This is Addendum Number Four to the Paulette Burdick Park project (Project Number 18230) issued by the Palm Beach County Board of County Commissioners, Facilities Development and Operations Department, Capital Improvements Division on November 17, 2026. The addendum modifies the original bid documents and comprises five pages with five attachments, including revised Exhibit 1, updated civil specifications, a new athletic court surfacing specification for basketball courts, and a pre-bid attendance record. The addendum addresses responses to 23 requests for information (RFIs) submitted by prospective bidders including Shade Systems, Inc., West Construction, Inc., TrueBuild Group, All-Site Construction, Inc., DIY Court USA, Inc., Republic Construction Corp., and Conengineers Builders, LLC. Key clarifications include confirmation that the basketball court surface is concrete, the black vinyl chain-link fence backstop is located only at the north and south ends of the courts, the existing 6-foot chain-link fence is to remain in place, tree trimming at the construction entrance will be performed by Palm Beach County, and temporary water service is not available at the site. Bidders must acknowledge receipt of this addendum by signing and attaching it to their bid proposal form, with failure to do so potentially resulting in disqualification.

The addendum specifies that Palm Beach County will pay the main building permit fee, all Water Utilities Department and Florida Power & Light connection and service fees including new meter fees, and any required FDEP well abandonment and NPDES fees, while contractors are responsible for any required sub-permit fees. Concrete compressive strength specifications are clarified as 3,250 psi at 28 days throughout the project for consistency across civil, structural, and sports court work. The documentation confirms that the basketball system specifications call for a single pole with an acrylic backboard and that City Hoops products do not meet the specified requirements. Additionally, the potable-water service supplying the two drinking fountains is completely separate from the reclaimed-water service for irrigation, and the fountains are not connected to reclaimed water. No alternate manufacturers have been approved during the bidding process for playground equipment, Fit Zone equipment, shade sails, or mulch systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOARD OF COUNTY COMMISSIONERS

PALM BEACH COUNTY, FLORIDA

FACILITIES DEVELOPMENT AND OPERATIONS DEPARTMENT

CAPITAL IMPROVEMENTS DIVISION

PROJECT NAME: Paulette Burdick Park

PROJECT NUMBER: 18230

ADDENDUM NUMBER: FOUR

DATE OF ISSUANCE: 11/17/2026

TO: Prospective Bidders

This addendum forms a part of the contract documents, modifies the original bid documents and shall be as binding as if contained therein. Acknowledge receipt of this addendum in the space provided on the "Bid Proposal Form." Failure to do so may subject the Bidder to disqualification.

This Addendum consists of five (5) pages, five (5) attachments.

Attachments:

• Attachment 1 – Exhibit 1 REVISED

• Attachment 2 – Civil Specification Section 03050 page 34

• Attachment 3 – Civil Specification Section 03300 page 61

• Attachment 4 – Specification Section 32 18 23 Athletic Court Surfacing Basketball Court

• Attachment 5 – Pre-Bid Attendance Record

CHANGES TO IFQ/B ATTACHMENT C

1. Exhibit 1: Exhibit 1 is replaced in its entirety with Exhibit 1 REVISED, attached hereto.

2. Exhibit 2: Civil Specification Section 03050 page 34 replaced in its entirety with Attachment #2.

3. Exhibit 2: Civil Specification Section 03300 page 61 replaced in its entirety with Attachment #3.

4. Exhibit 2: Newly added Specification Section 32 18 23 Athletic Court Surfacing Basketball Court, Attachment #4.

RESPONSE TO REQUEST FOR INFORMATION

Shade Systems, Inc.

Question #1 I do not have intel for the playground shaded area. Do you have intel on this you can share? I was unable to determine actual heights of the columns for the shade products. Do you have this intel?

Response: The attached markup plan, Sheet SP-6, indicates the exact height for each proposed shade structure pole. See attachment #1.

West Construction, Inc.

Question #2 Drawing page SP-1 (plan section below) shows a basketball court with 10’HT. The black vinyl chain-link fence covers only the back of the basketball hoops, not the sides of the courts; please confirm.

