This is Addendum No. 002 to the bidding documents for the Shenandoah Village Drive Pump Station Replacement and System Improvements project for the City of Waynesboro, Virginia, issued by Thompson & Litton (T&L Project No. 18530). The addendum modifies the original bidding documents dated September 30, 2026, and must be acknowledged by all bidders to avoid disqualification. Key modifications include updates to the Bid Form (Section 00 4100), specification changes for water utility distribution piping requiring bevel gears for valves 14 inches or larger in diameter, and a revised table for utility boring and jacking specifications detailing minimum inside diameters and thicknesses of casing pipe for carrier pipes ranging from 4 to 24 inches. The bid schedule identifies 29 line items including 18-inch and 12-inch ductile iron water main installation (2,545 and 1,632 linear feet respectively), various gate valves and connections, open-cut and bored road crossings, fiber optic line installation (653 linear feet), and ancillary work such as erosion control, traffic control, mobilization, and demolition. A non-mandatory pre-bid conference was held on September 1, 2026, with attendance records enclosed. Sealed bids are due November 10, 2026, and must remain subject to acceptance for 90 days after bid opening.
The addendum addresses 17 pre-bid questions and clarifications, including confirmation that contractors are responsible for clearing, grubbing, and erosion control in the pump station area; that Shenandoah Village Drive cannot be closed during open-cut operations; that trench rock excavation shall be accounted for in unit pipe prices; that the jack and bore shall be a guaranteed bore per specification Section 33 0507.23; and that pipe installed in roadways shall be backfilled with full-depth stone. Mechanical joint restraining devices specifications were updated to include requirements for 8-, 12-, and 18-inch ductile iron pipe, with a working pressure assumption of 235 psi; only mechanical joint pipe is allowed for restrained joint ductile iron pipe. Additional clarifications specify that rodding for joint restraint is optional, that bevel gears are required on 18-inch gate valves, and that fiber optic cable in 1.5-inch PVC will be included in the contract and owned and operated by the City of Waynesboro. The addendum includes an updated Bid Form with lump-sum and unit price components, bidder representations and certifications regarding examination of documents and site conditions, and a detailed water line details sheet (C404) illustrating mechanical joint restraining device specifications and construction data.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERS ARCHITECTS SURVEYORS
T&L 103 East Main Street P.O. Box 1307 Wise, Virginia 24293 tel: 276.328.2161 fax: 276.328.1738 www.T-L.com
ADDENDUM NO. 002
TO: All Plan Holders
RE: Shenandoah Village Drive Pump Station Replacement and System Improvements – Contract I
For City of Waynesboro, Virginia
T&L Project No. 18530
DATE: October 30, 2026
BIDS RECEIVED DATE: November 10, 2026
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated September 30, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.
This Addendum consists of thirteen (13) pages.
CHANGE(S) TO PROJECT MANUAL:
1. Section 00 4100 Bid Form has been updated and replaced in its entirety.
2. Section 33 1116 – Water Utility Distribution Piping
Add the following paragraph between Paragraph 2.2.B.2 and Paragraph 2.2.B.3:
Valves that are 14” or larger in diameter shall use a bevel gear for operation.
3. Section 33 0507.23 – Utility Boring and Jacking
Replace the table in Section 2.1.A.1 with the following:
Addendum No. 002
Shenandoah Village Pump Station Replacement and System Improvements – Contract I
October 30, 2026
T&L www.T-L.com
Carrier Pipe Size
Minimum
Inside
Diameter of Casing
Pipe
Minimum
Thickness of
Casing Pipe
4-Inch Ductile Iron 12” ½”
6-Inch Ductile Iron 16” ½”
8-Inch Ductile Iron 20” ½”
10-Inch Ductile Iron 24” ½”
12-Inch Ductile Iron 24” ½”
14-Inch Ductile Iron 30” ½”
16-Inch Ductile Iron 30” ½”
18-Inch Ductile Iron 36” ½”
20-Inch Ductile Iron 36” ½”
24-Inch Ductile Iron 36” ½”
PRE-BID CONFERENCE:
A non-mandatory Pre-Bid Conference was held on September 1, 2026. The Pre-Bid Conference Minutes and Attendance Record is enclosed.
PRE-BID QUESTIONS:
1. QUESTION: In regard to Sheet C101 – Will the contractor for the Contract be responsible for clearing and grubbing the pump station area?
RESPONSE: Yes, the contractor shall be responsible for clearing and grubbing the pump station area.
2. QUESTION: In regard to Sheet C200-C202 – Will the Contractor for Contract II be responsible for all erosion control in the Pump Station Area?
