18491_Addendum_No._4.pdf

PDF 126 KB Posted

Attached to
Furnish and Deliver Laundry Equipment for MINNCOR
Solicitation number
2000018491
Issued by
Scott County, Minnesota

About this file

This is Addendum No. 4 to a solicitation issued by the Minnesota Department of Administration's Office of State Procurement for furnishing and delivering laundry equipment to MINNCOR Industries in Faribault, Minnesota. The addendum, dated October 20, 2026, extends the due date for submitting questions and pre-approved equivalent requests to October 26, 2026, and revises specifications in Exhibit C for five pieces of equipment: a 130-pound washer extractor, a towel folder (Jensen Butterfly Classic), an ironer (Jensen EXP 1200 2x1200x3300), a feeder (Jensen Express 3300), and a stacker/folder (Jensen Silverline 3300). The addendum clarifies that the 130-pound washer extractor must fit within a 56-foot-wide by 7-foot-deep area and provides detailed specifications for each piece of equipment, including voltage requirements (480V), UL listing requirements, operational features such as 3D interactive controls and QR code diagnostics, and size accommodations for various linens. The original proposal due date is November 4, 2026, at 3:00 p.m. Central Time. Attendance at the mandatory pre-proposal meeting held on October 7, 2026, is required for all responders; those who did not attend will have their responses rejected.

The addendum addresses a question regarding exceptions to the mandatory pre-proposal meeting attendance requirement, confirming that no exceptions will be granted and that responses from non-attending responders will be rejected per the RFP instructions. All specifications have been revised to include make and model references, detailed technical requirements, and dimensional specifications to ensure equipment compatibility and proper fit within the designated space at the facility. The contract term runs from November 16, 2026, through November 15, 2027, with an option to extend up to an additional 12 months in increments determined by the State, with award anticipated by November 9, 2026.

View the file

Other files

File Type Posted
18491_Addendum_No._1.pdf PDF
18491_RFP_Attachments.pdf PDF
18491_Addendum_No._5.pdf PDF
18491_Sample_Contract_and_Exhibits.pdf PDF
18491_Addendum_No._2.pdf PDF
18491_Exhibit_D_Price_Schedule.xlsx XLSX spreadsheet
18491_RFP_Content.pdf PDF
18491_Addendum_No._3.pdf PDF
Furnish_and_Deliver_Laundry_Equipment_for_MINNCOR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Office of State Procurement 112 Administration Building

50 Sherburne Avenue St. Paul, MN 55155

SOLICITATION ADDENDUM

Addendum No.: 4 Date of Addendum: October 20, 2026

Due Date, Time: November 4, 2026, 3:00 PM CT Revised Due Date, Time:

Buyer: Nicole Fuller Agency: Department of Administration

SWIFT Event/Posting Ref. No.: 18491 Title:

Furnish and Delivery Laundry Equipment for MINNCOR Industries – Faribault, MN

SCOPE OF ADDENDUM

This addendum containing the following revisions, additions, deletions, or clarifications is hereby made part of the Solicitation, including the Sample Contract and Exhibits if applicable.

The purpose of this addendum is to extend the due dates to submit questions and pre-approved equivalent requests, revise the Exhibit C Specifications in the Sample Contract and Exhibits document, and respond to questions received regarding the mandatory pre-proposal meeting.

Responders acknowledge receipt of this addendum by responding to SWIFT Event No. 18491, Version 5 (or more recent version) by the solicitation due date and time.

Except as modified by this addendum, all the terms and conditions remain in full force and effect.

ADDENDUM

I. The State extends the due date to submit questions to October 26, 2026.

II. The State extends the due date to submit pre-approved equivalent requests to October 26, 2026.

III. The following sections of the Solicitation are amended as follows (strike through is used for deletions and underlining for additions):

a. Exhibit C: Specifications, Duties, and Scope of Work, 2.1 130 lb. Washer Extractor., subsection 2.1.14 is REVISED to:

2.1.14 Must fit within a 5 6-foot-wide x 7-foot-deep area.

b. Exhibit C: Specifications, Duties, and Scope of Work, subsection 2.3 Towel Folder. is REVISED to:

2.3 Towel Folder.

2.3.1 Quantity. One (1)

2.3.2 Reference Make and Model. Jensen Butterfly Classic.

2.3.3 Towel folder must be for industrial use.

2.3.4 Materials to Fold. Must fold cotton, polyester, mix blends of bath towels and fitted sheets.

2.3.5 Size Range of Towels. Must accommodate towels 12 inches to 30 inches wide and 16 inches to 72 inches long.

2.3.6 Size Range of Fitted Sheets. Must accommodate fitted sheet sizes twin, twin XL, and full size.

2.3.76 Must have the ability to fold multiple size towels without changing programming between the different sizes with also stacking the different sizes separately.

2.3.87 Must have 3D interactive operator controls.

2.3.98 Must have production tracking with quantity count.

2.3.109 Must have visualization of current alarms such as jam, sensor failure, blockage.

2.3.1110 Must have QR code for diagnosing problems and provide a list of most current parts available.

2.3.1211 Must include option of a mechanical folding knife.

2.3.1312 Must be 480 V.

2.3.1413 Must be UL Listed.

c. Exhibit C: Specifications, Duties, and Scope of Work, 2.4 Ironer. is REVISED to:

2.4 Ironer.

2.4.1 Quantity. One (1)

2.4.2 Reference Make and Reference Model. Jensen EXP 1200 2x1200x3300.

2.4.3 Ironer must be for industrial use.

2.4.4 Must have 3D visualization of current alarms in real time of current faults such as jam, misfeed, incorrect sizing of materials, and fault alarms.