Response: The black vinyl coated chain link fence is a backstop and is only located at the north and south ends of the basketball courts per all plans. There is no fence depicted nor planned for the sides of the courts. See attachment #1.

Question #3 Drawing page SP-1 Basketball court – Note: All stripes to be black. Please confirm stripe color.

Response: See updated plan sheet SP-4 in attachment #1 and newly added specification in attachment #4.

Question #4 Drawing page SP-1 – Please confirm the basketball surface: concrete or asphalt.

Response: Basketball court is concrete per plans and sections on civil plans sheet C-7 (located in the upper left-hand side of this drawing). See attachment #1.

This plan section is part of the RFI submitted above:

TrueBuild Group

Question #5 Chain Link Fence: The plans indicate a proposed 8-foot-high chain link fence. However, other drawings identify the fence as existing. During the site visit, I observed an existing 6-foot-high chain link fence. Please confirm whether the existing 6-foot fence is to remain or if a new 8-foot fence is required. If a new fence is required, should the existing 6-foot fence be removed and the new 8 foot fence installed in the same location?

Response: The existing 6-foot-high chain link fence is to remain in place. See attachment #1.

Question #6 Tree Trimming at Construction Entrance: Access to the construction area through the water treatment plant entrance on Jog Road may be obstructed by existing tree canopies and overhanging limbs, which could interfere with equipment and material deliveries. Please clarify who will be responsible for trimming the trees to provide adequate clearance and prevent damage. Will this work be performed by the Owner, or will it be the General

Contractor's responsibility? If the GC is responsible, will a tree trimming permit from the

County be required? Please refer to the attached photos.

Response: Tree Trimming will be performed by Palm Beach County (PBC) as needed.

Question #7 Temporary Water Access: Please confirm whether temporary water service can be made available near the construction entrance on Jog Road (water treatment plant side) for use during construction.

Response: Temporary water service for construction use is not available at the site.

All-Site Construction, Inc.

Question #8 Attachment C, Item 1.e requires the Contractor to submit the permit application within five (5) days of Notice to Proceed, and the plan general notes state the Contractor shall secure and pay for all necessary permits. Please confirm whether Palm Beach County building permit fees for this project will be paid by the Contractor and should be included in the bid, or whether they will be waived or paid directly by the County. Please also confirm whether any other agency fees (e.g., PBCWUD water service/meter fees, FDEP well abandonment, NPDES) are the

Contractor's responsibility.

Response: Building Permit Fees: The County will pay the Main Permit fee. Any required sub-permit fees shall be paid by the Contractor. Utility Fees: The County will pay for all Water

Utilities Department (WUD) and Florida Power & Light (FPL) connection and service fees, including new meter fees. Environmental Fees: If required, The County will pay all Florida Department of Environmental Protection (FDEP) well abandonment fees and National Pollutant Discharge Elimination System (NPDES) fees.

DIY Court USA, Inc.

Question #9 The notice lists new basketball courts; the documents we have don't list equipment: Basketball systems (goals, backboards, rims): not stated

Response: See details 1 & 2 on Sheet SP-4. See attachment #1.

Question #10 Padding, backstop netting: not stated

Response: See details 1 & 2 on Sheet SP-4. See attachment #1. There is a chain link fence backstop that is required. Netting and padding are not required.

Question #11 Our matches: City Hoops in-ground systems, e.g. Platinum (CH-PLAT-T-BU), Diamond (CH-

DIA-T-BU), Fixed Height (CH-FIXED-A-BU), plus Backstop Netting System (CH-BN). We can provide documentation for review.

Response: See details 1 & 2 on Sheet SP-4. See attachment #1. We specified a single pole with an acrylic backboard. Neither City Hoops Platinum, Diamond, nor Fixed Height meet this specification nor dimensions.

Question #12 Could you confirm the basketball system model and quantity, whether equals are accepted, and send the list of prequalified contractors invited to bid?

Response: See details 1 & 2 on Sheet SP-4 for model and quantity. See attachment #1. City Hoops is not an equal. The Pre-Bid meeting attendance record is attached as attachment #5.

Republic Construction Corp.