RESPONSE: Yes, the contractor shall be responsible for all erosion control in the Pump Station
Area.
3. QUESTION: In regard to Sheet C300 – Can Shenandoah Village Drive be closed during the open cut of the 36” Steel Casing?
RESPONSE: Due to the commercial nature of Shenandoah Village Drive, Shenandoah Village Drive shall not be closed during the open cut of the 36” Steel Casing.
4. QUESTION: Is the clearing and grubbing along the Line 100W to be included in the price of the pipe or will there be an item added to the Bid Form for the Clearing?
October 30, 2026
T&L www.T-L.com
RESPONSE: A separate bid item has added to the bid form for clearing and grubbing. Please see attached revised bid form.
5. QUESTION: In regard to Sheet 301 – Note 2 states that the curb & gutter will be removed and replaced from Station 18+50 to 30+00 along with other crossing during the waterline installation.
Shall the demo and restoration of the curb & gutter be included in Item 21 (Concrete Surface
Restoration) of the Bid Form?
RESPONSE: Yes, the demo and restoration of the curb & gutter shall be included in Item 21
(Concrete Surface Restoration) of the Bid Form.
6. QUESTION: Can a bid item be added to the Bid Form for Trench Rock Excavation?
RESPONSE: Any trench rock excavation shall be accounted for in the unit price of the pipe for which trench rock excavation is anticipated. All excavation shall be unclassified per Section 31
2316.13 – TRENCHING, Section 1.7 in the project manual.
7. QUESTION: Can a bid item be added to the Bid Form for Unsuitable Material Excavation and
Replacement?
RESPONSE: A separate bid item has been added for Miscellaneous Aggregate on the bid form.
8. QUESTION: Is the Jack & Bore a Dirt Bore or a Guaranteed Bore?
RESPONSE: Please see Specification Section 33 0507.23 UTILITY BORING AND JACKING, Part 3.5 in the Project Manual. The Jack & Bore shall be a Guaranteed Bore.
9. QUESTION: Please confirm any pipe installed in the roadway/underneath placement shall be backfilled full depth stone.
RESPONSE: Yes, pipe installed in the roadway/underneath pavement (when not jack & bored) shall be backfilled full depth stone. Please see detail on Sheet C403 for pipe installed when pavement is cut.
10. QUESTION: Can a copy of the Pre-Bid Conference Attendance Record be provided?
RESPONSE: Please see Pre-Bid Conference Attendance Record attached to this addendum.
11. QUESTION: Lengths for Mechanical Joint Restraining Devices are shown in the chart on plan sheet
C404. The sizes shown on this chart are for 4” and 6” pipes only. Can the chart be updated to show the restraining requirements for 8”, 12”, and 18” DIP?
RESPONSE: The chart and accompanying notes on Sheet C404 have been updated (see attached).
12. QUESTION: What should we assume the working pressure is for restraining purposes?
RESPONSE: Assume the working pressure is 235 psi.
13. QUESTION: Does Augusta County Detail W-11 for restrained lengths only apply to the tie-in to their waterline?
October 30, 2026
T&L www.T-L.com
RESPONSE: Augusta County Detail W-11’s restrained length applies to all waterline constructed in Augusta County.
14. QUESTION: For area that do have to be restrained, will any other pipe types besides, Mechanical
Joint Pipe be allowed for restrained joint DIP, such as Tyton Joint Pipe with Field Lok Gaskets or
US Pipe’s HDSS joint?
RESPONSE: No, other pipe types besides Mechanical Joint Pipe will not be allowed for restrained joint DIP.
15. QUESTION: Specification 2.3 “TIED JOINT RESTRAINT SYSTEM” appears to be calling for rodding between fittings, valves, and hydrants. Is this in addition to Mechanical Joint Pipe or an alternative option for restraining pipe? If rodding is required, please confirm where rodding will be required on the project and the required lengths.
RESPONSE: Rodding is optional.
16. QUESTION: Will bevel gears be needed on the 18” Gate Valves? An 18” Gate Valve is 44.19” tall from the center line of the valve to the top of the 2” operating nut when a bevel gear is not utilized.
RESPONSE: Yes, on 18” gate valves a bevel gear will be required.
17. QUESTION: Please conform that the proposed fiber optic in 1 ½ PVC is included in this contract.
If so, which fiber optics company will be providing service to this line?
RESPONSE: The proposed fiber optic in the 1 ½ PVC will be included in this contract. This fiber optic cable will be owned and operated by the City of Waynesboro.