2.4.5 Must have QR code linked directly to each Serial Number with complete manual, ability to check machine’s call in history, and a list of most current parts available.

2.4.6 Should have carbon Steel instead of stainless-steel chest.

2.4.7 Must have fully insulated chests and top covers.

2.4.8 Must be direct heated and have fully insulated gap pieces between the steam chests.

2.4.9 Should include ironer tape holder.

2.4.10 Must be 480 V, 3 phase.

2.4.11 Must have auto pressure release on rolls when ironer is not in use.

2.4.12 Must have water separator to ensure dry saturated steam to the ironer.

2.4.13 Must have flexible chest.

2.4.14 Ordering Entity’s current model fits a 15-feet-wide by 15-feet-deep area. Contractor must verify site conditions and provide equipment that will adequately fit the space with all clearances as recommended by the original equipment manufacturer (OEM).

2.4.15 Must be UL Listed.

2.4.16 Size Range of Sheets and Pillowcases. Must accommodate the following sheet and pillowcase sizes: twin, twin XL, full, queen, and king size.

d. Exhibit C: Specifications, Duties, and Scope of Work, 2.5 Feeder. is REVISED to:

2.5 Feeder.

2.5.1 Quantity. One (1)

2.5.2 Reference Make and Model. Jensen Express 3300.

2.5.3 Feeder must be for industrial use.

2.5.4 Must be compatible with Iron (see specification 2.4) and Stacker/Folder (see specification 2.6).

2.5.5 Spreading brushes on delivery conveyor.

2.5.6 Machine pneumatically moveable for easier service is preferred.

2.5.7 Must be 480 V, 3 phase.

2.5.8 Must have colored touch screen with real-time visual operating system.

2.5.9 Must be cornerless feeding.

2.5.10 Must have three (3) feeding stations to enter linens into the ironer.

2.5.11 Must have QR code linked directly to each Serial Number with complete manual, ability to check machine’s call in history, and list of most current parts available.

2.5.12 Must have ability to buffer 9 or more pieces within the machine.

2.5.13 Must auto return dropped items to the operator.

2.5.14 Must have built-in corner correcting device ensuring perfect alignment of the flatwork.

2.5.15 Must be UL Listed.

2.5.16 Size Range of Sheets. Must accommodate the following sheet sizes: twin, twin XL, full, queen, and king size.

e. Exhibit C: Specifications, Duties, and Scope of Work, 2.6 Stacker/Folder. is REVISED to:

2.6 Stacker/Folder.

2.6.1 Quantity. One (1)

2.6.2 Reference Make and Model. Jensen Silverline 3300.

2.6.3 Stacker/Folder must be for industrial use.

2.6.4 Must be compatible with Iron (see specification 2.4) and Feeder (see specification 2.5)

2.6.5 Must be Inline Stacker.

2.6.6 Must cross-fold section all by reversing conveyor and knife.

2.6.7 Must have real-time 3D visual operating system to allow the operator to see the operation of the stacker/folder and faults, problems, and jams.

2.6.8 Must have QR code linked directly to each Serial Number with complete manual, ability to check machine’s call in history, and list of most current parts available.

2.6.9 Should have easy access panels or cover plates for maintenance or access to jammed materials in the cross-fold section.

2.6.10 Must be 480 V, 3 phase.

2.6.11 Should have high speed folding combining fast lateral folding by air blast and top-quality, precise cross-folds by knife and reversing conveyors.

2.6.12 Must fit within a 15-feet wide by 10-feet deep area.

2.6.13 Must be UL Listed.

2.6.14 Size Range of Sheets and Pillowcases. Must accommodate the following sheet and pillowcase sizes: twin, twin XL, full, queen, and king size.

IV. Below are the State’s responses to questions received regarding the mandatory pre-proposal meeting.

Q1. My company did not attend the mandatory pre-proposal meeting held on October 7, 2026. Is there an exception process for a responder that did not attend the mandatory pre-proposal meeting to be considered for award?

A1. No. Responses received from Responders that did not attend the pre-proposal meeting will be rejected.

See the RFP Content document, Section 1 – Instructions to Responders, and Section 3 – Proposal Instructions and Additional Information, 3. Mandatory Pre-Proposal Meeting and 4. Registration and Background Checks.

END OF ADDENDUM NO. 4

I. The State extends the due date to submit questions to October 26, 2026.
II. The State extends the due date to submit pre-approved equivalent requests to October 26, 2026.
III. The following sections of the Solicitation are amended as follows (strike through is used for deletions and underlining for additions):
a. Exhibit C: Specifications, Duties, and Scope of Work, 2.1 130 lb. Washer Extractor., subsection 2.1.14 is REVISED to:
2.1.14 Must fit within a 5 6-foot-wide x 7-foot-deep area.
b. Exhibit C: Specifications, Duties, and Scope of Work, subsection 2.3 Towel Folder. is REVISED to:
IV. Below are the State’s responses to questions received regarding the mandatory pre-proposal meeting.
Q1. My company did not attend the mandatory pre-proposal meeting held on October 7, 2026. Is there an exception process for a responder that did not attend the mandatory pre-proposal meeting to be considered for award?
A1. No. Responses received from Responders that did not attend the pre-proposal meeting will be rejected. See the RFP Content document, Section 1 – Instructions to Responders, and Section 3 – Proposal Instructions and Additional Information, 3. Mandat...