This is a Geotechnical Report dated June 25, 2026, prepared for the Paulette Burdick Park project as Attachment 1 to Addendum 5 of contract opportunity 18230. The report provides subsurface investigation findings and geotechnical analysis for the park development or improvement project. The document serves as a supporting technical exhibit for bid preparation, containing soil composition data, foundation recommendations, and site-specific geological conditions necessary for contractors to understand existing ground conditions and develop compliant proposals. The geotechnical assessment establishes baseline environmental and soil parameters that bidders must consider when preparing project estimates and construction methodologies.
The report functions as a technical reference document to inform procurement decisions and contractor submissions, eliminating ambiguity regarding site conditions and reducing bid variances attributable to subsurface uncertainties. As a geotechnical investigation document, it represents the results of professional site exploration and testing performed prior to solicitation release, providing factual data regarding soil bearing capacity, groundwater conditions, and other geotechnical parameters relevant to project execution and cost estimation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pacifica Engineering Services | 6835 International Center Boulevard – Suite 1 | Ft. Myers, Florida 33912 | 561-419-8460 | www.pacificaes.com | Florida Certification of Authorization License No. 32328
June 25, 2026
Ms. Helen L. Cohen, PLA ASLA Urban Design Studio 610 Clematis Street, Suite CU-02 West Palm Beach, Florida 33401
Re: Report of Geotechnical Engineering Services
Paulette Burdick Park Near 1461 Fair Green Road West Palm Beach, Florida 33417 PACIFICA Project No.: 320-26705
Dear Ms. Cohen, Pacifica Engineering Services, LLC. (PACIFICA) has completed a geotechnical engineering study for the above-referenced project. The scope of geotechnical services was completed in general accordance with PACIFICA Proposal No. 610-120117725 dated May 20, 2026.
PACIFICA appreciates the opportunity to provide geotechnical engineering services on this project and looks forward to an opportunity to participate in construction-related aspects of the development. If you have any questions or should additional information, be required, please do not hesitate to contact our office at (561) 419-8460.
Sincerely, Pacifica Engineering Services Florida Certification of Authorization License No. 32328
Kimberly Narvaez Ceballos Andre Kniazeff, P.E.
Staff Engineer Chief Geotechnical Engineer FL License No. 81315
V-DDelrioCabrera Text Box
ATTACHMENT #1
Paulette Burdick Park PACIFICA Project No.: 320-26705 Page i
TABLE OF CONTENTS
1.0 GENERAL PROJECT INFORMATION
2.0 FIELD EXPLORATION
2.1 GROUND PENETRATING RADAR (GPR) SCANNING
2.2 GEOTECHNICAL BORINGS
2.3 SUBSURFACE & GROUNDWATER CONDITIONS
2.4 SEASONAL HIGH GROUND WATER TABLE (SHGWT)
3.0 GEOTECHNICAL CLASSIFICATION AND LABORATORY TESTING
4.0 FOUNDATION RECOMMENDATIONS
4.1 GENERAL
4.1 SHALLOW FOUNDATIONS RECOMMENDATIONS
4.2 GROUND FLOOR SLAB RECOMMENDATIONS
5.0 SITE PREPARATION RECOMMENDATIONS
5.1 GENERAL SITE PREPARATION
5.2 DEWATERING RECOMMENDATIONS
5.3 COMPACTION RECOMMENDATIONS
5.4 STRUCTURAL FILL SOILS
5.5 SHALLOW FOUNDATION CONSTRUCTION
6.0 REPORT LIMITATIONS
APPENDIX:
Sheet G-1: Report of Core Borings
Laboratory Test Results GPR Scanning Documentation
PACIFICA Project No.: 320-26705 Page 1
1.0 GENERAL PROJECT INFORMATION
The subject site is located near 1461 Fair Green Road in West Palm Beach, Florida. We understand that the project will consist of the construction of several lightweight structures, such as a pavilion, shade structure over the fitness area and the playground equipment within the planned Paulette Burdick Park recreational facility. We have assumed maximum column and wall loads of 50 kips and 2 kips/linear foot, respectively, for the proposed structures. Additionally, site grading information was not provided, therefore we have assumed existing site grades will be within 2 feet of final site grades.