Enclosures: Pre-Bid Attendance Record, one page
00 4100 Bid Form, seven pages
Sheet C404, one page
END OF ADDENDUM NO. 002
EJCDC® C-410, Bid Form for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 4100
BID FORM FOR CONSTRUCTION CONTRACT
PROJECT IDENTIFICATION: Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I for City of Waynesboro, Virginia
CONTRACT IDENTIFICATION AND NUMBER: T&L Project No. 18530
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 1—OWNER AND BIDDER
1.01 This Bid is submitted to:
Michael G. Hamp, II, City Manager City of Waynesboro, Virginia 503 West Main Street Waynesboro, Virginia 22980
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2—ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security;
B. Evidence of authority to do business in the state of the Project;
C. Required Bidder Qualification Statement with supporting data;
D. Certification of Bidder Regarding Debarment by Agency of the Commonwealth of Virginia;
and
E. Commonwealth of Virginia Workers Compensation Certificate of Coverage.
ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 4100
BID SCHEDULE – BASE BID
The undersigned hereby proposes and agrees to furnish all the necessary labor, materials, equipment, tools, and services for the construction required for this Project in accordance with the Plans, Specifications, and other Contract Documents prepared by Thompson & Litton, at the prices stated below.
These prices are to cover all expenses to complete the Work and make it fully operational in accordance with the Contract Documents. Total Bid Amounts shall be stated in both words and figures. In case of a discrepancy, words shall govern. The undersigned agrees that the prices below are the balanced figures used in preparing the Bid and further agrees, if awarded the Contract, to furnish an itemized breakdown of costs for any Bid Item. All line items must be completed, and prices must be totaled on each Bid Schedule and on the Bid Summary, if applicable.
This Space is Intentionally Left Blank
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 4100
Item No.
Description Unit Estimated Quantity
Bid Unit Price
Bid Price
18” Ductile Iron Water Main, complete, in place.
L.F. 2,545
12” Ductile Iron Water Main, complete, in place.
L.F. 1,632
8” Ductile Bypass Water Line, complete, in place.
L.F. 205
4 8” Gate Valve and Box, complete, in place. EA. 6
5 12” Gate Valve and Box, complete, in place. EA. 6
6 18” Gate Valve and Box, complete, in place. EA. 9
Connect to existing 16” Dry Connect, complete, in place.
EA. 1
Connect to existing 12” Dry Connect, complete, in place.
EA. 3
Connect to existing 8” Dry Connect, complete, in place.
EA. 2
Air Release Valve and Vault, complete, in place
EA. 4
18” Open-Cut Stream Crossing with Concrete Casing, complete, in place.
L.F. 18
18” Open-Cut Road Crossing with 36” Steel Casing, complete, in place.
L.F. 45
12” Open-Cut Gas Line Crossing with 24” PVC Casing, complete, in place.
L.F. 58
12” Open-Cut Road Crossing, complete, in place.
L.F. 22
12” Bored Road Crossing with 24” Steel Casing, complete, in place.
L.F. 144
Precast Concrete Doghouse Manhole, complete, in place.
EA. 1
17 Sample Tap Station, complete, in place. EA. 2
Fiber Optic Line enclosed in new 1.5” Conduit, complete, in place.
L.F. 653
Fiber Optic Line Handhole, complete, in place.
EA. 4
20 Asphalt Pavement Restoration SF 7,996
21 Clearing and Grubbing AC. 0.44
22 Miscellaneous Aggregate TON 100
23 Concrete Surface Restoration LS ----
24 Demolition, complete, in place LS ----
Erosion and Sediment Control, complete, in place
LS ----
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 4100
Item No.
Description Unit Estimated Quantity
Bid Unit Price
Bid Price
26 Traffic Control LS ----
27 Field Office, complete, in place LS ----
28 Mobilization LS ----
29 Bonds, Taxes, Permits, and Insurance LS ----
Total of All Unit Price Bid Items $
* Contractor’s Choice ** Contingency Item
TOTAL BASE BID $
( DOLLARS)
1. Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
ARTICLE 4—TIME OF COMPLETION
4.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
4.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 5—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF
ADDENDA
5.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
B. Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within the timeframe presented in the Instructions to Bidders.
5.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
5.03 Receipt of Addenda
A. Bidder hereby acknowledges receipt of the following Addenda: [Add rows as needed. Bidder is to complete table.]
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 4100
Addendum Number Addendum Date
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as Contractor; and
(c) Bidder’s (Contractor’s) safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 4100
10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
6.02 Bidder’s Certifications
A. The Bidder certifies the following:
1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.
