representative). The COR will provide facility access and local security policies and procedures Directive 2014-05/AR 190-13), applicable installation, Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army National Crime Information Center interstate identification comply with adjudication standards and procedures using the Contractor and all associated subcontractor employees shall require changes in contractor security matters or processes.

individual facility or installation change, the Government may contract, should the Force Protection Condition (FPCON) at any changes otherwise authorized by the change clause of this directed by DoD, HQDA, and/or local policy. In addition to the Personal Identity Verification of Contractor Personnel) as identity verification requirements (FAR clause 52.204-9, The contractor workforce must comply with all personal the installation Director of Emergency Services.

to meet installation access requirements to be accomplished by shall provide all information required for background checks The contractor and all associated subcontractors employees access pass being issued.

Operations Center prior to a RIA-JMTC electronic keys and contractor employee and subcontractor employee to the RIA-JMTC The contractor shall sign a Memorandum of Record for each completed.

Level I awareness training and assuring the training is training. The COR will be provided a copy of the RIA-JMTC AT controlled access areas shall complete AT Level I awareness requiring access to Army installations, facilities, or All contractor employees,including subcontractor employees, SECURITY NOTES

JMTC CONCRETE WORK

bradley.niles Typewritten Text DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

INDEX

PC

STATE ST.

DRAWN BY

SCALE DATE

APPROVED

ROCK ISLAND ARSENAL

NA

PLANT ENGINEERING DIRECTORATE

NO.

DRAWING

NOTES

21 29

30-G

70-G

2-G 3-G

4-G

6-G

50 52

62 64

102 104

157120144

301-G

314 312

220210

332333

204203

R O

C K

IS

L

A N

D

U .S . G

O V

E R

N M

E N

T

B R I D

G E

PARKING

RODMAN

D A V E N P

O R T

G

IL

L E

S P

IE

KINGSBURY

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

TERRACE

PARKING PARKING PARKING

HEDGE

LANE

SOUTH AVENUE

NORTHAVENUE

PARKING

PARKING

PARKING

PARKING

E A

S T

RODMAN

DRIVE

BECK

SYLVAN

AV

EN

U E

KING

DRIVE

SHED

B L U

N T

R O

A D

PROSPECT

DRIV

E

D R

IV

E

C E

M E T E R

Y

D R

IV

E

DYKE

ROAD

R O

D M

AN

BLUNT

PARKING

PARKING

PARKING

PARKING

PARKING

79 83

S Y

V N

R

IV

E

AVE

BAUMBECK AVENUE

216212

LO

C

K

AND

DAM

NO

. 1

BETTENDORF

DAVENPORT

MOLINE

ROCK ISLAND

C A N A L

M

O

L

I N

E

S L O U G H

E. RIVER DR. GRANT ST.

2ND ST.

4TH ST.

3RD ST.

M I S S

I P P

I R

I V E R

LOCATION ON ROCK ISLAND ARSENAL

ROCK ISLAND ARSENAL JMTC

PLANT ENGINEERING

GENERAL NOTES

B. NILES

TARA-IFF

JMTC CONCRETE PROJECTS

SHEET- 2 OF 5J. Carpentier

03-14-22

X

X

X

X

X

X

X

X

X

X

X X

X

X X

X

X

X

X of Discharge F (C) Concrete Temperature at Point

50-64 (10-17.5)

65-90 (18-32) - without retarder

65-90 (18-32) - with retarder

Haul Time

Hours Minutes

17. DRAWING NOT TO SCALE.

RIA REPRESENTATIVE JOE CARPENTIER IMMEDIATELY.

SPECIFICATIONS, SHALL BE BROUGHT TO THE ATTENTION OF

16. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND

QUALIFIED WORKMENT.

WORK SHALL BE PERFORMED BY COMPETENT, EXPERIENCED,

CONSTRUCTION (AISC) STANDARDS AND SPECIFICATIONS. ALL

SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL

15. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL

AND INTO FORMS.

IS WORKED AROUND REINFORCING AND OTHER EMBEDDED ITEMS

EQUIPMENT WITH HAND RODDING AND TAMPING SO THAT CONCRETE

14. CONSOLIDATE PLACED CONCRETE USING MECHANICAL VIBRATING

EXISTING CONCRETE.

MINIMUM OF 6" INTO THE VERTICAL FACE OF THE

IN EACH DIRECTION. DOWELS WILL BE DRILLED A

TOP OR BOTTOM SURFACE AND HAVE A MINUMUM OF 2 RODS

SPACING. REBAR SHOULD BE A MIN OF 3" AWAY FROM

13. DOUBLE TIED LAYER OF #4 REBAR (1/2"), 12" X-W

FOR EQUIPMENT / TRUCKS GOING IN AND OUT OF BLDG.

12. CONTRACTOR WILL PROVIDE SPOTTER / GROUND MAN

CONTRACTOR SHALL PROVIDE AND PLACE THE BARRICADES

11. BARRICADES WILL BE POSITIONED 6' FROM EACH SIDE OF THE WORK AREA.

DUST DURING ENTIRE CONSTRUCTION.

1. THE CONTRACTOR WILL USE WATER TO ELIMINATE

CONSTRUCTION.

FLOOR OR THE UNDERLYING SOIL CAUSED BY THE

3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO

WITH LOCAL REGULATIONS.

BLOCKS, CONCRETE AND REBAR OFF RIA IN ACCORDANCE

AS BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD

4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH

CONVERTER ON ALL DIESEL ENGINES.