If any of the information in this report is incorrect or has changed, please notify PACIFICA so that we may check the recommendations presented in this report. PACIFICA will not be held responsible if not given the opportunity to check the recommendations once final designs have been completed.
2.0 FIELD EXPLORATION
2.1 Ground Penetrating Radar (GPR) Scanning
PACIFICA performed GPR scanning at each borehole location to ensure that there were no underground utilities present in the boring location prior to drilling. We used the following equipment for this project:
LEICA DSX Utility Scan: An underground GPR antenna that operates with frequencies ranging from 400 MHz to 600 MHz and is mounted in a stroller frame that rolls over the surface. Data is displayed on a screen and marked in the field in real-time. The surface needs to be reasonably smooth and unobstructed to obtain readable scans. Obstructions such as curbs, landscaping, and vegetation will limit the efficacy of GPR. The total effective scan depth can be as much as 15 feet or more with this antenna but can vary widely depending on the soil conditions and composition.
The presence of clay, or a shallow water table, may limit maximum scanning depths to 3 feet or less. As depth increases, targets must be larger to be detected, and non-metallic targets can be challenging to locate. The depths provided should always be treated as estimates as their accuracy can be affected by multiple factors.
LEICA DD100 Utility Locator: A radio-detection precision locator which detects electromagnetic fields. This device is used to actively trace conductive pipes and tracer wires or passively detect power and radio signals traveling along conductive pipes and utilities.
2.2 Geotechnical Borings
Five (5) Standard Penetration Test (SPT) geotechnical borings, each to a depth of 15 feet below existing grades (beg), were performed to assess the subsurface conditions at the requested locations. A boring location plan can be found on Sheets G-1 of the Appendix.
The SPT borings were performed using a track-mounted geotechnical drilling rig equipped with an automatic hammer utilizing mud rotary drilling techniques. The SPT samples were collected continuously in the upper 10 feet and at 5-foot intervals thereafter until final boring depth was reached.
After the samples were collected in the split barrel sampler they were bagged, labeled and transported back to the laboratory for description and limited testing. After the geotechnical
PACIFICA Project No.: 320-26705 Page 2 borings were completed, they were backfilled using access auger cuttings and the ground surface was generally leveled.
2.3 Subsurface & Groundwater Conditions
The subsurface soils encountered in the test borings generally consisted of loose to medium dense sands to silty sands (USCS classifications SP, SP-SM, and SM) from the existing ground surface elevation to the maximum depth explored of 15 feet beg.
The general soil profiles described above and as presented on the boring logs are based on our interpretation of subsurface conditions encountered at the boring locations only. Boundaries between soil layers are approximate and for illustration purposes only. Variations in soil conditions in both horizontal and vertical directions different from those presented are likely to exist between boring locations.
Groundwater was encountered at depths ranging from 8 feet to 9 feet beg at the time of the geotechnical exploration. The groundwater table may vary due to high/low tide fluctuations, rainfall, runoff, droughts or the infiltration rate of the soil and therefore the contractor should verify the groundwater table prior to construction.
2.4 Seasonal High Ground Water Table (SHGWT)
Seasonal high groundwater levels are expected to be controlled by existing drainage features, the time of year, rainfall events, and water bodies present in the project vicinity. Based on our review of the subsurface conditions encountered in the test borings, it appears that the normal permanent seasonal high groundwater (SHGW) table will occur within ±2 foot above the groundwater levels measured at each boring location during our field exploration.
We recommend the project design be coordinated with adjacent projects and the SHGWT and Design High Water (DHW) be adjusted accordingly for a smooth transition in roadway and drainage profiles with the adjacent projects. For more accurate measurements of groundwater levels, we recommended the installation of monitoring wells and monitoring groundwater levels throughout the year.
3.0 GEOTECHNICAL CLASSIFICATION AND LABORATORY TESTING
The soil samples taken from test borings were taken back to the laboratory and visually reviewed by a geotechnical engineer. The soil samples were classified using the Unified Soil Classification System (USCS) in general accordance with the American Society of Testing and Materials (ASTM) test designation D2487.
Laboratory tests for natural water content (ASTM D2216), percent passing the No. 200 sieve (ASTM D1140), and organic content (ASTM D2974) were performed on selected samples retrieved during the field exploration from soil borings to verify the visual and tactile soil classifications. Laboratory test results are included in the Appendix.