2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
3. Bidder has not solicited or induced any individual or entity to refrain from bidding.
4. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 8.02.A:
a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process.
b. Fraudulent practice means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.
c. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels.
d. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
BIDDER hereby submits this Bid as set forth above:
Bidder:
(typed or printed name of organization)
By:
(authorized signature)
Name:
(typed or printed)
Title:
(typed or printed)
Date:
(typed or printed)
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 4100
Attest:
(individual’s signature)
Name:
(typed or printed)
Title:
(typed or printed)
Date:
(typed or printed)
Address for giving notices:
Bidder’s Contact:
Name:
(typed or printed)
Title:
(typed or printed)
Phone:
Email:
Address:
Bidder’s Contractor License No.: (if applicable)
W
AT
ER
D
ET
AI
LS
C404
Da te
N o.
Pu rp os e of D oc um en t I ss ue
Date
Checked
Drawn
Designed
Sheet No.
Project No.
W
AY
N
ES
BO
RO
,V
IR
GI
N
IA
DEA/SEF/LCG
DEA/SEF/LCG
ESD/MAU
18530
9-30-2026
SH
EN
AN
DO
AH
V
IL
LA
GE
D
RI
VE
P U
M P
ST
AT
IO
N
RE
PL
AC
EM
EN
T
AN
D
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
9-
-2
IS
SU
ED
F
O R
RE
VI
EW
3-
-2
IS
SU
ED
F O
R
RE
VI
EW
8-
-2
IS
SU
ED
F
O R
RE
VI
EW
9-
-2
IS
SU
ED
F O
R
BI
D
-3
0-
AD
DE
N
DU
M
N O
.2
/3
0/
1:
:0
AM
Da te /T im e:
Fi le
N am e:
R:
\E N
GI
N
EE
RI
N G\
PR
O
JE
CT
S\
SH
EN
AN
DO
AH
V
IL
LA
GE
P
S
DE
SI
GN
\0
EN
GI
N
EE
RI
N
G\
CI
VI
L\
CA
DD
\W O
RK
IN
G
DR
AW
IN
GS
\C
IV
IL
S
IT
E\
SH
EE
T
SE
T\
0_
SH
EE
T_
C4
.D W
G
TYPICAL DETAILS - MECHANICAL JOINT RESTRAINING DEVICES
CONSTRUCTION DATA - MECHANICAL JOINT RESTRAINING DEVICES
TYPICAL DETAIL - WATER LINE ROAD CROSSING
9. THE CASING PIPE MATERIAL SHALL BE AS INDICATED ON THE DRAWINGS.
CASING PIPE
CASING PIPE
THOMPSON
& LITTON
('C) (D)
RESTRAINED
LENGTH, FT
RESTRAINED
LENGTH, FT
RESTRAINED
LENGTH, FT
TABLE OF LENGTHS REQUIRING JOINT RESTRAINT FOR DUCTILE IRON PIPE
(A) (B)
NOMINAL
PIPE
DIAMETER
(INCHES)
PRESSURE
CLASS
HORIZONTAL BENDS AND VERTICAL-UP
BENDS AS FUNCTION OF BEND ANGLE
11.25 22.5 45 90
RESTRAINED
LENGTH, FT
VERTICAL-DOWN BENDS AS FUNCTION OF
BEND ANGLE
11.25
RESTRAINED
LENGTH, FT
22.5
RESTRAINED
LENGTH, FT
RESTRAINED
LENGTH, FT
RESTRAINED
LENGTH, FT
HORIZONTAL
TEE BASED
ON BRANCH
SIZE
RESTRAINED
LENGTH, FT
DEAD ENDS
RESTRAINED
LENGTH, FT
REDUCERS
LARGER PIPE
SIZE, IN
SMALLER PIPE
SIZE, IN
4 350 N/A N/A 18 36 N/A N/A 18 54 36 36 4 3 6 350 N/A N/A 18 54 N/A 18 36 72 36 36 6 4 8 350 N/A 18 36 72 N/A 18 36 108 54 54 8 6
10 350 N/A 18 36 90 N/A 18 54 126 72 72 10 8 12 350 N/A 18 36 108 18 36 54 144 72 72 12 10 16 250 N/A 36 54 144 18 36 72 198 90 90 16 12 20 250 18 36 72 180 18 54 108 234 126 126 20 18 24 200 18 36 72 198 36 54 126 288 144 144 24 20
BASED ON "THRUST RESTRAINT DESIGN FOR DUCTILE IRON PIPE", 4TH EDITION, 1997, DIPRA
RESTRAINED
LENGTH, FT
N/A
(E)
File details come from the government source that posted it. Updated .