About this file
This document is a civil specification page from a 100% bid set for Paulette Burdick Park prepared by Palm Beach County, dated June 21, 2024. The specification details concrete mix design requirements and execution standards for the project. The specification requires that a testing laboratory design concrete mixes for each strength and type in accordance with ACI 301, Chapter 3, Method 2, based on strength test records of 30 or more tests from the past year to establish appropriate water-cement ratios. The testing laboratory must submit four copies of proposed mix designs to the Architect/Engineer for approval no later than five working days prior to commencing concrete placement. Concrete shall achieve minimum compressive strength as indicated on the drawings, or a minimum of 3,250 psi at 28 days if not otherwise designated, with all constituents including admixtures batched at a central batch plant.
The specification establishes that once a source, type, kind, or brand of each concrete constituent is accepted for job mixtures, that source cannot be changed throughout the duration of the concreting work. The Architect/Engineer retains authority to continue design control and supervision work and may require the contractor to engage a qualified testing laboratory or engineer if deemed necessary. The document provides technical standards for placement methods, including gravity placement and pumping when approved by the Architect/Engineer, ensuring consistency and quality control throughout the concrete construction phase of the park project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Palm Beach County 100% Bid Set Paulette Burdick Park June 21, 2024 testing laboratory or engineer to continue with the design, control or supervision work herein specified, if he believes it is in the interest of the Owner.
PART 3 - EXECUTION
3.1 CONCRETE MIX DESIGN:
A. The laboratory shall design mixes for each strength and type of concrete, in accordance with ACI 301 - Chapter 3, Method 2.
1. Ability to produce the required average strength calculated in accordance with Section 3.8.2.3 of ACI 01 shall be determine on the basis of the strength test record of 30 or more tests made during the past year which will permit establishing directly or by interpolation, the water-cement ratio corresponding to the required average strength.
2. Mixes shall be designed according to placement methods in addition to the criteria specified above.
a. Placement by gravity.
b. Placement by pumping (if method is approved by the Architect/
Engineer for use).
3. The testing laboratory shall submit in writing to the Architect/Engineer four (4) copies of proposed mix designs. Final recommended job mixtures shall be presented to the Architect/Engineer for approval as soon as possible and no later than five (5) working days prior to commencing concrete placement.
B. All concrete shall have a minimum compressive strength as indicated on the drawings. Concrete not so designated shall have a minimum compressive strength of 3250 psi at 28 days.
C. When a source, type, kind or brand of each constituent has been established and accepted for job mixtures, this source, type, kind or brand shall not be changed throughout the duration of the concreting.
D. Batch all constituents, including admixtures, at the central batch plant.
V-DDelrioCabrera Text Box
ATTACHMENT #2
File details come from the government source that posted it. Updated .