4.0 FOUNDATION RECOMMENDATIONS
4.1 General
Structural loading was not provided at the time of the issuance of this report; therefore, PACIFICA
PACIFICA Project No.: 320-26705 Page 3 has assumed maximum columns and wall loads will not exceed 50 kips and 2 kips/linear foot, respectively, for the proposed structures. Similarly, site grading information was not provided, therefore PACIFICA has assumed existing site grades will be within 2 feet of final site grades.
Site preparation activities should be conducted under the full-time supervision of a PACIFICA representative to ensure the prepared subgrade is capable of satisfactorily supporting the proposed development.
Once final design plans and specifications are available, a general review by PACIFICA is strongly recommended as a means to check that the evaluations made in preparation of this report are correct and that earthwork and foundation recommendations are properly interpreted and implemented.
4.1 Shallow Foundations Recommendations
After the recommended site preparation, the proposed structure may be supported on shallow spread footings/grade beams or monolithic reinforced slab-on-grade foundation systems. Prior to placement of the shallow foundations properly compacted in-situ granular soils or structural fill soils should be placed and compacted within the footprint of each shallow foundation. Structural fill backfill classification and compaction requirements shall be followed and are outlined in Section 5.0 of this report.
Shallow foundations, or monolithic reinforced slab-on-grade systems, with an allowable bearing pressure of 2,000 pounds per square foot and placed at a minimum of 18 inches below finished floor elevation is recommended for the proposed structure. Footing widths and depths should follow, at a minimum, Florida Building Code guidelines when the geometry produces a bearing pressure less than the allowable. The footing sizes should be designed to counter the design uplift load.
Designers should use a friction factor of 0.55 for base shearing resistance and values calculated from this shearing resistance should be considered ultimate. Passive earth pressure resistance should be computed using an equivalent fluid pressure of 180 pounds per square foot per foot of depth, for granular materials. Additional soil values the designer may require for uplift design are the unit weight and submerged unit weight of the soil, 110 pcf and 48 pcf, respectively.
Settlement estimates were determined based on the assumed maximum columns and wall loads and the allowable bearing capacity detailed in the beginning of this section. Please contact PACIFICA if the assumed loads are incorrect. PACIFICA is not responsible nor will be held liable if the assumed loads in this report are inaccurate. Settlement estimates were determined from empirical relationships and based on experience with similar projects. Based on the geotechnical exploration, the required compaction recommendations in this report and the assumed loads listed in Section 1.0, an estimated settlement of 1 inch or less, was calculated. Differential settlement between adjacent shallow foundations may be approximately ½ the total estimated settlement. Due to the elastic characteristics of granular soils the settlement should be observed as soon as the live loads are applied. These settlements are usually considered to be tolerable for the proposed structure. However, if more stringent settlements are required then PACIFICA should be contacted to revise the recommendations given in this report.
PACIFICA Project No.: 320-26705 Page 4
4.2 Ground Floor Slab Recommendations
Ground floor slabs can bear directly on top of compacted structural fill material that is compacted based on requirements in Section 5.0. A modulus of subgrade reaction value of 150 pounds per cubic inch (pci) may be used for design. The underside of the ground floor slab should be lined with a vapor barrier at least 6 mil thick. A friction factor of 0.21 (ultimate) can be used for the soil to vapor barrier interface.
5.0 SITE PREPARATION RECOMMENDATIONS
5.1 General Site Preparation
The results of the field investigation and experience from similar projects have yielded the following recommendations detailed in steps. These steps should be conducted by an experienced contractor adhering to current regulatory standards. It should be noted that these steps should be performed with care to not damage any adjacent structures or any underground utilities.
1) Prior to construction activities on-site underground utilities should be identified and marked in the field. If any of the existing utility lines are in conflict with the proposed construction, then plans should be made to relocate these lines. If the utilities discovered are abandoned or out of service, they should be removed.
2) All vegetations, topsoil, asphalt, concrete, unsuitable material or any other debris should be stripped to expose in-situ soils. If any old foundations from previous structures are encountered, then they should be removed in their entirety. If deep foundations are encountered the geotechnical engineer should be retained to assess the impact on the proposed structures and to make recommendations on mitigation.
3) The exposed on-site soils within the structure footprints should be properly compacted per the recommendations in the section entitled Compaction Recommendations. The compaction should extend 5 feet beyond the each structure footprint.