Question #13 Sheet Sp-4, basketball plan view 1/Sp-4 specifies Surface Logic black striping. Please provide the specific Surface Logic black striping to use including specification sheet.

attachment #4

Question #14 Same plan view and section calls for sealed concrete surface. Please clarify the specific sealer compatible with the black striping specified.

attachment #4

Question #15 Plans, and Specifications call for Playground Equipment, Fit Zone equipment, Shade sails, and

Mulch systems by very specific manufacturers, or Owner Approved and Landscape Architect

Approved equal. Strict Conformance to specifications is understood.

Please confirm whether any alternate manufacturers have been submitted and approved during the bidding process and in conformance with bid documents?

Response: No alternate manufacturers have been submitted and approved for playground equipment, Fit Zone equipment, shade sails or mulch in conformance with the bid documents.

Question #16 Please confirm we are to provide 3,000.00 Allowance for FPL fees per specifications.

Response: The County will pay for all Water Utilities Department (WUD) and Florida Power &

Light (FPL) connection and service fees, including new meter fees.

Question #17 Is temp water available for construction?

Response: Temporary water service for construction use is not available at the site.

Question #18 Confirm who pays for permit fees?

Response: The County will pay the Main Building Permit fee. Any required sub-permit fee shall be paid by the Contractor.

Question #19 Sheet C-7 Basketball Court and Fit Zone detail calls for an approved silicone joint filler. Please provide a approved joint filler acceptable for this specific project.

Response: See updated plan sheet C-7 in attachment #1 for Basketball Court and Fit Zone Slab detail notes.

Question #20 Concrete specifications vary between consultant drawings. Structural plans call for 3,250 psi.

Civil plans cal for FDOT concrete... specifications mention 3,000 and 4,000 psi.

Please confirm concrete specifications specific to and consistent throughout this project, including civil, structural and sports courts, etc, both slab on grade and footings. Please include w/c ratio.

Response: Concrete Compressive Strength is 3250 psi at 28 days. See attachments #2 and #3.

Conengineers Builders, LLC

Question #21 Sheet C-9 labels a "2-inch water meter by PBCWUD" for the service originating at the existing

6-inch water main, and calls for construction of a "2-inch RPZ and connection to 2-inch water meter." However, Water Note 2 on the same sheet states: "Contractor to install 2-inch backflow preventer with connection to water meter (1-inch)." Please confirm whether the potable-water meter serving the two drinking fountains is 2 inches, whether the RPZ is 2 inches, and whether the 1-inch meter reference in Note 2 is a drafting error.

Response: Refer to Revised plan sheet C-9 water connection note. See attachment #1.

Question #22 C-9 separately identifies a 1-inch reclaimed-water meter/connection to the existing 12-inch reclaimed-water main for irrigation. Please confirm that the 1-inch reclaimed-water service is completely separate from the 2-inch potable-water service supplying the two drinking fountains, and that the fountains are not connected to reclaimed irrigation water.

Response: The 1-inch reclaimed water service is separate from the 2” potable water service. The fountains are not connected to reclaimed irrigation water.

Question #23 Please confirm the extent of the work furnished by PBCWUD versus the contractor:

specifically, the main tap and water meter by PBCWUD, versus the downstream 2-inch HDPE potable-water service, 2-inch RPZ and cover, valves, sampling/testing, and final connections to the two ADA fountains by the contractor.

Response: See updated plan sheet C-8 for added Section A-A, indicating the end of PBCWUD installation responsibility. See attachment #1.

PLEASE ACKNOWLEDGE RECEIPT OF THIS ADDENDUM NO. FOUR BY SIGNING BELOW

AND ATTACHING THIS ADDENDUM TO YOUR BID FORM. THIS ADDENDUM MUST BE

SIGNED BY AN AUTHORIZED AGENT AND ATTACHED TO YOUR BID FORM, AND RECEIPT

OF THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE “BID PROPOSAL FORM”.

FAILURE TO DO THIS MAY RESULT IN BIDDER’S DISQUALIFICATION.

ACKNOWLEDGMENT OF RECEIPT: _____________________________________

END OF ADDENDUM 4