*CONTRACTOR SHALL HAVE CATALYTIC*

EQUIPMENT USED ARE GAS ENGINES.

5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE. IF

AFTER COMPLETION OF THE PROJECT.

7. THE CONTRACTOR SHALL CLEANUP THE WORKSITE

A MIN. 5000 PSI.

6. NEW CONCRETE FOR MACHINE FOUNDATION SHALL BE

JOINT SEALANT SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.

WITH 1/2" RIGID FOAM INSULATION FOR VIBRATION ISOLATION.

IF REQUIRED. AFTER CLEANUP IS COMPLETE, LINE FOUNDATION

8. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL,

WITH SAW CUTS.

REBAR WILL BE PRESENT AND MUST BE CUT OFF EVEN

2. WHEN SAW CUTTING FLOOR AROUND WORK AREA,

WILL BE DAY SHIFT WORK.

*POURING OF NEW CONCRETE,FRAMING, TYING OF REBAR

2:30 PM AND 11:00 PM OR SATURDAYS.

9. JACK HAMMERING / REMOVAL WILL BE DONE BETWEEN THE TIMES OF

OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:

THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS

WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK.

SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND

10. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS

JMTC CONCRETE WORK

222 Layout Drawing

SECURITY NOTES

222 ELEV/CONST PLAN

222 Demolition Drawing

GENERAL NOTES

bradley.niles

W A

L L

A T

C O

L U

M N

L I N

E

BACK FLUSH WITH "D" COLUMN LINE

PIT FOUNDATION BUILDING 211

03-14-22

222 HAMMER FLATWORK

ROCK ISLAND ARSENAL JMTC

PLANT ENGINEERING

DRAWN BY

SCALE DATE

APPROVED

ROCK ISLAND ARSENAL

NA

PLANT ENGINEERING DIRECTORATE

NO.

DRAWING

B. NILES

TARA-IFF

DEMO DRAWING

SHEET- 3 OF 5J. Carpentier

DEMO PLAN

HIGHLY RECOMMENDED.

SOME AREAS ALSO HAVE AN IMBEDDED METAL HONEYCOMB SUBSTRATE. ATTENDANCE AT SITE VISIT IS

NOTE: AREA HAS ASSORTED CONCRETE SLABS WITH VARYING THICKNESSES, SHALLOW PITS, ETC.

bradley.niles

360336336

163197180156

21-3528-12E-Rev0

CONCRETE-

21-3528-13b-Rev0 (003)

REBAR-

REFERENCE DRAWING #

PIT FOUNDATION BUILDING 211

03-14-22

DRAWN BY

SCALE DATE

APPROVED

ROCK ISLAND ARSENAL

NA

PLANT ENGINEERING DIRECTORATE

NO.

DRAWING

B. NILES

TARA-IFF

SHEET- 4 OF 5J. Carpentier

222 HAMMER FLATWORK

ROCK ISLAND ARSENAL JMTC

PLANT ENGINEERING

LAYOUT DRAWING

21-3528-02E-REV0

CONCRETE-

21-3528-03B-Rev0

REBAR-

REFERENCE DRAWING #

12" NEW FLATWORK 12" NEW FLATWORK

FOUNDATION

48" NEW

bradley.niles

8"-12" EXISTING CONCRETE

8"-12" EXISTING CONCRETE

NOTES:

12"

6" CA6

5000 PSI CONCRETE

PRODUCT WILL BE USED IN TOPICAL CRACK

1/2" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT

48"

6" CA6

5000 PSI CONCRETE

PRODUCT WILL BE USED IN TOPICAL CRACK

1/2" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT

5000 PSI CONCRETE

48" FOUNDATION12" FLATWORK PLAN

DRAWN BY

SCALE DATE

APPROVED

ROCK ISLAND ARSENAL

NA

PLANT ENGINEERING DIRECTORATE

NO.

DRAWING

B. NILES

TARA-IFF

SHEET- 4 OF 5J. Carpentier

ROCK ISLAND ARSENAL JMTC

PLANT ENGINEERING

ELEVATION/CONSTRUCTION PLAN

222 HAMMER FLATWORK

EXISTING ELEVATION.

MEET TO SLOPED BE CAN 12" FINAL THE SLAB

EXISTING MEET NOT CAN THIS IF DEVEATION. 10'

OVER 1/4" A THAN GREATER NO MAINTAIN MUST

FOUNDATION ELEVATION. SAME THE BE ALWAYS

NOT WILL FOUNDATION SURROUNDING AREA 1.)

PIT FOUNDATION BUILDING 211

03-14-22

CA6 OR EXISTING CONCRETE IF BELOW 12"

CA6 OR EXISTING CONCRETE IF BELOW 48"

4" DOWN FROM SURFACE OF CONCRETE

2 EVENLY SPACED LONGITUDINAL BARS

4" DOWN FROM SURFACE OF CONCRETE

2 EVENLY SPACED LONGITUDINAL BARS

bradley.niles

222 Hammer Foundation - 1
222 Hammer Foundation - 2
222 Hammer Foundation - 3
222 Hammer Foundation - 4
222 Hammer Foundation - 5
21-3528-13B-Rev0.pdf
Pläne und Ansichten
Modell
PLOT
ALLES
OL
ML
UL
OZ
MZ
UZ
OR
MR
UR
21-3528-02E-Rev0.pdf
Pläne und Ansichten
Modell
PLOT
ALLES
OL
ML
UL
OZ
MZ
UZ
OR
MR
UR

File details come from the government source that posted it. Updated .