4) Any unsuitable material or debris encountered should be removed and replaced with structural fill.
5) Any fill needed to bring up the site to the proper elevation, including any reference to structural fill in this report, should adhere to the recommendations given in the section entitled Structural Fill Soils.
6) A representative of the geotechnical engineer should be present and properly document these activities.
7) Any other geotechnical related questions should be directed to the geotechnical engineer of record.
The contractor should adhere to and be aware of all OSHA and any regulatory standards during construction activities. The contractor is responsible and held solely liable if these standards are not upheld.
5.2 Dewatering Recommendations
Dewatering may be required on this site if deeper excavations are warranted. Groundwater may be pumped out using pumps or other processes to at least 2 feet below and compaction activities. Well point systems may be used if deeper excavations are required for proper and safe construction.
A specialty contractor should design these systems and adhere to any regulatory standards.
PACIFICA Project No.: 320-26705 Page 5
5.3 Compaction Recommendations
Once initial site clearing has been performed the exposed in-situ soils in the structure footprints should be properly compacted until the surface is firm and unyielding. The compaction should extend 5 feet beyond each structure footprint. A self-propelled vibratory roller no less than 40,000 pounds should be used to compact the exposed in-situ soils; however, care should be taken when compacting adjacent to existing structures and construction vibrations should be monitored. If high vibrations or signs of damage to adjacent buildings occur, then vibratory settings on equipment should be lowered to a frequency that produces acceptable vibration levels or the static weight of the equipment only should be used for compaction. In addition, pre- and post-condition surveys of nearby structures may be warranted to more easily resolve any potential claims. Protection of adjacent structures should be made the responsibility of the contractor. The proof rolling should be observed by PACIFICA to identify and mitigate any weak subgrade conditions.
If any locations of in-situ soils overly deflect under the weight of the roller then the soils should be removed to a depth of 24 inches and replaced with properly compacted structural fill materials.
The structural fill soils should be compacted to 98% of the Modified Proctor maximum dry density per ASTM D1557. Wetting of the subgrade soils may be used in order to achieve proper compaction.
5.4 Structural Fill Soils
Structural fill soils should be inorganic and consist of granular material containing less than 12 percent passing the U.S. Standard No. 200 mesh sieve, a maximum particle size of 3 inches and have a Unified Soil Classification System (USCS) designation of GP, GW, GP-GM, GW-GM, SP, SW, SP-SM, or SW-SM. The structural fill material may be composed of either clean sands and/or limerock. The on-site near surface sands to slightly silty sands (SP, SP-SM) can be used for structural fill provided they are free of organic or deleterious materials. Soils with fines contents between 13 and 25 percent (SM) may also be used as fill soils for this project, but we note these materials may be difficult to dry and compact and strict moisture control would be required at the time of placement for these moisture-sensitive soils.
Density tests should be performed by a qualified technician working under the supervision of the geotechnical engineer and be in accordance with the appropriate ASTM standards. The representative of the geotechnical engineer should be present and agree with the placement and compaction of all structural fill materials.
Loose lifts not exceeding 12 inches should be performed on all structural fill materials. The lifts should be compacted to 98% of the Modified Proctor (ASTM D1557). If a small vibratory plate or roller is used, then loose lifts should not exceed 8 inches.
5.5 Shallow Foundation Construction
Based on the results of the geotechnical exploration, the following recommendations apply for the soils beneath the structure(s) foundations. In-situ or imported structural fill soils at the base of the footing excavations should be compacted to at least 98% of the Modified Proctor (ASTM D1557).
If any locations of in-situ or imported structural fill soils overly deflect under the weight of the compactor/roller then the soils should be removed to a depth of 24 inches and replaced with properly compacted structural fill materials.
PACIFICA Project No.: 320-26705 Page 6
6.0 REPORT LIMITATIONS
Our geotechnical engineering services have been performed, findings obtained, and recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices at the time of this report. This company is not responsible for the conclusions, opinions or recommendations made by others based on this data. No other warranties are implied or expressed.
After the plans and specifications are complete, PACIFICA should be provided the opportunity to review the final design and specifications, in order to verify that the earthwork and foundation recommendations are properly interpreted and implemented. At that time, it may be necessary to submit supplemental recommendations. If PACIFICA is not afforded the opportunity to participate in construction related aspects of foundation installation as recommended in this report, we can accept no responsibility for the interpretation of our recommendations made in this report or for foundation performance.
The scope of investigation was intended to evaluate soil conditions within the influence of the proposed foundations. The analyses and recommendations submitted in this report are based upon the data obtained from the soil borings performed at the locations indicated. If any subsoil variations become evident during the course of this project, a re-evaluation of the recommendations contained in this report will be necessary after we have had an opportunity to observe the characteristics of the conditions encountered. The applicability of the report should also be reviewed in the event significant changes occur in the design, nature or location of the proposed structures. The scope of our services did not include an environmental assessment for the presence or absence of hazardous or toxic materials in the soil and groundwater. Any statements in this report regarding odors, staining of soils, or other unusual conditions observed are strictly for the information of our client.
This report has been prepared for the exclusive use of Urban Design Studio and their design consultants for the proposed development located in West Palm Beach, Florida.
PAULETTE BURDICK PARK
SCALE: N.T.S.
DRAWN:
CHECKED:
DATE:
KN
AK
06/17/2026
SHEET NO.:
REPORT OF CORE BORINGS
DESIGN FILE NAME: DRAWING NO.: PACIFICA PROJECT NO.:
320-26705
NO. REVISION BY DATE
G-1
APPROXIMATE BORING LOCATION
PACIFICA ENGINEERING SERVICES, LLC
601 N CONGRESS AVE - SUITE 303
DELRAY BEACH, FLORIDA 33445
PHONE: (561) 419-8460
CERTIFICATE OF AUTHORIZATION No.32328
ENGINEER OF RECORD:
ANDRE KNIAZEFF, P.E. NO. 81315
D E
P T
H
F E
E T
N
D E
P T
H
F E
E T
BORING
DATE
GW DEPTH
LAT.
LONG.
B-1 06-11-2026
8.0 FT
26.699485° -80.143693°
N
BORING
DATE
GW DEPTH
LAT.
LONG.
B-2 06-11-2026
8.0 FT
26.699526° -80.143924°
BORING
DATE
GW DEPTH
LAT.
LONG.
B-3 06-11-2026
9.0 FT
26.699196° -80.144170°
N
STRATUM LEGEND
1A. TOPSOIL (A-8 / OL)
140 POUNDS, 30 INCHES
AUTOMATIC
CME-55, L.S.
18 OR 24 INCHES
1 3/8 INCHES, 2 INCHES
HAMMER WEIGHT, DROP HEIGHT
TYPE OF HAMMER
TYPE OF RIGS, DRILLERS
SPOON LENGTH
SPOON ID, OD
SPT AND DRILLING NOTES
BORING
DATE
WATER
XX
XX
XX
B-XX
X-XX-XX
X.X FT
X.
X.
X.
NUMBERS TO THE LEFT OF BORINGS
INDICATE SPT N-VALUE FOR 12"
PENETRATION.
NUMBERS TO THE RIGHT OF THE BORINGS
INDICATE STRATUM NUMBER
BORING ID
DRILL DATE
GROUNDWATER LEVEL AT THE TIME
OF DRILLING (WATER DEPTH)
SOIL PROFILE LEGEND/NOTES
NOTES:
1) SUBSURFACE ELEVATIONS BETWEEN BORINGS SHOULD BE AS INDICATED IN
SECTION 2-4 OF THE FDOT STANDARD SPECIFICATIONS.
2) BORINGS WERE PERFORMED UTILIZING AN AUTOMATIC HAMMER IN
ACCORDANCE WITH ASTM-D1586.
3) BOREHOLES WERE GROUTED WITH A PORTLAND CEMENT COMPOUND UPON
COMPLETION OF THE BORING.
GRANULAR MATERIALS-
RELATIVE DENSITY
AUTOMATIC HAMMER
SPT-N
(BLOWS/12-INCH)
LESS THAN 3
3-8
9-24
25-40
GREATER THAN 40
AUTOMATIC HAMMER
SPT-N
(BLOWS/12-INCH)
SILTS AND CLAYS
CONSISTENCY
VERY SOFT
SOFT
FIRM
STIFF
VERY STIFF
HARD
LESS THAN 1
1-3
4-6
7-12
13-24
GREATER THAN 24
VERY LOOSE
LOOSE
MEDIUM DENSE
DENSE
VERY DENSE
15 15
PREPARED FOR
URBAN DESIGN STUDIO, LLC
610 CLEMATIS STREET - SUITE CU-02, WEST PALM BEACH
B-2
B-1
B-3
B-4
B-5
D E
P T
H
F E
E T
N
D E
P T
H
F E
E T
BORING
DATE
GW DEPTH
LAT.
LONG.
B-4 06-11-2026
9.0 FT
26.699008° -80.143962°
BORING
DATE
GW DEPTH
LAT.
LONG.
B-5 06-11-2026
9.0 FT
26.699148° -80.143739°
N
15 15
1A
1A
1A
1A
1A
3. BROWN TO LIGHT BROWN, SILTY SAND WITH
OCCASIONAL SHELL FRAGMENTS (A-2 / SM)
2. BROWN TO LIGHT BROWN, CLEAN TO SLIGHTLY SILTY,
POORLY GRADED FINE SAND WITH OCCASIONAL SHELL
FRAGMENTS AND LIMESTONE (A-3 / SP OR SP-SM)22
2 2
B-2 B-1
B-3
B-4
B-5
B-1 2-4 3 A-2 SM 15.0 4.5 22.5
B-1 4-6 3 A-2 SM 34.1 - 16.7
B-2 0-2 2 A-3 SP-SM 9.9 1.7 7.4
B-2 4-6 3 A-2 SM 34.2 2.6 19.5
B-3 6-8 2 A-3 SP-SM 9.7 1.0 12.9
B-3 13-15 2 A-3 SP 3.9 - 18.0
B-4 2-4 2 A-3 SP 4.9 - 10.4
B-4 8-10 2 A-3 SP-SM 9.1 - 13.8
B-5 0-2 2 A-3 SP 2.3 - 5.6
B-5 13-15 3 A-2 SM 17.6 0.9 12.0
Organic
Content (%)
Natural
Moisture
Content (%)
PACIFICA Project No.: 320-26705
Summary of Laboratory Test Results
Paulette Burdick Park
Boring Number Sample Depth
(ft)
Stratum
Number
AASHTO
Classification
USCS
Classification
Fines Content
SHEET No.: 1
B- 1 West to East Scan
B- 1 South to North Scan
GROUND PENETRATING RADAR (GPR) SCANNING DOCUMENTATION
DATE: 06/16/2026
DRAWN: KN
CHKD: AK PACIFICA PROJ. NO: 320-26705
GEOTECHNICAL ENGINEERING SERVICES
Paulette Burdick Park City of West Palm Beach, Palm Beach County, Florida
B-1
SHEET No.: 2
B- 2 West to East Scan
B- 2 South to North Scan
GROUND PENETRATING RADAR (GPR) SCANNING DOCUMENTATION
DATE: 06/16/2026
DRAWN: KN
CHKD: AK PACIFICA PROJ. NO: 320-26705
GEOTECHNICAL ENGINEERING SERVICES
Paulette Burdick Park
B-2
SHEET No.: 3
B- 3 West to East Scan
B- 3 South to North Scan
GROUND PENETRATING RADAR (GPR) SCANNING DOCUMENTATION
DATE: 06/16/2026
DRAWN: KN
CHKD: AK PACIFICA PROJ. NO: 320-26705
GEOTECHNICAL ENGINEERING SERVICES
Paulette Burdick Park
B-3
SHEET No.: 4
B- 4 West to East Scan
B- 4 South to North Scan
GROUND PENETRATING RADAR (GPR) SCANNING DOCUMENTATION
DATE: 06/16/2026
DRAWN: KN
CHKD: AK PACIFICA PROJ. NO: 320-26705
GEOTECHNICAL ENGINEERING SERVICES
Paulette Burdick Park
B-4
SHEET No.: 5
B- 5 West to East Scan
B- 5 South to North Scan
GROUND PENETRATING RADAR (GPR) SCANNING DOCUMENTATION
DATE: 06/16/2026
DRAWN: KN
CHKD: AK PACIFICA PROJ. NO: 320-26705
GEOTECHNICAL ENGINEERING SERVICES
Paulette Burdick Park
B-5
| 2026-06-25T16:47:06-0400 | |
| Andre Kniazeff |